Attachment 1-Pricing Scheduel DS FQ2 FY27.xls
XLS spreadsheet 60 KB Posted
- Solicitation number
- 70Z08526QLREP0020
- Issued by
- Not on record
About this file
This is a pricing schedule for repair services on the USCGC WAESCHE (WMSL-418) during dockside availability in FY2027, associated with solicitation 70Z08526QLREP0020 issued by the U.S. Coast Guard under the Department of Homeland Security. The schedule outlines twenty definite line items (D-001 through D-020) and two option items (O-00A and O-00B) for which vendors must provide unit prices. Definite work includes tank cleaning and inspection for aviation fuel, marine fuel, and ballast systems; void space cleaning and inspection; engine overhaul of the ship service diesel generator; reverse osmosis system maintenance; davit and crane maintenance; deck covering repair and renewal; structural repairs; equipment installation; fire prevention measures; and sea trials support.
The pricing structure includes labor and material/subcontractor components. Option item O-00A allows for potential growth in labor hours based on a vendor-proposed composite labor rate multiplied by 3,202 hours (a fixed Coast Guard figure), while option item O-00B accounts for potential material and subcontractor cost growth using a vendor-proposed markup percentage applied to an estimated $100,000 in combined material and subcontractor costs (also fixed). Vendors must insert their proposed composite labor rates and markup percentages into the designated blocks. The total price calculation combines all definite items, option items, and the combined definite and optional items total. Offers are due by 27 August 2026 at 2:00 pm Pacific Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 002 - CGC WAESCHE DS FY27.doc | DOC document | |
| Amendment 001 - CGC WAESCHE DS FY27.doc | DOC document | |
| Attachment 2-WAESCHE DS FQ2 FY27 Specification REV-0.docx | DOCX document | |
| Attachment 8 Change Request Proposal Form.xlsx | XLSX spreadsheet | |
| Attachment 3 Consolidated List of References.docx | DOCX document | |
| Attachment 5 Questions.docx | DOCX document | |
| Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA).pdf | ||
| Attachment 6 - Government Property Report.pdf | ||
| Solicitation-WAESCHE-Q2-FY27 Rev 4.docx | DOCX document | |
| Attachment 4 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR:70Z08526QLREP0020 | |||||
| USCGC WAESCHE (WMSL-418) DOCKSIDE AVAILABILITY FY2027 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | |||
| D-002 | Tanks (MP Fuel Storage and Overflow), Clean and Inspect | JOB | |||
| D-003 | Tanks (MP Fuel Service), Clean and Inspect | JOB | |||
| D-004 | Tanks (Ballast), Clean and Inspect | JOB | |||
| D-005 | Voids (Accessible), Clean and Inspect | JOB | |||
| D-006 | Ship Service Diesel Generator, Engine Major Overhaul | JOB | |||
| D-007 | Reverse Osmosis, System Groom | JOB | |||
| D-008 | Side Boat Davit, Renew | JOB | |||
| D-009 | Stern Notch Pads, Renew | JOB | |||
| D-010 | Folding Boom Cranes, Biennial Maintenance, Perform | JOB | |||
| D-011 | Deck Covering (Polymeric), Repair and Seal | JOB | |||
| D-012 | Decks, Preserve | JOB | |||
| D-013 | Deck Covering (Electrical Insulating Sheet), Renew | JOB | |||
| D-014 | Deck Covering (Polymeric), Renew | JOB | |||
| D-015 | Tenting, Provide | JOB | |||
| D-016 | Deck Covering (Slip-Resistant), Renew | JOB | |||
| D-017 | Cracks (GT Collector and Exhaust), Repair | JOB | |||
| D-018 | Elex Dry Air Compressor Equipment, Install | JOB | |||
| D-019 | Stern Door HPU Cooler, Install | JOB | |||
| D-020 | Fire Prevention, Provide | JOB | |||
| D-021 | Sea Trials Performance, Support, Provide | JOB | |||
| O-00A | Estimated amount for potential growth in labor hours after award. Calculation is as follows: Proposed composite Labor Rate x 3202 hours = the extended total. 3202 hours is a Coast Guard figure and cannot be changed. | Vendor shall insert its proposed composite labor rate in this block | Hour | 3202 | $0.00 |
| O-00B | Estimated amount for potential growth in material and subcontractor cost after award, plus Mark Up Rate; based on an estimated $50K of material cost and $50K of subcontractor cost. Calculation is as follows: (Proposed markup percentage x $100,000) + $100,000 = Extended total. The $100,000 is a Coast Guard figure and cannot be changed. | $100,000.00 | JOB | Vendor shall insert its proposed markup percentage rate in this block | $0.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(11/12/2025) Draft-00 - Page &P of &N
Sheet1
File details come from the government source that posted it. Updated .