This is a set of design and construction drawings for fire system upgrades at the National Center for Cool and Cold Water Aquaculture (NCCCWA) located at 11861 Leetown Road, Kearneysville, West Virginia 25430.

The project encompasses comprehensive fire alarm and fire suppression system modifications across multiple buildings including the main building, tank building, second floor, and broodstock building. For fire alarm systems, the contractor must disconnect and remove the existing fire alarm and detection system, then provide a new NFPA 72 (2025 Edition) and ARS 242.1 (2024 Edition) compliant system. Requirements include Class B solid wiring for riser, SLC, and NAC circuits; Survivability Level 0 wiring; EMT conduit in the main/tank building and gray CPVC conduit in the broodstock building; placement of equipment at ceiling tile centers; and design by a NICET Level II certified fire alarm system designer or licensed professional fire protection engineer. The fire alarm system must produce sound levels at least 15 dB above average ambient sound or 5 dB above maximum sound for at least 60 seconds. For fire suppression, the contractor must modify the existing wet-pipe sprinkler system per ARS 242.1 and NFPA 13 (2025 Edition) using light hazard criteria unless otherwise noted. All sprinkler system outages require coordination at least 15 working days in advance with continuous fire watch documentation. Additional requirements include 25% circuit capacity for strobes and horns, labeling of all circuits and components, sealing of fire barrier penetrations with UL-listed or FM-approved assemblies, and compliance with biosecurity protocols in sensitive areas including tank rooms and fish health laboratories. The drawings show electrical details, equipment schedules, and coordination requirements across multiple zones and building sections. Design submission dates were December 3, 2025 (100% not for construction) with final issuance for construction on January 9, 2026.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FI

LE

N

AM

E:

OU

R

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:32

A M

2.0

G

-0

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

PATERSON, A

ROBERTSON, A

NICHOLS, J

ROBERTSON, A

G-001COVER SHEET

C. MORRIS

T. VIGIL

TBD

TBD

BROODSTOCK BUILDING

TANK / AQUARIA BUILDING MAIN OFFICE / LAB BUILDING

N N

SEE LOCATION MAP

LOCATION OF WORK

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

9 JANUARY 2026

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 9 JANUARY 2026

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:42

A M

G-

2 S

HE

ET

LI

ST

.D

W G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

SHEET NUMBER SHEET TITLE

GENERAL

G-001 COVER SHEET

G-002 SHEET LIST

FIRE ALARM

FA001 SYMBOLS & ABBREVIATIONS

FD101 FIRST FLOOR MAIN BUILDING - DEMOLITION

FD102 FIRST FLOOR TANK BUILDING - DEMOLITION

FD103 SECOND FLOOR - DEMOLITION

FD104 BROODSTOCK BUILDING - DEMOLITION

FD601 RISER DETAIL - DEMOLITION

FA101 FIRST FLOOR MAIN BUILDING

FA102 FIRST FLOOR TANK BUILDING

FA103 SECOND FLOOR

FA104 BROODSTOCK BUILDING

FA601 RISER DIAGRAM AND MATRIX

FIRE SUPPRESSION

FX001 SYMBOLS & ABBREVIATIONS

FD111 FIRST FLOOR MAIN BUILDING - DEMOLITION

FD112 FIRST FLOOR TANK BUILDING - DEMOLITION

FD113 SECOND FLOOR - DEMOLITION

FD401 FIRE PUMP DETAIL - DEMOLITION

FX101 FIRST FLOOR MAIN BUILDING

FX102 FIRST FLOOR TANK BUILDING

FX103 SECOND FLOOR

FX401 FIRE PUMP DETAIL

SHEET NUMBER SHEET TITLE

ELECTRICAL

E-001 SYMBOLS & ABBREVIATIONS

E-101 FIRST FLOOR OVERALL

E-102 BROODSTOCK BUILDING

E-401 DETAILS

E-402 DETAILS

E-403 DETAILS

E-601 SCHEDULES

G-002SHEET LIST

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:52

A M

2.0

F

A0

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA001SYMBOLS & ABBREVIATIONS

FIRE ALARM REQUIREMENTS

1. DISCONNECT AND REMOVE THE EXISTING FIRE ALARM AND DETECTION SYSTEM FOLLOWING THE INSTALLATION OF

THE NEW FIRE ALARM SYSTEM.

2. PROVIDE FIRE ALARM AND DETECTION SYSTEM AS INDICATED IN THE DRAWINGS, SPECIFICATIONS IN COMPLIANCE

WITH ARS 242.1 2024 EDITION AND NFPA 72 2025 EDITION COMPLIANT SYSTEM.

3. PROVIDE CLASS B, SOLID WIRING FOR RISER, SLC, AND NAC CIRCUIT. FOLLOW MANUFACTURER GUIDELINES FOR

CIRCUIT SIZING.

4. PROVIDE SURVIVABILITY LEVEL 0 WIRING AT MINIMUM.

5. PROVIDE FIRE ALARM CONDUCTORS IN EMT CONDUIT IN MAIN/TANK BUILDING. PROVIDE GRAY CPVC CONDUIT IN

BROODSTOCK BUILDING.

6. PLACE EQUIPMENT AT CENTER OF ACOUSTICAL CEILING TILES.

7. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO BE USED FOR COMPLETE SYSTEM DESIGN.

COORDINATE SYSTEM COMPONENTS WITH ALL OTHER DISCIPLINES AND TRADES.

8. PROVIDE A FIRE ALARM SYSTEM DESIGNER WITH A MINIMUM NICET LEVEL II CERTIFICATION IN FIRE ALARM SYSTEM TECHNOLOGY OR A LICENSED PROFESSIONAL FIRE PROTECTION ENGINEER RESPONSIBLE FOR THE FIRE ALARM

SYSTEM DESIGN.

9. CHANGES TO THE DESIGN AND EQUIPMENT INSTALLATION IS THE RESPONSIBILITY OF CONTRACTOR.

10. EXPOSED WIRING WILL NOT BE PERMITTED IN ANY PORTION OF THE BUILDING. FLEXIBLE METALLIC CONDUIT NOT EXCEEDING 6 FEET IS PERMITTED FOR TERMINATIONS AT DEVICES. ROUTE EMT CONDUIT TIGHT TO STRUCTURE.

11. T-TAPS ARE PERMITTED. CONDUIT TERMINATIONS MUST BE ON SCREW TERMINALS OF SYSTEM COMPONENT. WIRE

NUTS ARE PROHIBITED.

12. PROVIDE A LABEL FOR EACH WIRE/CIRCUIT (WITHIN ALL PANELS, CABINETS AND JUNCTION BOXES) INDICATING ITS PURPOSE AND LOCATION. LABELS MUST BE A MINIMUM FONT SIZE OF 1/4-INCH AND ARIAL NARROW. EXAMPLE OF A

FIRST FLOOR SIGNALING LINE CIRCUIT ONE OF TWO IS SLC-CIR1-FL1.

13. PROVIDE 25% ADDITIONAL CIRCUIT CAPACITY FOR STROBES AND HORNS.

14. SEAL FIRE BARRIER/PARTITIONS AND FIRE RATED FLOOR PENETRATIONS WITH AN UL LISTED OR FM APPROVED FIRE STOPPING ASSEMBLY. FIRE STOPPING SYSTEM MUST AT MINIMUM MATCH THE EXISTING RATING OF THE

PENETRATED WALL/FLOOR.

15. ALL REQUIRED FIRE ALARM SYSTEM OUTAGES SHALL BE COORDINATED THROUGH THE CONTRACTING OFFICER

REPRESENTATIVE NOT LESS THAN 15 WORKING DAYS IN ADVANCE.

16. A FIRE WATCH MUST BE CONDUCTED CONTINUOUSLY THROUGHOUT THE DURATION OF THE OUTAGE IN ALL AREAS AFFECTED BY THE OUTAGE. SEE USDA DIV 1 SPEC FOR INFORMATION AND FORMS. FINDINGS/COMMENTS WILL BE DOCUMENTED HOURLY ON FIRE WATCH FORMS. DOCUMENTATION OF FINDINGS WILL BE MADE AVAILABLE TO THE FIRE DEPARTMENT OFFICIALS UPON THEIR REQUEST. IN THE EVENT OF ANY FIRE/SMOKE EMERGENCIES DISCOVERED DURING THE FIRE WATCH, EMERGENCY NOTIFICATION SHALL BE PROVIDED TO THE PREDETERMINED

POINTS OF CONTACT.

17. OVERNIGHT OUTAGES WILL NOT BE PERMITTED UNLESS WORK IS BEING DONE DURING THAT TIME PERIOD AND THE FIRE ALARM SYSTEM IS PUT BACK INTO SERVICE WITHIN AN HOUR FROM COMPLETION OF WORK. OUTAGES SHALL

BE LIMITED TO 8 HOURS.

18. THE FIRE ALARM SYSTEM IS NOT PERMITTED TO HAVE AN OUTAGE FOR MORE THAN AN HOUR BEFORE STARTING WORK. THE FIRE ALARM SYSTEM SHALL BE RESTORED WITHIN AN HOUR OF COMPLETION OF WORK. THE

CONTRACTOR CANNOT LEAVE THE CONSTRUCTION SITE UNPROTECTED.

19. THE FIRE ALARM SYSTEM SHALL PRODUCE A SOUND LEVEL AT LEAST 15 dB ABOVE THE AVERAGE AMBIENT SOUND LEVEL, OR 5 dB ABOVE THE MAXIMUM SOUND LEVEL HAVING A DURATION OF AT LEAST 60 SECONDS, WHICHEVER IS

GREATER, MEASURED 5 FT ABOVE THE FLOOR IN THE ADS REQUIRING AUDIBILITY.

20. BIOSECURITY MUST BE FOLLOWED WHEN OPERATING IN THE FOLLOWING LOCATIONS TO PROTECT FISH HEALTH:

TANK ROOMS A-G, FISH HEALTH LABS 07, 08, 17, 18 AND ALONG THE BROODSTOCK BUILDING. FURTHER

INFORMATION CAN BE FOUND ON ATTACHMENT BIOSECURITY STATEMENT.

SYMBOLS

AREA OF WORK / FIRE ALARM ZONE

MODIFICATION OF THE FIRE ALARM SYSTEM IN

THIS AREA IS NOT IN CONTRACT (N.I.C.)

GENERAL SYMBOLSABBREVIATIONS

F

WF

TS

FACP

FAAP

FATC

BATT

MANUAL PULL STATION

WATERFLOW SWITCH

TAMPER SWITCH

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM TERMINAL CABINET

BATTERY CABINET

TYPE

SMOKE DETECTOR - CEILING MOUNTED

DUCT SMOKE DETECTOR

A AMPERES.

AC ABOVE CEILING

ADS ACOUSTICALLY DISTINGUISHABLE SPACE

AFF ABOVE FINISHED FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AMP AMPLIFIER

AS ASPIRATING SMOKE

AWG AMERICAN WIRE GAUGE

C CEILING MOUNT

CA CLEAN AGENT

CL CEILING LEVEL

CONT. CONTINUED

D DRAIN

DN DOWN

ELEV. ELEVATOR

EMT ELECTRICAL METALLIC TUBING

(E) EXISTING

F FIRE LINE

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FARP FIRE ALARM RELEASING PANEL

FP FIRE PUMP

FPL FIRE PUMP PHASE LOSS

FPP FIRE PUMP POWER

FPR FIRE PUMP PHASE REVERSAL

FPS FIRE PUMP SECONDARY POWER

FMCP FIRE ALARM / MASS NOTIFICATION CONTROL PANEL

FATC FIRE ALARM TERMINAL CABINET

LOC LOCAL OPERATING CONSOLE

MNS MASS NOTIFICATION SYSTEM

NAC NOTIFICATION APPLIANCE CIRCUIT

N.I.C. NOT IN CONTRACT

P PHOTOELECTRIC

(R) RELOCATE

SLC SIGNALING LINE CIRCUIT

SP SPRINKLER PIPING

SPD SURGE PROTECTIVE DEVICE

TYP. TYPICAL

WP WEATHERPROOF

ZCA SPRINKLER ZONE CONTROL ASSEMBLY

H

CD

HORN - CEILING MOUNTED

HORN / STROBE - WALL MOUNTED

CD = CANDELA RATING

FA101

N

8'0 1/8"=1'-0"

SECTION IDENTIFICATION

2-PART REFERENCE DETAIL IDENTIFICATION:

FLOOR PLAN

FA101,FA1022

FLOOR PLAN AND DETAIL TITLES:

FA101

N

(E)

REVISION CLOUD WITH REVISION

NUMBER DESIGNATION

BREAKLINE

MATCHLINE DESIGNATIONM A T C H L I N E A-A

EXISTING

POINT OF CONNECTION TO EXISTING

POINT OF TERMINATION OF REMOVAL

NOTE NUMBER

ARROW INDICATES TRUE NORTH

AND/OR PROJECT NORTH.

ROOM NUMBER

COLUMN LINE NUMBER

NORTH ARROW

SHEET NUMBER WHERE

SECTION IS DRAWN

INDICATES DIRECTION

OF CUTTING PLANE

NUMBER INDICATES SECTION

NUMBER INDICATES

DETAIL/SECTION

SHEET NUMBER WHERE

DETAIL/SECTION IS DRAWN

ALL DRAWINGS WHERE

THIS DETAIL IS

REFERENCED FROM

GRAPHIC SCALE OF

THIS PLAN OR DETAIL

UNIQUE PLAN OR

DETAIL NUMBER ON

THIS DRAWING

NAME OF PLAN OR DETAIL

NORTH ARROW

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

CD

CD

CD HORN / STROBE - CEILING MOUNTED

CD = CANDELA RATING

AIM

AOM

ADDRESSABLE INPUT (MONITOR) MODULE

- TS = TAMPER SWITCH

- PS = PRESSURE SWITCH

- WF = WATER FLOW SWITCH

- PW = POWER MONITOR

ADDRESSABLE OUTPUT (CONTROL) MODULE

- FPR = FIRE PUMP RUNNING

- FPP = FIRE PUMP PHASE REVERSAL

- FPS = FIRE PUMP SECONDARY POWER

- FPL = FIRE PUMP POWER LOSS

- FP = GENERAL GROUPING OF ABOVE

NOTATION

STROBE - CEILING MOUNTED

CD = CANDELA RATING

STROBE - WALL MOUNTED

CD = CANDELA RATING

H

DACT

SPD

DIGITAL ALARM COMMUNICATOR TRANSMITTER

SURGE PROTECTIVE DEVICE

HORN - WALL MOUNTED

NAC

SLC

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

A A.3 B C D E E.6 F G G.6G.8 H.2H H.6 J

10.3

11.2

11.8

12.5

10.8

12.2

12.5

2.3

3.2

3.8

6.2

6.8

7 K.5K L

10.3

D.8 E F G H J J.3 K K.5 L

FIRE ALARM ZONE 1-1

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:05

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD101FIRST FLOOR MAIN BUILDING -

DEMOLITION0 24'8' 16'

3/32"=1'-0"

FIRST FLOOR MAIN BUILDING - DEMOLITION1

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOVE THE EXISTING FIRE ALARM

SYSTEM, ASSOCIATED 24V POWER, CONDUCTORS,

CONDUIT, ELECTRICAL BACK-BOXES, MOUNTS,

BRACKETS, SCREWS, ETC IN ITS ENTIRETY. PATCH AND

REPAIR ALL WALLS.

2. THE DACT PROVIDES COMMUNICATION PRIMARILY FOR

SECURITY. THERE ARE CONNECTIONS FOR FIRE ALARM,

SUPERVISORY, AND TROUBLE REPORTING. DISCONNECT

AND REMOVE ALL FIRE ALARM CONDUCTORS, STRAPS,

AND REPROGRAM THE PANEL.

3. DISCONNECT FIRE ALARM CONDUCTORS FROM

TERMINAL CABINET.

MATCHLINE MATCHLINESEE FD102 FOR CONTINUATION

F

F

H

F

F

H

F

F

F

F

F

FACP

FAAP

DACT (E)

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

BATT FATC

(E)

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

14.5

F F.1 G.5 H.8 H.9 J.4 K 14.8

16.9

17.5

18.5

19.5

G.5F.1 J.1 K.2 M M.5 N

19.5

18.5

17.5

K.2 M M.5 N

FIRE ALARM ZONE 1-1

FIRE ALARM ZONE 1-2

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:18

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD102FIRST FLOOR TANK BUILDING -

DEMOLITION

0 24'8' 16' 3/32"=1'-0"

FIRST FLOOR TANK BUILDING - DEMOLITION1

F

F

F

F

F

FF

MATCHLINE MATCHLINESEE FD101 FOR CONTINUATION GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOVE THE EXISTING FIRE ALARM

CONTROL PANEL AND ASSOCIATED POWER, CONDUIT,

MOUNTS, ETC.

