36C77624B0020_Amendment 0001.pdf

PDF 201 KB Posted

Attached to
Y1DZ--Minor Construction - Danville VAMC - 550-319 Construct Two New Homes 7 & 8
Solicitation number
36C77624B0020
Issued by

About this file

This document is an amendment to Solicitation Number 36C77624B0020 for the "550-319 Construct Two New Green Homes 7 & 8 (Minor)" project at the Illiana VA Medical Center in Danville, Illinois. The amendment provides the Site Visit Sign-In sheet as Attachment 19 and confirms that the cutoff date for technical questions remains July 26, 2024 at 2:00pm EDT, and the due date for receipt of offers is August 13, 2024 at 2:00pm EDT. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

File Type Posted
Amendment0005 - Attachment 34 - SF102.pdf PDF
Amendment0005 - Attachment 33 - Structural Bidding Addendum Set.pdf PDF
Amendment0005 - Attachment 35 - WD - IL - IL20240002 - 8-09-2024.pdf PDF
36C77624B002_Amendment0005.pdf PDF
36C77624B0020_Amendment0004.pdf PDF
Amendment0003 - Attachment 24 - 550-319 Drawings Set_Part 3 Full Size.pdf PDF
Amendment0003 - Attachment 26 - 550-319 Drawings Set_Part 5 Full Size.pdf PDF
Amendment0003 - Attachment 31 - 60 Master.pdf PDF
Amendment0003 - Attachment 28 - 550-319 Drawings Set_Part 7 Full Size.pdf PDF
Amendment0003 - Attachment 22 - 550-319 Drawings Set_Part 1 Full Size.pdf PDF
36C77624B0020_Amendment0003.pdf PDF
Amendment0003 - Attachment 21 - Danville Technical Questions and VA Responses.pdf PDF
Amendment0003 - Attachment 27 - 550-319 Drawings Set_Part 6 Full Size.pdf PDF
Amendment0003 - Attachment 32 - Facility Map.pdf PDF
Amendment0003 - Attachment 23 - 550-319 Drawings Set_Part 2 Full Size.pdf PDF
Amendment0003 - Attachment 29 - 550-319 Drawings Set_Part 8 Full Size.pdf PDF
Amendment0003 - Attachment 30 - Section 01 45 00 - Quality Control.pdf PDF
Amendment0003 - Attachment 25 - 550-319 Drawings Set_Part 4 Full Size.pdf PDF
Amendment0002_Attachment 20 - WD - IL - IL20240002 - 08-02-2024.pdf PDF
36C77624B0020 _Amendment0002.pdf PDF
Amendment0001_ Attachment 19 - 550-319 - Site Visit Sign-in Sheet.pdf PDF
Attachment 12 - 550-319 Geotechnical Report_Part2.pdf PDF
Attachment 16 - WD - IL - IL20230002 - 07-05-2024.pdf PDF
Attachment 7 - 550-319 Construction Drawings Set_Part5.pdf PDF
Attachment 1 - 550-319 100pct Specifications Vol 1_rev.pdf PDF
Attachment 11 - 550-319 Geotechnical Report_Part1.pdf PDF
Attachment 4 - 550-319 Construction Drawings Set_Part2.pdf PDF
Attachment 10 - 550-319 Construction Drawings Set_Part8.pdf PDF
Attachment 5 - 550-319 Construction Drawings Set_Part3.pdf PDF
Attachment 3 - 550-319 Construction Drawings Set_Part1.pdf PDF
Attachment 2 - 550-319 100pct Specifications Vol 2_rev.pdf PDF
Attachment 15 - Brand Name JA - Danville - signed.pdf PDF
36C77624B0020.pdf PDF
Attachment 8 - 550-319 Construction Drawings Set_Part6.pdf PDF
Attachment 14 - 019100-General-Commissioning-Reqt.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 18 - Previous RFIs - VA Responses.pdf PDF
Attachment 13 - 550-319 Geotechnical Report_Part3.pdf PDF
Attachment 9 - 550-319 Construction Drawings Set_Part 7.pdf PDF
Attachment 6 - 550-319 Construction Drawings Set_Part4.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 550-319

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77624B0020

07-11-2024

X

X X

August 13, 2024 2:00pm EDT (1:00pm CDT)

X 1

**** See Continuation Page ****

Maria Rodeffer Contracting Officer

VA VHA RPOC 2023-0094

DATE SIGNED PAGE OF PAGES

AMENDMENT OF SOLICITATION

SEE BLOCK 16C 2 2

SOLICITATION NUMBER: 36C77624B0020

AMENDMENT NUMBER: 0001

CONTRACT TITLE: “550-319 Construct Two New Green Homes 7 & 8 (Minor)”

LOCATION: Illiana VA Medical Center 1900 East Main St. Danville, IL 61832

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Continued)

A. SCOPE OF WORK:

1. The purpose of this Amendment is to post the Site Visit Sign – In sheet see Attachment 19 - 550-319 - Site Visit Sign-in Sheet .

2. The cutoff for Technical Questions remains the same: July 26, 2024, at 2:00PM EDT (1:00PM CDT)

3. The date specified for Receipt of Offers remains the same: August 13, 2024, 2:00pm EDT (1:00pm

CDT).

B. CLOSING STATEMENT:

All other terms and conditions of the solicitation remain the same.

CONTINUATION PAGE

End of Document

See attached document: Attachment 19 - 550-319 Site Visit Sign-in Sheet.

“550-319 Construct Two New Green Homes 7 & 8”

2024-07-18T17:08:03-0400
MARIA RODEFFER

File details come from the government source that posted it. Updated .