This document is Amendment 0003 to Attachment 29 of the 550-319 Drawings Set for Solicitation 36C77624B0020, which is a minor construction project for the Department of Veterans Affairs (VA) to construct two new green homes at the Danville VA Medical Center.

The key details are: The solicitation is for the construction of two new homes (7 and 8) at the Danville VAMC, with questions due by July 26, 2024 at 2:00 pm EDT and bids due on August 13, 2024 at 2:00 pm EDT. All questions and bids must be submitted via email to the specified VA contracting points of contact. The solicitation is being issued by the VA Technology Acquisition Center in Austin, TX, which is a civilian federal agency. No additional details about the construction requirements, pricing, set-asides, or incumbents are provided in this particular document.

View the file

Other files

File Type Posted
Amendment0005 - Attachment 34 - SF102.pdf PDF
Amendment0005 - Attachment 33 - Structural Bidding Addendum Set.pdf PDF
Amendment0005 - Attachment 35 - WD - IL - IL20240002 - 8-09-2024.pdf PDF
36C77624B002_Amendment0005.pdf PDF
36C77624B0020_Amendment0004.pdf PDF
Amendment0003 - Attachment 24 - 550-319 Drawings Set_Part 3 Full Size.pdf PDF
Amendment0003 - Attachment 26 - 550-319 Drawings Set_Part 5 Full Size.pdf PDF
Amendment0003 - Attachment 31 - 60 Master.pdf PDF
Amendment0003 - Attachment 28 - 550-319 Drawings Set_Part 7 Full Size.pdf PDF
Amendment0003 - Attachment 22 - 550-319 Drawings Set_Part 1 Full Size.pdf PDF
36C77624B0020_Amendment0003.pdf PDF
Amendment0003 - Attachment 21 - Danville Technical Questions and VA Responses.pdf PDF
Amendment0003 - Attachment 27 - 550-319 Drawings Set_Part 6 Full Size.pdf PDF
Amendment0003 - Attachment 32 - Facility Map.pdf PDF
Amendment0003 - Attachment 23 - 550-319 Drawings Set_Part 2 Full Size.pdf PDF
Amendment0003 - Attachment 30 - Section 01 45 00 - Quality Control.pdf PDF
Amendment0003 - Attachment 25 - 550-319 Drawings Set_Part 4 Full Size.pdf PDF
Amendment0002_Attachment 20 - WD - IL - IL20240002 - 08-02-2024.pdf PDF
36C77624B0020 _Amendment0002.pdf PDF
Amendment0001_ Attachment 19 - 550-319 - Site Visit Sign-in Sheet.pdf PDF
36C77624B0020_Amendment 0001.pdf PDF
Attachment 12 - 550-319 Geotechnical Report_Part2.pdf PDF
Attachment 16 - WD - IL - IL20230002 - 07-05-2024.pdf PDF
Attachment 7 - 550-319 Construction Drawings Set_Part5.pdf PDF
Attachment 1 - 550-319 100pct Specifications Vol 1_rev.pdf PDF
Attachment 11 - 550-319 Geotechnical Report_Part1.pdf PDF
Attachment 4 - 550-319 Construction Drawings Set_Part2.pdf PDF
Attachment 10 - 550-319 Construction Drawings Set_Part8.pdf PDF
Attachment 5 - 550-319 Construction Drawings Set_Part3.pdf PDF
Attachment 3 - 550-319 Construction Drawings Set_Part1.pdf PDF
Attachment 2 - 550-319 100pct Specifications Vol 2_rev.pdf PDF
Attachment 15 - Brand Name JA - Danville - signed.pdf PDF
36C77624B0020.pdf PDF
Attachment 8 - 550-319 Construction Drawings Set_Part6.pdf PDF
Attachment 14 - 019100-General-Commissioning-Reqt.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 18 - Previous RFIs - VA Responses.pdf PDF
Attachment 13 - 550-319 Geotechnical Report_Part3.pdf PDF
Attachment 9 - 550-319 Construction Drawings Set_Part 7.pdf PDF
Attachment 6 - 550-319 Construction Drawings Set_Part4.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SA

SA

RA

SA

EA

OA

TA

FD

SD

FSD

RA

RA

EA

EA

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

LINEAR SLOT DIFFUSER

TS

FS

PS

SA AIR DUCT TURNING UP

SA AIR DUCT TURNING DOWN

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

AUTOMATIC AIR VENT

BALANCING VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

FLEXIBLE PIPE CONNECTION

FLOW METER (VENTURI)

FLOW SWITCH

PRESSURE SWTICH

TAMPER SWITCH

THERMOMETER

FLEXIBLE DUCT

DOUBLE CHECK VALVE ASSEMBLY

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

OUTSIDE AIR DUCT

TRANSFER AIR DUCT

PIPING UNION

FIRE DAMPER

SMOKE DAMPER

COMBINATION FIRE/SMOKE DAMPER

PETE'S PLUG

MANUAL AIR VENT

TRIPLE DUTY VALVE

MANUAL ISOLATION VALVE

GLOBE VALVE

OS&Y (GATE) VALVE

AUTO-FLOW CONTROL VALVE

VOLUME DAMPER

PIPE ELBOW TURNING UP/TURNING DOWN

PIPE TEE TURNING UP/TURNING DOWN

HVAC LEGEND

X TAGGED NOTE DESIGNATOR

REVISION DESIGNATOR

STRAINER

PRESSURE REDUCING VALVE (STEAM, GAS, WATER, ETC.)

MOTORIZED DAMPER

RA AIR DUCT TURNING UP

RA AIR DUCT TURNING DOWN

EA AIR DUCT TURNING UP

EA AIR DUCT TURNING DOWN

EQUIPMENT TAG DESIGNATOR (BUILDING NO. - ITEM - ITEM NUMBER)

T THERMOSTAT

TEMPERATURE SENSOR

XX—XX —XX

H HUMIDISTAT

T

X

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,

TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM

COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIALLY LEFT BLANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED

BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

HVAC ABBREVIATIONS

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:1

A

M

ML100

MECHANICAL LEGEND AND

GENERAL NOTESGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

MECHANICAL GENERAL NOTES:

A. COORDINATE THE LOCATION OF DRAINS, THERMOSTATS, GAS

OUTLETS, ETC., WITH ALL CASEWORK EQUIPMENT,

MECHANICAL ROOM EQUIPMENT, ETC., PRIOR TO COMMENCING

INSTALLATION. WORK NOT SO COORDINATED SHALL BE

REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE

CONTRACTOR.

B. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE

COURSE OF THEIR WORK SO AS TO INSURE THAT THEY DO NOT

INTERRUPT ANY EXISTING SERVICE. FOR SAFETY PURPOSES,

PAY PARTICULAR ATTENTION TO THIS PRECAUTION RELATIVE

TO NATURAL GAS AND ELECTRICAL LINES. VERIFY THE

LOCATION, SIZE, TYPE, ETC., OF EACH UNDERGROUND OR

OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN

ACCORD WITH ALL FEDERAL, STATE AND/OR LOCAL RULES,

REGULATIONS, STANDARD AND SAFETY REQUIREMENTS.

UTILITIES SHALL BE INSTALLED IN ACCORD WITH THE

APPLICABLE MUNICIPALITY OR UTILITY COMPANY STANDARDS.

IN ALL CASES, THE MOST STRINGENT REQUIREMENT SHALL

APPLY.

C. WHERE WORK IS REQUIRED ABOVE EXISTING LAY-IN, PLASTER

OR GYPSUM BOARD CEILINGS, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR REMOVAL AND REINSTALLATION (OR

REPLACEMENT, IF DAMAGED) OF ALL CEILING OR TILE AND

GRID MEMBERS NECESSARY TO PERFORM HIS WORK. NEW

TILE AND GRID SHALL MATCH THE SURROUNDING AREAS. ALL

PATCHING WORK SHALL MATCH ADJACENT SURFACES.

D. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM

THE WORK OF OTHER TRADES, WHETHER EXISTING OR NEW.

E. COORDINATE ALL WORK WITH PROJECT PHASING

REQUIREMENTS.

F. PATCH, REPAIR AND PAINT (TO OWNER'S STANDARDS) OR

PROVIDE WALL COVERING FOR EXISTING WALLS, CEILINGS,

ETC., THAT ARE TO REMAIN IF DAMAGED DURING

CONSTRUCTION. REPAIRS SHALL MATCH ADJACENT

SURFACES TO THE SATISFACTION OF THE ARCHITECT AND

OWNER.

G. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS

THAT MAY APPLY TO THE WORK UNDER THIS CONTRACT.

(CITY, COUNTY, LOCAL, FEDERAL, MUNICIPALITY, UTILITY

COMPANY, COMMONWEALTH OF KENTUCKY, ETC.)

H. CONTRACTOR SHALL BE AWARE OF UNSEEN PLUMBING, HVAC

AND ELECTRICAL WORK DURING DEMOLITION. IF ITEMS ARE

UNCOVERED DURING DEMOLITION THEN FIELD VERIFY THE USE

OF THE ITEMS AND PLAN AN ALTERNATE ROUTE TO RUN THESE

ITEMS. THEN CONTACT THE ENGINEERS TO REVIEW THE

ROUTING.

I. IF AREA OF CONSTRUCTION HAS A POST TENSION FLOOR SLAB.

CONTRACTOR SHALL USE ULTRA SOUND OR OTHER APPROVED

METHODS TO SURVEY THE EXISTING FLOOR STRUCTURE

BEFORE MAKING ANY AND ALL FLOOR PENETRATIONS.

J. WHERE FIRE PROOFING IS SPRAYED ON EXISTING STRUCTURE

ALL EXISTING CONDUITS, WATER, HYDRONIC, STEAM, CHILLED

WATER, FIRE PROTECTION LINES, MED GAS, ETC. SHALL BE

LOWERED TO BE BELOW FULL THICKNESS OF FIRE PROOFING

WITH NO INTERFERENCE.

K. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES

SHALL BE APPROPRIATELY FIRE STOPPED PER AN APPROVED

U.L. LISTED STANDARD. CONTRACTOR SHALL PAY PARTICULAR

ATTENTION TO INSULATED PIPING PENETRATIONS.

L. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE

BUILDING SHALL BE SCHEDULED 2 WEEKS IN ADVANCE, AND

SHALL COMPLY WITH INTERIM LIFE SAFETY MEASURES.

M. ALL DUCTWORK, PIPING, CONDUITS, ETC. IN ROOMS WITH

CEILINGS SHALL BE ABOVE CEILING EXCEPT AS NOTED.

N. INSTALL AIR VENTS AT HIGH POINTS IN PIPING AND DRAINS IN

LOW POINTS. USE CARE TO AVOID FREEZING OF EXTERIOR

VENTS.

O. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE

APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE

FIELD. DO NOT SCALE THE DRAWINGS.

P. ALL OFFSETS IN DUCTS AND PIPING ARE NOT NECESSARILY

SHOWN. PROVIDE ADDITIONAL OFFSETS WHERE NECESSARY.

Q. COORDINATE ALL HVAC WORK WITH ELECTRICAL, PLUMBING

AND OTHER TRADES TO AVOID INTERFERENCE WITH PIPING,

DUCTS, CONDUIT AND OTHER EQUIPMENT.

R. INSTALL ALL PIPING, DUCTWORK AND EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURER'S INSTALLATION

INSTRUCTION. IF IN CONFLICT WITH THE DESIGN INDICATED IN

CONTRACT DOCUMENTS, ADVISE THE ENGINEERS PRIOR TO

INSTALLATION FOR CLARIFICATION. PROVIDE RECOMMENDED

ACCESS AND SERVICE CLEARANCES FOR ALL EQUIPMENT.

S. SEAL AIRTIGHT AROUND ALL DUCTS AND PIPING PENETRATIONS

THROUGH WALLS, FLOORS AND ROOF. PROVIDE FIRE

STOPPING IN FIRE PARTITION.

T. SEAL ALL NEW DUCTWORK JOINTS WITH UNITED MCGILL,

IRONGRIP 6O1 OR EQUAL WATER BASED SEALANT.

U. ALL MOTOR DRIVEN EQUIPMENT SHALL BE INSTALLED WITH

FLEXIBLE CONNECTIONS TO DUCTWORK, PIPING, ETC., UNLESS

OTHERWISE NOTED.

V. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING

EQUIPMENT APPURTENANCES, ETC., THAT CONFLICT WITH

NEW WORK.

W. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN

CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE

ENGINEERS BEFORE INSTALLATION. REFER ALSO TO

ARCHITECTURAL WALL INTERIOR AND EXTERIOR WALL

ELEVATIONS, CEILING HEIGHTS AND OTHER DETAIL OF THESE

DOCUMENTS.

X. DOUBLE WIDTH TURNING VANES SHALL BE INSTALLED IN ALL

SUPPLY, RETURN, AND EXHAUST DUCTWORK ELBOWS.

TURNING VANES NOT REQUIRED FOR KITCHEN EXHAUSTS.

Y. ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION

PRODUCING EQUIPMENT SHALL BE ISOLATED FROM

SURROUNDING SYSTEMS IN AN APPROVED MANNER. NOISY OR

STRUCTURALLY DAMAGING INSTALLATIONS SHALL BE

SATISFACTORILY REPLACED OR REPAIRED AT THE INSTALLING

CONTRACTOR'S EXPENSE. THE FINAL DECISION ON THE

SUITABILITY OF A PARTICULAR INSTALLATION'S ACCEPTABILITY

SHALL BE THAT OF THE ENGINEER.

Z. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR

EQUIPMENT FROM THAT USED AS BASIS OF DESIGN SHALL BE

THE RESPONSIBILITY OF THE PURCHASER OF THAT

EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A

DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT,

SHALL BE THE RESPONSIBILITY OF THE PURCHASER.

AA. VALVES, BALANCING DAMPERS OR ANY

MECHANICAL/ELECTRICAL ITEM REQUIRING ACCESS SHALL NOT

BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE,

THEN AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE

PLACED UNDER THE ITEM TO ALLOW EASY MAINTENANCE AND

ADJUSTMENT. ADDITIONALLY ALL SUCH ITEMS SHALL NOT BE

LOCATED AN UNREASONABLE DISTANCE ABOVE THE CEILINGS.

IN GENERAL ALL SUCH ITEMS UNLESS INDICATED OTHERWISE

SHALL BE MOUNTED SIX TO TWELVE INCHES ABOVE THE

CEILING. IF IN DOUBT, CONTACT ENGINEER PRIOR TO

INSTALLING.

BB. ALL MANHOLES, VAULTS AND SIMILAR UNDERGROUND

STRUCTURES SHALL HAVE THE TOP ELEVATION SET FLUSH

WITH FINISHED GRADE UNLESS SPECIFICALLY NOTED

OTHERWISE.

CC. WHEN RUNNING ANY TYPE OF PIPING BELOW A FOOTER, OR IN

THE ZONE OF INFLUENCE THE PIPING SHALL BE BACKFILLED

WITH CEMENTITIOUS FLOWABLE FILL PER SPECIFICATIONS.

WHENEVER POSSIBLE, LOCATE PIPING OUTSIDE OF THE ZONE

OF INFLUENCE. THE ZONE OF INFLUENCE IS THE AREA UNDER

THE FOOTER WITHIN A 45 DEGREE ANGLE PROJECTING DOWN

FROM THE BOTTOM EDGE OF THE FOOTER OF ALL SIDES OF

THE FOOTER. ADDITIONALLY, GREASE TRAPS, MANHOLES,

VAULTS AND OTHER UNDERGROUND STRUCTURES SHALL BE

HELD AWAY FROM BUILDING WALLS FAR ENOUGH TO BE

OUTSIDE OF THE ZONE OF INFLUENCE.

DD. WORK IN CONFINED AREAS SHALL BE IN ACCORDANCE WITH

THE OWNER'S SAFETY POLICY REQUIREMENTS.

EE. THE DOCUMENTS COMPLY WITH 2006 IMC, 2007 KBC, AND 2009

IECC.

FF. THE DOCUMENTS COMPLY WITH 2006 IMC, 2007 KBC, AND

ASHRAE 90.1-2007.

Revisions: Date:

R E

F

OVEN

R E

F

DW

DN

AA.2

B B.2 D E F G H J

C

2.5

C.6

9.6

C.7C.5

7.1

9.1

H.6E.5D.5

STORAGE

Unoccupied

Unoccupied

GARAGE

CLOSET

23A

CLOSET

22A

KITCHEN

CORRIDOR / STORM SHELTER

MEDICATION

EQUIP. STORAGE

CLEAN LINEN

TOILET

27B

STAFF LOUNGE

SOILED HOLDING

JANITOR

LAUNDRY

OFFICE

HOUSEKEEPING

DEN

BATH

16B

VESTIBULE

BATH

17B

BEDROOM

BEDROOM

VESTIBULE

LIVING ROOM

DINING

KITCHEN

PATIO

BATHROOM

23B

CLOSET

21A

BATHROOM

20B

BEDROOM

BATHROOM

11B

BEDROOM

BATHROOM

12B

BEDROOM

CLOSET

13A

BEDROOM

BATHROOM

13B

BEDROOM

BEDROOM

BATHROOM

21B

BATHROOM

14B

CORRIDOR

TOILET

BATHROOM

22B

BEDROOM

BARIATRIC

S-2

R-3

"x

O

A

"x

E A

"x

E A

12"x10" EA

STORAGE

M8

R-3

R-3

E-2A

E-2A

R-2A

E-2A

E-2A

E-2A

E-2A

E-2A

E-2A

E-2A

E-2A

CLEAN SUPPLY

"x

O A

"x

E

A

"x

O

A

S-6

S-7

S-6

S-6

"x

O

A

S-2A

S-2A

S-2A

S-2A

S-2A

S-2A

S-2

S-2A

S-2A

S-2A

S-2A

E-3

"x

E

A

E-2A

135—FCU—16

135—FCU—17

S-6

S-6

R-3

S-6

S-7

R-3

R-3

S-7

S-6

R-2A

R-2A

S-6

S-6

R-2A

R-2A

R-2A

R-3

S-2

R-2

S-2

S-2

S-5

S-2

S-2

R-5

S-2

135—FCU—23

135—FCU—22

135—FCU—21

135—FCU—20

135—FCU—14

135—FCU—13

135—FCU—12

10"x10" RA

"x

R

A

135—FCU—19B

135—FCU—11

R-7

E-5

M4

M5

135—CUH—1

135—CUH—2

135—CUH—3

"x

E A

E-6

S-3

S-3

10"x10" OA

SPA

19B

BATH

19A

"x

S A

FOR WORK IN THIS

AREA REFER TO

ENLARGED PLAN

ON SHEET MH102.

S-1A

135—RCP—10

135—RCP—11

135—RCP—12

135—RCP—13

135—RCP—14

135—RCP—16135—RCP—17

135—RCP—19B

135—RCP—20

135—RCP—21

135—RCP—22

135—RCP—23

135—RCP—6D

135—RCP—6C

135—RCP—6B135—RCP—6A

CORRIDOR

CORRIDOR

CORRIDOR

S-6

S-7

S-1A

S-2

R-2

R-3

135—BCU—2

"x

O A

"x

O

A

"x

E

A

"x

O

A

"x

O A

"x

O

A

"x

S A

10"x12" RA

"x

O A

"x

E

A

12"x8" SA8"x8" SA

"x

S A

12"x10" RA

"x

S A

S-1

S-1

S-1

S-1

S-5

S-5

S-5

"x

E

A

M2

M22

M7

M7

M7

M24

M24

M24

M1

135—RCP—7A

135—RCP—7B

"x

R

A

"x

S

A

10"x12" RA

B E

LO

W

A B

O V

E

135—CUH—4

GENERAL NOTES - MECHANICAL:

A. FLOOR PLAN FOR BUILDING 135 IS SHOWN. FLOOR PLAN APPLIES TO

BUILDINGS 134 AND 135.

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:5

A

M

MH101

FIRST FLOOR PLAN - AIR

DISTRIBUTIONGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR PLAN - AIR DISTRIBUTION

TAGGED NOTES

M1 40x12 OA AND 34x12 EA DUCTS UP TO MECHANICAL ROOM.

REFER TO SHEET MH103 FOR CONTINUATION.

M2 12x8 AND 8x8 SA DUCTS UP TO MECHANICAL ROOM. REFER TO

SHEET MH103 FOR CONTINUATION.

M4 6x6 EA DUCT UP TO MECHANICAL ROOM. REFER TO SHEET

MH102 FOR CONTINUATION.

M5 10x10 EA DUCT UP TO EF-3. REFER TO SHEET MH104 FOR

CONTINUATION.

M7 DUCT DOWN IN CHASE TO LOW GRILLE. BOTTOM OF GRILLE 6"

A.F.F.

M22 12x10 RA DUCT UP TO MECHANICAL ROOM. REFER TO SHEET

MH103 FOR CONTINUATION.

M24 MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES

(TYPICAL).

GRD RUNOUT SCHEDULE

SYMBOL DUCT INLET

E-1 6"Ø

E-1A 6"Ø

E-2 8"Ø

E-2A 8"Ø

E-3 10"Ø

E-5 6x6

E-6 12x6

R-1 6"Ø

R-1A 6"Ø

R-2 8"Ø

R-2A 8"Ø

R-3 10"Ø

R-4 12"Ø

R-5 14"Ø

R-6 12x10

R-7 12x12

S-1 6"Ø

S-1A 6"Ø

S-2 8"Ø

S-2A 8"Ø

S-3 10"Ø

S-4 12"Ø

S-5 6"Ø

S-6 8"Ø

S-7 10"Ø

S-8 8x6

S-9 12x6

F

OVEN

R E

F

DW

D E F G

2.5

E.5D.5

CORRIDOR / STORM SHELTER

MEDICATION

EQUIP. STORAGE

CLEAN LINEN

TOILET

27B

STAFF LOUNGE

27SOILED HOLDING

JANITOR

LAUNDRY

OFFICE

HOUSEKEEPING

KITCHEN

CORRIDOR

TOILET

BATHROOM

22B

S-2

"x

O

A

"x

O A

18"x10" EA

"x

E A

"x

E A

"x

S A

E-1A

E-1A

E-2

125E-1

S-2

R-4

S-2

S-1

E-2

R-1

S-1

S-2

S-1

S-1

E-1

CLEAN SUPPLY

R-3

"x

E

A

"x

O

A

S-1

R-2

S-2

S-1

S-1

S-1

S-1

S-2

S-2

S-2

S-2

R-1A

R-5

16"x8" SA

R-3

R-2

S-2

R-1

10"x10" SA

10"x10" SA

S-4

135—FCU—45

135—FCU—34

135—FCU—29

135—FCU—8

10"x10" RA

"x

R

A

S-1A

135—KH—1

"x

R

A

"x

S

A10"x10" RA

12"x10" EA

S-9

S-9

M3

M5

S-9

16"x10" SA

S-3

10"x10" OA

S-1

"x

S

A

135—BCU—1

"x

S A

"x

S

A

M21

"x

E

A

"x

R

A

MECHANICAL CLOSET

M11

MECHANICAL CLOSET

M12

"x

R

A

"x

R

A

"x

O A

"x

E

A

"x

O

A

"x

S A

"x

O

A

"x

O

A

"x

O A

"x

O

A

"ø

S A

10"x10" SA

20"x10" OA

12"x10" EA

10"x12" RA

"x

O A

135—EDH—1

S-9

30"x10" OA

16"x10" RA

"x

S

A

12"x10" OA

"x

R

A

M24

M24

M24

135—FCU—7135—FCU—10

E-2

M27

135—FCU—27

135—FCU—44

"x

R

A

10"x10" SA

10"x10" EA

"x

E

A

R-2

16"x8" EA

"x

E A

M32

GENERAL NOTES - MECHANICAL:

A. FLOOR PLAN FOR BUILDING 135 IS SHOWN. FLOOR PLAN APPLIES TO

BUILDINGS 134 AND 135.

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:5

A

M

MH102

ENLARGED FIRST FLOOR PLAN -

AIR DISTRIBUTIONGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/4" = 1'-0"

ENLARGED FIRST FLOOR PLAN - AIR

DISTRIBUTION

TAGGED NOTES

M3 10x10 EA DUCT UP TO EF-2. REFER TO SHEET MH103 FOR

CONTINUATION.

M5 10x10 EA DUCT UP TO EF-3. REFER TO SHEET MH104 FOR

CONTINUATION.

M21 8"ø DRYER VENT UP THROUGH ROOF. REFER TO SHEET MI200

FOR TERMINATION DETAIL.

M24 MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES

(TYPICAL).

M27 CONNECT KITCHEN EXHAUST DUCT TO KITCHEN HOOD.

TRANSITION TO SIZE OF EQUIPMENT OPENING AS

NECESSARY.

M32 PROVIDE 2 HOUR FIRE WRAP ON KITCHEN HOOD EXHAUST

DUCTWORK.

GRD RUNOUT SCHEDULE

SYMBOL DUCT INLET

E-1 6"Ø

E-1A 6"Ø

E-2 8"Ø

E-2A 8"Ø

E-3 10"Ø

E-5 6x6

E-6 12x6

R-1 6"Ø

R-1A 6"Ø

R-2 8"Ø

R-2A 8"Ø

R-3 10"Ø

R-4 12"Ø

R-5 14"Ø

R-6 12x10

R-7 12x12

S-1 6"Ø

S-1A 6"Ø

S-2 8"Ø

S-2A 8"Ø

S-3 10"Ø

S-4 12"Ø

S-5 6"Ø

S-6 8"Ø

S-7 10"Ø

S-8 8x6

S-9 12x6

D E

C C.6

9.6

E.5D.5

135—FCU—6

135—FCU—M21

"x

E

A

34"x12" EA

S-8

S-9

M15

M16

M14

MH103

M9

L-1

24"x20" OA

L-2

"x

S

A

135—H—1

"x

O

A

8"x6" SA

M23

M17

M24

M18

M8

M13 6"x6" EAM25

M26

1" LPS

M8

M8

IT

M22

MECHANICAL PENTHOUSE

M21

135—OA—1

M30

M31

R-6

135—FCU—M22

12"x6" SA

R-6

T

T

S-8

"x

S

A

86"x68" EA

PLENUM - 24" DEEPM33

M34

FD

FD

FD

FD

FD

GENERAL NOTES - MECHANICAL:

A. FLOOR PLAN FOR BUILDING 135 IS SHOWN. FLOOR PLAN APPLIES TO

BUILDINGS 134 AND 135.

D EC C.6 D.5

30"x40" OA

30"x40" OA

24"x24" EA

12"x34" EA

M19

M9

M18

M20

M28

M35

500-OA-1 LEGEND

1. EXHAUST FAN SECTION

2. FILTER SECTION

3. ENERGY RECOVERY WHEEL

4. FILTER SECTION

5. FACE AND BYPASS DAMPER

6. DX COOLING COIL

7. ACCESS SETION

8. SUPPLAY FAN SECTION

9. GAS-FIRED HEATING SECTION

10. ACCESS SECTION

11. HUMIDIFIER SECTION

12. DISCHARGE PLENUM

1 3 4

6 8 10 12

2 5 7 9 11

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:5

A

M

MH103

ENLARGED MECHANICAL ROOM

PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/4" = 1'-0"

ENLARGED MECHANICAL ROOM PLAN

TAGGED NOTES

M8 VRF REFRIGERANT PIPING. REFER TO PIPING SCHEMATIC ON

SHEET MI203 FOR SIZING. (TYPICAL)

M9 SIZE REFRIGERANT PIPING PER MANUFACTURER'S

RECOMMENDATIONS.

M13 6x6 EA DUCT UP TO EF-1. REFER TO SHEET MH104 FOR

CONTINUATION.

M14 6x6 EA DUCT DOWN TO OXYGEN STORAGE ROOM. REFER TO

SHEET MH101 FOR CONTINUATION.

M15 34x12 EA DUCT DOWN IN ATTIC SPACE. REFER TO SHEET

MH101 FOR CONTINUATION.

M16 40x12 OA DUCT DOWN IN ATTIC SPACE. REFER TO SHEET

MH101 FOR CONTINUATION.

M17 12x10 RA DUCT DOWN. REFER TO SHEET MH101 FOR

CONTINUATION.

M18 REFRIGERANT PIPING DOWN. REFER TO SHEET MP101 FOR

CONTINUATION.

M19 NATURAL GAS PIPING. REFER TO PLUMBING DRAWINGS.

M20 DOMESTIC HOT WATER PIPING. REFER TO PLUMBING

DRAWINGS.

M23 12x8 AND 8x8 SA DUCTS DOWN. REFER TO SHEET MH101 FOR

CONTINUATION.

M24 MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES

(TYPICAL).

M25 REFRIGERANT PIPING UP TO ACCU-1 ON ROOF. REFER TO

SHEET MH104 FOR CONTINUATION.

M26 REFRIGERANT PIPING UP TO ACCU-2 ON ROOF. REFER TO

SHEET MH104 FOR CONTINUATION.

M28 PROVIDE 6" THICK CONCRETE PAD UNDER UNIT.

M30 LOUVER SHALL BE USED TO REMOVE OA UNIT FOR

REPAIR/REPLACEMENT IF NECESSARY.

M31 DDC CONTROL PANEL

M33 SLOPE PLENUM BACK TO LOUVER

M34 PROVIDE UNISTRUT ASSEMBLY FOR MOUNTING OF

HUMIDIFIER.

M35 COORDINATE PIPE ROUTING TO ENSURE ADEQUATE ACCESS

TO UNIT.

1/4" = 1'-0"

MECHANICAL ROOM SECTION VIEW

1/4" = 1'-0"

DEDICATED OUTSIDE AIR UNIT SECTION

VIEW

AA.2

B B.2 D E F G H J

C

2.5

C.6

9.6

C.7C.5

7.1

9.1

H.6E.5D.5

135—EF—1

135—EF—2

135—EF—3

135—ACCU—1135—ACCU—2

M36

RD M29

135—EF—4

135—EF—5 135—EF—6

135—EF—7

M38M38M38

M38

GENERAL NOTES - MECHANICAL:

A. FLOOR PLAN FOR BUILDING 135 IS SHOWN. FLOOR PLAN APPLIES TO

BUILDINGS 134 AND 135.

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:5

A

M

MH104

ROOF PLAN - MECHANICAL

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/8" = 1'-0"

ROOF PLAN - MECHANICAL

TAGGED NOTES

M29 ROOF HATCH

M36 REFER TO DRYER VENT DETAIL ON SHEET MI200.

M38 ATTIC VENTILATION FAN. PROVIDE WITH

TEMPERATURE/HUMIDITY SENSOR LOCATED IN DRAFTSTOP

ZONE SERVED BY THIS FAN. REFER TO ARCHITECTURAL

PLANS FOR DRAFTSTOP ZONE LOCATIONS. CONFIRM EXACT

SENSOR LOCATION WITH VA IN THE FIELD.

F

OVEN

R E

F

DW

AA.2

B B.2 D E F G H J

C

2.5

C.6

9.6

C.7C.5

7.1

9.1

H.6E.5D.5

STORAGE

GARAGE

CLOSET

23A

CLOSET

22A

SPA

19B

CLEAN SUPPLY

CORRIDOR / STORM SHELTER

MEDICATION

EQUIP. STORAGE

CLEAN LINEN

TOILET

27B

STAFF LOUNGE

SOILED HOLDING

JANITOR

LAUNDRY

OFFICE

HOUSEKEEPING

DEN

BEDROOM

CLOSET

17A

CLOSET

16A

BATH

16B

VESTIBULE

BATH

17B

BEDROOM

BEDROOM

VESTIBULE

CORRIDOR

LIVING ROOM

DINING

KITCHEN

PATIO

BATHROOM

23B

CLOSET

21A

CLOSET

20A

BATHROOM

20B

BEDROOM

BATHROOM

11B

BEDROOM

BATHROOM

12B

BEDROOM

BEDROOM

BATHROOM

13B

BEDROOM

BEDROOM

BATHROOM

21B

BATH

19A

SCREENED PORCH

BATHROOM

14B

CORRIDOR

TOILET

BATHROOM

22B

BEDROOM

BARIATRIC

135—FCU—45

135—FCU—34

135—FCU—27

135—FCU—44

135—FCU—8

135—FCU—29

135—FCU—20

135—FCU—19B

135—FCU—17 135—FCU—16

135—FCU—14

135—FCU—13

135—FCU—12

135—FCU—11

135—FCU—23

135—FCU—22

135—FCU—21

135—BCU—1

135—FCU—10

135—FCU—7

M8

M8

M8

M8

M8

M8

M8

M8

M10

M10

M11

1" CD

1" CD

C D

C D

1" CD

135—BCU—2

T

T

T

T

T

H

T

T

T

T

T

TT

T

T

T

T

T

T

T

T

T

CORRIDOR

CORRIDOR

PANTRY

M37

M37

M6

GENERAL NOTES - MECHANICAL:

A. FLOOR PLAN FOR BUILDING 135 IS SHOWN. FLOOR PLAN APPLIES TO

BUILDINGS 134 AND 135.

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:1

A

M

MP101

FIRST FLOOR PLAN - HYDRONICS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR PLAN - HYDRONICS

TAGGED NOTES

M6 REFRIGERANT PIPING UP TO MECHANICAL ROOM. REFER TO

SHEET MH103 FOR CONTINUATION.

M8 VRF REFRIGERANT PIPING. REFER TO PIPING SCHEMATIC ON

SHEET MI203 FOR SIZING. (TYPICAL)

M10 ROUTE CONDENSATE TO NEAREST FLOOR DRAIN.

M11 ROUTE CONDENSATE TO MOP SINK.

M37 ROUTE 3/4" CONDENSATE DRAIN FROM VERTICAL FAN COIL

UNITS TO FLOOR DRAIN IN MECHANICAL ROOM.

NTS

EXHAUST OR RETURN BRANCH DUCTWORK

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm] MIN.

BRANCH DUCT

VD

AIR

FLOW

W

NTS

FLEXIBLE DUCT CONNECTIONS

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED.

6" [150mm] NOMINAL WITH MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON

12" [300mm] CENTERS

RIVET ON 4" [100mm]

CENTERS

SHEET METAL

AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION OF

BOLT 1 1/2" [40mm] POCKET

SLIP

DUCT

SHEET METAL

AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED.

6" [150mm] NOMINAL WITH MATERIAL TAUT

FLANGED CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL

AS

SPECIFIED

1/2" 1/2"1 1/2"

NTS

NOTE:

1.

2.

3.

SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm]

ON CENTER.

SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH RUST RESISTANT BOLTS.

RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY DAMPER, THEN THROUGH

VENTILATOR ELECTRICAL CONDUIT GUIDE.

POWER ROOF VENTILATOR

GRAVITY BACKDRAFT DAMPER

RIGID CONDUIT TO

ACCOMMODATE

ELECTRICAL WIRES

SEE NOTE 2

PREFABRICATED

ROOF CURB

WOOD NAILING

STRIP

ELECTRICAL CONDUIT

GUIDE

MOTOR HOUSING

DUCT

TRANSITION DUCT TO FULL

SIZE OF DAMPER SUPPLIED

WITH ROOF VENTILATOR

ROOF

SEE NOTE 2

SEE NOTE 1

CURB CAP

NTS

ROUND DUCT HANGERS

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13]∅ RODS

TWO 3/8 [10]∅. RODS

ONE 1 [25] x 16 GA STRAP

84 [2100]

60 [1500]

50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT ∅

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

IN. [mm]

SPACING

IN. [mm] IN. [mm]

144 [3600]

144 [3600]

144 [3600]

144 [3600]

NOTE:

TABULATED DATA FROM SMACNA ALLOWS FOR

DUCT REINFORCING AND INSULATION, BUT NO

EXTERNAL LOAD.

BAND

OVER 50"

[1250mm]∅

HANGER RODS

50" [1250mm]Ø

& UNDER

LOAD RATED

FASTENERS

BAND OF SAME

SIZE AS HANGER

STRAP

NTS

VOLUME DAMPER DETAIL

SECTIONSIDE ELEVATION

STIFFEN BLADE

AS REQUIRED

DUCT

1/2" [15mm] ROUND

ROD PIN

INSULATION

STAND-OFF

HANDLE WITH

LOCKING

QUADRANT

INSIDE END BEARING

OUTSIDE END BEARING

1/8" [6mm]

CLEARANCE ALL

AROUND

DAMPER BLADE

INSULATION SEE

SPECIFICATION

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

NOTE:

1.

2.

FULL SIZE TRANSITION

FROM UNIT OPENING TO SA

DUCT SIZE SHOWN ON

FLOOR PLANS. PROVIDE A

FLEXIBLE DUCT

CONNECTION AT UNIT

OPENING.

MAINTAIN ALL

MANUFACTURER

RECOMMENDED

SERVICE

CLEARANCES.

RETURN DUCT; REFER

TO FLOOR PLANS FOR

SIZES

PROVIDE AND INSTALL A FULL SIZE

EQUIPMENT STAND TO ELEVATE UNIT FOR

BOTTOM RETURN AIR DUCT CONNECTION.

STAND SHALL BE A MINIMUM OF 18" TALL.

CLEAN-LINE FLAT BANK FILTER

RACK, WITH HINGED ACCESS

DOOR. FILTER RACK SHALL BE

16 GAUGE ALUMINIZED STEEL.

24X12-2"

UNIT CONDENSATE LINE

CONNECTION; SPILL CONDENSATE TO

NEAREST FLOOR DRAIN. PROVIDE

WITH P-TRAP PER MANUFACTURER'S

RECOMMENDATIONS.

REFRIGERANT BRANCH LINE

CONNECTIONS FROM MAIN WITH

ISOLATION VAVLES. REFER TO

FLOOR PLANS FOR CONTINUATION

OF PIPING.

NTS

VERTICAL FAN COIL UNIT INSTALLATION DETAIL

X

FAN COIL UNIT DETAIL TAG NOTES:

1. HORIZONTAL VRF UNIT. DO NOT BLOCK ACCESS PANEL FOR UNIT WITH ANY PIPING,

CONDUIT, ETC.

2. PROVIDE FLEXIBLE CANVAS CONNECTIONS AT UNIT CONNECTION. TRANSITION

DUCTWORK TO UNIT OPENING AS NEEDED.

3. INSTALL REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATION.

4. INSTALL CONDENSATE PIPING PER MANUFACTURER'S RECOMMENDATION.

5. SUPPLY AIR DUCTWORK. REFER TO DRAWINGS FOR DUCT SIZE.

6. PROVIDE UNI-STRUT BETWEEN BEAMS FOR HORIZONTAL PROPER SUPPORT OF

VRF INSTALLATION.

7. PROVIDE SECONDARY DRAIN PAN.

R F

RF

RF

CD

NTS

HORIZONTAL FAN COIL UNIT INSTALLATION DETAIL

CD

18"

FINISHED ROOF

FLASH EXHAUST AIR DUCT

ACCORDING TO ROOF

MANUFACTURER'S

RECOMMENDATIONS

12"

12"

EA DUCT (REFER TO

FLOOR PLAN FOR SIZE)

PAINT DUCTWORK WITH

EPOXY WEATHER

COATING. MATCH COLOR

WITH ADJACENT ROOF.

PROVIDE ALUMINUM BIRD SCREEN

SEAL ROOF PENETRATION

WATERTIGHT

NTS

DRYER VENT/ROOF PENETRATION DETAIL

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:5

A

M

MI200

MECHANICAL DETAILS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1/2'' DOMESTIC COLD WATER

1/2'' CW

V

KOOLER

DRANE

DRANE KOOLER 2

WAY CONTROL

VALVE, TYP.

AHU

STEEL PIPE PER SPECIFICATIONS

ATMOSPHERIC STEAM TO AHU. PIPE

PER MANUFACTURER'S

INSTRUCTIONS.

PITCH 1/8''

PER FT.

TEMPERED WATER

SPILL TO F.D.

MECH. RM

FLOOR

CONCRETE CURB AREA

STEAM HEADER

CONDENSATE HEADER

SUPPORT HUMIDIFER GRID

AS RECOMMENDED BY

MANUFACTURER.

DISPERSION TUBE SPACE AS

RECOMMENDED BY

MANUFACTURER FOR SCHEDULED

CAPACITY AND REQUIRED

ABSORPTION DISTANCE.

LONG RADIUS 90. TYP.

CONNECT TO DOMESTIC WATER

HUMIDIFIER

HUMIDIFIER PIPING SCHEMATIC

NTS

SPILL TO F.D.

TYPICAL INSULATED CURB OPENING,

THYCURB TC-1, OR EQUAL. CURB SHALL BE

18'' TALL.

SPACE ALLOWED FOR ROOFING

MATERIAL UNDER PORTAL

CONVENIENCE OUTLET (CAULK ALL

PENETRATIONS)

13X13 PORTAL TO BE

16 GAUGE ALUMINUM

CONSTRUCTION

UNISTRUT BACKING CHANNEL

INSIDE

WELDED CORNERS

(MICRO SEALED)

FASTENERS

(TYPICAL)

REMOVABLE WATERTIGHT

COVER.

GLUE 1/2" ARMAFLEX INSULATION TO THE

INSIDE OF THE PORTAL.

1" LIP

ROOF PRODUCTS, INC. MODEL

RPPC-90 OR APPROVED EQUAL.

HOLE SAW PIPE PENETRATIONS

ACCOUNT FOR INSULATION IF

APPLICABLE. CAULK OPENING AFTER

CONDUIT INSTALLATION.

SUPPORT PIPE WITH UNISTRUT

ATTACHED TO ROOF CURB WITH

HYDRAZORB CLAMPS.

* GALVANIZED STEEL IS NOT

ACCEPTABLE.

PIPE CHASE / ROOF CURB DETAIL

NTS

AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS

DRAW THRU

BLOW THRU

2" [50mm]

PLUS X

1" [25mm]

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE

NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M

UNLESS

NOTE BELOW IS MET

PITCH DOWN

TOWARD

DRAIN

CLEAN OUT

FLOOR SINK

DRAIN PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA

AND IS INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS

ARE TO BE CONNECTED.

[2 5m m

DIELECTRIC

FITTING

A B1

REFER TO THE PIPING

PORTAL DETAIL ON THIS

DRAWING FOR CONTINUATION

THYBAR TEMS-1 EQUIPMENT RAILS

OR APPROVED EQUAL, RAILS

SHALL BE 10'' TALL. COORDINATE

ROOF CUT AND PATCH WITH

GENERAL CONTRACTOR.

FASTEN TO THE RAILS WITH

LAG BOLTS. SEAL

PENETRATION WITH SILICON

FASTEN RAILS TO

STRUCTURE BELOW.

RAILS ARE TO BE FULL

LENGTH OF UNIT PLUS LENGTH

REQUIRED TO SPAN ROOF

STRUCTURE BELOW.

ROOF MOUNTED CONDENSING UNIT DETAIL

NTS

NTS

FIRE DAMPER INSTALLATION

SECTION THRU

NOTE:

1.

2.

3.

4.

5.

6.

A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION IS SIMILAR.

FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS

AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE

INSTALLED IN THE PARTITION OR FLOOR AND NOT OUTSIDE THE PENETRATION.

GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO

DAMPER FRAME AND TO PERIMETER ANGLES.

PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON

ALL 4 SIDES.

BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN

SMACNA. ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE

LINK OR LINKS.

PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL

OPEN SPACE WITH ROCK WOOL FIRESTOP FIBER.

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS

AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH

CONCRETE CURB AROUND OPENING FOR DUCT.

SLEEVE, NOTE 2

DUCT

CONNECTION

NOTE 4

DAMPER,

NOTE 1

DAMPER COLLAR

EXTENSION INTEGRAL

PART OF SLEEVE

SLEEVE, NOTE 2

NOTE 6FIRE BARRIER

PARTITION OR CHASE

TYPICAL

DUCT

INSULATION

PERIMETER ANGLE, NOTE 3

(NOTE FASTENED TO

PARTITION)

ACCESS

PANEL

NOTE 5

[2 m m

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:0

A

M

MI201

MECHANICAL DETAILS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMENTS

VRF FAN COIL UNIT CONTROLS

NTS

RA

RR

RS

LEV

FAN

SST

HS

T-1

ROOM TEMPERATURE SENSOR WITH SPACE ADJUSTABLE WALL

MOUNTED

48" [1200mm] AFF.

T

PC

FILTER

24/7 CONSTANT VOLUME FAN COIL SEQUENCE OF OPERATION

FAN COIL UNIT SHALL OPERATE 24/7. FAN SHALL RUN CONTINUOUSLY. FAN STATUS SHALL BE MONITORED AND AN ALARM MESSAGE SHALL BE GENERATED IN THE EVENT THE UNIT FAILS TO RUN. THE ADJUSTABLE ROOM TEMP SET POINT WILL BE 70°-75° WITH 0.5° HEATING/COOLING OFFSETS. THE UNIT SHALL MODULATE ITS INTERNAL LINEAR EXPANSION VALVE (LEV) TO MAINTAIN THE TEMPERATURE SET POINT VIA THE INDOOR UNIT'S INTERNAL CONTROLS. ROOM TEMPERATURE SETPOINT SHALL BE ADJUSTABLE FROM THE BAS. UPON FALL IN ROOM TEMPERATURE 3°F BELOW SET POINT THE ELECTRIC RADIANT CEILING PANEL SHALL

OPERATE TO PROVIDE SUPPLEMENTAL HEAT.

TT

CS

COOLING/HEATING COIL

RA

RR

RS

LEV

FAN

SST

HS

T-1

ROOM TEMPERATURE SENSOR WITH

SPACE ADJUSTABLE WALL MOUNTED

48" [1200mm] AFF.

T

PC

FILTER

TT

CS

COOLING/HEATING COIL

TT

ELECTRIC DUT HEATER

H-1H

MEDICATION ROOM FAN COIL SEQUENCE OF OPERATION

FAN COIL UNIT SHALL OPERATE CONTINUOUSLY. FAN SHALL RUN CONTINUOUSLY. FAN STATUS SHALL BE MONITORED AND AN ALARM MESSAGE SHALL BE GENERATED IN THE EVENT THE UNIT FAILS TO RUN. THE ADJUSTABLE ROOM TEMP SET POINT WILL BE 70°-75° WITH 0.5° HEATING/COOLING OFFSETS. THE UNIT SHALL MODULATE ITS INTERNAL LINEAR EXPANSION VALVE (LEV) TO MAINTAIN THE TEMPERATURE SET POINT VIA THE INDOOR UNIT'S INTERNAL CONTROLS. ROOM OCCUPANT WILL HAVE ABILITY OF ADJUSTING ROOM TEMPERATURE BETWEEN 70°-75°. IF THE ROOM HUMIDITY EXCEEDS 55% AND THE ROOM TEMPERATURE IS SATISFIED, THEN THE UNIT SHALL ENTER DEHUMIDIFICATION MODE. IN DEHUMIDIFICATION MODE THE UNIT SHALL OPERATE IN FULL COOLING AND THE ELECTRIC DUCT HEATER SHALL MODULATE TO MAINTAIN A LEAVING AIR TEMPERATURE EQUAL TO ROOM TEMPERATURE.

SCHEDULED CONSTANT VOLUME FAN COIL SEQUENCE OF OPERATION

FAN COIL SHALL OPERATE ON A SCHEDULE AS SET BY ECC. SCHEDULE SHALL BE ADJUSTABLE BY ECC.

OCCUPIED MODE:

FAN SHALL RUN CONTINUOSULY. FAN STATUS SHALL BE MONITORED AND AN ALARM MESSAGE SHALL BE GENERATED IN THE EVENT THE UNIT FAILS TO RUN. THE ADJUSTABLE ROOM TEMP SET POINT WILL BE 70°-75° WITH 0.5° HEATING/COOLING OFFSETS. THE UNIT SHALL MODULATE ITS INTERNAL LINEAR EXPANSION VALVE (LEV) TO MAINTAIN THE TEMPERATURE SET POINT VIA THE INDOOR UNIT'S INTERNAL

CONTROLS. ROOM TEMPERATURE SETPOINT SHALL BE ADJUSTABLE FROM THE BAS.

UNOCCUPIED MODE:

FAN SHALL ONLY RUN WHEN THE ROOM THERMOSTAT REQUIRES HEATING OR COOLING. THE ADJUSTABLE ROOM TEMP SET POINT WILL BE 65°-81° WITH 0.5° HEATING/COOLING OFFSETS. THE UNIT SHALL MODULATE ITS INTERNAL LINEAR EXPANSION VALVE (LEV) TO MAINTAIN THE TEMPERATURE SET POINT VIA THE INDOOR UNIT'S INTERNAL CONTROLS. ROOM TEMPERATURE SETPOINT SHALL BE ADJUSTABLE FROM THE BAS.

VARIABLE VOLUME FAN COIL SEQUENCE OF OPERATION

FAN COIL UNIT SHALL OPERATE AS REQUIRED TO MAINTAIN SPACE TEMPERATURE. FAN SHALL ONLY RUN WHEN THE ROOM THERMOSTAT REQUIRES HEATING OR COOLING. THE ADJUSTABLE ROOM TEMP SET POINT WILL BE 70°-75° WITH 0.5° HEATING/COOLING OFFSETS. THE UNIT SHALL MODULATE ITS INTERNAL LINEAR EXPANSION VALVE (LEV) TO MAINTAIN THE TEMPERATURE SET POINT VIA THE INDOOR UNIT'S

INTERNAL CONTROLS. ROOM TEMPERATURE SETPOINT SHALL BE ADJUSTABLE FROM THE BAS.

NTS

DEDICATED OUTSIDE AIR SYSTEM AIR HANDLING UNIT CONTROL DIAGRAM

EXHAUST AIR

D-2

P R

E

F

IL

T E

R

OUTSIDE

AIR

D-1

C O

IL

C

O O

LI

N

G

LOCATE SENSOR

OUTSIDE UNDER

SHIELD

V-1

RF

RF

EXHAUST FAN

RETURN

AIR

A F

M D

SUPPLY AIR TO

TERMINAL UNIT

TT

TT TT

FT

A F

T E

R

F

IL

T E

R

TT

HS

IT

VSMC

HSVSMC

4 6

SD

CURRENT

TRANSMITTER

FOR FAN

STATUS

,TYP.

PSH

SMOKE

DETECTOR

VARIABLE SPEED MOTOR

CONTROLLER, TYP.

ZC

ZC

PDS PDS

SST

PSL

IT

SST

SD

SD

SD

SPSTSL

TSL-1

NO

ECC

ECC

PRESSURE SWITCH LOW

TO DISABLE RETURN FAN WHEN

SMOKE DAMPER IN RETURN DUCT

CLOSES

PRESSURE SWITCH HIGH

TO DISABLE FAN WHEN

HIGH

PRESSURE LIMIT SETPOINT

IS REACHED

TT

MT

A F

M D

FT

F

IL

T E

R

PDS

MT

AT

CO2

C O

IL

H

E A

T

IN

G

NG

V-2

E N

E R

G Y

R E

C O

V E

R Y

W H

E E

L

TT

MT

PDS

HS

IT

VSMC

VARIABLE SPEED MOTOR

CONTROLLER, TYP.

SST

ECC

HT

HHL

2C

ELECTRIC STEAM HUMIDIFIER

SUPPLY FAN

TT

ZC

D-3

ALARM

PROCESSING

D U

TY

C

YC

LE

FU

N

C

TI

O N

SC

H

ED

U

LE

S

TA

R

T/

ST

O P

HUMIDITY HIGH LIMIT

EXHAUST FAN VSMC ALARM

SUPPLY FAN VSMC ALARM

EXHAUST FAN STATUS

STATIC PRESSURE HIGH LIMIT

SUPPLY AIR FLOW (CFM)

RETURN LOW PRESSURE

ST

AT

U S

SYSTEM

AL

AR

M

P R

IO

R

IT

Y

/A D

D -A

LT

E

R N

A T E

N O

EL

EC

TR

IC

D

EV

IC

E

SP

EE

D C

O M

M

AN

D

PO

IN

T

ID

DISCHARGE STATIC PRESSURE

DISCHARGE AIR HUMIDITY

DISCHARGE AIR TEMPERATURE

OUTSIDE AIR TEMPERATURE DOWNSTREAM OF ERW

EXHAUST AIR TEMPERATURE

COOLING COIL TEMPERATURE

SYSTEM COMPONENT:

RETURN AIR FLOW (CFM)

RETURN AIR TEMPERATURE

-- O

PE

N /C

LO

SE

ST

AR

T/

ST

O P

-- VA

LV

E

PO

SI

TI

O N

D

AM

PE

R

P O

SI

TI

O N

JOB: 550-319

DEDICATED OUSTIDE AIR

SYSTEM AIR HANDLER

7 & 8

SYSTEM:

BUILDING:

LEGEND

POINT

BINARY

TE

M

PE

R

AT

U

R E

(T I)

Lo ca l A la rm P an el

M as te r A la rm

P an el

Ar ea

A la rm P an el

H

IG

H S

TA

TI

C P

R

ES

SU

R

E

H

IG

H H

U M

ID

IT

Y

PR

ES

SU

R

E

--LO

W

T

EM

PE

R

AT

U

R E

PE

R

C

EN

T

PR

ES

SU

R

E

PO

SI

TI

O N

FL

O

W

H

IG

H L

IM

IT

LO

W

L

IM

IT

SYSTEM INPUTS

ANA- BINARY ANALOG

SP

AC

E

TE

M P.

C O

N

TR

O L

--ST

AT

IC

P

R

ES

SU

R

E R

ES

ET

--D

EM

AN

D

L

IM

IT

IN

G

TE

M

PE

R

AT

U

R E

R

ES

ET

TE

M

PE

R

AT

U

R E

O

VE

R R

ID

E

EN

TH

AL

PY

E C

O N

O M

IZ

ER

TE

M

PE

R

AT

U

R E

EC

O

N O

M

IZ

ER

FA

IL

U R

E M

O D

E

P R

E S

S U

R E

/V O

LU

M

E C

O N

T R

O L

REMARKS

FU

LL

C O

M M

U N

IC

AT

IO

N

SYSTEM SOFTWARE/CONTROL

APPLICATION/FUNCTION

PAGE:

RETURN AIR HUMIDITY

SUPPLY FAN STATUS

OUTSIDE AIR LOW LIMIT

RETURN FAN START/STOP

COOLING VALVE V-1

HEATING VALVE V-2

EXHAUST AIR DAMPER

SUPPLY FAN VSMC

OUTSIDE AIR DAMPER

EXHAUST FAN VSMC

ST

AT

IC

P

R

ES

SU

R

E

C

AR

BO

N

M O

N O

XI

D

E

H U

M

ID

IT

Y

VA

C

U U

M

ENERGY RECOVERY WHEEL START/STOP

SUPPLY FAN START/STOP

AI-1

AI-2

AI-3

AI-4

AI-5

AI-6

AI-7

AI-8

AI-9

AI-10

TR

EN

D

IN

G

OUTSIDE AIR TEMPERATURE AI-11

BI-1

BI-2

BI-3

BI-4

BI-5

BI-6

BI-7

BI-8

AO-1

AO-2

AO-4

AO-5

AO-7

AO-8

BO-1

BO-2

BO-3

FULL COMMUNICATION

FULL COMMUNICATION

AB

BR

EV

IA

TI

O

N

RAT

RAH

RAF

EAT

OAT-2

CCT

DAT

DASP

DAH

SAF

OAT-1

RLP

EF-STS

SF-STS

TSL-1

SPS-2

HHL

SF-ALA

RF-ALA

RF-SPD

SF-SPD

OAD

EAD

HTG-V2

CLG-V1

RF-SST

SF-SST

ERW-SST

NTS

AIR HANDLING UNIT

POINTS LIST FOR DEDICATED OUTSIDE AIR SYSTEM

OUTPUTS

LOG

ENERGY RECOVERY WHEEL (ERW) VSMC ALARM BI-9 ERW-ALA

ENERGY RECOVERY WHEEL VSMC AO-3 FULL COMMUNICATIONERW-SPD

FACE AND BYPASS DAMPER AO-6 FBD

HUMIDIFIER START/STOP BO-4 HUM-SST

HUMIDIFIER STATUS BI-10 HUM-STS

EF-1 START/STOP BO-5 EF1-SST

EF-2 START/STOP BO-6 EF2-SST

EF-3 START/STOP BO-7 EF3-SST

EF-4 START/STOP BO-8 EF4-SST

EF-5 START/STOP BO-9 EF5-SST

EF-6 START/STOP BO-10 EF6-SST

EF-7 START/STOP BO-11 EF7-SST

EF-4 ATTIC AIR TEMPERATURE AI-12 AAT-4

EF-5 ATTIC AIR TEMPERATURE AI-14 AAT-5

EF-4 ATTIC AIR HUMIDITY AI-13 AAH-4

EF-5 ATTIC AIR HUMIDITY AI-15 AAH-5

EF-6 ATTIC AIR TEMPERATURE AI-16 AAT-6

EF-6 ATTIC AIR HUMIDITY AI-17 AAH-6

EF-7 ATTIC AIR TEMPERATURE AI-18 AAT-7

EF-7 ATTIC AIR HUMIDITY AI-19 AAH-7

SEQUENCE OF OPERATION FOR DEDICATED OUTSIDE AIR SYSTEM AIR HANDLING UNIT

1. GENERAL

1.1

2. TEMPERATURE CONTROL

2.1

2.2

2.3

2.4

3. AIR FLOW CONTROL

3.1

3.2

3.3

4. HUMIDITY CONTROL

4.1

5. AUTOMATIC SHUTDOWN/RESTART

6.1

6.2

7. EMERGENCY CONSTANT SPEED OPERATION

7.1

THE SYSTEM WILL BE PLACED INTO A MODE OF OPERATION BASED UPON THE FOLLOWING ADJUSTABLE TEMPERATURE

SCHEDULE:

OUTSIDE AIR TEMPERATURE MODE OF OPERATION

65°F OR GREATER (ADJ.) COOLING MODE

BETWEEN 55°F AND 65°F (ADJ.) ECONOMIZER MODE

55°F OR LESS (ADJ.) HEATING MODE

UPON FAILURE OF THE VSMC, THE SUPPLY AND EXHAUST FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL

CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER. FANS SHALL THEN BE OPERATED AT CONSTANT SPEED.

WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY AND EXHAUST FANS SHALL SHUT "OFF" AND

AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM.

THE ANCILIARY EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY AND EXHAUST

FANS SHALL RESTART WHEN FIRE ALARM CIRCUIT IS RESET.

IF THE RETURN AIR HUMIDITY SENSOR H-1 MEASURES HUMIDITY ABOVE 60% RH (ADJ.), THEN THE UNIT SHALL OPERATE IN COOLING MODE REGARDLESS OF OUTSIDE AIR TEMPERATURE. ONCE H-1 READS BELOW 55% RH (ADJ.), THE SYSTEM SHALL

RETURN TO NORMAL OPERATION.

IN COOLING MODE THE ENERGY RECOVERY WHEEL SHALL BE ON. THE DX COOLING COIL SHALL MODULATE TO MAINTAIN A 55°F LEAVING AIR TEMPERATURE. THE FACE AND BYPASS DAMPERS SHALL MODULATE TO MAINTAIN A UNIT DISCHARGE AIR

TEMPERATURE OF 63°F.

IN HEATING MODE THE ENERGY RECOVERY WHEEL SHALL BE ON. THE GAS FIRED HEATING SECTION SHALL MODULATE TO

MAINTAIN A UNIT DISCHARGE AIR TEMPERATURE OF 70°F.

ENERGY RECOVERY WHEEL: IF THE OUTSIDE AIR TEMPERATURE IS BETWEEN 60°F (ADJ) AND 65°F (ADJ), THEN THE ENERGY

RECOVERY WHEEL SHALL BE OFF AND THE WHEEL BYPASS DAMPERS SHALL BE OPEN.

UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION.

"HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-1, D-2, SHALL BE FULLY

CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, SD-1 AND SD-2 SHALL BE FULLY OPEN.

1.2 THE MAJOR COMPONENTS OF THE SYSTEM ARE A SUPPLY FAN, EXHAUST FAN, TOTAL ENERGY RECOVERY WHEEL, DX

COOLING COIL, AND GAS HEAT SECTION.

THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE SUPPLY FAN SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25mm] OF DUCT STATIC PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1.

COORDINATE WITH BALANCE CONTRACTOR.

THE DIGITAL CONTROL PANEL, USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS, SHALL RESET THE EXHAUST AIR FAN VSMC TO MAINTAIN A CONSTANT AIR FLOW DIFFERENCE BETWEEN THE SUPPLY AIR AND THE RETURN AIR EQUAL TO

10% OF THE SUPPLY AIR FLOW.

USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE, SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" [75mm] OF STATIC PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 DOES EXCEED 3" [75mm] THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE.

4.2 RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 35% RH (ADJ) BY MODULATING ELECTRIC HUMIDIFIER TO

MAINTAIN THE DESIRED HUMIDITY.

8. ANCILIARY EXHAUST FANS

8.1 ANCILIARY EXHAUST FANS, EF-1, EF-2, AND EF-3, SHALL RUN CONTINOUSLY 24/7.

8.2 ATTIC VENTILATION EXHAUST FANS, EF-4, EF-5, EF-6, AND EF-7, SHALL OPERATE BASED ON TEMPERATURE/HUMIDITY SENSORS LOCATED IN THE DRAFTSTOP ZONE SERVED BY THE ASSOCIATED FAN. THE FAN SHALL OPERATE WHEN THE

RELATIVE HUMIDITY EXCEEDS 60% (ADJ.) OR THE TEMPERATURE EXCEEDS 90°F (ADJ.).

I LL IN O IS

R

.E

SS

E J

FARBE

LICENSED

PROFESSIONAL

OF

ENGINEER

062.069980

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \m h e a le y \D o c u m e n ts \V

IG

H

-M -R m h e a le y c m ta e g rs .c o m

.r v t

/1

/2

:3

:0

A

M

MI202

CONTROL SCHEMATICS

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

SUITE 200

317.800.6388

CMTA

10411 Meeting Street

Prospect, Kentucky 40059

502.326.3085

CONSTRUCT TWO NEW GREEN

HOMES 7 & 8

1900 E. MAIN ST., DANVILLE, IL 61832

550-319

7 & 8

04/09/2020 AJM MJH

100% CONSTRUCTION

DOCUMEN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .