Attachment 1 - Furniture Statement of Work.pdf
PDF 157 KB Posted
- Attached to
- Cubicle Style/Classroom Furniture Federal contract opportunity
- Solicitation number
- FA303020QA035
About this file
This combined synopsis/solicitation seeks quotations for cubicle style and classroom furniture to update instructor offices and classrooms at Goodfellow Air Force Base in Texas. The Air Force requires installing 123 cubicles, desks, chairs, and storage cabinets across five instructor offices, as well as furnishing 25 classrooms each with seven tables, 15 chairs, an instructor desk, and lectern. The contractor must remove and dispose of existing furniture. The performance period is 90 calendar days. Quoters must represent that any telecommunications or video surveillance equipment provided will not be from prohibited sources as defined in the Federal Acquisition Regulation.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
UPDATING CLASSROOMS AND INSTRUCTOR OFFICES
GOODFELLOW AFB – FIRE TRAINING SCHOOL
1. DESCRIPTION:
Scope: This statement of work will be executed in three phases.
a. Phase 1: Remove and replace all classroom tables and chairs.
b. Phase 2: Remove and replace classroom Instructor desks and podiums.
c. Phase 3: Remove instructor desks and lockers from office areas and replace with cubicle style furniture and storage cabinets.
d. The Contractor shall provide all personnel, equipment, tools, material, transportation, labor, and supervision required to complete all phases.
Location: Louis F. Garland Fire Training Academy (Bldg. 3453/3454) on Goodfellow
AFB, TX.
2. PERSONNEL: Contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of company or by wearing appropriate badges that contain the company name and employee name.
3. QUALITY CONTROL: The contractor shall ensure that all work performed under this Statement of Work (SOW) meets the quality established in paragraph 9, General Tasks, and paragraph 11, Specific Tasks of this statement of work.
4. SECURITY REQUIREMENTS: The contractors shall comply at all times with base law enforcement and security requirements to include base pass requirements.
a. Contractor Installation Access Pass. Before arrival, a government identification card-holding person from the sponsoring agency, base contracting office/administrator or applicable local project manager will submit a request for base access using the wing’s Base Access List (BAL) memorandum as a form of registration for each credential applicant. The base sponsor/sponsoring agency/contract officer and the contracted management team should establish an accountability process to account for each applicant, to oversee the BAL process, and to retrieve installation passes when access is no longer required. Base sponsors/sponsoring agencies or contract officers will ensure the BAL is accurate, it is signed and forwarded to the 17 SFS Pass & Registration section for completion of the vetting and fitness determination processes. The BAL should be delivered to Pass & Registration, located at the Visitor Control Center (VCC). When delivery is not possible, the BAL may be forwarded to Pass & Registration via a “.mil” email account located on Goodfellow AFB. The BAL will include pertinent visitor information, reason for entry, frequency of entry, destination, times each day requiring entry, and duration of request.
b. Contractor Initial (and periodic) Installation Access Screening. Contractors will provide Pass and Registration with two forms of identification, one of which will be a state issued photo identification. Prior to being allowed access, a minimum of a background/National Crime Information Center (NCIC) check will be completed on all contractors, requesting unescorted access for official business. This screening process will validate the contractor's suitability to visit Goodfellow and certify that the contractor does not pose an increased threat to the base populace. The contractor will then be issued a temporary Defense Biometric Identification System (DBIDS) pass or AF Form 75A through the expiration date on the BAL request. Possession of an authorized access pass does not automatically authorize or guarantee access to the installation. The individual must still have a valid purpose to be on the installation and properly sponsored, as applicable.
c. Access Denial. If it is determined a contractor requesting access has been convicted of a felony or pled guilty to a felony charge within the past 10 years, or is considered not fit to obtain authorized access based on the information obtained during the identity vetting, or criminal history indicates the individual may present a threat to the good order, discipline and morale of the installation, Security Forces personnel will deny entry. The contractor will be informed of the access denial, will be issued an Access Denial Letter, and will be informed on how they may appeal this order.
d. Access Denial Appeal Process. When denied access, contract visitors will be informed to report back their manager. If the contract worker and management are considering an appeal, it will be submitted by letter to the 17 SFS Commander, within 30 days of access denial. The contract manager should first contact the military contract officer/administrator or on-base sponsor for additional guidance and clarification. The appeal may be delivered to the installation Visitor Control Section or mailed to Security Forces, addressed to 17 SFS/CC, 361 Apache Trail, Goodfellow AFB, 76908. The contractor's appeal should discuss all facts and reasons to support rescinding access denial. The 17 TRW/CC will approve/disapprove all appeals for entry.
e. For installation access on non-duty hours or down days:
1. Identify which workers need access on weekends, federal holidays/family days, and down days.
2. Ensure only workers that are already vetted are on the Extended-Hours request (no new personnel). New personnel require a new BAL and formal vetting.
3. Complete the “After Hours” BAL for workers requiring down day access to the installation.
4. Identify the vehicle requirements. If operations cannot support the search procedures for large vehicles/special purpose equipment, the request may be declined unless arrangements are made to deliver the vehicle/equipment prior, during normal duty hours.
5. During the above-mentioned days, the contract officer, contract representative sponsoring ID cardholder is required to be present during hours of the work request.
6. All BALs are (re)accomplished each time employees or personnel change, not to exceed 180 days. Oversight for BAL updates and establishment of procedures to ensure Physical Access Control System (PACS) credentials and locally created access credentials from individuals who no longer require installation access is the responsibility of the contracting officer/contract administrator.
7. When an employee (regardless of position) is no longer employed by the contractor or subcontractor all DBIDS passes are to be returned to the Contract Officer/Administrator or to the Visitor Control Center. If a local issued access credential/pass is not returned, the contract officer may withhold funds or the Installation Commander may consider permanent debarment to the installation. Immediate access denial may be initiated by Pass & Registration updating the DBIDS database until disposition of the DBIDS pass is resolved.
f. Traffic Laws. Contractor and employees shall comply with Texas transportation code, base traffic regulations and posted signs while on the installation.
g. WEAPONS, FIREARMS, AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle or privately-owned vehicles while on base.
h. The Contractor shall be responsible for safeguarding Government property associated with the required work. At the close of each work period, facilities, equipment and materials shall be secured.
5. HOURS OF OPERATION: Normal duty hours are Monday through Friday, 6:00 am to 3:00 pm. The contractor is not required to schedule work on Federal Holidays. No weekend work unless approved by contracting in writing.
6. CONSERVATION OF UTILITIES: The Contractor shall instruct their employees in utilities conservation practices and shall be responsible for operating under conditions, which preclude the waste of Government utilities.
7. GOVERNMENT FURNISHED UTILITIES AND SERVICES: The Government shall provide the following without costs to the Contractor:
a) Primary Power
9. GENERAL TASKS:
a. The Contractor shall visit the job site to verify location, conditions, quantities and dimensions prior to starting work. The Contractor shall coordinate with the government representative prior to their visit to the job site.
b. The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits, and contract documents and shall not congest the site with any materials or equipment without prior written authorization. Subject to prior written approval of exact location of each, the Contractor may be permitted to set-up an office trailer/portable building, a similar job tool trailer, and a waste dumpster in a location designated inside the work area and approved by the government. The Contractor shall store his other materials and equipment at the site reserved by the government at the end of each workday.
c. The Contractor shall plan operations so as to keep temporary work from blocking access to completed work. If, however, conflict with normal traffic access occurs, the Contractor shall provide temporary bypass routing until such temporary work is complete.
d. Toilet facilities inside may not be available for use by Contractor’s personnel.
e. The Contractor shall coordinate all operations with and get written approval from the Contracting Officer before using any portion of the site.
f. The Contractor shall be responsible for any cutting, fitting, or patching required to complete the work.
g. The Contractor shall take all actions to prevent work-generated refuse from entering storm drainage systems. Actions may include installation of temporary plugs, screens, strainers, or similar measures to prevent entry into systems or other actions, as necessary.
h. The Contractor-generated refuse and waste shall be hauled from the worksite as required to a disposal area to be selected by the Contractor, and shall be located outside the physical boundaries of the installation. This refuse and waste material shall be kept neat, orderly, and safe for workers at all times.
i. During the performance period of this contract, and until final completion and acceptance thereof, the Contractor shall exercise the utmost care to avoid accidents or injuries to persons or property. The Contractor shall place and maintain all necessary barriers and safeguards, if necessary, about the work site for the prevention of accidents and shall take all precautions required to protect personnel and property to include the general public and properties adjacent to the work site.
j. The Contractor shall provide a full time quality control function to ensure that all materials and workmanship are in strict accordance with industry standards and this statement of work. Installation and materials shall conform to the requirements of applicable codes to include all of the following:
1) OSHA
2) AFOSHA
3) CoE
4) U.S. Consumer Product Safety Commission
5) NFPA 70 – National Electrical Codes
10. SPECIFICATIONS: Products will be installed using the manufacturers recommended methods, and must be installed by a professional who is knowledgeable of these products to prevent exclusion of any warranty on materials. Upon completion of each phase the Contractor shall request a final inspection. The Government shall inspect all work before acceptance. All work identified during the final inspection not meeting the criteria specified by this statement of work shall be repaired by the Contractor at no additional cost to the Government.
11. SPECIFIC TASKS:
a. PRIOR TO STARTING: Contractor will contact the 312TRS project POC 325- 654-3303 to finalize the work schedule.
b. Phase 1: Remove and dispose of old classroom table and chairs. Install: Each classroom will be fitted with seven 18” X 60” folding tables. Table tops will be light grey with black framing and legs. Each classroom will have 15 straight legged chairs. The chair seats and back rests will be dark grey, the frames and legs will be black, with no wheels. 25 classrooms will be outfitted with these tables and chairs. (175 tables and 375 chairs) Classrooms will be completed in groups two per section for a total of eight at a time. See attached floor plan for reference.
c. Phase 2: Remove and dispose of old instructor desks and podiums. Install: Each classroom will be outfitted with a new wooden instructor’s desk measuring no larger than 40” by 32” with at least two drawers, and a lectern/podium constructed of wood with a hinged top storage compartment. 25 classrooms will be outfitted with these desks and podiums. (25 desks and 25 podiums) See attached floor plan for reference.
d. Phase 3: Remove all and dispose of instructor office desks and lockers. Install:
Requirement is for a panel system or module style, fabric covered office furniture installed in an individual or team cubicles/workstations, office task chairs with wheels, and a storage cabinet to house office supplies. The number of cubicles will vary depending on the office physical size. Panel walls will be no higher than three (3) feet. Each workstation will include a work surface between 24-36 inches wide by 60-72 inches long, and at least one set of three drawers. Cubicles with be Earth tone colors. Storage cabinet will be arranged in a common area for ease of access. Cubicles will be arranged to utilize power poles located in the offices to power computers and other devices. Electrical drops will be installed as required to power computers with an additional 110 outlet per cube. Network cable will be ran as necessary into any cable management system to ensure each cube/workstation will have access to the base network (customer provided cable).
See attached floor plan for reference.
-Office 81/83 will have 27 cubicles (39’ 6” X 25’ 6”) -Office 118 will have 22 cubicles (39’ 5” X 38’) -Office 125 will have 22 cubicles (38’ 6” X 37’) -Office 155 will have 26 cubicles (54’ 4” X 38’ 2”) -Office 194 will have 26 cubicles (43.6’ X 38.2’) Totals: 123 cubicles/workstations, 5 storage cabinets
12. PERIOD OF PERFORMACE: Performance period shall not exceed 90 calendar days for install or completion of work. In the event the contractor encounters problems that may prevent or delay scheduled work, the contractor shall contact the contracting office POC for this requirement, SSgt Patrick Berger at 325-654-5216 or MSgt Andre Casiano at 325-654-3804.
| STATEMENT OF WORK |
| FOR |
| UPDATING CLASSROOMS AND INSTRUCTOR OFFICES |
| GOODFELLOW AFB – FIRE TRAINING SCHOOL |
File details come from the government source that posted it. Updated .