K

17.5

0 8' 12'4' 3/16"=1'-0"

ENLARGED PUMP ROOM - DEMOLITION

FD1022

K.2

AIM

AIM

TS x 13 WF x 32

FD102

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

AIMFP x 4

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

FIRE ALARM ZONE 2-1

FIRE ALARM ZONE 2-1

AOM AOM

AOM AOM

FIRE ALARM ZONE 2-2

AOM

AOM

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:26

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD103SECOND FLOOR - DEMOLITION

8'0 16' 1/8"=1'-0"

SECOND FLOOR TANK PENTHOUSE - DEMOLITION1

F

H

8'0 16' 1/8"=1'-0"

SECOND FLOOR NORTH PENTHOUSE - DEMOLITION2

8'0 16' 1/8"=1'-0"

SECOND FLOOR SOUTH PENTHOUSE - DEMOLITION3

F

F

F

F

F

J.1 K K.2 M

17.5

18.5

19.5

D E

E F G H J

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOVE THE EXISTING FIRE ALARM

CONTROL PANEL AND ASSOCIATED POWER, CONDUIT,

MOUNTS, ETC.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

FIRE ALARM ZONE 1

VESTIBULE

F

F

F

F

ROOM

PUMP

STORAGE

FEED

STORAGE

HATCHERY BLDG

ROOM

TANK

AI

M

AI

M WP

FACP

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:32

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD104BROODSTOCK BUILDING -

DEMOLITION

0 8' 12'4' 3/16"=1'-0"

BROODSTOCK BUILDING - DEMOLITION1

A B C D

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOVE THE EXISTING FIRE ALARM

CONTROL PANEL AND ASSOCIATED POWER, CONDUIT,

MOUNTS, ETC.

2. RETAIN POWER AND TELEPHONE FOR FIRE ALARM

CONTROL PANEL INSTALLATION.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:37

A M

2.0

F

D6

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD601RISER DETAIL - DEMOLITION

NOT TO SCALE

FIRE ALARM RISER DIAGRAM - DEMOLITION1

FIRE PUMP

CONTROLLER

FIRE ALARM

CONTROL PANEL

BATTERY

FAA

120V AC

PUMP START

PUMP RUNNING

PUMP FAILURE

PUMP TROUBLE

SYSTEM FAILURE

TO LOCAL FIRE DEPARTMENT

VIA TELEPHONE LINE

WATERFLOW ALARM

F F F F F F

F F F F F F F

F F F F F F F F F

TS TS TS TS TS TS WF WF TS WF TS

TS

LAB/OFFICE BUILDING

LAB/OFFICE BUILDING

TANK/AQUARIA BUILDING

TANK/AQUARIA BUILDING

LAB/OFFICE PENTHOUSEAHU-1 AHU-1 AHU-2 AHU-2

SUPPLY RETURN SUPPLY RETURN

TANK BLDG PENTHOUSEAHU-3 AHU-3

SUPPLY RETURN

BACKFLOW

OS&Y VALVES

FIRE PUMP INLET

/ DISCHARGE

BYPASS LINE

OS&Y VALVES

SPRINKLER

HEADER

WET PIPE

SPRINKLER

WET PIPE

SPRINKLER

HOSE MANIFOLD

LINES

ZONE 1 ZONE 2

OS&Y VALVES

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. EQUIPMENT SHOWN IS SCHEMATIC.

NOTES

1. DEMOLISH EXISTING FIRE ALARM SYSTEM.

FIRE PUMP ROOM

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

TS

ADDITIONAL PUMP ROOM

X4

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

10.3

11.2

11.8

12.5

10.8

12.2

12.5

2.3

3.2

3.8

6.2

6.8

7 K.5K L

10.3

D.8 E F G H J J.3 K K.5 L

15 15

H

15 15

H

FACP

FIRE ALARM ZONE 1-1

60 60

/12

/20

8:

:45 A

M

2.0

F

A1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA101FIRST FLOOR MAIN BUILDING

0 24'8' 16'

3/32"=1'-0"

FIRST FLOOR MAIN BUILDING1

MATCHLINE MATCHLINESEE FA102 FOR CONTINUATION

F

F

F

F

F

F

F

F

F

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE NFPA 72 AND ARS 242.1 MANUAL COMPLIANT

FIRE ALARM SYSTEM THROUGHOUT THE MAIN BUILDING.

ANN

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

NM.5MK.2

17.5

18.5

19.5

NM.5MK.2J.1F.1 G.5

19.5

18.5

17.5

16.9

14.8

KJ.4H.9H.8G.5F.1F

14.5

F

FF

F

F

F

HH

H

H15 15

FIRE ALARM ZONE 1-1

FIRE ALARM ZONE 1-2

WPWP

FIRE ALARM ZONE 1-3

F

15 15

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:52

A M

2.0

F

A1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA102FIRST FLOOR TANK BUILDING

0 24'8' 16' 3/32"=1'-0"

FIRST FLOOR TANK BUILDING1

MATCHLINE MATCHLINESEE FA101 FOR CONTINUATION GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH

NFPA 72.

2. PROVIDE FOUR ADDRESSABLE INPUT MODULES FOR

FIRE PUMP RUNNING, CONTROLLER OR SYSTEM

TROUBLE, LOSS OF PHASE, AND PHASE REVERSAL.

3/16"=1'-0" 4' 12'8'0

ENLARGED PUMP ROOM

FD1022

AIM

AIM

TS x 13 WF x 3

AIM AIM

FA102

AIM AIM

AIM AIM

AIM AIM

AIM PS x 3

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

F

FIRE ALARM ZONE 2-1

F

FIRE ALARM ZONE 2-1

F

FIRE ALARM ZONE 2-2

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:59

A M

2.0

F

A1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA103SECOND FLOOR

8'0 16' 1/8"=1'-0"

SECOND FLOOR TANK PENTHOUSE1

8'0 16' 1/8"=1'-0"

SECOND FLOOR NORTH PENTHOUSE2

8'0 16' 1/8"=1'-0"

SECOND FLOOR SOUTH PENTHOUSE3

J.1 K K.2 M

17.5

18.5

19.5

D E

E F G H J

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH

NFPA 72.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

FIRE ALARM ZONE 1

VESTIBULE

ROOM

PUMP

STORAGE

FEED

STORAGE

HATCHERY BLDG

ROOM

TANK

F F

F

F

AO

M WP

FACP

HF

AO

M

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:05

A M

2.0

F

A1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA104BROODSTOCK BUILDING

0 8' 12'4'

3/16"=1'-0"

BROODSTOCK BUILDING1

A B C D

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE FIRE ALARM AND DETECTION SYSTEM.

2. PROVIDE DUCT DETECTION FOR EXTERIOR AIR

HANDLING UNIT.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

3. PROVIDE REMOTE TEST SWITCHES FOR

CEILING MOUNTED DETECTORS.

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:10

A M

2.0

F

A6

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FA601RISER DIAGRAM AND MATRIX

NOT TO SCALE

FIRE ALARM RISER DIAGRAM1

PATERSON, A

PIRTLE, R

PATERSON, A

PIRTLE, R

C. MORRIS

T. VIGIL

TBD

TBD

BATT

FIRST FLOOR

SPD

FACP

WIRE

TROUGHNAC

SLC

SECOND FLOOR

WIRE

TROUGH

NAC

SLC

NA

C

SL

C

NAC

SLC

TANK BUILDING

WIRE

TROUGH

MAIN BUILDING

NAC

SLC

WIRE

TROUGH

NA

C

SL

C

NAC

SLC

ENGINEERS

ROOM

NAC

SLC

NA

C

SL

C

DACT

F

H

F F

F

H

F

ZONE 1-1

ZONE 2-1 ZONE 2-2

ZONE 1-2

AN

NUNCIAT

ION

NOTIF

ICAT

ION

AL

AR

M

AN

NU

NC

IA

TI

ON

A

T

FA

CP

/F

AA

P

A

ND

S

EN

D

ST

AT

US

T O

FI

RE

S

TA

TI

ON

SU

PE

RV

IS

OR

Y

AN

NU

NC

IA

TI

ON

A T

FA

CP

A

ND

S

EN

D

ST

AT

US

T O

FI

RE

ST

AT

IO

N

TR

OU

BL

E

AN

NU

NC

IA

TI

ON

A T

FA

CP

A

ND

S

EN

D

ST

AT

US

T O

FI

RE

S

TA

TI

ON

SMOKE DETECTOR

DUCT SMOKE DETECTOR

FIRE PUMP RUNNING

FIRE PUMP PHASE LOSS

SPRINKLER SYSTEM - WATER FLOW SWITCH

SPRINKLER SYSTEM - TAMPER SWITCH

MANUAL PULL STATION

AC

TI

VA

TE

V

IS

UA

L A

ND

A

UD

IB

LE

N

OT

IF

IC

AT

IO

N

- G

EN

ER

AL

E

VA

CU

AT

IO

N

SH

UT

D

OW

N

AS

SO

CI

AT

ED

H

VA

C

UN

IT

FIRE PUMP POWER LOSS

FIRE PUMP SECONDARY POWER

SPRINKLER SYSTEM - ALARM PRESSURE SWITCH

SPRINKLER SYSTEM - HIGH/LOW PRESSURE SWITCH

ANN

AIM

TS

AIM

WF

AIM

PS

AIM

WF

AOM

FPR

AOM

FPP

AOM

FPS

AOM

FPL

FACP POWER FAILURE

LOW BATTERY

OPEN CIRCUIT

GROUND FAULT

NO SCALE

FIRE ALARM MATRIX2

CONTR

OL

NOT TO SCALE

FIRE ALARM RISER DIAGRAM - BROODSTOCK3

FIRST FLOOR

FACP

NAC

SLC

WIRE

TROUGH

BROODSTOCK BUILDING

SLC

VESTIBULE

NA

C

SL

C

F

WP

ZONE 1

AOM

AOM

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. EQUIPMENT SHOWN IS SCHEMATIC.

DACT

BATT

SPD

EXTERIOR AHU

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:15

A M

2.0

F

X0

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FX001SYMBOLS & ABBREVIATIONS

FIRE SUPPRESSION REQUIREMENTS

1. MODIFY THE EXISTING WET-PIPE SPRINKLER SYSTEM DESIGNED AND INSTALLED PER ARS 242.1 2024 EDITION AND

NFPA 13 2025 EDITION CRITERIA.

2. UNLESS OTHERWISE NOTED BY HATCHING, PROVIDE SPRINKLER SYSTEM DESIGN IN ACCORDANCE WITH LIGHT

HAZARD CRITERIA.

3. PROVIDE QUICK RESPONSE CHROME SPRINKLERS IN AREAS WITH FINISHED CEILINGS. PROVIDE QUICK RESPONSE BRASS UPRIGHT SPRINKLERS IN AREAS WITHOUT FINISHED CEILINGS. PROVIDE A MINIMUM SPRINKLER

TEMPERATURE OF 155 FAHRENHEIT OR HIGHER FOR ORDINARY TEMPERATURE SPRINKLERS.

4. PROVIDE SPRINKLERS IN CENTER OF ACOUSTIC CEILING TILES.

5. PROVIDE BLACK STEEL SPRINKLER PIPE. PIPE 2-INCH AND BELOW MUST BE SCHEDULE 40 THREADED PIPE. PIPE

2.5-INCHES AND GREATER MUST BE MINIMUM SCHEDULE 10 GROOVED JOINT PIPE.

6. RETAIN OR PROVIDE IDENTIFICATION SIGNAGE FOR ALL VALVES LOCATED ABOVE SUSPENDED CEILINGS.

7. ALL SPRINKLER SYSTEM OUTAGES SHALL BE COORDINATED THROUGH THE CONTRACTING OFFICER

REPRESENTATIVE NOT LESS THAN 15 WORKING DAYS IN ADVANCE.

8. A FIRE WATCH MUST BE CONDUCTED CONTINUOUSLY THROUGHOUT THE DURATION OF THE OUTAGE IN ALL AREAS AFFECTED BY THE OUTAGE. FINDINGS/COMMENTS WILL BE DOCUMENTED HOURLY ON FIRE WATCH FORMS. IN THE EVENT OF ANY FIRE/SMOKE EMERGENCIES DISCOVERED DURING THE FIRE WATCH, EMERGENCY NOTIFICATION

WILL BE PROVIDED TO THE PREDETERMINED POINT OF CONTACT.

9. OVERNIGHT OUTAGES WILL NOT BE PERMITTED UNLESS WORK IS BEING DONE DURING THAT TIME PERIOD AND THE SPRINKLER SYSTEM IS PUT BACK INTO SERVICE WITHIN AN HOUR FROM COMPLETION OF WORK. OUTAGES SHALL

BE LIMITED TO 8 HOURS INCLUDING TIME FOR DRAINING AND REFILLING.

10. THE SPRINKLER SYSTEM IS NOT PERMITTED TO HAVE AN OUTAGE FOR MORE THAN AN HOUR BEFORE STARTING WORK. THE SPRINKLER SYSTEM SHALL BE RESTORED WITHIN AN HOUR OF COMPLETION OF WORK. THE CONTRACTOR CANNOT LEAVE THE CONSTRUCTION SITE UNPROTECTED. THE SPRINKLER SYSTEM SHALL BE FILLED

WITHIN AN HOUR OF COMPLETION OF WORK.

11. PAINT THE ABOVE CEILING PIPE IN MAIN BUILDING AND PAINT THE PIPE IN TANK BUILDING RED.

12. BIOSECURITY MUST BE FOLLOWED WHEN OPERATING IN THE FOLLOWING LOCATIONS TO PROTECT FISH HEALTH:

TANK ROOMS A-G, FISH HEALTH LABS 07, 08, 17, 18 AND ALONG THE BROODSTOCK BUILDING. FURTHER

INFORMATION CAN BE FOUND ON ATTACHMENT BIOSECURITY STATEMENT.

SYMBOLS

ORDINARY HAZARD GROUP 1

DISCHARGE DENSITY 0.15 GPM/SF

REMOTE AREA 1500 SF

MODIFICATION OF THE SPRINKLER SYSTEM IN THIS

AREA IS NOT IN CONTRACT (N.I.C.)

FA101

N

8'0 1/8"=1'-0"

SECTION IDENTIFICATION

2-PART REFERENCE DETAIL IDENTIFICATION:

FLOOR PLAN

FA101,FA1022

FLOOR PLAN AND DETAIL TITLES:

FA101

N

(E)

REVISION CLOUD WITH REVISION

NUMBER DESIGNATION

BREAKLINE

MATCHLINE DESIGNATIONM A T C H L I N E A-A

EXISTING

POINT OF CONNECTION TO EXISTING

POINT OF TERMINATION OF REMOVAL

NOTE NUMBER

ARROW INDICATES TRUE NORTH

AND/OR PROJECT NORTH.

ROOM NUMBER

COLUMN LINE NUMBER

NORTH ARROW

GENERAL SYMBOLSABBREVIATIONS

A AMPERES.

AC ABOVE CEILING

AFF ABOVE FINISHED FLOOR

AHJ AUTHORITY HAVING JURISDICTION

ATC ACOUSTIC TILE CEILING

AWG AMERICAN WIRE GAUGE

CA CLEAN AGENT

CL CEILING LEVEL

CONT. CONTINUED

D DRAIN

DN DOWN

ELEV. ELEVATOR

EMT ELECTRICAL METALLIC TUBING

(E) EXISTING TO REMAIN

F FIRE LINE

FDC FIRE DEPARTMENT CONNECTION

FH FIRE HYDRANT

FHV 2-1/2" FIRE HOSE VALVE

N.I.C. NOT IN CONTRACT

PA PRE-ACTION

(R) RELOCATE EXISTING EQUIPMENT

SP SPRINKLER PIPING

TYP. TYPICAL

ZCA SPRINKLER ZONE CONTROL ASSEMBLY

AREA OF WORK

LIGHT HAZARD

DISCHARGE DENSITY 0.1 GPM/SF

REMOTE AREA 1500 SF

WF WATERFLOW SWITCH

TS TAMPER SWITCH

FIRE PUMP TEST RESULTS

TEST DATE: 25 NOVEMBER 2024

RUN TIME: 5 MINUTES AT 100%

EQUIPMENT USED: TWO (2) 50 FT 2-1/2-INCH HOSES WITH DIFFUSER

FIRE PUMP GAUGES ARE BROKEN AND UNABLE TO REGISTER PRESSURE ABOVE 50 PSI. TEST

CONFIRMED FIRE PUMP IS ABLE TO RUN.

THE PREVIOUS FIRE PUMP TEST WAS RUN BY ARK SYSTEMS, INC. ON 12 FEBRUARY 2024,

YIELDING THE FOLLOWING DISCHARGE PRESSURES AND FLOWS.

SHEET NUMBER WHERE

SECTION IS DRAWN

INDICATES DIRECTION

OF CUTTING PLANE

NUMBER INDICATES SECTION

NUMBER INDICATES

DETAIL/SECTION

SHEET NUMBER WHERE

DETAIL/SECTION IS DRAWN

ALL DRAWINGS WHERE

THIS DETAIL IS

REFERENCED FROM

GRAPHIC SCALE OF

THIS PLAN OR DETAIL

UNIQUE PLAN OR

DETAIL NUMBER ON

THIS DRAWING

NAME OF PLAN OR DETAIL

NORTH ARROW

SPRINKLER ZONE

FIRE SUPPRESSION PIPEF

GATE VALVE

GLOBE VALVE

SWING CHECK VALVE

OS&Y VALVE

BALL VALVE

BUTTERFLY VALVE

BACKFLOW PREVENTER

PIPE TURN UP

PIPE TURN DOWN

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PIPE CAP

FIRE PUMP

WET PIPE SPRINKLER RISER

EXISTING SPRINKLER

UPRIGHT SPRINKLER

PENDENT SPRINKLER

SIDEWALL SPRINKLER

ZCA ZONE CONTROL ASSEMBLY

DOUBLE CHECK BACKFLOW PREVENTERDBP

FP

DRY PIPE SPRINKLER RISER

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

CHURN 100 PSI 0 GPM

100% 100 PSI 500 GPM

150% 70 PSI 750 GPM

E ELECTRIC WATER FLOW ALARM BELL

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

9 JANUARY 2026

PAINT PIPE RED WHERE PIPE AND FITTINGS IS PROVIDED.

10.3

11.2

11.8

12.5

10.8

12.2

12.5

2.3

3.2

3.8

6.2

6.8

7 K.5K L

10.3

D.8 E F G H J J.3 K K.5 L

SPRINKLER ZONE 1-1

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:22

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD111FIRST FLOOR MAIN BUILDING -

DEMOLITION0 24'8' 16'

3/32"=1'-0"

FIRST FLOOR MAIN BUILDING - DEMOLITION1

MATCHLINE MATCHLINESEE FD112 FOR CONTINUATION

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOVE CORRODED ARM-OVERS

AND HANGERS.

2. DISCONNECT AND REMOVE CORRODED SPRIG UPS AND

ASSOCIATED SUPPORTS.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

14.8

16.9

17.5

18.5

19.5

G.5F.1 J.1 K.2 M M.5 N

19.5

18.5

17.5

K.2 M M.5 N

SPRINKLER ZONE 1-2

SPRINKLER ZONE 1-1

2" F

2" F

2" F

2" F

FD112

2" F

2" F

2" F

2" F

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:29

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD112FIRST FLOOR TANK BUILDING -

DEMOLITION

0 24'8' 16' 3/32"=1'-0"

FIRST FLOOR TANK BUILDING - DEMOLITION

ROOF SPRINKLER SYSTEM

MATCHLINE MATCHLINESEE FD111 FOR CONTINUATION

0 24'8' 16' 3/32"=1'-0"

FIRST FLOOR TANK BUILDING - DEMOLITION

CEILING SPRINKLER SYSTEM

FD1122

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. DISCONNECT AND REMOTE THE EXISTING FIRE

DEPARTMENT CONNECTION.

2. DISCONNECT AND REMOVE EXISTING 2-INCH PIPE AND

ASSOCIATED EQUIPMENT/SUPPORTS.

FD401

K.2 M

17.5

18.5

19.5

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

SPRINKLER ZONE 1-1 1

SPRINKLER ZONE 1-1 1

SPRINKLER ZONE 1-2

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:42

A M

2.0

F

D1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FD113SECOND FLOOR - DEMOLITION

8'0 16' 1/8"=1'-0"

SECOND FLOOR TANK PENTHOUSE - DEMOLITION1

8'0 16' 1/8"=1'-0"

SECOND FLOOR NORTH PENTHOUSE - DEMOLITION2

8'0 16' 1/8"=1'-0"

SECOND FLOOR SOUTH PENTHOUSE - DEMOLITION3

J.1 K K.2 M

17.5

18.5

19.5

D E

E F G H J

F

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

1. SHEET PROVIDED FOR INFORMATION ONLY. NO

DEMOLITION REQUIRED.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

10.3

11.2

11.8

12.5

10.8

12.2

12.5

2.3

3.2

3.8

6.2

6.8

7 K.5K L

10.3

D.8 E F G H J J.3 K K.5 L

SPRINKLER ZONE 1-1

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:09

A M

2.0

F

X1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FX101FIRST FLOOR MAIN BUILDING

0 24'8' 16'

3/32"=1'-0"

FIRST FLOOR MAIN BUILDING1

MATCHLINE MATCHLINESEE FX102 FOR CONTINUATION

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE SPRINKLER HEADS AND ARMOVERS WITHIN

AREA OF WORK.

2. PROVIDE SPRINKLER HEADS AND SPRIG UPS WITHIN

AREA OF WORK.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

14.8

16.9

17.5

18.5

19.5

G.5F.1 J.1 K.2 M M.5 N

19.5

18.5

17.5

K.2 M M.5 N

MATCHLINEMATCHLINE SEE FD101 FOR CONTINUATION

SPRINKLER ZONE 1-1

SPRINKLER ZONE 2

SPRINKLER ZONE 1-3

(E )4

"F

2"F

2" F

2" F

E

2" F

2" F

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:19

A M

2.0

F

X1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FX102FIRST FLOOR TANK BUILDING

0 24'8' 16' 3/32"=1'-0"

FIRST FLOOR TANK BUILDING1

MATCHLINE MATCHLINESEE FX101 FOR CONTINUATION GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. PROVIDE COMPLETE DRY PIPE SPRINKLER PROTECTION

IN ACCORDANCE WITH NFPA 13 AND ARS 242.1.

2. PROVIDE FIRE DEPARTMENT CONNECTION.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FX401

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

SPRINKLER ZONE 2-1

SPRINKLER ZONE 2-1

SPRINKLER ZONE 1

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:26

A M

2.0

F

X1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FX103SECOND FLOOR

8'0 16' 1/8"=1'-0"

SECOND FLOOR TANK PENTHOUSE1

8'0 16' 1/8"=1'-0"

SECOND FLOOR NORTH PENTHOUSE2

8'0 16' 1/8"=1'-0"

SECOND FLOOR SOUTH PENTHOUSE3

J.1 K K.2 M

17.5

18.5

19.5

D E

E F G H J

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. EXISTING TO REMAIN WET-PIPE SPRINKLER SYSTEM.

PROVIDED FOR INFORMATION ONLY. NO NEW WORK.

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/12 /20

8:

:27

A M

2.0

F

X4

.D W

G

FX401FIRE PUMP DETAIL

PATERSON, A

ROBERTSON, A

PATERSON, A

ROBERTSON, A

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

18 INSTALL EXISITNG DOMESTIC WATER ISOLATION

VALVE AND DOMESTIC BACKFLOW. ROUTE

BACKFLOW VALVE DRAIN TO FLOOR DRAIN.

N

RE

F:

PL

OT

D

AT

E:

/3/

2:

:37

P M

2.0

E

-0

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

E-001SYMBOLS & ABBREVIATIONS

AA

J

J

T

EM2

1,3,5

#10

#10

1,3,5

EM2

#10

EM2

1,3,5

SYMBOLS

EM2

1,3,5

#10

EX

EC

W

SM

GENERAL SYMBOLS

NORTH ARROW

COLUMN BUBBLE

DESIGNATION

REVISION CLOUD WITH REVISION

NUMBER DESIGNATION

BREAKLINE

MATCHLINE DESIGNATION

NOTE NUMBER

ARROW INDICATES

TRUE NORTH AND/OR

PROJECT NORTH

N

E-101

N

8'0 1/8"=1'-0"

UNIQUE PLAN OR

DETAIL NUMBER

ON THIS DRAWING NORTH ARROW

NAME OF PLAN OR DETAIL

ALL DRAWINGS WHERE

DETAIL IS REFERENCED

GRAPHIC SCALE OF

PLAN OR DETAIL

SECTION IDENTIFICATION

INDICATES DIRECTION

OF CUTTING PLANE

NUMBER INDICATES SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

2-PART REFERENCE DETAIL IDENTIFICATION:

SHEET NUMBER WHERE

DETAIL/SECTION IS DRAWN

NUMBER INDICATES

DETAIL/SECTION

FLOOR PLAN

E-101, E-1022

FLOOR PLAN AND DETAIL TITLES:

E-101

DN

UP

Ø PHASE.

WYE GROUNDING CONFIGURATION.

DELTA CONFIGURATION.

CONDUIT DOWN.

CONDUIT UP.

EQUIPMENT IDENTIFICATION NUMBER.

FEEDER DESIGNATION.

JUNCTION BOX, 4" SQUARE x 2-1/8" DEEP GALVANIZED PRESSED

STEEL, MOUNTED ABOVE SUSPENDED TILE CEILING.

JUNCTION BOX, 4" SQUARE x 2-1/8" DEEP GALVANIZED PRESSED

STEEL, RECESS MOUNTED AT 18" ABOVE FINISHED FLOOR, WITH

BLANK COVER PLATE.

DUPLEX RECEPTACLE, 20 AMPERE, 125 VOLT GROUNDING TYPE,

NEMA 5-20R CONFIGURATION, SURFACE MOUNTED IN 4" SQUARE x

2-1/8" DEEP PRESSED STEEL JUNCTION BOX AT 18" ABOVE

FINISHED FLOOR.

DUPLEX RECEPTACLE, 20 AMPERE, 125 VOLT GROUNDING TYPE,

NEMA 5-20R CONFIGURATION, RECESS MOUNTED IN 4" SQUARE x

2-1/8" DEEP PRESSED STEEL JUNCTION BOX AT 18" ABOVE

FINISHED FLOOR.

ELECTRICAL POINT OF CONNECTION.

CIRCUIT BREAKER TYPE PANELBOARD.

HEAVY DUTY ENCLOSED SAFETY SWITCH, SEE MOTOR AND

EQUIPMENT SCHEDULE FOR SIZES AND CHARACTERISTICS.

M A T C H L I N E A-A

MANUAL MOTOR STARTER WITH THERMAL OVERLOAD RELAY,

SURFACE MOUNTED IN DEVICE BOX ON UNIT UNLESS OTHERWISE

NOTED.

SURFACE METAL RACEWAY, WIREMOLD SERIES 700 UNLESS

SPECIFICALLY NOTED OTHERWISE.

BRANCH CIRCUIT CONDUIT AND CONDUCTORS RUN CONCEALED IN

CONCRETE, ALL OTHER CHARACTERISTICS SAME AS SHOWN

ABOVE.

BRANCH CIRCUIT CONDUIT AND CONDUCTORS RUN CONCEALED IN

WALLS AND CEILING, ALL OTHER CHARACTERISTICS SAME AS

SHOWN ABOVE.

NUMBER OF SLASH MARKS INDICATE THE NUMBER OF

CONDUCTORS IN RACEWAY. NO SLASH MARKS INDICATE 2

CIRCUIT CONDUCTORS PLUS A GROUND CONDUCTOR.

HOME RUN TO PANEL. NUMBER OF ARROWS INDICATE THE

NUMBER OF CIRCUITS.

BRANCH CIRCUIT CONDUIT AND CONDUCTORS RUN EXPOSED. SIZE

IN ACCORDANCE WITH N.E.C. RACEWAY SHALL BE MINIMUM 3/4"

CONDUIT, AND WIRE SHALL BE MINIMUM SIZE #12 AWG COPPER,

UNLESS OTHER SIZES ARE SPECIFICALLY NOTED.

EMPTY 1" CONDUIT WITH NYLON PULL STRING.

EXISTING CONDUIT AND CONDUCTORS TO REMAIN.

WIRE SIZE IN AWG. SIZE NOT SHOWN INDICATES #12 AWG.

CIRCUIT BREAKERS IN PANEL SERVING THESE CIRCUITS.

PANEL NAME TO WHICH CIRCUITS RUN.

GREEN GROUND CONDUCTOR RUN IN RACEWAY.

ROOM NUMBER DESIGNATION.

ABBREVIATIONS

TRANSFORMER, SEE POWER RISER DIAGRAM FOR

CHARACTERISTICS.

A AMPERES.

AF FRAME SIZE IN AMPERES.

AFF ABOVE FINISHED FLOOR.

AT TRIP SIZE IN AMPERES.

ATS AUTOMATIC TRANSFER SWITCH.

AWG. AMERICAN WIRE GAUGE.

BATT BATTERY BACK-UP.

BLDG. BUILDING.

C/B CIRCUIT BREAKER.

CBM CERTIFIED BALLAST MANUFACTURERS.

DDC DIRECT DIGITAL CONTROL.

EC EMPTY CONDUIT.

EM EMERGENCY PANEL.

EMT ELECTRICAL METALLIC TUBING.

ETR EXISTING TO REMAIN.

FA FIRE ALARM.

FAAP FIRE ALARM ANNUNCIATOR PANEL.

FACP FIRE ALARM CONTROL PANEL.

FLA FULL LOAD AMPERES.

FVNR FULL VOLTAGE NON-REVERSING.

GFI GROUND FAULT INTERRUPTER.

GRD. GROUND CONDUCTOR.

H-O-A HAND-OFF-AUTOMATIC SELECTOR SWITCH.

IDS INTRUSION DETECTION PANEL.

KAIC THOUSAND AMPERE INTERRUPTING CAPACITY.

KW KILO-WATTS.

M.L.O. MAIN LUGS ONLY.

N.C. NORMALLY CLOSED.

N.E.C. NATIONAL ELECTRICAL CODE.

NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION.

NFSS NON-FUSED SAFETY SWITCH.

N.O. NORMALLY OPEN.

P NUMBER OF POLES.

PH. NUMBER OF PHASES.

PVC POLY-VINYL CHLORIDE.

RGS RIGID GALVANIZED STEEL.

SPD SURGE PROTECTIVE DEVICE.

U.L. UNDERWRITER'S LABORATORIES.

V VOLTAGE.

PATERSON, A

DI SAVINO, E

URDA, K

DI SAVINO, E

C. MORRIS

T. VIGIL

TBD

TBD

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

NOTES

1. FOR INFORMATION ONLY.

2. PROVIDE CIRCUIT BREAKER INDICATED AND LABEL AS

NOTED.

3. PROVIDE TYPEWRITTEN PANELBOARD SCHEDULE.

MOTOR STARTER, SEE MOTOR AND EQUIPMENT SCHEDULE

FOR SIZES AND CHARACTERISTICS.

(E)PANEL LMPE5

MAIN BUS SIZE (AMPS): 225 INTERRUPT. RATING (KAIC): 10 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 120 / 208 SECTION NO.: 1 OF 1 LOCATION: SERVICE CORRIDOR 60 MAIN CIRCUIT BREAKER (AMPS): PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 SQUARE D NQOD

CKT

NO. DESCRIPTION LOAD

TYPE

LOAD

(KVA)

BREAKER BREAKER LOAD

(KVA)

LOAD

TYPE DESCRIPTION CKT

NO.AMPS POLES POLES AMPS

1 (E)EXH FAN EF-5 N 0.86 20 1 A 1 20 0.86 M (E)EXH FAN EF-16 2

3 (E)EXH FAN EF-6 M 0.86 20 1 B 1 20 0.86 M (E)EXH FAN EF-17 4

5 (E)EXH FAN EF-7 M 0.86 20 1 C 1 20 0.86 M (E)EXH FAN EF-19 6

7 (E)EXH FAN EF-8 M 0.86 20 1 A 1 20 0.86 M (E)EXH FAN EF-20 8

9 (E)EXH FAN EF-18 M 0.86 20 1 B 1 20 1.18 M (E)FTU-21 10

11 (E)EXH FAN EF-21 M 0.86 20 1 C 1 20 1.18 M (E)FTU-22 12

13 (E)FTU-1/FTU-2 M 1.39 20 1 A 1 20 0.86 M (E)FTU-23 14

15 (E)FTU-3 M 0.86 20 1 B 1 20 0.86 M (E)FTU-24 16

17 (E)FTU-4 M 1.66 20 1 C 1 20 0.50 N (E)RM 200 DCC PANEL 18

19 (E)FTU-5 M 1.66 20 1 A 1 20 0.50 N (E)RM 200 DCC PANEL 20

21 (E)FTU-6 M 1.18 20 1 B 1 20 0.50 N (E)RM 200 DCC PANEL 22

23 (E)FTU-7/FTU-8 M 1.73 20 1 C 1 20 0.50 N (E)RM 200 DCC PANEL 24

25 (E)FTU-9/FTU-10 M 1.39 20 1 A 1 20 0.50 N (E)AHU-1 DCC PANEL 26

27 (E)FTU-11 M 0.86 20 1 B 1 20 0.50 N (E)AHU-1 DCC PANEL 28

29 (E)FTU-12 M 0.86 20 1 C 1 20 0.50 C (E)FIRE ALARM PANEL (FACP) 30

31 (E)FTU-13/FTU-14 M 1.73 20 1 A 1 20 0.50 C SECURITY PANEL 32

33 (E)FTU-15 M 1.18 20 1 B 1 20 0.00 N SPARE 34

35 (E)FTU-16 M 1.18 20 1 C 1 20 0.00 N SPARE 36

37 (E)FTU-17/FTU-18 M 1.39 20 1 A 1 20 0.00 N SPARE 38

39 (E)FTU-19 M 0.86 20 1 B 1 20 0.00 N SPARE 40

41 (E)FTU-20 M 1.18 20 1 C 1 20 0.00 N SPARE 42

CONNECTED LOAD PER PHASE (kVA) = 13.4 10.6 11.9 TOTAL CONNECTED LOAD = 35.8 KVA 99.5 AMPS

(AMPS) = 111.5 88.1 98.9 TOTAL DEMAND LOAD = 37.2 KVA 103.4 AMPS

PERCENT LOAD IMBALANCE= 0% 21% 11%

LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS

(E)PANEL RP

MAIN BUS SIZE (AMPS): 225 INTERRUPT. RATING (KAIC): 10 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 120 / 208 SECTION NO.: 1 OF 1 LOCATION: TANK ROOM MAIN CIRCUIT BREAKER (AMPS): 150 PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 SQUARE D NQOD

CKT

NO. DESCRIPTION LOAD

TYPE

LOAD

(KVA)

BREAKER BREAKER LOAD

(KVA)

LOAD

TYPE DESCRIPTION CKT

NO.AMPS POLES POLES AMPS

1 (E)TANK RM LTG VIA RELAY R1 N 0.40 20 1 A 1 20 0.30 R (E)TANK RM LTG VIA RELAY R5 2 3 (E)TANK RM LTG VIA RELAY R2 N 0.40 20 1 B 1 20 0.30 R (E)TANK RM LTG VIA RELAY R6 4 5 (E)TANK RM LTG VIA RELAY R3 N 0.40 20 1 C 1 20 1.20 R (E)TANK RM LTG VIA RELAY R7 6

7 (E)TANK RM LTG VIA RELAY R4 N 0.40 20 1 A 1 20 1.20 R (E)TANK RM LTG 8

9 (E)LTG CONTROL PANEL XFMR C 0.20 20 1 B 1 20 1.20 R (E)TANK RM LTG 10

11 (E)RECPT-100,103,104 R 1.20 20 1 C 1 20 1.30 R (E)LTG ROOMS 101-105 12

13 (E)RECPT-TANK ROOM R 1.00 20 1 A 1 20 0.90 R (E)EF-2 14

15 (E)RECPT-EXTERIOR R 1.20 20 1 B 1 20 1.65 R (E)UH-2 16

17 (E)RECPT-TANK ROOM R 0.60 20 1 C 1 -- 1.65 N SPACE 18

19 (E)RECPT-TANK ROOM R 0.40 20 1 A 1 20 0.00 N SPARE 20

21 (E)RECPT-TANK ROOM R 1.20 20 1 B 1 30 3.00 R (E)WATER HEATER 22

23 (E)RECPT-TANK ROOM R 0.60 20 1 C 1 20 0.90 R (E)AC-1 24

25 (E)RECPT-TANK ROOM R 0.60 20 1 A 1 -- 0.00 N SPACE 26

27 (E)FIRE ALARM PANEL C 0.20 20 1 B 1 20 0.00 N SPARE 28

29 (E)TELEPHONE CABINET C 0.20 20 1 C 1 20 0.00 N SPARE 30

31 SECURITY PANEL C 0.20 20 1 A 1 20 0.00 N SPARE 32

33 SPARE N 0.00 20 1 B 1 20 0.00 N SPARE 34

35 (E)FEED SYSTEM N 0.20 20 1 C 1 20 0.00 N SPARE 36

37 SPARE N 0.00 20 1 A 1 20 0.00 N SPARE 38

39 (E)SUMP PUMP M 1.60 20 1 B 1 20 1.40 R (E)RECPT-EYE WASH HTR 40

41 SPARE N 0.00 20 1 C 1 20 0.00 N SPARE 42

CONNECTED LOAD PER PHASE (kVA) = 5.4 12.4 8.3 TOTAL CONNECTED LOAD = 26.0 KVA 72.2 AMPS

(AMPS) = 45.0 102.9 68.8 TOTAL DEMAND LOAD = 21.5 KVA 59.8 AMPS

PERCENT LOAD IMBALANCE= 56% 0% 33%

LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS

(E)PANEL LMPN9

MAIN BUS SIZE (AMPS): 225 INTERRUPT. RATING (KAIC): 10 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 120 / 208 SECTION NO.: 1 OF 1 LOCATION: PUMP ROOM 112 MAIN CIRCUIT BREAKER (AMPS): PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 SQUARE D NQOD

CKT

NO. DESCRIPTION LOAD

TYPE

LOAD

(KVA)

BREAKER BREAKER LOAD

(KVA)

LOAD

TYPE DESCRIPTION CKT

NO.AMPS POLES POLES AMPS

1 (E)TASK LIGHTING-RM119 N 0.10 20 1 A

2 20

1.20 N

(E)REVERSE SOMOSIS UNIT

3 (E)UNIT HTR UH-12 (RM103) M 0.01 20 1 B 1.20 N 4

5 (E)RO REPREASSURE PUMP M 1.18 20 1 C

2 20

0.50 N (E)CARBON FILTER

TIMER/RESISTYIVITY METER

7 (E)UNIT HTR UH-11(RM208) M 0.01 20 1 A 0.50 N 8

9 (E)UNIT HTR UH-8 (RM112) M 0.01 20 1 B 1 20 1.08 R (E)REC - RMS 121, 122, 123 10 11 (E)UNIT HTR UH-5 (RM 123) M 0.01 20 1 C 1 20 0.90 R (E)REC - RMS 121, 122, 123 12 13 (E)UNIT HTR UH-7 (RM 208) M 0.03 20 1 A 1 20 0.90 R (E)REC - RMS 121, 122, 123 14 15 (E)REC - RM 208 R 0.54 20 1 B 1 20 1.08 R (E)REC - RMS 113, 116, 117, 118, 120 16 17 (E)REC - RM 208 R 0.54 20 1 C 1 20 0.90 R (E)REC - RMS 113, 116, 117, 118, 120 18 19 (E)REC - RM 208 R 0.54 20 1 A 1 20 0.90 R (E)REC - RMS 113, 116, 117, 118, 120 20 21 AIR COMPRESSOR M 0.83 20 1 B 1 20 0.54 R (E)REC - RMS 113, 116, 117, 118, 120 22

JOCKEY PUMP

M 0.9

20 3

C 1 20 0.54 R (E)REC - RMS 112 24

25 M 0.9 A 2 20

1.20 N

EXISTING

27 M 0.9 B 1.20 N 28

29 SPACE N 0.00 -- 1 C 1 -- 0.00 N SPACE 30

31 SPACE N 0.00 -- 1 A 1 -- 0.00 N SPACE 32

33 SPACE N 0.00 -- 1 B 1 -- 0.00 N SPACE 34

35 SPACE N 0.00 -- 1 C 1 -- 0.00 N SPACE 36

37 SPACE N 0.00 -- 1 A 1 -- 0.00 N SPACE 38

39 SPACE N 0.00 -- 1 B 1 -- 0.00 N SPACE 40

41 SPACE N 0.00 -- 1 C 1 -- 0.00 N SPACE 42

CONNECTED LOAD PER PHASE (kVA) = 6.3 7.4 5.5 TOTAL CONNECTED LOAD = 19.1 KVA 53.1 AMPS

(AMPS) = 52.3 61.6 45.5 TOTAL DEMAND LOAD = 19.9 KVA 55.2 AMPS

PERCENT LOAD IMBALANCE= 15% 0% 26%

LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS

15 DECEMBER 20259 JANUARY 2026

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

A A.3 B C D E E.6 F G H J

10.3

11.2

11.8

12.5

10.8

12.2

12.5

2.3

3.2 3.8

6.2

6.8

K.5K L

10.3

D.8 E F G H J J.3 K K.5 L

14.5 F F.1 G.5 H.8 H.9 J.4 K

14.8

16.9

17.5

18.5

19.5

K.2 M M.5 N

17.5

18.5

19.5

F.1 G.5 J.1 K.2 M M.5 N

DIESEL FUEL TANK

GENERATOR

PUMP STATION

/3/

1:

:20 P

M

2.0

E

-1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

E-101FIRST FLOOR OVERALL

32'0 16' 1/16"=1'-0"

FIRST FLOOR OVERALL PLAN - MAIN BUILDING1

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

32'0 16' 1/16"=1'-0"

FIRST FLOOR OVERALL PLAN - TANK BUILDING2

MATCHLINE MATCHLINESEE DETAIL 1 FOR CONTINUATION

MATCHLINE MATCHLINESEE DETAIL 2 FOR CONTINUATION

E-402

E-401

PATERSON, A

DI SAVINO, E

URDA, K

DI SAVINO, E

C. MORRIS

T. VIGIL

TBD

TBD

E-403

E-402

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

VESTIBULE

ROOM

PUMP

STORAGE

FEED

STORAGE

HATCHERY BLDG

ROOM

TANK

FACP

(E)PANEL ERP

(E)PANEL EP

(E)PULL BOX

(E)PANEL LP

(E)LIGHTING CONTROL PANEL

(E)PANEL RP

21 RP

27 3

IDS

RP

31 3

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/3/

1:

:23

P M

2.0

E

-1

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

E-102BROODSTOCK BUILDING

0 8' 12'4'

3/16"=1'-0"

BROODSTOCK BUILDING1

A B C D

PATERSON, A

DI SAVINO, E

URDA, K

DI SAVINO, E

C. MORRIS

T. VIGIL

TBD

TBD

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

G3. DEMOLITION DEFINITION: DISCONNECTION AND

REMOVAL OF ASSOCIATED CONDUCTORS SHALL

CONSIST OF THE REMOVAL OF THE CONDUCTORS BACK

TO THE NEXT EXISTING DEVICE TO REMAIN. NEW

CONDUIT AND CONDUCTORS SHALL BE PROVIDED TO

RECONNECT ANY EXISTING TO REMAIN DEVICES

INTERRUPTED BY THE DEMOLITION UNDER THIS

PROJECT.

NOTES

1. DISCONNECT FIRE ALARM CONTROL PANEL. TAG,

PROTECT AND RETAIN ALL ASSOCIATED CONDUIT AND

CONDUCTORS BACK TO SOURCE.

2. CONNECT FIRE ALARM CONTROL PANEL TO CONDUIT

AND CONDUCTORS RETAINED DURING DEMOLITION.

CONNECT TO OPERATE AS BEFORE.

3. FOR INFORMATION ONLY.

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

FIRE PUMP CONTROLLER

JOCKEY PUMP

CONTROLLEREF-28 DISCONNECT SWITCH

LMPN9

JOCKEY PUMP

FIRE PUMP1

K K.2

17.5

16.9

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/3/

1:

:27

P M

2.0

E

-4

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

E-401DETAILS

4'0 2' 1/2"=1'-0"

PUMP ROOM - DEMOLITION

DETAIL -

E-1011

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

G3. DEMOLITION DEFINITION: DISCONNECTION AND

REMOVAL OF ASSOCIATED CONDUCTORS SHALL

CONSIST OF THE REMOVAL OF THE CONDUCTORS BACK

TO THE NEXT EXISTING DEVICE TO REMAIN. NEW

CONDUIT AND CONDUCTORS SHALL BE PROVIDED TO

RECONNECT ANY EXISTING TO REMAIN DEVICES

INTERRUPTED BY THE DEMOLITION UNDER THIS

PROJECT.

NOTES

1. DISCONNECT FIRE PUMP. REMOVE ASSOCIATED

CONDUIT AND CONDUCTORS BACK TO CONTROLLER.

TAG, PROTECT AND RETAIN ASSOCIATED FIRE PUMP

CONTROLLER. TAG, PROTECT AND RETAIN ALL

ASSOCIATED CONDUIT AND CONDUCTORS FROM FIRE

PUMP CONTROLLER BACK TO SOURCE.

2. DISCONNECT AND REMOVE JOCKEY PUMP. REMOVE

ASSOCIATED CONTROLLER AND ASSOCIATED CONDUIT

AND CONDUCTORS BACK TO SOURCE.

PATERSON, A

DI SAVINO, E

URDA, K

DI SAVINO, E

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION - ISSUED FOR CONSTRUCTION - 12 DECEMBER 2025

2025-12-12

FIRE PUMP CONTROLLER

(E)EF-28 DISCONNECT SWITCH

(E)LMPN9

JOCKEY PUMP

(E)FIRE PUMP

FIRE PUMP1 FIRE PUMP1

JOCKEY PUMP

CONTROLLER1

FIRE PUMP CONTROLLER1

LMPN9

23, 25, 27

LMPN9

AIR COMPRESSOR1

S M

(E)MAIN DISTRIBUTION SWITCHBOARD

(E)FIRE PUMP CIRCUIT BREAKER

(E)PULL BOX

(E)EMERGENCY SWITCHBOARD

(E)EMERGENCY

ATS/BYPASS-ISOLATION SWITCH (E)MPE2

(E)MPE1

(E)LP1

(E)LPE

(E)LMPN7

(E)XFMR-10

(E)

FI

LE

N

RE

F:

PL

OT

D

AT

E:

/3/

1:

:31

P M

2.0

E

-4

.D W

G

FI

LE

N

RE

F:

PL

OT

D

AT

E:

2.0

FIRE SYSTEM UPGRADES

7900 Westpark Dr. | Suite A405 | McLean, VA 22102

(703) 556-8820 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

KEARNEYSVILLE, WEST VIRGINIA

100% SUBMISSION - NOT FOR CONSTRUCTION - 3 DECEMBER 2025

2025-11-10

NATIONAL CENTER FOR COOL AND COLD WATER

AQUACULTURE

E-402DETAILS

4'0 2' 1/2"=1'-0"

PUMP ROOM

DETAIL -

E-1012

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

G2. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",

"EXIST", OR "(E)".

4'0 2' 1/2"=1'-0"

ELECTRIC ROOM

DETAIL -

E-1011

NOTES

1. SEE MOTOR AND EQUIPMENT SCHEDULE FOR MOTOR

AND FEEDER CHARACTERISTICS.

2. PROVIDE 6" W x 24" L x 12" D JUNCTION BOX A MINIMUM

OF 12 INCHES ABOVE THE FLOOR. JUNCTION BOX SHALL

BE A MINIMUM NEMA TYPE 2 ENCLOSURE. EXTEND

EMERGENCY AND NORMAL FEEDS FOR THE FIRE PUMP

RETAINED DURING DEMOLITION TO JUNCTION BOX.

SPLICE FEEDERS IN JUNCTION BOX TO SERVE THE TWO

FIRE PUMP CONTROLLERS.

3. PROVIDE 36" DEPTH WORKING CLEARANCE IN FRONT OF

EQUIPMENT.

PATERSON, A

DI SAVINO, E

URDA, K

DI SAVINO, E

C. MORRIS

T. VIGIL

TBD

TBD

FINAL SUBMISSION…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .