attachment-1-bid-68-25-rev.pdf
PDF 267 KB Posted
- Attached to
- SECURITY CAMERA SYSTEMS INSTALLATION SERVICES
- Solicitation number
- Bid 68-25
- Issued by
- Rockingham County, New Hampshire
About this file
Summary
This is a Scope of Work document for RFB #68-25 issued by the New Hampshire Department of Transportation (NHDOT) in cooperation with the NH Department of Information Technology (NH DoIT) and Boston Express Bus for the installation of security camera systems across three transit centers in Rockingham County. The project requires the installation of 54 new Axis Power-over-Ethernet cameras capable of 1920x1080 resolution at 30 FPS minimum across three facilities: Salem Transit Center (14 new cameras), Londonderry Exit 4 Transit Center (6 new cameras), and Londonderry Exit 5 Transit Center (34 new cameras). All existing cameras and cabling must be removed and disposed of, with the exception of cabling in underground conduit which may be abandoned in place. The contractor is responsible for supplying and installing server rack enclosures, patch panels, mounting equipment, communication and networking infrastructure, and approximately 2,000 linear feet of 12-strand Single Mode Fiber optic cable between the L5TC terminal and bus maintenance building. A mandatory pre-bid meeting and site walkthrough is scheduled for January 7, 2025, at 1:00 PM at the Londonderry Exit 5 Transit Center, with subsequent walkthroughs at the other two locations. The final bid due date is February 5, 2025, at 9:30 AM Eastern Time. The contract term is one year from the notice to proceed issued by NHDOT, with the contractor required to provide a 2-year warranty on all workmanship and equipment.
The contractor must supply all Milestone XProtect Corporate Edition licenses for the cameras and provide Ethernet certification testing reports demonstrating CAT6 standards compliance and wireless communication test reports confirming no frequency conflicts. NHDOT and NH DoIT will provide all major equipment including Cisco wireless radios, Ethernet switches, Hewlett Packard recording servers, and battery backups for each location; the detailed bill of materials for each facility is provided in the Scope of Work. The contractor must coordinate with NH DoIT for equipment migration from existing racks to new racks and provide an Excel spreadsheet inventory listing all installed equipment including model year, manufacturer, model, description, serial number, cost, and location. The project is funded through federal transit funds, requiring compliance with federal guidelines including Buy America provisions and federal wage rate requirements. Insurance requirements include $1,000,000 per occurrence and $2,000,000 aggregate comprehensive general liability coverage. The contractor must be registered in SAM.Gov and comply with Disadvantaged Business Enterprise participation requirements, with DBEs eligible for 100% contract credit as prime contractors or subcontractors and 60% credit as suppliers.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Scope of Work RFB 68-25 revised 1/29/2025 Security Camera Systems Installation Services
Bidder Initials: ________
Date: ____________
1. Introduction:
1.1. New Hampshire Department of Transportation is soliciting quotes for a Contractor to install 54 static (fixed) security cameras. The locations are the Salem Transit Center (STC) located at 10 Raymond Road in Salem, Londonderry Exit 4 Transit Center (L4TC) located at 2 Garden Lane in Londonderry, and Londonderry Exit 5 Transit Center (L5TC) located at 4 Symmes Drive in Londonderry. The facilities are owned by the State and managed by Boston Express Bus. This project will be done in cooperation with the NH Department of Transportation (NHDOT) and the NH Department of Information Technology (NH DoIT). NHDOT and NH DoIT will provide Cisco Wireless radios, Ethernet switches, Hewlett Packard recording servers and battery backups for each location. The list of NHDOT and NH DoIT supplied equipment is provided at the conclusion of this Scope of Work and as shown on the plans. The Cisco wireless radios shall be installed by the Contractor.
1.2. This project consists of installing a total of 54 Axis cameras. All cameras shall be Power-over-Ethernet (PoE) and be capable of displaying video at a 1920 x 1080 resolution at 30 FPS, at a minimum. The cameras’ video and control will utilize both wireless radio and Ethernet communications. The cameras shall be terminated to a new Contractor-supplied patch panel that shall be located in a new Contractor-supplied server rack enclosure located in the terminal buildings for each transit center and in the L5TC (bus) maintenance building and (bus) storage building.
1.3. The point of demarcation for the Contractor shall be the termination of the cameras to an Ethernet patch panel installed in the new server rack enclosures. The patch panels and server rack enclosures shall be provided by the Contractor. It shall be the Contractor’s responsibility to verify connectivity to the cameras by providing Ethernet certification testing reports to the NHDOT and NH DoIT Project Managers to demonstrate the cabling meets or exceeds CAT6 standards. In addition, the Contractor shall provide wireless communication test reports to demonstrate that there are no frequency conflicts and to confirm the available bandwidth of each link. The Contractor shall be responsible for providing all necessary testing equipment to demonstrate these functionalities.
1.4. The project will be considered complete when the Contractor demonstrates successful transmission of video from each camera to the new patch panel at each Transit Center.
2. General Project Description:
2.1. Salem Transit Center (STC):
2.1.1. The general project area is presented in the plans and Special Provisions. The STC has a single terminal and 4 adjacent and connected parking lots. Three (3) existing cameras are installed on the interior of the terminal to monitor activity within, 2 existing cameras are installed on the exterior canopy of the terminal, and 5 existing cameras are mounted on light poles in the parking lots to monitor activities in the parking lots. The following statements describe the Contractor’s responsibilities for this project as shown on the plans and in the Special Provisions.
2.1.2. All existing cameras and connecting cabling shall be removed and disposed of, with the exception of cabling in underground conduit which may be abandoned in place if the conduit is not required for the project. Fourteen (14) new static cameras will be supplied and installed, 3 new static cameras shall be installed on the interior of the terminal to monitor activities inside the terminal, and 11 new static cameras shall be installed on the exterior of the terminal building and on existing light poles in the parking lots as shown on the plans. Of these 11 new exterior cameras, 4 will be installed under the terminal’s roof canopy to monitor the terminal sidewalks and 1 to monitor a parking lot, and 6 will be installed on existing light poles in the parking lot to monitor activities in the parking lots.
2.1.3. NH DoIT will provide a Cisco 24 port 1 Gb Ethernet switch for the project. The contractor shall provide a 24U server rack enclosure to be installed in the terminal building. To support the equipment installed within the server rack, the contractor shall install two dedicated 20-amp circuits with 4 gang outlets each adjacent to the server rack. The outlets shall be connected to the electrical panel such that when there is an electrical power failure, the outlets are powered when a portable generator is in use and connected through a socket on the exterior of the building.
2.1.4. The Contractor shall connect two (2) #10 AWG wires and one (1) #10 AWG wire to the existing light circuit to provide power service connection to the cameras and associated equipment to be mounted on light poles. The wire splices shall be water-sealed and accessible through the handhole at the base of the pole. The Contractor shall bring the three wires and connect to a 15-amp molded circuit breaker inside the proposed cabinet to be mounted to the light pole. The cabinet shall include a minimum of two (2) AC receptacles to provide power to the equipment installed in the cabinet including the Cisco Access Point and a Power-over-Ethernet (PoE) injector or a PoE switch as shown on the plans. Power to the light poles can be turned off via a circuit breaker panel at the facility.
2.2. Londonderry Exit 4 Transit Center (L4TC):
2.2.1. The general project area is presented in the plans and Special Provisions. The L4TC has a single terminal and 3 adjacent parking lots. Two (2) existing cameras are installed on the interior of the terminal to monitor activity within, 1 existing camera is mounted outside under the roof canopy to monitor the terminal boarding area, and 1 existing camera is mounted upon an emergency call box tower west of the terminal that monitors the west entrance of the terminal.
The following statements describe the Contractor’s responsibilities for this project as shown on the plans and in the Special Provisions.
2.2.2. All existing cameras and connecting cabling shall be removed and disposed of, and 6 new static cameras will be supplied and installed. Two (2) new static cameras shall be installed on the interior of the terminal, 2 new static cameras shall be installed on the exterior of the terminal building under the roof canopy to monitor activity on the sidewalks, 1 new static camera shall be installed on the exterior of the terminal building under the roof canopy to monitor the south terminal sidewalk and entrance from Garden Lane, and 1 static camera shall be installed in the existing emergency call box tower as shown on the plans and Special Provisions.
2.2.3. NH DoIT will provide a Cisco 24 port 1 Gb Ethernet switch for the project. The contractor shall provide a 24U server rack enclosure to be installed in the terminal building. To support the equipment installed within the server rack, the contractor shall install two dedicated 20-amp circuits with 4 gang outlets each adjacent to the server rack.
2.3. Londonderry Exit 5 Transit Center (L5TC):
2.3.1. The general project area is presented in the plans and Special Provisions. L5TC has a terminal building with a main parking lot and a bus maintenance building and bus storage building with an overflow parking lot. There are 6 multi-mode fiber optic cables that run between the terminal and bus maintenance building. There are 25 existing cameras.
Fifteen (15) are installed at the main parking lot and terminal building, and 10 at the overflow parking lot, bus maintenance building and bus storage building. The 15 existing cameras at the main parking lot and terminal building consist of 5 mounted on the interior of the terminal building to monitor activities within the terminal, 5 mounted on the exterior of the terminal to monitor the bus docks and terminal building entrances, 1 mounted on the exterior of the terminal under the canopy to monitor the parking lot, and 4 mounted in the main parking lot on existing light poles.
The 10 existing cameras at the overflow parking lot, bus maintenance building and bus storage building include 5 interior cameras, 4 exterior cameras mounted on existing light poles, and 1 exterior camera mounted at a covered bus stop in the overflow parking lot. All existing cameras and cabling shall be removed and disposed of, with the exception of cabling in underground conduit which may be abandoned in place if the conduit is not required for the project.
2.3.2. Thirty-four (34) new static cameras will be supplied and installed; 20 at the terminal building and main parking lot and 14 at the bus maintenance building, bus storage building and overflow parking lot. At the terminal building and main parking lot, 5 cameras shall be installed within the interior of the terminal building, 5 exterior cameras shall be mounted under the roof of the bus dock to monitor the docks and entrances to the terminal building, 3 exterior cameras shall be installed under the terminal roof canopy to monitor the sidewalks, 1 exterior camera shall installed under the terminal roof canopy to monitor the parking lot, and 6 exterior cameras shall be installed on existing light poles to monitor the main parking lot. At the bus maintenance building, bus storage building, and overflow parking lot, 3 cameras shall be installed within the interior of the bus maintenance building, 2 cameras shall be installed within the bus storage building, 2 exterior cameras shall be installed on the exterior of the bus maintenance building, 1 exterior camera at the bus stop in the overflow parking lot, and 6 exterior cameras on existing light poles in the overflow parking lot. The Contractor shall provide and install a WALL MOUNTED NEMA 3R ENCLOSURE CABINET to install din rail mounted 19” CISCO IE3200 PoE SWITCH (provide by NH DoIT; see section 2.3.3 below) in the bus storage building as shown on the plans. This switch shall be wired to cameras N25 and N26 and connected to the ethernet switch in the bus maintenance building.
2.3.3. NH DoIT will provide a Cisco 24 port 1 Gb Ethernet switch for the bus terminal building and bus maintenance building. The contractor shall provide a 24U server rack to be installed in the terminal building and a 24U server rack to be installed in the bus maintenance building. To support the equipment installed within the server rack enclosures at both locations, the Contractor shall install two dedicated 20-amp circuits with 4 gang outlets each adjacent to the server racks. The outlets shall be connected such that they are powered when the bus maintenance building is being powered by the emergency generator.
2.3.4. The Contractor shall connect two (2) #10 AWG wires and one (1) #10 AWG wire to the existing light circuit to provide power service connection to the cameras and associated equipment to be mounted on light poles. The wire splices shall be water-sealed and accessible through the handhole at the base of the pole. The Contractor shall bring the three wires and connect to a 15-amp molded circuit breaker inside the proposed cabinet to be mounted to the light pole. The cabinet shall include a minimum of two (2) AC receptacles to provide power to the equipment installed in the cabinet including the Cisco Access Point and a Power-over-Ethernet (PoE) injector or a PoE switch as shown on the plans. The Contractor shall coordinate with the utility service provider Eversource to control power to the light poles during installation of the power connection wires, camera, antenna, cabinet and equipment.
3. Other Items:
3.1. The NH DoIT shall install any new equipment for the new camera systems in the new racks. The Contractor shall coordinate with NH DoIT for the migration of any existing equipment in the old racks that will remain components of the new systems to the new racks.
3.2. The contractor shall install a continuous run of approximately 2000 LF of 12F Single Mode Fiber (SMF) optic cable between the L5TC terminal and bus maintenance building in accordance with Section 2.2 of the NHDOT Fiber Optic Communications Specification (attached). The contract includes a provision for the repair and/or replacement of up to 10 linear feet of the existing fiber optic cable conduit between the buildings.
3.2.1. Specification Requirement Documents are:
• Test Reports shall adhere to the testing procedures as defined in the 677 ITS Fiber specifications document Section
2.1.4.1.
• Rack Mounted Fiber Optic Distribution Enclosures shall adhere to the specifications as defined in the 677 ITS
Cabinet Components document Section 2.9.
• In addition, Fiber Optic Patch Panels shall adhere to the specifications as defined in the 677 ITS Cabinet
Components Section 2.10.
3.2.2. Patch panel termination:
• The Contractor shall supply and install two (2) standalone EIA 19-inch 12 position patch panels with hinged access door including splice tray, connectorized pigtails, connector sleeves, connector adapter panels, and hardware necessary for a complete installation in accordance with Section 2.10 of the Departments Cabinet Components Specification.
• The patch panel(s) shall accommodate at a minimum 12 SC/UPC connections, with a slide out, fiber adapter patch and splice style panel installed in the building as directed by the Department including all necessary mounting hardware.
• The patch panels shall include a minimum of one splice tray with available space for 1 additional splice tray.
• Pigtails shall be sets of 12 fiber connectorized SM, SC/UPC, blue boot connectors
• All 12 pigtail strands shall be connected to the appropriate 12F fiber tube strands (1 – 12).
• Adapter panels shall include two (2) loaded six pack duplex adapter plates SC/UPC, SM. Blank adapter plates shall be installed in the unused panel positions.
• Pigtails shall include one (2) loaded duplex LC/UPC, SM patch panel port.
3.2.3. Fiber Testing:
• Fiber testing results shall be provided by the Manufacturer prior to shipping, by the Contractor after delivery, and by the Contractor after installation in the Conduit in accordance with Section 2.1.4.1 of the fiber specification. The Contractor assumes responsibility of any damaged fiber during manufacture, delivery, or installation if testing results are not provided to the Department prior to splicing and final installation testing.
• Installation of the 12F fiber cable between the L5TC Main Terminal and Maintenance building shall include routing through the building using existing conduit or new conduit and cable management hardware to the vendor provided patch panel at the designated location in the building.
• In the event of a failure in the fiber optic testing the Contractor shall correct the problem or replace the damaged section and retest until satisfactory results are achieved at the expense of the Contractor.
3.2.4. Final installed fiber optic communications test:
• Final communications testing shall be completed in accordance with Section 3.15 of the Departments ITS Fiber specification after all terminations have been completed and inspected.
• Fiber testing shall be completed bidirectional using an OTDR for both 1310 nm and 1550 nm wavelengths from both locations.
3.3. Equipment to be purchased by the Contractor as listed is the specifications may not be the most current model(s) available as equipment upgrades happen frequently. The Contractor is required to purchase the most current equipment model/version and shall provide a list of equipment to be purchased to NH DoIT for approval prior to ordering the equipment.
3.4. Contractor shall provide an excel spreadsheet for each facility listing each piece of equipment installed that includes, but is not limited to, model year, manufacturer, model, description, serial number, cost, and location. This information is necessary for equipment inventory purposes. NHDOT will provide an example of the excel spreadsheet if requested.
3.5. All new cameras require a Milestone XProtect Corporate Edition license to be provided by the Contractor. NH DoIT can provide vendor resources to procure the Milestone Licenses.
3.6. The Contractor shall supply, install, and test communications to each camera from the patch panel installed in the terminal/maintenance buildings. The Contractor shall be responsible for removing all existing power and communication cables to existing cameras.
3.7. The contractor shall supply and install all necessary mounting equipment, communication, power and networking equipment, cabinets, racks and ancillary equipment as shown on the plans and in the Special Provisions to make the system functional. Contractor shall be responsible for procuring extended warranties on equipment when available.
3.8. For equipment mounted on existing light poles, earth ground and bonding are required for each pole as follows:
• The electrical subpanel located in the pole mounted cabinet (identified as “Cabinet Circuit Breakers” in the specifications), shall be wired to the primary panel per current NEC standards.
• The electrical subpanel shall be grounded to a ground rod using a dedicated insulated bonding wire.
• The pole shall be grounded to the same ground rod using a dedicated insulated bonding wire. The subpanel and the pole shall not be grounded to the ground rod using the same bonding wire.
• The bonding wires shall be protected in a nonmetallic flexible conduit from the pole and or cabinet to below surface grade and securely attached to the concrete pole base, as applicable.
• The bonding wires shall be connected to the grounding rod with an exothermal weld, or with another process approved by NHDOT.
• Earth terminal ground rods shall be installed in accordance with current NEC or NFPA standards, as applicable.
3.9. The Contractor shall migrate the equipment from the existing racks to the new rack and make the systems functional. The new equipment called out for the additional cameras shall also be installed in this new rack. The Contractor shall coordinate with NH DoIT for the migration of the existing equipment to the new rack.
3.10. The Contractor shall warranty all workmanship and equipment for a period of 2 years, unless the standard equipment warranty is less than two years.
4. Pre-Bid Meeting and Site Visits:
4.1. A pre-bid meeting will be held at the Londonderry bus terminal building at 4 Symmes Drive in Londonderry (L5TC) on
Tuesday, January 7, 2025, at 1:00 pm. Vendors are strongly encouraged to attend. At this meeting will be representatives from WSP (project consultant), Boston Express Bus, NHDOT, and NH DoIT to discuss the project and answer any questions regarding the project’s specifics. Following the meeting portion just described, Boston Express Bus, NHDOT, and NH DoIT will provide potential bidders with a walk-though of the L5TC project area. Following the L5TC walk-through, potential bidders will transport themselves to the L4TC and then to the STC for similar walk-throughs with WSP, Boston
Express Bus, NHDOT, and NH DoIT. During all walk-throughs, vendors will be permitted to take photos, make sketches and notes, and ask WSP, Boston Express Bus, NHDOT, and NH DoIT questions regarding the project.
5. List of Equipment to be Supplied by NH DOT and NH DoIT:
Group Name:
SALEM TRANSIT
CENTER
BILL OF MATERIALS – SALEM EXIT 2
Part Number: Description Quantity
C9200-24P-E Catalyst 9200 24-port PoE+, Network Essentials 1
CON-SNT-C920024P SNTC-8X5XNBD Catalyst 9200 24-port PoE+, Maintenance 1
C9200-NW-E-24 C9200 Network Essentials, 24-port license 1
C9200-NM-4X Catalyst 9200 4 x 10G Network Module 1
PWR-C6-600WAC/2 600W AC Config 6 Power Supply - Secondary Power Supply 1
CAB-TA-NA North America AC Type A Power Cable 2
C9200-DNA-E-24 C9200 Cisco DNA Essentials, 24-Port Term Licenses 1
C9200-DNA-E-24-5Y C9200 Cisco DNA Essentials, 24-Port, 5 Year Term License 1 NETWORK-PNP- LIC Network Plug-n-Play Connect for zero-touch device deployment 1 IE-3200-8P2S-E Catalyst IE3200 with 8 GE PoE+ & 2 GE SFP, Fixed System, NE 1
CON-SNT-IE32008S SNTC-8X5XNBD Catalyst IE3200 Rugged Series Fixed Syst 1
IE3X00_SW Software for Catalyst IE3x00 rugged series 1
DIGITAL-DL-CODE Digital Download Code for Software License 1
IE3200-DNA-E Cisco DNA Essentials license for IE3200 Series 1
IE3200-DNA-E-3Y IE 3200 DNA Essentials, 3 Year Term license 1
IW9167EH-B-URWB IW9167, 11ax 6E AP, 8 RF ports, B domain, URWB mode 4
CON-SNT-IW9T67EH SNTC-8X5XNBD IW9167, 11ax 6E AP, 8 RF ports, B domain 4
SWIW9167-URWB-K9 URWB software for IW9167 4
IW9167-URWB- NW-E IW URWB Network Essentials License 4
NETWORK-PNP- LIC Network Plug-n-Play Connect for zero-touch device deployment 4
IOTOD-IW-E-5Y IOTOD IW Essential 5-year subscription 4 SVS-IOTOD-ESS Embedded Support for Cisco IOTOD Licenses 4 IW9165DH-B-URWB IW9165, 11ax 6E, directional ant, B dom., URWB SW Version 5
CON-SNT-IW5DHBUB SNTC-8X5XNBD IW9165, 11ax 6E, directional 60 N/A ant, B dom. 5
IW9165-URWB- NW-E IW9165 URWB Network Essentials License 5
SWIW9165-URWB-K9 URWB software for IW9165 5
IOTOD-IW-E-5Y IOTOD IW Essential 5-year subscription 5
SVS-IOTOD-ESS Embedded Support for Cisco IOTOD Licenses 5
IW-PWRADPT-MFIT4P= Power Adapter, AC-DC, Micro-Fit 4Pin connector 5
IW-ACC-PMK1= Pole/Wall Mount Kit for IW9165D with tilt and rotation 5
AIR-ACCPMK3700-2= IW3700 Series Pole-Mount Kit, 2" to 16" 4
FLMESH-HW-HORN-90 FM-HORN-90 --- 70 8
Hewlett Packard HPE DL380 Gen11 24SFF CTO Server 1
Group Name:
SALEM TRANSIT
Milestone Recording Server
HPE DL380 Gen11 6126 Xeon-G FIO Kit 1 HPE DL380 Gen10 6126 Xeon-G Kit 1 HPE 16GB 2Rx8 PC4-2666V-R Smart Kit 4 HPE 960 GB Solid State Drive - 2.5" Internal - SATA (SATA/600) - Read Intensive 10
HPE DL38X Gen10 12Gb SAS Expander 1 HPE 96W Smart Storage Battery 145mm Cbl 1 HPE Smart Array P408i-a SR Gen10 Ctrlr 1 HP Raid 6 w/SP Drive 1 FIO Setting 1 HPE 800W FS Plat Ht Plg LH Pwr Sply Kit 2 HPE 2U SFF Easy Install Rail Kit 1 HPE Mobile USB DVDRW Drive 1 HPE 5Y TC Bas wDMR DL380 Gen11 HW SVC 1
HPE iLO Adv 1-svr Lic 3yr Support 1
BUFFALO TECHNOLOGY DRIVESTATION VELOCITY USB 3.0 3 TB 1
Windows OS Licenses (6 Year Life Cycle) Windows Server 2022 License (2 Core License) with 2 year Software Assurance 12
SALEM TRANSIT
Part Number: Description Quantity
SQL Server 2022 MS-SQL Server 2022 License with Software Assurance 1 SQL Server User License CAL 10
Remote Power Reset for Cameras /
UPS
PDU Remote Power Manager 1
SCHNEIDER SMART-UPS 2200VA OL RM LCD 100-127V NT 1
LONDONDERRY EXIT
4 TRANSIT CENTER
BILL OF MATERIALS - LONDONDERRY Exit 4
Part Number: Description Quantity C9200-24P-E Catalyst 9200 24-port PoE+, Network Essentials 1 CON-SNT-C920024P SNTC-8X5XNBD Catalyst 9200 24-port PoE+, Maintenance 1 C9200-NW-E-24 C9200 Network Essentials, 24-port license 1 C9200-NM-4X Catalyst 9200 4 x 10G Network Module 1 PWR-C6-600WAC/2 600W AC Config 6 Power Supply - Secondary Power Supply 1 CAB-TA-NA North America AC Type A Power Cable 2 C9200-DNA-E-24 C9200 Cisco DNA Essentials, 24-Port Term Licenses 1 C9200-DNA-E-24-5Y C9200 Cisco DNA Essentials, 24-Port, 5 Year Term License 1 NETWORK-PNP- LIC Network Plug-n-Play Connect for zero-touch device deployment 1
Hewlett Packard Milestone Recording Server
HPE DL380 Gen11 24SFF CTO Server 1 HPE DL380 Gen11 6126 Xeon-G FIO Kit 1 HPE DL380 Gen10 6126 Xeon-G Kit 1 HPE 16GB 2Rx8 PC4-2666V-R Smart Kit 4 HPE 960 GB Solid State Drive - 2.5" Internal - SATA (SATA/600) - Read Intensive 10
HPE DL38X Gen10 12Gb SAS Expander 1 HPE 96W Smart Storage Battery 145mm Cbl 1 HPE Smart Array P408i-a SR Gen10 Ctrlr 1 HP Raid 6 w/SP Drive 1 FIO Setting 1 HPE 800W FS Plat Ht Plg LH Pwr Sply Kit 2 HPE 2U SFF Easy Install Rail Kit 1 HPE Mobile USB DVDRW Drive 1 HPE 5Y TC Bas wDMR DL380 Gen11 HW SVC 1 HPE iLO Adv 1-svr Lic 3yr Support 1
BUFFALO TECHNOLOGY DRIVESTATION VELOCITY USB 3.0 3 TB 1
Windows OS Licenses Windows Server 2022 License (2 Core License) w/ 2 Yr. Software Assurance 12
SQL Server 2022 MS-SQL Server 2022 License with Software Assurance 1 SQL Server User License CAL 10
Remote Power Reset for Cameras /
UPS:
PDU Remote Power Manager 1
SCHNEIDER SMART-UPS 2200VA OL RM LCD 100-127V NT 1
5 TRANSIT CENTER
BILL OF MATERIALS – LONDONDERRY Exit 5
Part Number: Description Quantity C9200-24P-E Catalyst 9200 24-port PoE+, Network Essentials 2 CON-SNT-C920024P SNTC-8X5XNBD Catalyst 9200 24-port PoE+, Maintenance 2 C9200-NW-E-24 C9200 Network Essentials, 24-port license 2 C9200-NM-4X Catalyst 9200 4 x 10G Network Module 2 PWR-C6-600WAC/2 600W AC Config 6 Power Supply - Secondary Power Supply 2 C9200-DNA-E-24 C9200 Cisco DNA Essentials, 24-Port Term Licenses 2 C9200-DNA-E-24-5Y C9200 Cisco DNA Essentials, 24-Port, 5 Year Term License 2 CAB-TA-NA North America AC Type A Power Cable 4 IW9167EH-B-URWB IW9167, 11ax 6E AP, 8 RF ports, B domain, URWB mode 8 CON-SNT-IW9T67EH SNTC-8X5XNBD IW9167, 11ax 6E AP, 8 RF ports, B domain Device maintenance 8 SWIW9167-URWB-K9 URWB software for IW9167 8 IW9167-URWB- NW-E IW URWB Network Essentials License 8 NETWORK-PNP- LIC Network Plug-n-Play Connect for zero-touch device deployment 8 IOTOD-IW-E-5Y IOTOD IW Essential 5year subscription 8 SVS-IOTOD-ESS Embedded Support for Cisco IOTOD Licenses 8 IW9165DH-B-URWB IW9165, 11ax 6E, directional ant, B dom., URWB SW Version 12 CON-SNT-IW5DHBUB SNTC-8X5XNBD IW9165, 11ax 6E, directional ant, B dom. Maintenance 12 IW9165-URWB- NW-E IW9165 URWB Network Essentials License 12 SWIW9165-URWB-K9 URWB software for IW9165 12 IOTOD-IW-E-5Y IOTOD IW Essential 5year subscription 12 SVS-IOTOD-ESS Embedded Support for Cisco IOTOD Licenses 12 IW-PWRADPT-MFIT4P= Power Adapter, AC-DC, Micro-Fit 4Pin connector 12 GLC-SX-MM-RGD= 1000Mbps Multi-Mode Rugged SFP 1 IW-ACC-PMK1= Pole/Wall Mount Kit for IW9165D with tilt and rotation 12 AIR-ACCPMK3700-2= IW3700 Series Pole-Mount Kit, 2" to 16" 8
FLMESH-HW-HORN-90 FM-HORN-90 16
Londonderry Exit 5 Wireless Devices Bill of Materials
5 TRANSIT CENTER
BILL OF MATERIALS – LONDONDERRY Exit 5
Part Number: Description Quantity
Hewlett Packard Milestone Recording Server
HPE DL380 Gen11 24SFF CTO Server 1 HPE DL380 Gen11 6126 Xeon-G FIO Kit 1 HPE DL380 Gen10 6126 Xeon-G Kit 1 HPE 16GB 2Rx8 PC4-2666V-R Smart Kit 4 HPE 960 GB Solid State Drive - 2.5" Internal - SATA (SATA/600) - Read Intensive 10 HPE DL38X Gen10 12Gb SAS Expander 1 HPE 96W Smart Storage Battery 145mm Cbl 1 HPE Smart Array P408i-a SR Gen10 Ctrlr 1 HP Raid 6 w/SP Drive 1 FIO Setting 1 HPE 800W FS Plat Ht Plg LH Pwr Sply Kit 2 HPE 2U SFF Easy Install Rail Kit 1 HPE Mobile USB DVDRW Drive 1 HPE 5Y TC Bas wDMR DL380 Gen11 HW SVC 1 HPE iLO Adv 1-svr Lic 3yr Support 1
BUFFALO TECHNOLOGY DRIVESTATION VELOCITY USB 3.0 3 TB 1
Windows OS Licenses (6 Year Life Cycle)
Windows Server 2022 License (2 Core License) w/ 2 Yr. Software Assurance 12
SQL Server 2022 MS-SQL Server 2022 License with Software Assurance 1 SQL Server User License CAL 10
Remote Power Reset for Cameras / UPSs:
PDU Remote Power Manager 2
SCHNEIDER SMART-UPS 2200VA OL RM LCD 100-127V NT 2
| 1. Introduction: |
| 2. General Project Description: |
| 3. Other Items: |
| 4. Pre-Bid Meeting and Site Visits: |
| 5. List of Equipment to be Supplied by NH DOT and NH DoIT: |
File details come from the government source that posted it. Updated .