ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105.pdf
PDF 34 MB Posted
- Solicitation number
- 36C24826R0028
About this file
This file is the final Design Analysis Report and Construction Documents for a federal construction project to create redundancy capacity in the chiller plant system at the Bruce W. Carter VA Medical Center in Miami, Florida. The project (546-23-105) involves designing and constructing a new four-story building addition to house a 1,250-ton water-cooled chiller on the second level, a two-cell cooling tower on the roof, and electrical equipment on the third level. The building structure will utilize micropile foundations with an estimated allowable pile capacity of 35 kips per pile, and includes composite steel framing with ordinary steel moment frames for lateral resistance. The new chiller and cooling tower will provide redundancy to the existing three 1,250-ton chillers currently operating in Building 44, with a design constraint that only three chillers can operate simultaneously due to secondary chilled water piping capacity limitations. The project includes connections to existing chilled and condenser water systems through new 18-inch chilled water lines and 20-inch condenser water lines, requiring facility shutdowns for installation.
The construction documents include complete specifications for mechanical systems, electrical infrastructure, fire protection, plumbing, structural components, and architectural design. Key equipment selections include a York YKOGOLK2_FAH water-cooled centrifugal chiller rated at 1,250 tons with R-513A refrigerant, a Baltimore Aircoil Series 3000 two-cell cooling tower (Model S3E-1222-10P-2/SY) with dual 40-horsepower motors, inline variable-flow exhaust fans for mechanical room ventilation (rated at 9,000 CFM for normal conditions and 9,900 CFM for emergency conditions), horizontal fan coil units for electrical room cooling, and new electrical switchgear with manual transfer switches allowing only one chiller to connect to any substation at a time. The geotechnical investigation recommends a micropile deep foundation system designed for 270 kips maximum service load, with at least one load test required per ASTM D1143. The project specification references VA Master Construction Specifications and includes demolition of existing structures, site preparation requiring partial concrete slab removal, utility relocation around new foundation work, NPDES permitting compliance for construction stormwater management, and commissioning per ASHRAE Standard 202. The Period of Performance is 730 calendar days from notice to proceed, with the solicitation numbered 36C24826R0028.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Create Redundancy Capacity in Chiller Plant System/ Chilled and Condensed Water System
Repair/Replacement Bruce W. Carter VA Medical Center
Miami, Florida
Contract 36C24819D0021, 36C24823N0259 Project 546-23-105
DESIGN ANALYSIS REPORT
FINAL BID DOCUMENTS
Prepared for
Department of Veterans Affairs
Engineering Service, Room B110
Planning and Analysis
1201 NW 16th Street
Miami, FL 33125
Prepared by
3603 NW 98th Street, Suite B
Gainesville, Florida 32606
June 20, 2025
Design
Create Redundancy Capacity in Chiller Plant System/ Design Analysis Report – Final Bid Documents Chilled and Condensed Water System Repair/Replacement Bruce W. Carter VA Medical Center, Miami, FL
Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
AKEA Design, Inc. Contents – Page 1 of 1
Contents
Submittal Letter
Schedule
VA Minor Checklists
35% Review Comments
65% Review Comments
95% Review Comments
65%_R1 Review Comments
95%_R1 Review Comments
95%_R1 CITP Review Comments
100% Review Comments
Civil Narrative
Architectural Narrative
Structural Narrative
Mechanical Narrative
Plumbing Narrative
Fire Protection Narrative
Electrical Narrative
Appendix
Equipment Basis of Design
Chiller
Cooling Tower
Refrigerant Monitor
Exhaust Fan
Fan Coil
June 20, 2025
Mr. Santos Oquendo, COR
Engineering Service, Room B110
Planning and Analysis
1201 NW 16th Street
Miami, FL 33125
Re: 100% Construction Documents Submission for
MATOC Contract 36C24819D0021, Task Order 36C24823N0259, Project 546-23-105, Create Redundancy Capacity in Chiller Plant System/
Bruce W. Carter VA Medical Center, Miami, Florida
Dear Mr. Santos Oquendo:
The following documents are included in this 100% Construction Documents review submittal as specified in the project Statement of Work:
• (1) Full-size set of drawings
• (1) Specifications, redlined edits
• (1) Design Analysis Report (DAR)
• (1) CD with all submittal documents included (PDFs)
• (1) Cost Estimate (to be delivered under separate cover)
The DAR contains design narratives for each area identified in the Scope of Work. The 100%
Construction Document submittal files have been sent to our independent construction cost estimator, and we will forward the cost estimate upon receipt.
