Attachment 1 - 550-319 100pct Specifications Vol 1_rev.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Minor Construction - Danville VAMC - 550-319 Construct Two New Homes 7 & 8
Solicitation number
36C77624B0020
Issued by

About this file

This document is a 100% construction specifications package for the project to construct two new green homes 7 and 8 for the VA Illiana Health Care System in Danville, Illinois.

The key details are:

  • The project will construct two new green homes, each to house 10 patients, as part of the "Small House Model" at the VA Illiana Health Care System in Danville, Illinois.
  • The project has a total performance period of 546 days after receipt of notice to proceed, with alternate bid items that can reduce the performance period down to 472 days.
  • The solicitation includes a base bid and 7 bid alternates that offer different scopes of work and performance periods.
  • The document provides a detailed table of contents and list of drawings covering architectural, structural, civil, mechanical, electrical, and other disciplines.
  • It also includes general requirements such as security, safety, infection control, testing, and submittal procedures.

View the file

Other files

File Type Posted
Amendment0005 - Attachment 34 - SF102.pdf PDF
Amendment0005 - Attachment 33 - Structural Bidding Addendum Set.pdf PDF
Amendment0005 - Attachment 35 - WD - IL - IL20240002 - 8-09-2024.pdf PDF
36C77624B002_Amendment0005.pdf PDF
36C77624B0020_Amendment0004.pdf PDF
Amendment0003 - Attachment 24 - 550-319 Drawings Set_Part 3 Full Size.pdf PDF
Amendment0003 - Attachment 26 - 550-319 Drawings Set_Part 5 Full Size.pdf PDF
Amendment0003 - Attachment 31 - 60 Master.pdf PDF
Amendment0003 - Attachment 28 - 550-319 Drawings Set_Part 7 Full Size.pdf PDF
Amendment0003 - Attachment 22 - 550-319 Drawings Set_Part 1 Full Size.pdf PDF
36C77624B0020_Amendment0003.pdf PDF
Amendment0003 - Attachment 21 - Danville Technical Questions and VA Responses.pdf PDF
Amendment0003 - Attachment 27 - 550-319 Drawings Set_Part 6 Full Size.pdf PDF
Amendment0003 - Attachment 32 - Facility Map.pdf PDF
Amendment0003 - Attachment 23 - 550-319 Drawings Set_Part 2 Full Size.pdf PDF
Amendment0003 - Attachment 29 - 550-319 Drawings Set_Part 8 Full Size.pdf PDF
Amendment0003 - Attachment 30 - Section 01 45 00 - Quality Control.pdf PDF
Amendment0003 - Attachment 25 - 550-319 Drawings Set_Part 4 Full Size.pdf PDF
Amendment0002_Attachment 20 - WD - IL - IL20240002 - 08-02-2024.pdf PDF
36C77624B0020 _Amendment0002.pdf PDF
Amendment0001_ Attachment 19 - 550-319 - Site Visit Sign-in Sheet.pdf PDF
36C77624B0020_Amendment 0001.pdf PDF
Attachment 12 - 550-319 Geotechnical Report_Part2.pdf PDF
Attachment 16 - WD - IL - IL20230002 - 07-05-2024.pdf PDF
Attachment 7 - 550-319 Construction Drawings Set_Part5.pdf PDF
Attachment 11 - 550-319 Geotechnical Report_Part1.pdf PDF
Attachment 4 - 550-319 Construction Drawings Set_Part2.pdf PDF
Attachment 10 - 550-319 Construction Drawings Set_Part8.pdf PDF
Attachment 5 - 550-319 Construction Drawings Set_Part3.pdf PDF
Attachment 3 - 550-319 Construction Drawings Set_Part1.pdf PDF
Attachment 2 - 550-319 100pct Specifications Vol 2_rev.pdf PDF
Attachment 15 - Brand Name JA - Danville - signed.pdf PDF
36C77624B0020.pdf PDF
Attachment 8 - 550-319 Construction Drawings Set_Part6.pdf PDF
Attachment 14 - 019100-General-Commissioning-Reqt.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 18 - Previous RFIs - VA Responses.pdf PDF
Attachment 13 - 550-319 Geotechnical Report_Part3.pdf PDF
Attachment 9 - 550-319 Construction Drawings Set_Part 7.pdf PDF
Attachment 6 - 550-319 Construction Drawings Set_Part4.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT TWO NEW GREEN HOMES

7 & 8

Project # 550-319 For the

VA Illiana Health Care System 1900 E. Main St., Danville, IL 61832

PROJECT MANUAL

VOLUME 1: DIVISIONS 1-12

100% Construction Documents

April 9, 2020

GUIDON DESIGN INC.

PROJECT CONTACTS:

COR / OWNER:

ARCHITECT:

MEP ENGINEER:

VA Illiana Health Care System Attn: Mark Shoviak 1900 E. Main St.

Danville, IL 61832 Phone: 217-554- Email: mark.shoviak@va.gov

GUIDON DESIGN INC.

Attn: Mark Jones 1221 N Pennsylvania St. Suite 200 Indianapolis, Indiana 46202 Phone:

(317) 800-6388 x 153 Email: mjones@guidondesign.com

CMTA, INC.

Attn: Andy Myers 10411 Meeting St.

Prospect, KY 40059 Phone: 502-326-3085 Email: amyers@cmta.com

ISSUE DATE: April 9, 2020

April 9, 2020 100% Construction Documents

09-01-18

VA Illiana Health Care System 550-319 Construct Two New Green Homes 7 & 8 Danville, IL

BID ITEMS

NOTE: A SINGLE AWARD WILL BE MADE ON BID ITEM A BASE BID, BUT IN THE EVENT

THE OFFER EXCEEDS THE FUNDS AVAILABLE, A SINGLE AWARD WILL BE MADE ON BID

ITEM B, BID ITEM C, BID ITEM D, BID ITEM E, BID ITEM F, BID ITEM G OR BID

ITEM H IN THAT ORDER BASED ON AVAILABLE FUNDING. OFFERORS ARE REQUIRED TO

SUBMIT PRICING FOR EACH BID ITEM LISTED.

BASE BID: FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPERVISIO

AND ALL OTHER NECESSARY RESOURCES TO CONSTRUCT TWO GREEN HOMES 7 & 8 AS

REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. PERFORMANCE PERIOD: 546

DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

BID ALTERNATE 1: ALL WORK IN THE BASE BID EXCEPT: CONTRACTOR SHA

REDUCE LANDSCAPING PLANTINGS AND MATERIALS. CONTRACTOR TO REDUCE THE

AMOUNT OF LANDSCAPING AROUND AND ADJACENT TO THE GREEN HOMES. REFERENCE

DRAWING SHEETS DETAILED ON SHEET LP104 FOR MORE INFORMATION. PERFORMANCE

PERIOD: 533 DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

ID ALTERNATE 2: SAME AS BID ALTERNATE 1 EXCEPT: CONTRACTOR SHALL REMOVE

THE ROUNDABOUT FROM THE SITE ACCESS ROADWAY. REFERENCE DRAWING SHEETS

DETAILED ON SHEET LP104 FOR MORE INFORMATION. PERFORMANCE PERIOD: 519

DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

BID ALTERNATE 3: SAME AS BID ALTERNATE 2 EXCEPT: CONTRACTOR SHALL REMOVE

THE BACK CANOPY FROM THE GARDEN PATIO. REFERENCE DRAWING SHEETS AE106,

AE202, AND AE204. PERFORMANCE PERIOD: 500 DAYS AFTER RECEIPT OF NOTICE

TO PROCEEED.

BID ALTERNATE 4: SAME BID ALTERNATE 3 EXCEPT: CONTRACTOR SHALL

REMOVE THE CLERESTORY FROM THE ROOF PROFILE. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED WORK WITH THE CLERSTORY AND CONTINUNE ROOF TRUSSES AND

SHINGLE ROOF AS SHOWN. PROVIDE LAY-IN STYLE CEILING AS SHOWN IN LIEU IF

GYPSUM BOARD CEILING. REFERENCE DRAWING SHEETS AE107, AE202, AE204, AND

AE205 FOR MORE INFORMATION. PERFORMANCE PERIOD: 472 DAYS AFTER RECEIPT

OF NOTICE TO PROCEEED.

BID SCHEDULE

VA Illiana Health Care System April 9, 2020 550-319 100% Construction Documents Construct Two New Green Homes 7 & 8 09-01-18 Danville, IL

BID ALTERNATE 5: SAME AS BID ALTERNATE 4 EXCEPT: CONTRACTOR SHA

FURTHER REDUCE LANDSCAPING PLANTINGS AND MATERIALS, REFER TO CHANGES

DETAILED ON SHEET. REFERENCE DRAWING SHEET LP105 FOR MORE INFORMATION.

PERFORMANCE PERIOD: 472 DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

BID ALTERNATE 6: SAME AS BID ALTERNATE 5 EXCEPT: CONTRACTOR ALL

REMOVE MANHOLE CONDUIT BANK AND RUN FROM GENERATOR CONTRACTOR.

REFERENCE DRAWING SHEETS CU101 FOR MORE INFORMATION. PERFORMANCE

PERIOD: 472 DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

BID ALTERNATE 7: SAME AS BID ALTERNATE 6 EXCEP CONTRACTOR SHALL

REMOVE STREET LIGHTING ALONG NEW DRIVE. REMOVE ALL ASSOCIATED WORK.

REFERENCE DRAWING SHEETS CS101, CU101, AND UE101 FOR MORE INFORMATION.

PERFORMANCE PERIOD: 472 DAYS AFTER RECEIPT OF NOTICE TO PROCEEED.

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

Volume 1

DIVISION 00 - SPECIAL SECTIONS DATE

00 00 00 Cover Sheet 00 01 10 Table of Contents 10-17 00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18 01 12 16 Work Schedules 01 21 17 Job Meetings 01 32 16.01 Architectural and Engineering CPM Schedules 01-11 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 24 Electronic Submittals 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements -1

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 08-16 02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 07-19

DIVISION 04 – MASONRY Not Used

04 05 13 Masonry Mortaring 04 05 16 Masonry Grouting 04 20 00 Unit Masonry 04 43 13.16 Adhered Stone Masonry Veneer

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 10-2

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 02-16 05 36 00 Composite Metal Decking 10-15 05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Sheathing 02-16 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 00 Sheet Waterproofing 04-13 07 21 13 Thermal Insulation 10-17 07 21 19 Foamed in-Place Insulation 07 22 00 Roof and Deck Insulation 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 31 13 Asphalt Shingles 02-16 07 46 46 Fiber Cement Siding 07 53 23 Ethylene Propylene Diene Monomer Roofing 07 60 00 Flashing and Sheet Metal 07-14 07 71 00 Roof Specialties 10-15 07 72 33 Roof Hatch 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 34 53 Floor Doors and Frames 08 36 13 Sectional Doors 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 52 00 Wood Windows 08 51 13 Aluminum Windows 02-16 08 71 00 Door Hardware 08-19 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 10-3

09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 30 90 Electric Fireplaces 10 44 13 Fire Extinguisher Cabinets 08-18 10 75 00 Flagpoles 02-16

DIVISION 11 – EQUIPMENT

11 44 00 Food Cooking Equipment 11-11 11 48 00 Cleaning and Disposal Equipment 11-11 11 73 00 Ceiling Mounted Patient Lift System 01-17 11 79 13 Hydrotherapy Equipment

DIVISION 12 – FURNISHINGS

12 22 16 Drapery Track & Accessories 12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 10-15 12 35 70.21 Medication Cabinet 02-16 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

VOLUME 2

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 10-4

22 08 00 Commissioning of Plumbing Systems 22 11 00 Facility Water Distribution 09-15 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 13 23 Sanitary Waste Interceptors 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-15 22 40 00 Plumbing Fixtures 09-15 22 42 26 Commercial Disposers 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 11 23 Facility Natural-Gas Piping 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 23 00 Refrigerant Piping 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 37 00 Air Outlets and Inlets 02-15 23 38 13 Commercial-Kitchen Hoods 01-11 23 40 00 HVAC Air Cleaning Devices 02-12 23 70 00 Variable Refrigerant Flow 01-20 23 72 00 Air-to-Air Energy Recovery Equipment 05-11 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11

DIVISION 25 – INTEGRATED AUTOMATION – Not Used

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 08 00 Commissioning of Electrical Systems 11-16 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 10-5

26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 13 00 Physical Access Control Systems 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 31 40 High Security Fences and Gates 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-18

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET

GI101 LIFE SAFETY- FIRST FLOOR PLAN

GI102 LIFE SAFETY- MECHANICAL PENTHOUSE

CIVIL

CI001 CIVIL GENERAL NOTES

VF101 TOPOGRAPHIC SURVEY

CD101 SITE DEMOLITION PLAN

CS101 SITE LAYOUT PLAN

CS102 JOINTING PLAN

CS103 SITE PLAN - ALTERNATE DEDUCT #2

CS201 ROAD PLAN AND PROFILE

CS202 ROAD TYPICAL SECTIONS

CS501 SITE DETAILS

CS502 SITE DETAILS

CS503 SITE DETAILS

CG101 SITE GRADING PLAN

CU101 SITE UTILITY PLAN

CU102 SITE UTILITY PLAN

CU501 UTILITY DETAILS

CU502 UTILITY DETAILS

CJ101 EROSION AND SEDIMENT CONTROL PLAN

CJ501 EROSION CONTROL DETAILS

CJ502 EROSION CONTROL DETAILS

LANDSCAPE

LP101 OVERALL LANDSCAPE PLAN

LP102 LANDSCAPE PLAN - BLDG 7

LP103 LANDSCAPE PLAN - BLDG 8

LP104 LANDSCAPE PLAN - ALTERNATE DEDUCT 1

LP105 LANDSCAPE PLAN - ALTERNATE DEDUCT 5

LP501 LANDSCAPE DETAILS

STRUCTURE

SI001 STRUCTURAL ABBREVIATIONS AND SYMBOLS

SI002 STRUCTURAL GENERAL NOTES

SI003 LOAD MAPS

SB101 FOUNDATION PLAN

SB102 SLAB ON GRADE PLAN

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 15 - 2

SB501 FOUNDATION SECTIONS AND DETAILS

SF101 FRAMING PLAN

SF102 ROOF TRUSS PLAN

SF103 CLADDING AND COMPONENTS DESIGN PRESSURES

SF201 BRACE FRAME ELEVATIONS

SF202 TRUSS PROFILES

SF203 TRUSS PROFILES

SF501 FRAMING SECTIONS AND DETAILS

SF502 FRAMING SECTIONS AND DETAILS

ARCHITECTURAL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AE101 FIRST FLOOR ARCHITECTURAL PLAN

AE102 FIRST FLOOR DIMENSIONS PLAN

AE103 MECHANICAL PENTHOUSE ARCHITECTURAL PLAN

AE104 MECHANICAL PENTHOUSE DIMENSIONS PLAN

AE105 ROOF PLAN - BASE BID

AE106 ROOF PLAN - ALTERNATE DEDUCT #3

AE107 ROOF PLAN - ALTERNATE DEDUCT #4

AE111 FIRST FLOOR REFLECTED CEILING PLAN

AE112 MECHANICAL PENTHOUSE REFLECTED CEILING PLAN

AE201 BUILDING ELEVATIONS - NORTH & SOUTH - BASE BID

AE202 BUILDING ELEVATIONS - SOUTH - ALTERNATE DEDUCT #3 & #4

AE203 BUILDING ELEVATIONS - EAST & WEST - BASE BID

AE204 BUILDING ELEVATIONS - EAST - ALTERNATE DEDUCT 3 & 4

AE205 BUILDING ELEVATIONS - WEST - ALTERNATE DEDUCT #4

AE301 BUILDING SECTIONS - AT CANOPIES

AE302 BUILDING SECTIONS - AT CLERESTORY

AE303 BUILDING SECTIONS

AE311 EXTERIOR WALL SECTIONS

AE312 EXTERIOR WALL SECTIONS

AE313 EXTERIOR WALL SECTION AND DETAILS

AE314 WALL SECTION DETAILS

AE315 WALL SECTION DETAILS

AE321 STAIR SECTIONS, PLANS AND DETAILS

AE501 BUILDING DETAILS

AE502 BUILDING DETAILS

AE601 DOOR SCHEDULES AND DETAILS

AE602 WINDOW SCHEDULE AND DETAILS

AE900 PERSPECTIVES

AI101 FINISH FLOOR TREATMENT PLAN

AI201 INTERIOR FINISHES ELEVATIONS

AI202 INTERIOR FINISHES ELEVATIONS

AI203 INTERIOR FINISHES ELEVATIONS

AI204 INTERIOR FINISHES ELEVATIONS

AI501 INTERIOR FINISHES DETAILS

AI502 CASEWORK DETAILS

AI601 FINISHES SCHEDULE

AI901 SIGNAGE PLAN

QH101 EQUIPMENT FLOOR PLAN & SCHEDULE

QH201 ENLARGED EQUIPMENT PLANS AND ELEVATIONS

QH202 ENLARGED EQUIPMENT PLANS AND ELEVATIONS

Construct Two New Green Homes 7 & 8 10-01-17 Danville, IL

00 01 15 - 3

FIRE PROTECTION

FP101 FIRE PROTECTION PLAN

PLUMBING

PL000 PLUMBING LEGEND

PL100 PLUMBING UNDERGROUND PLAN

PL101 PLUMBING FIRST FLOOR PLAN

PL102 PLUMBING ISOMETRICS

PL103 PLUMBING DETAILS

MECHANICAL

ML100 MECHANICAL LEGEND AND GENERAL NOTES

MH101 FIRST FLOOR PLAN - AIR DISTRIBUTION

MH102 ENLARGED FIRST FLOOR PLAN - AIR DISTRIBUTION

MH103 ENLARGED MECHANICAL ROOM PLAN

MH104 ROOF PLAN - MECHANICAL

MP101 FIRST FLOOR PLAN - HYDRONICS

MI200 MECHANICAL DETAILS

MI201 MECHANICAL DETAILS

MI202 CONTROL SCHEMATICS

MI203 MECHANICAL PIPING SCHEMATICS

MI204 MECHANICAL SCHEDULES

MI205 MECHANICAL SCHEDULES

ELECTRICAL

EI001 ELECTRICAL LEGEND

UE001 ELECTRICAL SITE PLAN

EL101 FLOOR PLAN - LIGHTING

EP101 FLOOR PLAN - POWER

EP102 ROOF PLAN - POWER

ES101 ELECTRICAL SYSTEMS

EI200 ELECTRICAL SCHEDULES & DETAILS

EI201 ELECTRICAL DETAILS

EI202 ELECTRICAL POWER RISER

EI203 PANEL SCHEDULES

- - - END - - -

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 550-319 Construct Two Green Homes 7 & 8, as required by drawings and specifications.

B. Visits to the site by Offerors shall be as specified in solicitation provision 52.236-27 Site Visit.

C. Offices of Guidon Design, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his/her duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the COR the site in time to observe testing laboratory personnel in the taking and testing of specimens and field inspection. Such prior notice shall be not less than three business days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

F. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2)) will maintain a presence at the work site whenever the general or subcontractors are present.

G. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge. Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3)business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.

H. Training:

1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.

2. GC’s superintendent(s)/Project Manager shall have completed the 30-hour construction training OSHA certification. The GC shall submit an appointment letter on the General Contractor’s company letter head containing, the name of the designated OSHA certified superintendent(s), Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-2 state the name of the Competent Person (if different than the superintendent), as well as credentials for both. The letter shall be accompanied by a copy of the individual(s) safety training records.

3. Submit training records of all such employees for approval before the start of work.

4. All personnel working on VA property are required to complete VA Privacy training.

I. VHA Directive 2011-36, Safety and Health during Construction, dated 9/22/2011 in its entirety is made a part of this section.

1.2 STATEMENT OF BID ITEM(S)

A. The Statement of Bid Items(s) is located within the solicitation Information and Instructions to Bidder section.

ALL PRICING IS TO BE ENTERED IN BLOCK 17 OF THE SF1442 SOLICITATION

OFFER PAGE (BLOCK 17) OR THE BID SHCEDULE IF SO INCLUDED WITH THE

SOLICITATION.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor’s expense.

1.4 ADMINISTRATIVE WORKING HOURS

A. Administrative working hours for the Medical Center are normally between the hours of 8:00 A.M. to 4:30 P.M. excluding Saturday and Sunday. If the Contractor desires to work during periods other than above, the Contractor shall make his/her request to the COR three (3) days in advance of his/her intention to work during other periods and wait for approval from the COR.

B. No work will be scheduled on the following federal holidays or any other day specifically declared a federal holiday by the President of the United States.

Labor Day Columbus Day Veterans Day Thanksgiving Day

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth Independence Day

Christmas Day

1.5 CONSTRUCTION SECURITY, SAFETY AND HEALTH REQUIREMENTS

A. The Security and Safety Requirements pertains to station policy for construction projects performed at the VA Illiana Health Care System, Danville, IL. Safety and health concerns are taken seriously at this facility. All employees of the Contractor are expected to strictly adhere to these regulations and requirements. This is exceedingly important, since we must be primarily concerned for the safety and health of our patients. In

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-3 this regard, OSHA Standards may protect worker safety and health, but they have minimal benefit for protecting the safety and health of our patients, due primarily to their differing medical conditions. Review this information as orientation with your personnel performing work on site. Where the requirements as outlined in this or other regulations are differing, the more stringent shall apply.

B. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

C. Security Procedures:

1. Secure all construction areas, especially mechanical and electrical rooms against entry of unauthorized individuals including patients.

2. Unless specified, working hours other than regular working hours will require authorization by the contracting officer.

Regular work hours for the medical center are Monday–Friday, 7:30 a.m. to 4:00 p.m..

3. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

4. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 working days’ notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

5. No photography of VA premises is allowed without written permission of the Contracting Officer.

6. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

D. Key Control:

1. The general contractor's superintendent will be issued necessary keys daily for those areas outside the construction

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-4 barriers that require their access (i.e. utility closets, electrical closets, mechanical spaces, etc.) and return these keys at the end of each business day. No more than two keys/day will be issued. The Engineering Office will maintain a logbook to account for these keys. Contractors that fail to return these keys will be assessed a $25.00 charge.

2. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons (i.e. patients, staff).

3. The General Contractor shall provide security locks for the construction area. Duplicate keys or lock combinations are to be provided to the COR for the purpose of security inspections of every area of the project including tool boxes, powered equipment, and parked machines and take any emergency action.

E. Motor Vehicle Restrictions

1. Contractor and associated sub-contractor vehicles shall be parked within the staging area of the project. The staging area shall be determined at the time of the pre-bid meeting.

Parking in patient/visitor/staff will require a request and approval for such parking through the COR.

F. General Safety:

1. Follow all federal, state and local safety and health regulations.

2. Maintain safety in the construction site/area in accordance with the provisions of the contract that includes the Occupational Safety and Health Administration (OSHA) Regulations; National Electrical Codes; National Fire Protection Association, etc . Work in a safe manner and take all proper precautions while performing your work. Extra precautions shall be taken when working around persons occupying the building during construction.

3. Provide Personal Protective Equipment (PPE) for your employees.

4. Post appropriate signs in specific hazardous areas.

5. Tools, ladders, etc. are to be secured when not in use.

6. Weekly Safety Inspections: The Construction Safety Committee at this facility will perform safety inspections of all contract operations periodically throughout the month. Written reports of unsafe practices or conditions will be reported to the COR and Contracting Officer for immediate attention and resolution.

G. Environmental Protection:

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-5

1. No hazardous materials will be disposed of on Government property. All waste will be hauled off-site or disposed in contractor owned and operated waste removal containers.

2. A copy of all waste manifests for special or hazardous wastes will be forwarded to the COR. Environmental requirements will be strictly enforced.

H. Fire Alarms:

1. The General Contractor is responsible for reviewing locations of fire alarm systems within their construction area.

2. In the event of a fire alarm sounding, you are to remain in your area, unless medical center personnel (Safety, Nursing or Engineering) instruct otherwise, or unless a fire situation is in your area, in which case you should immediately evacuate.

3. Any work involving the fire protection systems will require written permission to proceed from the COR and requires 48 hours’ notice. An impairment number will be issued through the COR by the Fire Safety Manager.

4. Do not tamper with or otherwise disturb any fire alarm system components without prior written permission. To do so without written permission will result in an adverse action.

5. Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks.

Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.

I. Permit Required Confined Spaces:

1. Contractors performing work on this facility will follow all requirements outlined in OSHA Standards for working in confined spaces. There are numerous permits required for confined spaces on this facility. These spaces have been identified. Some spaces have been posted, but the majority have not due to their configuration. A complete listing of these areas will be provided upon request by the contractor at the NTP meeting.

2. Confined spaces are areas that are large enough to be entered have limited egress/exit potential and are not designed for permanent human occupancy. If you encounter any space that meets this definition, and if it is a suspected confined space, please contact the COR.

3. Contractors performing work in confined spaces are responsible for compliance with all applicable standards and regulations.

J. Housekeeping:

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-6

1. Protect patients and VA personnel in occupied areas from the hazards of dust, noise, construction debris and material associated with a construction environment. Keep work area clear, clean and free of loose debris, construction materials and partially installed work that would create a safety hazard or interfere with VA personnel duties and traffic.

2. Clean and remove any accumulation of dust/debris from any surface at the end of each workday.

3. Make every effort to keep dust and noise to a minimum at all times. Take special precautions to protect VA equipment from damage including excessive dust.

4. Maintain clear access to mechanical, electrical devices, equipment and main corridors. This will ensure access to existing systems in the event of an emergency.

5. Clean area of all construction debris and dust upon completion of demolition and/or renovation.

6. During construction operations, keep existing finishes protected from damage. Cover and protect all flooring materials during construction. Any flooring materials or surfaces damaged as a result of construction activities will be replaced at the expense of the contractor.

K. Emergency Medical Services: Emergency medical services for stabilization purposes are available for contractors at this facility. For medical emergencies, dial “0” when inside any building. Report the nature of the emergency and location. The operator will dispatch in-house personnel or coordinate an outside emergency assistance based on the nature of the emergency.

L. Use of Government-Owned Material and Equipment: Use of Government-owned material and equipment is prohibited.

M. Superintendent Communications: At all times during the performance of this contract, the Contractors Superintendent is to be on site and available by cellular phone. At the beginning of the contract and prior to beginning any construction, supply the COR with the telephone number for the Superintendent.

N. Traffic:

1. Traffic hazards are minimal at this facility. Drivers should be particularly concerned with pedestrian traffic.

2. Seat belt use is mandatory on the station.

3. Federal police officers maintain a 24-hour patrol of the area.

O. Contractor's Trailers: Contractor's trailers shall be located at the area assigned. All utility connections to the trailer shall

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-7 be installed at the contractor expense. Trailer removal is required upon completion of the contract, unless approved by the CO to leave in place.

P. Smoking: VA Illiana Health Care System is a smoke-free campus.

Any smoking inside a government building or on the campus grounds is subject to a fine without warning.

1.6 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-2009 .......... Surface Burning Characteristics of Building Materials

2. National Fire Protection Association (NFPA):

NFPA 10 ........... Standard for Portable Fire Extinguishers

NFPA 30 ........... Flammable and Combustible Liquids Code

NFPA 51B .......... Standard for Fire Prevention During Welding, Cutting and Other Hot Work

NEC 70 ............ National Electrical Code

NFPA 241 .......... Standard for Safeguarding Construction, Alteration, and Demolition Operations

NFPA 101 …………………………………. Life Safety Code

NFPA 99…………………………………….Health Care Facilities

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 ....... Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to beginning work, all the contractor’s employees and the sub-contractors shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-8

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Fire Protection During Construction:

1. Coordinate with the facility prior to and concurrent with design.

2. In the event that the fire protection systems within the construction space are disabled, one-hour fire protection is required from floor to deck per NFPA requirements.

3. Coordinate construction as necessary to ensure that obstruction of any exit is minimized or avoided. If exits are obstructed during construction, provide alternate exit routes during each phase of construction and identify the alternate routes on the construction drawings.

4. Minimize or avoid disruptions to fire alarm and sprinkler systems. Delineate phasing of construction to ensure that installations of new systems are expedited, and where possible, maintain existing systems in service until the replacement system is operational. If fire protection systems are to be disrupted, ensure procedures are incorporated to maintain equivalent levels of fire protection and provide formal notification to the facility while systems are down.

5. Separations are to be maintained daily by the contractor

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR. When necessary an Interim Life Safety Measure (ILSM) survey will be provided by the Life Safety Manager. This document will be adhered to the construction barrier as with locations identified by the COR.

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Contractor shall report findings and corrective actions weekly to COR.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-9

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

K. Coordinate with COR for modifications to sprinkler system so as to maintain fire protection to all portions of the building. 48 hours prior to shutting down any and all fire protection devises, submit a verbal request to the COR. An impairment number will be issued by the facility Life Safety manager for a period not to exceed four hours. Anticipated shutdowns of these systems will require written notice five days prior to the anticipated shutdown.

L. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COR and facility Safety Officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.

M. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR and facility Safety Officer.

N. Hot Work: Any hot work operations including cutting, welding, thermal welding, brazing, soldering, grinding, thermal spraying, thawing pipes or any other similar activity, will require a Hot Work Permit to be obtained from the COR. The Contractor will be responsible for conforming to all Medical Center regulations, policies and procedures concerning Hot Work Permits as outlined below:

a. Prior to the performance of hot work in occupied buildings, a request for a Hot Work Permit will be made to the COR.

b. The COR will inspect the area and ensure that the requirements of NFPA 241, 51b and OSHA standards have been satisfied. Approved Hot Work Permits will be posted in the immediate area of the work.

c. The Hot Work Permit will apply only to the location and work identified on the permit. If additional areas involve hot work, additional permits must be requested.

d. Upon completion of all hot work, the COR will be notified by the responsible individual to perform a re-inspection of the area.

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-10

1. Do not use any of the extinguishers in the medical center for standby purpose while conducting hot work. Contractors are required to supply their own Class ABC extinguishers. Medical center extinguishers are only to be used in the event of a fire.

2. Hot work is not permitted on any roofing area unless authorized by the Authority Having Jurisdiction.

O. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COR and facility Safety Officer.

P. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing building or grounds and additions under construction. Smoking is prohibited on station except in designated smoking areas.

Q. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

R. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

S. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.

1.7 OPERATIONS AND STORAGE AREAS

A. Working space and space available for storing materials shall be as determined by the COR.

B. Workmen are subject to rules of Medical Center applicable to their conduct.

C. Keep roads clear of construction material, debris, standing construction equipment and vehicles at all times.

D. Execute work in such a manner as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas in quantities sufficient for not

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-11 more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

E. Phasing requirements: To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates as required by the drawings on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

F. Coordinate with COR for removal of existing furnishings and equipment to permit Work to proceed. Contractor shall provide the COR with a copy of their LOTO procedure within ten days of receiving the NTP.

G. Building(s) will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in the affected areas of construction against dust and debris, so that any equipment and affected areas of the occupied Medical Center Operations will not be hindered. Contractor shall permit access to the Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.

Coordinate alteration work with the COR in areas occupied by Department of Veterans Affairs in order to facilitate uninterrupted Medical Center operations during the construction period.

2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.

H. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven-foot) minimum height, around each construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (fifteen-inches). Bottom of fences shall extend to 25mm (one-inch) above grade. The Contractor shall be responsible for control over access to the site and keep gates closed at all times during working hours and shall secure them with locks at

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-12 the end of each work day and outside of working hours. Remove the fence when directed by COR.

I. When a building or construction site is turned over to Contractor, Contractor shall accept entire responsibility therefore.

1. Contractor shall maintain a minimum inside temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services as required by the drawings and specifications. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval.

2. Contractor shall submit a request to interrupt any such services to the COR, in writing, a minimum of two (2) working days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. Interruptions that affect the daily operations of the facility are to be performed on non-business days.

Contractor is responsible for the cost of performing this work on weekends or off hours.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-13 at other than Contractor's normal working hours at the contractor’s expense.

4. Major interruptions of any system must be requested, in writing, a minimum of at least 15 work days prior to the desired time and shall be performed in cooperation with the COR and facility maintenance department during non-business days and at the expense of the contractor.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed as per the bid documents, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces. All abandoned lines that remain in place are to be tagged as “abandoned in place” and dated. All abandoned lines are to be documented on the as-built drawings.

L. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

M. Hazardous Communication (HAZCOM): Contractor is to comply with the requirements for HAZCOM as per OSHA 1926 standards applicable to hazardous materials. SDS’ are to be readily available to all employees of the GC and employees of VA. Prior to performing work that could result in dust, chemicals, fumes, etc. entering any occupied space, the GC shall notify the COR 48 hours in advance.

Written approval from the COR is required prior to proceeding with the operation.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk Assessment (ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-14

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group as specified here. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COR and Facility ICRA team for review for compliance with contract requirements in accordance with Section 01 33 23, Shop Drawings, and Product Data And Samples and Section 01 33 24.

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical Center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, the following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by COR. Contractor shall blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

2. Do not perform dust producing tasks within occupied areas without the approval of the COR. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:

a. Provide dust proof one-hour fire-rated temporary drywall construction barriers from floor to deck to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied

Construct Two New Green Homes 7 & 8 Danville, IL

01 00 00-15 side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access.

Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier from floor to deck meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the COR and Medical Center.

b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings.

Install HEPA (High Efficiency…