Sincerely, Jennifer Fong, AIA, NOMA, CGC, NCARB
Lead Architect / Project Manager cc: Mr. Aldwyn Singleton, Contracting Officer
3603 NW 98th St., Suite B Gainesville, FL 32606 Office (352) 474-6124Design
CONTRACT 36C24819D0021 D.O. 36C24823N0259 print date: 6/5/2025
PROJECT NO. 546‐23‐105
PROJECT TITLE: Create Redundancy Capacity in the Chiller Plant System
PROJECT LOCATION: Miami VA Medical Center, Miami, Florida
Schedule Notes
Sub. Task
Incremental
Days Day Date
Contract 12/30/2022 Fri
Contract Kickoff Meeting 1/13/2023 Fri
0 NTP / Initiate Design 0 1/17/2023 Tue add 6 weeks to design schedule for additional site investigation add 16 weeks to design schedule for new site location investigation and new site location survey and underground utility investigation
1 35% Schematic submittal 256 256 9/29/2023 Fri
VA Review ‐ 35% Schematic 14 270 10/13/2023 Fri period includes Federal holiday (Columbus Day 10/09/23 Mon)
35% REVIEW 11/30/2023 Thur
Proceed to 65% Design 12/4/2023 Mon
Contract days
2 65% Design Development submittal 45 367 1/19/2024 Fri
VA Review ‐ 65% CD 30 396 2/16/2024 Fri
3 95% Construction Documents submittal 45 442 4/2/2024 Tue
VA Review ‐ 95% CD 15 458 4/18/2024 Thur
VA On‐Site Design Review Meeting 8 466 4/26/2024 Fri
Contract Modification award 200 11/12/2024 Tue
2a
65%_R1 Design Development
Revised Floor Plan Layouts Confirmation
(3 week VA review period) 65 731 1/16/2025 Thur
(layouts confirmed in Thurs Virtual Meeting)
65%_R1 Design Development submission_R1_After 95% Submittal 43 774 2/28/2025 Fri
(changed from 45 to 43 for Friday delivery)
VA Review ‐ 65%_R1 CD 14 788 3/14/2025 Fri
(changed from 30 to 14 per VA)
3a
95%_R1 Construction Documents submission_R1 28 816 4/11/2025 Fri
(changed from 45 to 42 for Friday delivery)
VA Review ‐ 95%_R1 CD 14 830 4/25/2025 Fri
(changed from 15 to 14 per VA)
4 100% Construction Documents submittal 28 858 5/23/2025 Fri
(back to original remaining submissions) (changed from 45 to 42 for Friday delivery)
VA Review ‐ 100% CD 14 872 6/6/2025 Fri
(changed from 15 to 14 per VA)
5 Final S&S Bid CDs submittal 14 886 6/20/2025 Fri
(changed from 15 to 14 for Friday delivery)
NOTE: INCREMENTAL DAYS WILL BE ADJUSTED TO AVOID SAT/SUN/HOLIDAY DUE DATES.
VA Minor Checklists
Site Development
Architectural
Asbestos Abatement
Space Planning
Structural
HVAC
Fire Protection
Plumbing
Sanitary
Electrical
Specifications
Estimating
THIS PAGE INTENTIONALLY LEFT BLANK
Create Redundancy Capacity in Chiller Plant System/ VA Minor Checklist – Final Bid Documents
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Site Development
VA MINOR CHECKLIST
Phase: Construction Documents Reviewer: Michael Tootle
Submittal Schematics (15-30%)
A/E Confirm DD A/E
Confirm CD A/E Confirm
Narrative Yes
Analysis of site Yes
Circulation study N/A
Phasing analysis N/A
Parking analysis N/A
Development concept showing proposed buildings and structures Yes
Landscape drawings with plant groupings N/A
Topographic, utility, and landscape survey Yes Yes
Demolition plan No Yes Yes Layout plan showing location of:
Building and structures Yes Yes Yes
Roads (existing) Yes Yes Yes
Fire access (same as roads) N/A Yes Yes
Parking (there is no parking in project) N/A N/A N/A
Accessible spaces (no parking) N/A N/A
Van spaces (no parking) N/A N/A
Mechanical and electrical equipment on grade (none) N/A N/A N/A
Future expansion (none) N/A N/A N/A
Off-site roads (none) N/A N/A N/A
Off-site utilities (none) N/A N/A N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Service area(s) (none) N/A N/A
Entrances and exits (none ground level) Yes Yes
Walks (existing) Yes Yes
Inlets (storm) (existing) Yes Yes
Contractor’s staging area (at site) Yes Yes
Vertical and horizontal road alignment N/A N/A
Paving joint patterns N/A N/A
Grading plan showing: (NOTE – there is no SITE GRADING)
Existing contours (existing) N/A N/A
Proposed contours (same) N/A N/A
Spot elevations at structure corners, entrances, equipment pads, etc. Yes Yes
First floor elevations (finish floor slab) Yes Yes
Rim and invert elevations on storm drainage fixtures (existing) N/A N/A
Erosion and sediment control Yes Yes
Rock excavation (quantity) (N/A) N/A N/A
Planting plan showing: (none) N/A N/A
List of plant material (none) N/A N/A N/A
Limits of irrigation (none) N/A N/A N/A
Other N/A N/A
Site details (existing) Yes Yes
Landscape details (N/A) N/A N/A
Signage plan and schedule (N/A) N/A N/A
Specifications Yes Yes
* Submit site and landscape plans at an appropriate scale to show all work involved.
** Submit site and landscape plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Architectural
VA MINOR CHECKLIST
Phase: Construction Documents Reviewer: Jennifer Fong / Sierra Gillion
Submittal Schematics
(15-30%) A/E
Confirm DD A/E Confirm CD A/E
Confirm Location of:
Rooms ¹ Yes Yes Yes
Doors ² Yes Yes Yes
Corridor(s) ³ N/A N/A N/A
Basic column grid/sizes Yes Yes Yes
Expansion and seismic joints N/A Yes Yes
Electrical closets (room) Yes Yes Yes
Equipment rooms Yes Yes Yes
Signal and telephone closets N/A N/A N/A
Mechanical shafts and space Yes Yes Yes
Stair(s) N/A Yes
Ramp(s) Yes Yes
Elevator(s) N/A N/A N/A
Automatic Conveyances N/A N/A N/A Floor Plans/Drawings:
All floors (new and renovated) Yes Yes Yes
Penthouse N/A Yes Yes
Roof plan Yes Yes Yes
Pipe basement N/A N/A N/A
Pipe tunnel N/A N/A
Reflected ceiling⁴ N/A N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Equipment floor plans 1:50 (1/4 inch) scale⁵ Yes Yes
Demolition plans⁶ Yes Yes
Room names and numbers⁷ Yes Yes
Program net/designed net Yes Yes Yes
Exterior dimensions/total building gross area Yes Yes Yes
Size and shape of all departmental functions and services⁹ Yes Yes Yes
Exterior building elevations¹⁰ Yes Yes Yes
Finish floor elevations¹¹ Yes Yes Yes
Door locations, sizes, and swings Yes Yes
Wall thickness and chase walls Yes Yes
Handrail location/dimensions Yes Yes
Fixed equipment Yes Yes
Equipment elevations and details Yes
Plumbing fixtures N/A N/A
Wheelchair accessible facilities N/A N/A
Wall sections¹² Yes Yes
Building sections¹³ Yes Yes
Finish grades at corners, entrances, exits, platforms, and ramps Yes Yes
Fire and smoke rated partitions¹⁴ N/A Yes Yes
Lead-lined and radio frequency-shielded partitions¹⁴ N/A N/A
Fire extinguisher cabinets¹⁴ Yes Yes
Spray-on fire proofing (see fire protection) Yes Yes
Construction details¹⁵ Yes Yes
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Drafting symbols, abbreviations, and general notes Yes Yes
Door, window, and louver schedules Yes
Interior details, elevations, sections Yes
Finish schedule¹⁶ Yes Yes
Graphics and signage¹⁷ Yes
Color rendering Yes
Specifications Yes Yes
Lead abatement¹⁸ Yes N/A
Lead abatement specification¹⁸ Yes N/A
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. Use lines between spaces to indicate the centerline of the partition (for schematics only).
2. Indicate doors with a slash mark.
3. Along the corridor, the line shall represent the corridor side of the partition.
4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.
5. Identify all equipment for each room. Indicate and coordinate all equipment with the Equipment Guide List (Program Guide 7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)] and relocated (R) equipment. Equipment floor plans are not required for the offices, consultation rooms, classrooms, conference rooms, and waiting rooms within the above departments. Draw equipment details which are necessary for major decisions, though complete detailing is not required for this submittal.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
6. Indicate existing finish schedule and notes on plan.
7. Label as required for schematic drawings. Coordinate new room numbering with medical center.
8. Use the same names on drawings as those used in the space program. Provide area figures in fractional form, e.g., 400/390. Indicate space provided, but not called for in the space program, as: -/390.
9. Label each service or activity listed in the Project Scope Data of the Design Program and indicate boundaries with a distinctive line.
Include the activity code number (see Handbook 7610).
10. If the project requires exterior work, show all facades indicating massing, proposed fenestration and the building relationship to adjacent structures and the finish grade. Show all significant building materials, including their colors, any proposed roof top mechanical equipment, architectural screens, skylights, and stacks on the elevation drawings. If building is designed for future expansion (vertical and/or horizontal), delineate elevations with and without the future expansion. If project is an addition, show elevations of the existing building in sufficient detail to illustrate the relationship between the new and existing in terms of scale, material, and detail.
11. Define the relationship of the finish ground floor to finish grade at major entrances and docks.
12. Indicate construction including fire resistance rating, building materials and systems, and proposed sill and head heights of openings.
Indicate both new and renovated areas on form provided by VA.
13. Define building configuration. Draw sections at the same scale as floor plans, normally 1:100 (1/8 inch). If the building abuts an existing structure, indicate in the section how the new floor elevations align with existing.
14. Identify psychiatric areas where special considerations are required to ensure the safety of patients (e.g., hard ceilings, safety glazing, etc.).
15. Indicate new building components and systems, such as window design, roofing system, special entryways, building "skin", and any special architectural elements for the project. Complete detailing of miscellaneous items is not required for this submission.
16. Indicate all building systems, materials, and future expansion, if applicable.
17. Submit a drawing for all which is part of the construction contract.
18. Provide square meters (feet) of lead paint and x-ray shielding to be removed.
19. Format provided in SPECIFICATIONS. If there is no VA master specification, develop contract specification that is in compliance with regulations of the Environmental Protection Agency.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
ASBESTOS ABATEMENT
VA MINOR CHECKLIST
Reviewer: GLE (NOTE: see Asbestos Survey – no asbestos identified in project)
A/E
Confirm DD A/E Confirm CD A/E
Confirm Narrative:
Asbestos abatement report including:
1. Summary results of building records
2. Summary results of station personnel interview
3. Determination of materials known to contain asbestos
4. Visual inspection of building to determine location and condition of asbestos
5. Sample strategy on the extent of asbestos present
NOTE: no asbestos identified Reports included with specifications
Yes
Name and location of qualified laboratory for sample analysis Yes
Asbestos abatement drawing N/A
Major Decontamination Areas showing:
1. Limits of sealing off the location
2. Quantities of asbestos material
3. Arrangements for auxiliary rooms
4. Engineering of negative air systems
5. Path of asbestos to loading platform
6. Location and connection to required utilities
N/A
Minor Decontamination Areas showing:
1. Location, type, and length of pipe element to be abated by "Glove and Bag" approach
2. Other abatement features
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Summary of:¹
Square meter (feet) of floor space for abatement N/A N/A
Total linear and square meter (feet) of asbestos to be abated N/A N/A
Total cost of abatement² N/A N/A
Asbestos abatement drawings including:
1. Restoration of impacted building sub-systems
2. Integrated phasing on execution of abatement
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. Provide a copy of the summary to the construction cost estimator for inclusion as a separate bid item in the project estimate.
2. Include any cost for decontamination of equipment and fixtures.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Space Planning
VA MINOR CHECKLIST
Reviewer: Jennifer Fong / Sierra Gillion
A/E
Confirm DD A/E Confirm CD A/E
Space-Accounting Summary Table 1 Yes 2 Yes 3 Yes
1. Provide a tabular table with columns entitled Departmental Function, H-7610 Requirements, Approved Space Program [Net Square Meters (Net Square Feet)], Variance Between H-7610 and Approved Space Program, Departmental Conversion Factor, Planned Departmental Gross Square Meters (Feet); column totals; and a Total Project Net to Gross Factor. Also, list separately the area required for additions to the program, unassigned space, major circulation (inter-departmental corridors, stairs, elevators), major mechanical and electrical spaces, exterior walls, connecting corridors to other buildings, space for future mechanical system expansion, and similar special requirements.
2. Update table. Justify in writing substantial deviations from the approved space program.
3. Update table.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Structural
VA MINOR CHECKLIST
Reviewer: Stephen Morgan
A/E
Confirm DD A/E Confirm CD A/E
Confirm Three alternative structural systems for typical bays¹ Yes
Supporting calculations² Yes Yes Yes
Cost estimates for each system³ N/A
Recommend preferred system Yes
Column locations Yes
Sheer load resisting elements⁴ Yes
Boring location plan⁵ N/A
Structural plans⁶ Yes Yes
Sections Yes Yes
Details Yes Yes Size/location of:
Columns Yes Yes
Beams Yes Yes
Lateral load resisting elements Yes Yes
Slabs Yes Yes
Foundations Yes Yes
Elevations Yes
Schedules Yes
General notes Yes
Boring logs Yes
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Subsurface investigation report Yes
Estimated quantity of rock N/A
Specifications Yes
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
1. When only one structural system is possible due to other project requirements, include an explanatory statement and submit only that structural system.
2. Include vertical and lateral load design for CD submission.
3. Include foundation and fireproofing.
4. Indicate existing utilities and structures within, adjacent, or contiguous to the new construction.
5. Upon approval of the subsurface investigation criteria, submit qualifications of at least three consultants being considered for the work together with the proposal of the consultant recommended as most qualified.
6. If there is only a CD submission, provide a Structural Engineering Analysis Submission within six weeks from the notice to proceed including sketches, calculations, and cost estimates of three alternative structural systems for typical bays, boring location plan for subsurface investigation, and consultant qualifications. For vertical expansion projects, analyze existing structure for structural feasibility.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
HVAC
VA MINOR CHECKLIST
Phase: Design Development Reviewer: Daniel Ellis
A/E
Confirm DD A/E Confirm CD A/E
Description of HVAC systems Yes
Equipment for each functional space Yes
Life cycle cost analysis¹ N/A Tentative location and size of:
Mechanical equipment room Yes
Principal vertical shafts No
Block layout of equipment Yes Louvers²:
Outside air Yes Yes Yes
Exhaust air No Yes Yes
Relief air N/A N/A N/A
Engineering calculations³ Yes Yes Yes
Selection of HVAC equipment Yes Yes
Catalog cuts of equipment Yes Yes
Room by room heating and cooling loads N/A N/A
Zone by zone heating & cooling loads N/A N/A
Building block heating & cooling loads Yes Yes
Tabulation of steam consumption N/A N/A
Psychometric chart for air handling unit N/A N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Coil entering and leaving conditions N/A N/A
Fan motor heat gains N/A N/A
Consumption of humidification loads N/A N/A
Sound/acoustic analysis No N/A
Room-by-room air balance charts⁴ N/A N/A Chilled Water Plant⁵
Quantity and type of chillers Yes Yes
Capacity in tons of refrigeration Yes Yes
Electrical equipment Yes Yes Heating System
Total heating load N/A N/A
Domestic hot water load N/A N/A
Humidification load N/A N/A
Equipment steam demand N/A N/A
Zoning of heating system N/A N/A HVAC floor plan⁶
Main supply, return, and exhaust ductwork N/A N/A
Volume dampers N/A N/A
Fire and smoke partitions N/A N/A
Fire and smoke dampers N/A N/A
Smoke detectors N/A N/A
Automatic control dampers N/A N/A
Air quantities for each room N/A N/A
Air inlets/outlets N/A N/A
Rises and drops in ductwork N/A N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Expansion loops N/A N/A
Anchors N/A N/A
Vales N/A N/A
Drip assemblies N/A N/A
Balancing fittings Yes Yes
Interconnection of HVAC equipment with fire protection equipment (see fire protection)
N/A N/A
Plan/section of mechanical equipment rooms Yes Yes
Schematic flow and riser diagrams⁷ Yes Yes
Schematic control diagrams⁸ Yes Yes
HVAC demolition drawings Yes Yes
Phasing plan N/A N/A
Equipment schedule Yes Yes
Seismic bracing N/A N/A
VA symbols and abbreviation Yes Yes Selection of:
Pumps Yes
Fans Yes Sizing and selection of:
Expansion tanks N/A
Steam to hot water convertor N/A
Heat exchangers N/A
Other:
Sound analysis N/A
Complete selection data Yes
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Outside chilled water and condenser water distribution⁹ Yes
Standard detail drawings Yes
Automatic temperature control drawings¹⁰ Yes
HVAC specifications Yes
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
HVAC NOTES:
1. Provide specific design recommendations and full back-up data. Include the heating and cooling capacities of each functional area and the block cooling and heating loads for each new and/or existing building.
2. The locations of these louvers must not allow short circuiting of air from emergency generator exhaust or truck waiting and loading dock areas into air intake etc. Consider factors affecting louver location such as visibility, historical considerations, wind direction, nuisance and health hazard odors (from emergency generator or truck exhausts).3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads.
Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.
3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads. Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.
4. Show supply, return, exhaust, make-up, and transfer quantities with intended pressure relationships, i.e. positive, negative, or zero with respect to adjoining spaces.
5. Provide pertinent data on accessories such as pumps and cooling tower etc. Show the extent of the outside chilled water and condenser water piping. Clearly show how the piping will be laid in tunnels, trenches, or by direct burial.
6. Show ceiling clearances, at locations where ducts cross each other, by providing 1:50 (1/4 inch) scale local sections. Show all ductwork, and piping 150 mm (6 inch) and larger in double line. Show separate floor plans for air distribution and piping unless waived by VA. Show clearances required for access and maintenance with coil and tube pull.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
7. Show typical air handling systems and all hydronic systems with existing capacities and new estimated loads. Verify actual operating conditions and capacities of HVAC systems prior to design.
8. Show control devices, such as, thermostats, humidistats, flow control valves, dampers, freezestats, operating and high limit sensors for all air systems and fluids, smoke dampers, duct detectors etc. Provide a written description of the sequence of operation on the floor plans. Detail the scope of work involved with the Central Engineering Center (ECC) and address if enough spare capacity is available or a new ECC is required.
Show a point schedule for analog/digital input/output to be included in ECC.
9. Show pipe sizes and insulation with plans, profile, sections, details, and all accessories, such as, anchors, expansion loops/joints, valves, manholes, capped and flanged connections, interface between the new and existing work (if any). Clearly indicate interferences (if any) with the existing utilities and/or landscape elements on outside piping layout drawings. Show rerouting any utilities, cuttings of roads, pavements, trees, etc., and the extent of new and demolition work. Outside utility drawings shall be based on the study of the latest site drawings, discussions with engineering personnel, and actual site inspection of the existing utility.
10. Show all duct detectors, control valves/dampers static pressure sensors, differential pressure control assemblies, etc., whose actual physical location is critical for the intended sequence of operation on floor plans.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Fire Protection
VA MINOR CHECKLIST
Reviewer: Andrew Peter, Jennifer Fong, Bob Haffeman
A/E
Confirm DD A/E Confirm CD A/E
Confirm Fire Protection Narrative¹:
Fire and smoke separation Yes
Fire sprinkler/standpipe system Yes
Size of fire pumps Yes
Water supply available/max. demand Yes
Water flow testing results Yes
Fire alarm systems² Yes
Existing to be modernized Yes
Base loop system for interface of new construction Yes
Kitchen extinguishing systems N/A
Size of air handling unit N/A
Exit paths from each zone Yes
Distances to stairs Yes
Occupancy of each area Yes
Exit calculations for each floor Yes
Smoke control features N/A Floor Plans/Drawings³⁴:
Sprinkler zones Yes
Fire alarm zones N/A
Smoke zones N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Building water supply Yes
Interior sprinkler supply lines Yes
Standpipes Yes
Fire extinguisher cabinets Yes Yes Yes
Fireproofing of structural members Yes
Sprinkler/standpipe riser supply piping Yes Yes
Termination of sprinkler main and inspector test drains Yes Yes
Sprinkler alarm valves Yes Yes
Waterflow and tamper switches Yes Yes
Sprinkler system fire department connections No No
Sprinkler design hazards per NFPA 13 Yes Yes
Exit signs and emergency lighting Yes Yes
Occupied areas not protected by automatic sprinklers Yes Yes
Calculations No No No
Estimated capacities for proposed air handling units in cubic meters (cubic feet) per minute
N/A N/A
Location of:
Fire alarm system Yes Yes
Annunciator panels No No
Pull stations Yes Yes
Flow switches Yes Yes
Audio-visual devices Yes Yes
Smoke detectors No No
Duct smoke detectors No No
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Smoke dampers No No
Fire dampers No No
Fire alarm risers⁵ Yes Yes
Exit signs Yes Yes
Emergency lighting Yes
Fire sprinklers Yes
Standpipes Yes Yes
Fire hydrants No
Fire pumps No
Post indicator valves N/A N/A
Sectional valves No
Fire extinguisher cabinets Yes Yes
Electromagnetic door-hold open devices No
Wall sections indicating fire resistive ratings Yes
Staff sleeping rooms No
Excavation plan signage Yes
Door and window schedule with fire rating or fire-rated glazing No
Zoning of each fire alarm initiating device Yes
Details
Fire pump system (capacity and pressure) No
Elevation and isometric view of fire pump No
Stairwell sign Yes
Annunciator panel Yes
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Interconnection of fire alarm system with:
Smoke dampers No
Air handlers No
Elevator controls No
Kitchen fire extinguishing and fire pump system No
HVAC system with smoke duct detectors No
Single line riser diagram for fire alarm system Yes
Height/configuration of storage racks and shelving No
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
NOTES:
1. Indicate NFPA 220 and UBC fire resistive rating of the building, NFPA 101 occupancy type, and fire protection code analysis to access compliance with NFPA 101.
2. Determine type, features, age, reliability, compliance with present day codes, capacity, zoning, supervision, control panel and power supplies, initiating devices and circuits, and auxiliary functions for existing fire alarm system. Indicate manufacturer, model number, voltage, and wiring style of existing alarm systems and devices. Provide recommendations for the proposed fire alarm work.
3. Provide information to meet JCAHO requirements, e.g., location of all fire rated barriers, smoke barriers, exit signs, fire extinguishers, manual pull stations, smoke detectors, and sprinkler flow switches. Show all interim life safety measures such as temporary systems Fire Alarm, Sprinkler, and Smoke.
4. At DD Submission, add room names, room numbers, door locations and swings, smoke and fire rated partitions, sprinkler/standpipe risers to floor plans. Identify psychiatric areas on drawings so areas for institutional type heads are identified. Add location of all valves (post indicator, sectional) and backflow preventer if provided.
5. Show new equipment and/or the necessary changes involved if modification to the existing system is required. Include any recommendations where certain requirements of VA criteria might be waived, in order to allow the existing equipment to be reused.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
PLUMBING
VA MINOR CHECKLIST
Reviewer: Andrew Peter
A/E
Confirm DD A/E Confirm CD A/E
Confirm Narrative:
Existing plumbing systems to be used and necessary modifications Yes Yes Yes
New plumbing systems Yes Yes Yes
New or modified water treatment N/A N/A N/A Floor Plans/Drawings. Identify:
Room names Yes Yes Yes
Existing plumbing fixtures w/ VA numbering systems Yes N/A N/A
New plumbing fixture w/ VA numbering systems N/A N/A N/A
Existing equipment N/A N/A N/A
New equipment N/A N/A N/A
New medical gas outlets N/A N/A
New laboratory gas outlets N/A N/A
Plumbing piping Yes Yes Yes
Size of pipe Yes Yes
Equipment schedule N/A N/A
Fire & smoke partitions N/A N/A N/A
Demolition plans N/A N/A
Riser diagrams Yes
Legends, notes, and details Yes Other:
Location and size of sprinkler riser, standpipes, and fire pumps (see fire protection)
Yes Yes
Location of emergency eyewash and shower equipment N/A N/A
Calculations (equipment & piping) Yes Yes
List of required contract specifications Yes Yes
Contract Specifications Yes
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics phase.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch).
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Sanitary
VA MINOR CHECKLIST
Reviewer: Andrew Peter
A/E
Confirm DD A/E Confirm CD A/E
Narrative:
Existing sanitary systems: underground water, sanitary sewers, storm sewers, & fuel gas with sources, disposal methods, storage pressures, condition, etc.
Yes Yes
New sanitary systems Yes Yes Yes
Provide water analysis & expected yield if well required N/A N/A N/A
Circulation study to assess emergency vehicle access N/A N/A N/A
Install test well, if well is required N/A Utility Plans/Drawings showing existing and new sanitary systems:
Size of pipes Yes Yes Yes
Invert elevations of sewers Yes Yes Yes
Locate/size:
Pumps N/A N/A N/A
Storage facilities N/A N/A N/A
Treatment equipment N/A N/A N/A
Fire hydrants No No
Sectional and post indicator valves No No
Backflow preventer Yes Yes
Areas of new irrigation system N/A
New irrigation system N/A
Profiles of sanitary and storm sewers N/A
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Demolition plans Yes Yes
Legends, notes, and details Yes Other:
Point of connection to sprinkler system Yes Yes Yes
Calculations No No
List of specifications Yes
Contract specifications Yes
* Submit utility drawings at same scale as provided for Site Development drawings.
** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the schematics phase.
*** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the design development phase. Submit legend, notes, and details at a scale not less than 1:100 (1/8 inch).
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Electrical
VA MINOR CHECKLIST
Reviewer: Bob Haffeman
A/E
Confirm DD A/E Confirm CD A/E
Confirm Narrative:
Design Yes
Life cycle analysis for electrical systems N/A Location and size of:
Electrical equipment Yes
Electrical closets N/A
Telephone closets N/A
Signal closets N/A
Electrical distribution equipment Yes
Primary distribution switchgear/switchboard N/A Yes
Engine-generator sets N/A N/A
Substation/padmounted transformer N/A N/A
Manholes N/A N/A
Location of smoke dampers and duct smoke detectors N/A
Interconnection of electrical control equipment with HVAC equipment (see fire protection)
Yes
Smoke partitions and fire alarm zones N/A N/A N/A
Fire alarm and signal riser diagrams (see fire protection) Yes Yes
Calculations for emergency generator(s)
Yes N/A
Bruce W. Carter VA Medical Center, Miami, FL
Floor Plans/Drawings. Identify:
Electrical plot plan of existing and proposed underground power (including manholes)
N/A N/A N/A
Telephone systems N/A N/A N/A
Signal inter-building systems N/A Yes Yes
Proposed electrical system Yes Yes Yes
Electric symbols Yes Yes Yes
Lighting fixture schedule No Yes Yes
Symbols, note, abbreviations Yes Yes
List of specialty areas N/A
Method of short-circuit calculations Yes
Method of voltage drop and demand calculations Yes
Utility company correspondence N/A
Utility company requirements N/A N/A
Load calculations for normal & emergency use Yes Yes Yes
Lighting layouts Yes Yes
Power layouts Yes Yes
Signal layouts Yes Yes
Specialty area layouts N/A N/A
Demolition plans No No
Riser diagrams Yes Yes
Branch circuit wiring (typ.) No Yes Other:
Phasing scheme N/A N/A
Electrical details Yes
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
ELECTRICAL NOTES:
1. Include basic assumptions, points of interconnection, impact of new construction to existing electrical distribution system, current demand loading (high voltage switchgear and primary feeder), and projected load of new construction. Propose various feasible electrical systems for project and provide advantages/disadvantages.
2. Include means and clearances for installation, maintenance, and removal/replacement of equipment.
3. Electrical, signal and telephone closets must stack vertically.
4. Include high voltage and low voltage switchgear, transformers, and low voltage main.
Bruce W. Carter VA Medical Center, Miami, FL
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Specifications
VA MINOR CHECKLIST
Reviewer: Jennifer Fong/Michael Tootle/Stephen Morgan/Bob Haffeman/David Brooks/Mark Akin
A/E
Confirm DD A/E Confirm CD A/E
Specifications (All Disciplines) 1,2,3 Yes ⁴,⁵ Yes
1. Submit for all technical disciplines the original VA Master Specification section drafts marked-up with pencil showing the editing for the project. Clearly identify modifications, deletions, and insertions. Assure the specification drafts have been edited and tailored in their application to represent accurate coordination between drawings and specifications.
2. When no VA Master Construction Specification exists for a "unit of work", prepare the specification section consistent with VA Master Construction Specifications format.
a. Use generic or non-proprietary specifications describing the minimal acceptable product criteria level where no "Standard" exists to define quality and workmanship levels.
b. Use applicable "Standards" to define quality and workmanship when these publications exist. List complete designation and title of each publication used in Part 1; follow format in VA Master Construction Specifications for Applicable Publications.
c. Do not use proprietary specifications or systems that restrict competition unless authorization in writing has been received from the VA Project Manager for such proprietary specification. See the Federal Acquisition Regulation (FAR) Part 10, Part 14, and Part 36.
d. Do not use trade names or manufacturers brand names, except as previously noted.
e. When a deviation is requested, define, and specify the minimum acceptable levels of essential criteria in descriptive, physical, functional, or performance requirements.
3. Type specifications in final format and content including any desk copy changes made by the VAMC staff at the previous review. Submit a complete set of the typed specifications for review. Include one set of full size final drawings of all disciplines, fully coordinated.
4. Return all draft specifications reviewed at DD review to aid the final bid document review. These draft specifications will later be returned to the A/E.
Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105
Estimating
VA MINOR CHECKLIST
Reviewer: OCMI, Inc. (NOTE: cost estimate delivered under separate cover)
A/E
Confirm DD A/E Confirm CD A/E
Cost estimate in compliance with Manual for Preparation of Estimates (Separate estimates for new construction and alteration work)
Yes Yes Yes
Level "A" Summary Sheets for building Yes Yes
Level "A" Summary Sheets for sitework Yes Yes
Building gross area computation (new) Yes Yes
Building gross area computation (alteration work) Yes Yes
Project Data Sheet 1 Yes
Project Data Sheet 1 and 2 Yes Yes
Asbestos abatement N/A N/A
Detailed estimate take-off sheets Yes
Level "B" Summary Sheets for buildings Yes
Level "B" Summary Sheets for sitework Yes
Supplement A to SF 252 Yes
Detail Market Analysis Yes
Facilities Management Services DESIGN REVIEW / INSPECTION COMMENT SHEET
Project:
Number:
Facility:
Submittal Received:
Review Completed:
Design Phase
Design Phase Dwg/Spec/ Reference
Description Government Comments Gov. Reviewer AE Response/Actions A/E
Reviewer Government Back Check
Comments
DRAWINGS AND STUDY REPORT
DD1 - 35% AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET Existing Chilled Water System
• 2 CTs with 2 Cells (Aerial View Shows 6 cells) with 1 Cell standby. Please explain how each CT cell is tied into the Chiller Loop. What is your Cooling Tower configuration?
| • | 3 Chillers (1 Standby) |
| • | 4 Chilled Water Pumps (2 primary pumps). Please explain how each Chiller is |
tied into the System. What is your Chiller configuration?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET Existing vs. Proposed Please provide single line block diagram to help explain existing conditions and separate single line block diagram to show the proposed configuration. (Ref.
Table 1A and 1B in the report)
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How did you arrive at the campus actual tonnage/flow demand of 4,024.17 tons and 9,658 GPM, respectively (Ref. Table 3A)?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How was the Design Demand Flow determined in Table 3B per individual building/zone? Drawing M701G - Chilled Water and Condenser Flow Diagram Area G, Utility Plant, November 3, 2003 was referenced. Was field verification performed? Have they added anything to the system since then? Did the A/E confirm design loads at the air handlers?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement
546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.
The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.
AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.
VISN Project Scope:
9/29/23
35% Schematic Design
546 - Miami
Number:
Facility:
Submittal Received:
Review Completed:
Design Phase
Design Phase Dwg/Spec/ Reference
Description Government Comments Gov. Reviewer AE Response/Actions A/E
Reviewer Government Back Check
Comments
546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement
546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.
The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.
AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.
VISN Project Scope:
9/29/23
35% Schematic Design
546 - Miami
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET What is the existing loads and how were they calculated for each Building (Building 1, Building 7 and Building 10)? What is the maximum demand for all of those buildings? (Ref. Table 3A).
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET On Table 4C. How did you arrive at future consumption numbers?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How was the actual 9,658 gpm in the primary loop and the 7,835 gpm in the secondary loop determined?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report Are you stating that the limiting factor is the secondary loop (size of the pipes and pumps)? With your proposed design of 12,000 gpm (4 chillers running) that the secondary loop does not have the capacity (existing conditions) to distribute these 12,000 gpm?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
Number:
Facility:
Submittal Received:
Review Completed:
Design Phase
Design Phase Dwg/Spec/ Reference
Description Government Comments Gov. Reviewer AE Response/Actions A/E
Reviewer Government Back Check
Comments
546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement
546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.
The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.
AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.
VISN Project Scope:
9/29/23
35% Schematic Design
546 - Miami
AS101 Study Report Was the actual flow determined based on actual needs for each air handler? Is your design load of the building based on actual flow rates needs?
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
AS101 Study Report Summary and Recommendations section: Paragraph 1.a. Does not represent actual conditions.
Architectural Site Plan - comment not relevant to drawing.
Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.
See revisions in Study Report included with Design Analysis Report.
LS101 Life-Safety Plan AE to confirm using only one chiller and second chiller space for future use design
MH Confirmed per November 30, 2023 site visit meeting. Only one chiller will be designed to be redundant to the existing three chillers.
Design shown will be revised at 65% DD.
NONE AT 35% SPECIFICATIONS
- - - - - - - - - - - - - - - - Only proposed specifications Table of Contents included with Design Analysis Report at 35% SD submittal. No comments were received.
DESIGN ANALYSIS REPORT
DD1 - 35% Title Page Please refer to scope of work this is not the correct title. It should be Create Redundancy cCpacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement.
DR Corrected. Title of project will be changed per MOD P0001 to contract.
Number:
Facility:
Submittal Received:
Review Completed:
Design Phase
Design Phase Dwg/Spec/ Reference
Description Government Comments Gov. Reviewer AE Response/Actions A/E
Reviewer Government Back Check
Comments
546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement
546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.
The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .