ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105.pdf

PDF 34 MB Posted

Attached to
Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement
Solicitation number
36C24826R0028
Issued by

About this file

This file is the final Design Analysis Report and Construction Documents for a federal construction project to create redundancy capacity in the chiller plant system at the Bruce W. Carter VA Medical Center in Miami, Florida. The project (546-23-105) involves designing and constructing a new four-story building addition to house a 1,250-ton water-cooled chiller on the second level, a two-cell cooling tower on the roof, and electrical equipment on the third level. The building structure will utilize micropile foundations with an estimated allowable pile capacity of 35 kips per pile, and includes composite steel framing with ordinary steel moment frames for lateral resistance. The new chiller and cooling tower will provide redundancy to the existing three 1,250-ton chillers currently operating in Building 44, with a design constraint that only three chillers can operate simultaneously due to secondary chilled water piping capacity limitations. The project includes connections to existing chilled and condenser water systems through new 18-inch chilled water lines and 20-inch condenser water lines, requiring facility shutdowns for installation.

The construction documents include complete specifications for mechanical systems, electrical infrastructure, fire protection, plumbing, structural components, and architectural design. Key equipment selections include a York YKOGOLK2_FAH water-cooled centrifugal chiller rated at 1,250 tons with R-513A refrigerant, a Baltimore Aircoil Series 3000 two-cell cooling tower (Model S3E-1222-10P-2/SY) with dual 40-horsepower motors, inline variable-flow exhaust fans for mechanical room ventilation (rated at 9,000 CFM for normal conditions and 9,900 CFM for emergency conditions), horizontal fan coil units for electrical room cooling, and new electrical switchgear with manual transfer switches allowing only one chiller to connect to any substation at a time. The geotechnical investigation recommends a micropile deep foundation system designed for 270 kips maximum service load, with at least one load test required per ASTM D1143. The project specification references VA Master Construction Specifications and includes demolition of existing structures, site preparation requiring partial concrete slab removal, utility relocation around new foundation work, NPDES permitting compliance for construction stormwater management, and commissioning per ASHRAE Standard 202. The Period of Performance is 730 calendar days from notice to proceed, with the solicitation numbered 36C24826R0028.

View the file

Other files

File Type Posted
36C24826R0028 0004.pdf PDF
fact_sheet_acc_7.pdf PDF
S4100-1031.pdf PDF
VA Hydrant Inspection Report_out of date.pdf PDF
h6-a-dome-camera-datasheet.pdf PDF
014500a QC Form Attachment.pdf PDF
36C24826R0028 0003.pdf PDF
03 SD-100.pdf PDF
04 SC-100.pdf PDF
06 SW-100.pdf PDF
00_CCG_MIAMI_VAMC_B44_IR_E1 30 X 42 - GRID-Key_Planning.pdf PDF
avigilon-unity-h6a-h6x-bullet-camera-datasheet-en.pdf PDF
RFIs Combined 546-23-105 SO.xlsx XLSX spreadsheet
SARGENT_10X_Line_Catalog.pdf PDF
SARGENT_10X_Line_Sell_Sheet.pdf PDF
avigilon-nvr6-form-d-fips- datasheet-en.pdf PDF
013323a Submittal Register Form.pdf PDF
36C24826R0028 0002.pdf PDF
ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105 R1.pdf PDF
36C24826R0028 0001.pdf PDF
S02 - 36C24826R0028 - R1 - Final.pdf PDF
ATTACHMENT 9 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Specialized Experience Form.pdf PDF
ATTACHMENT 6 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT - 3 100 Bid Drawings 546-23-105.zip ZIP file
ATTACHMENT 2 - 100 CIH Report 546-23-105.zip ZIP file
ATTACHMENT 4 - GEO Tech Report.zip ZIP file
S02 - 36C24826R0028 - Final.pdf PDF
ATTACHMENT 5 - DBA Wage Determination FL20260215.pdf PDF
ATTACHMENT 8 - EMR.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Create Redundancy Capacity in Chiller Plant System/ Chilled and Condensed Water System

Repair/Replacement Bruce W. Carter VA Medical Center

Miami, Florida

Contract 36C24819D0021, 36C24823N0259 Project 546-23-105

DESIGN ANALYSIS REPORT

FINAL BID DOCUMENTS

Prepared for

Department of Veterans Affairs

Engineering Service, Room B110

Planning and Analysis

1201 NW 16th Street

Miami, FL 33125

Prepared by

3603 NW 98th Street, Suite B

Gainesville, Florida 32606

June 20, 2025

Design

Create Redundancy Capacity in Chiller Plant System/ Design Analysis Report – Final Bid Documents Chilled and Condensed Water System Repair/Replacement Bruce W. Carter VA Medical Center, Miami, FL

Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

AKEA Design, Inc. Contents – Page 1 of 1

Contents

Submittal Letter

Schedule

VA Minor Checklists

35% Review Comments

65% Review Comments

95% Review Comments

65%_R1 Review Comments

95%_R1 Review Comments

95%_R1 CITP Review Comments

100% Review Comments

Civil Narrative

Architectural Narrative

Structural Narrative

Mechanical Narrative

Plumbing Narrative

Fire Protection Narrative

Electrical Narrative

Appendix

Equipment Basis of Design

Chiller

Cooling Tower

Refrigerant Monitor

Exhaust Fan

Fan Coil

June 20, 2025

Mr. Santos Oquendo, COR

Engineering Service, Room B110

Planning and Analysis

1201 NW 16th Street

Miami, FL 33125

Re: 100% Construction Documents Submission for

MATOC Contract 36C24819D0021, Task Order 36C24823N0259, Project 546-23-105, Create Redundancy Capacity in Chiller Plant System/

Bruce W. Carter VA Medical Center, Miami, Florida

Dear Mr. Santos Oquendo:

The following documents are included in this 100% Construction Documents review submittal as specified in the project Statement of Work:

• (1) Full-size set of drawings

• (1) Specifications, redlined edits

• (1) Design Analysis Report (DAR)

• (1) CD with all submittal documents included (PDFs)

• (1) Cost Estimate (to be delivered under separate cover)

The DAR contains design narratives for each area identified in the Scope of Work. The 100%

Construction Document submittal files have been sent to our independent construction cost estimator, and we will forward the cost estimate upon receipt.

Sincerely, Jennifer Fong, AIA, NOMA, CGC, NCARB

Lead Architect / Project Manager cc: Mr. Aldwyn Singleton, Contracting Officer

3603 NW 98th St., Suite B Gainesville, FL 32606 Office (352) 474-6124Design

CONTRACT 36C24819D0021 D.O. 36C24823N0259 print date: 6/5/2025

PROJECT NO. 546‐23‐105

PROJECT TITLE: Create Redundancy Capacity in the Chiller Plant System

PROJECT LOCATION: Miami VA Medical Center, Miami, Florida

Schedule Notes

Sub. Task

Incremental

Days Day Date

Contract 12/30/2022 Fri

Contract Kickoff Meeting 1/13/2023 Fri

0 NTP / Initiate Design 0 1/17/2023 Tue add 6 weeks to design schedule for additional site investigation add 16 weeks to design schedule for new site location investigation and new site location survey and underground utility investigation

1 35% Schematic submittal 256 256 9/29/2023 Fri

VA Review ‐ 35% Schematic 14 270 10/13/2023 Fri period includes Federal holiday (Columbus Day 10/09/23 Mon)

35% REVIEW 11/30/2023 Thur

Proceed to 65% Design 12/4/2023 Mon

Contract days

2 65% Design Development submittal 45 367 1/19/2024 Fri

VA Review ‐ 65% CD 30 396 2/16/2024 Fri

3 95% Construction Documents submittal 45 442 4/2/2024 Tue

VA Review ‐ 95% CD 15 458 4/18/2024 Thur

VA On‐Site Design Review Meeting 8 466 4/26/2024 Fri

Contract Modification award 200 11/12/2024 Tue

2a

65%_R1 Design Development

Revised Floor Plan Layouts Confirmation

(3 week VA review period) 65 731 1/16/2025 Thur

(layouts confirmed in Thurs Virtual Meeting)

65%_R1 Design Development submission_R1_After 95% Submittal 43 774 2/28/2025 Fri

(changed from 45 to 43 for Friday delivery)

VA Review ‐ 65%_R1 CD 14 788 3/14/2025 Fri

(changed from 30 to 14 per VA)

3a

95%_R1 Construction Documents submission_R1 28 816 4/11/2025 Fri

(changed from 45 to 42 for Friday delivery)

VA Review ‐ 95%_R1 CD 14 830 4/25/2025 Fri

(changed from 15 to 14 per VA)

4 100% Construction Documents submittal 28 858 5/23/2025 Fri

(back to original remaining submissions) (changed from 45 to 42 for Friday delivery)

VA Review ‐ 100% CD 14 872 6/6/2025 Fri

(changed from 15 to 14 per VA)

5 Final S&S Bid CDs submittal 14 886 6/20/2025 Fri

(changed from 15 to 14 for Friday delivery)

NOTE: INCREMENTAL DAYS WILL BE ADJUSTED TO AVOID SAT/SUN/HOLIDAY DUE DATES.

VA Minor Checklists

Site Development

Architectural

Asbestos Abatement

Space Planning

Structural

HVAC

Fire Protection

Plumbing

Sanitary

Electrical

Specifications

Estimating

THIS PAGE INTENTIONALLY LEFT BLANK

Create Redundancy Capacity in Chiller Plant System/ VA Minor Checklist – Final Bid Documents

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Site Development

VA MINOR CHECKLIST

Phase: Construction Documents Reviewer: Michael Tootle

Submittal Schematics (15-30%)

A/E Confirm DD A/E

Confirm CD A/E Confirm

Narrative Yes

Analysis of site Yes

Circulation study N/A

Phasing analysis N/A

Parking analysis N/A

Development concept showing proposed buildings and structures Yes

Landscape drawings with plant groupings N/A

Topographic, utility, and landscape survey Yes Yes

Demolition plan No Yes Yes Layout plan showing location of:

Building and structures Yes Yes Yes

Roads (existing) Yes Yes Yes

Fire access (same as roads) N/A Yes Yes

Parking (there is no parking in project) N/A N/A N/A

Accessible spaces (no parking) N/A N/A

Van spaces (no parking) N/A N/A

Mechanical and electrical equipment on grade (none) N/A N/A N/A

Future expansion (none) N/A N/A N/A

Off-site roads (none) N/A N/A N/A

Off-site utilities (none) N/A N/A N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Service area(s) (none) N/A N/A

Entrances and exits (none ground level) Yes Yes

Walks (existing) Yes Yes

Inlets (storm) (existing) Yes Yes

Contractor’s staging area (at site) Yes Yes

Vertical and horizontal road alignment N/A N/A

Paving joint patterns N/A N/A

Grading plan showing: (NOTE – there is no SITE GRADING)

Existing contours (existing) N/A N/A

Proposed contours (same) N/A N/A

Spot elevations at structure corners, entrances, equipment pads, etc. Yes Yes

First floor elevations (finish floor slab) Yes Yes

Rim and invert elevations on storm drainage fixtures (existing) N/A N/A

Erosion and sediment control Yes Yes

Rock excavation (quantity) (N/A) N/A N/A

Planting plan showing: (none) N/A N/A

List of plant material (none) N/A N/A N/A

Limits of irrigation (none) N/A N/A N/A

Other N/A N/A

Site details (existing) Yes Yes

Landscape details (N/A) N/A N/A

Signage plan and schedule (N/A) N/A N/A

Specifications Yes Yes

* Submit site and landscape plans at an appropriate scale to show all work involved.

** Submit site and landscape plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Architectural

VA MINOR CHECKLIST

Phase: Construction Documents Reviewer: Jennifer Fong / Sierra Gillion

Submittal Schematics

(15-30%) A/E

Confirm DD A/E Confirm CD A/E

Confirm Location of:

Rooms ¹ Yes Yes Yes

Doors ² Yes Yes Yes

Corridor(s) ³ N/A N/A N/A

Basic column grid/sizes Yes Yes Yes

Expansion and seismic joints N/A Yes Yes

Electrical closets (room) Yes Yes Yes

Equipment rooms Yes Yes Yes

Signal and telephone closets N/A N/A N/A

Mechanical shafts and space Yes Yes Yes

Stair(s) N/A Yes

Ramp(s) Yes Yes

Elevator(s) N/A N/A N/A

Automatic Conveyances N/A N/A N/A Floor Plans/Drawings:

All floors (new and renovated) Yes Yes Yes

Penthouse N/A Yes Yes

Roof plan Yes Yes Yes

Pipe basement N/A N/A N/A

Pipe tunnel N/A N/A

Reflected ceiling⁴ N/A N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Equipment floor plans 1:50 (1/4 inch) scale⁵ Yes Yes

Demolition plans⁶ Yes Yes

Room names and numbers⁷ Yes Yes

Program net/designed net Yes Yes Yes

Exterior dimensions/total building gross area Yes Yes Yes

Size and shape of all departmental functions and services⁹ Yes Yes Yes

Exterior building elevations¹⁰ Yes Yes Yes

Finish floor elevations¹¹ Yes Yes Yes

Door locations, sizes, and swings Yes Yes

Wall thickness and chase walls Yes Yes

Handrail location/dimensions Yes Yes

Fixed equipment Yes Yes

Equipment elevations and details Yes

Plumbing fixtures N/A N/A

Wheelchair accessible facilities N/A N/A

Wall sections¹² Yes Yes

Building sections¹³ Yes Yes

Finish grades at corners, entrances, exits, platforms, and ramps Yes Yes

Fire and smoke rated partitions¹⁴ N/A Yes Yes

Lead-lined and radio frequency-shielded partitions¹⁴ N/A N/A

Fire extinguisher cabinets¹⁴ Yes Yes

Spray-on fire proofing (see fire protection) Yes Yes

Construction details¹⁵ Yes Yes

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Drafting symbols, abbreviations, and general notes Yes Yes

Door, window, and louver schedules Yes

Interior details, elevations, sections Yes

Finish schedule¹⁶ Yes Yes

Graphics and signage¹⁷ Yes

Color rendering Yes

Specifications Yes Yes

Lead abatement¹⁸ Yes N/A

Lead abatement specification¹⁸ Yes N/A

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

NOTES:

1. Use lines between spaces to indicate the centerline of the partition (for schematics only).

2. Indicate doors with a slash mark.

3. Along the corridor, the line shall represent the corridor side of the partition.

4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.

5. Identify all equipment for each room. Indicate and coordinate all equipment with the Equipment Guide List (Program Guide 7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)] and relocated (R) equipment. Equipment floor plans are not required for the offices, consultation rooms, classrooms, conference rooms, and waiting rooms within the above departments. Draw equipment details which are necessary for major decisions, though complete detailing is not required for this submittal.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

6. Indicate existing finish schedule and notes on plan.

7. Label as required for schematic drawings. Coordinate new room numbering with medical center.

8. Use the same names on drawings as those used in the space program. Provide area figures in fractional form, e.g., 400/390. Indicate space provided, but not called for in the space program, as: -/390.

9. Label each service or activity listed in the Project Scope Data of the Design Program and indicate boundaries with a distinctive line.

Include the activity code number (see Handbook 7610).

10. If the project requires exterior work, show all facades indicating massing, proposed fenestration and the building relationship to adjacent structures and the finish grade. Show all significant building materials, including their colors, any proposed roof top mechanical equipment, architectural screens, skylights, and stacks on the elevation drawings. If building is designed for future expansion (vertical and/or horizontal), delineate elevations with and without the future expansion. If project is an addition, show elevations of the existing building in sufficient detail to illustrate the relationship between the new and existing in terms of scale, material, and detail.

11. Define the relationship of the finish ground floor to finish grade at major entrances and docks.

12. Indicate construction including fire resistance rating, building materials and systems, and proposed sill and head heights of openings.

Indicate both new and renovated areas on form provided by VA.

13. Define building configuration. Draw sections at the same scale as floor plans, normally 1:100 (1/8 inch). If the building abuts an existing structure, indicate in the section how the new floor elevations align with existing.

14. Identify psychiatric areas where special considerations are required to ensure the safety of patients (e.g., hard ceilings, safety glazing, etc.).

15. Indicate new building components and systems, such as window design, roofing system, special entryways, building "skin", and any special architectural elements for the project. Complete detailing of miscellaneous items is not required for this submission.

16. Indicate all building systems, materials, and future expansion, if applicable.

17. Submit a drawing for all which is part of the construction contract.

18. Provide square meters (feet) of lead paint and x-ray shielding to be removed.

19. Format provided in SPECIFICATIONS. If there is no VA master specification, develop contract specification that is in compliance with regulations of the Environmental Protection Agency.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

ASBESTOS ABATEMENT

VA MINOR CHECKLIST

Reviewer: GLE (NOTE: see Asbestos Survey – no asbestos identified in project)

A/E

Confirm DD A/E Confirm CD A/E

Confirm Narrative:

Asbestos abatement report including:

1. Summary results of building records

2. Summary results of station personnel interview

3. Determination of materials known to contain asbestos

4. Visual inspection of building to determine location and condition of asbestos

5. Sample strategy on the extent of asbestos present

NOTE: no asbestos identified Reports included with specifications

Yes

Name and location of qualified laboratory for sample analysis Yes

Asbestos abatement drawing N/A

Major Decontamination Areas showing:

1. Limits of sealing off the location

2. Quantities of asbestos material

3. Arrangements for auxiliary rooms

4. Engineering of negative air systems

5. Path of asbestos to loading platform

6. Location and connection to required utilities

N/A

Minor Decontamination Areas showing:

1. Location, type, and length of pipe element to be abated by "Glove and Bag" approach

2. Other abatement features

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Summary of:¹

Square meter (feet) of floor space for abatement N/A N/A

Total linear and square meter (feet) of asbestos to be abated N/A N/A

Total cost of abatement² N/A N/A

Asbestos abatement drawings including:

1. Restoration of impacted building sub-systems

2. Integrated phasing on execution of abatement

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

NOTES:

1. Provide a copy of the summary to the construction cost estimator for inclusion as a separate bid item in the project estimate.

2. Include any cost for decontamination of equipment and fixtures.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Space Planning

VA MINOR CHECKLIST

Reviewer: Jennifer Fong / Sierra Gillion

A/E

Confirm DD A/E Confirm CD A/E

Space-Accounting Summary Table 1 Yes 2 Yes 3 Yes

1. Provide a tabular table with columns entitled Departmental Function, H-7610 Requirements, Approved Space Program [Net Square Meters (Net Square Feet)], Variance Between H-7610 and Approved Space Program, Departmental Conversion Factor, Planned Departmental Gross Square Meters (Feet); column totals; and a Total Project Net to Gross Factor. Also, list separately the area required for additions to the program, unassigned space, major circulation (inter-departmental corridors, stairs, elevators), major mechanical and electrical spaces, exterior walls, connecting corridors to other buildings, space for future mechanical system expansion, and similar special requirements.

2. Update table. Justify in writing substantial deviations from the approved space program.

3. Update table.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Structural

VA MINOR CHECKLIST

Reviewer: Stephen Morgan

A/E

Confirm DD A/E Confirm CD A/E

Confirm Three alternative structural systems for typical bays¹ Yes

Supporting calculations² Yes Yes Yes

Cost estimates for each system³ N/A

Recommend preferred system Yes

Column locations Yes

Sheer load resisting elements⁴ Yes

Boring location plan⁵ N/A

Structural plans⁶ Yes Yes

Sections Yes Yes

Details Yes Yes Size/location of:

Columns Yes Yes

Beams Yes Yes

Lateral load resisting elements Yes Yes

Slabs Yes Yes

Foundations Yes Yes

Elevations Yes

Schedules Yes

General notes Yes

Boring logs Yes

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Subsurface investigation report Yes

Estimated quantity of rock N/A

Specifications Yes

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

1. When only one structural system is possible due to other project requirements, include an explanatory statement and submit only that structural system.

2. Include vertical and lateral load design for CD submission.

3. Include foundation and fireproofing.

4. Indicate existing utilities and structures within, adjacent, or contiguous to the new construction.

5. Upon approval of the subsurface investigation criteria, submit qualifications of at least three consultants being considered for the work together with the proposal of the consultant recommended as most qualified.

6. If there is only a CD submission, provide a Structural Engineering Analysis Submission within six weeks from the notice to proceed including sketches, calculations, and cost estimates of three alternative structural systems for typical bays, boring location plan for subsurface investigation, and consultant qualifications. For vertical expansion projects, analyze existing structure for structural feasibility.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

HVAC

VA MINOR CHECKLIST

Phase: Design Development Reviewer: Daniel Ellis

A/E

Confirm DD A/E Confirm CD A/E

Description of HVAC systems Yes

Equipment for each functional space Yes

Life cycle cost analysis¹ N/A Tentative location and size of:

Mechanical equipment room Yes

Principal vertical shafts No

Block layout of equipment Yes Louvers²:

Outside air Yes Yes Yes

Exhaust air No Yes Yes

Relief air N/A N/A N/A

Engineering calculations³ Yes Yes Yes

Selection of HVAC equipment Yes Yes

Catalog cuts of equipment Yes Yes

Room by room heating and cooling loads N/A N/A

Zone by zone heating & cooling loads N/A N/A

Building block heating & cooling loads Yes Yes

Tabulation of steam consumption N/A N/A

Psychometric chart for air handling unit N/A N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Coil entering and leaving conditions N/A N/A

Fan motor heat gains N/A N/A

Consumption of humidification loads N/A N/A

Sound/acoustic analysis No N/A

Room-by-room air balance charts⁴ N/A N/A Chilled Water Plant⁵

Quantity and type of chillers Yes Yes

Capacity in tons of refrigeration Yes Yes

Electrical equipment Yes Yes Heating System

Total heating load N/A N/A

Domestic hot water load N/A N/A

Humidification load N/A N/A

Equipment steam demand N/A N/A

Zoning of heating system N/A N/A HVAC floor plan⁶

Main supply, return, and exhaust ductwork N/A N/A

Volume dampers N/A N/A

Fire and smoke partitions N/A N/A

Fire and smoke dampers N/A N/A

Smoke detectors N/A N/A

Automatic control dampers N/A N/A

Air quantities for each room N/A N/A

Air inlets/outlets N/A N/A

Rises and drops in ductwork N/A N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Expansion loops N/A N/A

Anchors N/A N/A

Vales N/A N/A

Drip assemblies N/A N/A

Balancing fittings Yes Yes

Interconnection of HVAC equipment with fire protection equipment (see fire protection)

N/A N/A

Plan/section of mechanical equipment rooms Yes Yes

Schematic flow and riser diagrams⁷ Yes Yes

Schematic control diagrams⁸ Yes Yes

HVAC demolition drawings Yes Yes

Phasing plan N/A N/A

Equipment schedule Yes Yes

Seismic bracing N/A N/A

VA symbols and abbreviation Yes Yes Selection of:

Pumps Yes

Fans Yes Sizing and selection of:

Expansion tanks N/A

Steam to hot water convertor N/A

Heat exchangers N/A

Other:

Sound analysis N/A

Complete selection data Yes

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Outside chilled water and condenser water distribution⁹ Yes

Standard detail drawings Yes

Automatic temperature control drawings¹⁰ Yes

HVAC specifications Yes

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

HVAC NOTES:

1. Provide specific design recommendations and full back-up data. Include the heating and cooling capacities of each functional area and the block cooling and heating loads for each new and/or existing building.

2. The locations of these louvers must not allow short circuiting of air from emergency generator exhaust or truck waiting and loading dock areas into air intake etc. Consider factors affecting louver location such as visibility, historical considerations, wind direction, nuisance and health hazard odors (from emergency generator or truck exhausts).3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads.

Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.

3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads. Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.

4. Show supply, return, exhaust, make-up, and transfer quantities with intended pressure relationships, i.e. positive, negative, or zero with respect to adjoining spaces.

5. Provide pertinent data on accessories such as pumps and cooling tower etc. Show the extent of the outside chilled water and condenser water piping. Clearly show how the piping will be laid in tunnels, trenches, or by direct burial.

6. Show ceiling clearances, at locations where ducts cross each other, by providing 1:50 (1/4 inch) scale local sections. Show all ductwork, and piping 150 mm (6 inch) and larger in double line. Show separate floor plans for air distribution and piping unless waived by VA. Show clearances required for access and maintenance with coil and tube pull.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

7. Show typical air handling systems and all hydronic systems with existing capacities and new estimated loads. Verify actual operating conditions and capacities of HVAC systems prior to design.

8. Show control devices, such as, thermostats, humidistats, flow control valves, dampers, freezestats, operating and high limit sensors for all air systems and fluids, smoke dampers, duct detectors etc. Provide a written description of the sequence of operation on the floor plans. Detail the scope of work involved with the Central Engineering Center (ECC) and address if enough spare capacity is available or a new ECC is required.

Show a point schedule for analog/digital input/output to be included in ECC.

9. Show pipe sizes and insulation with plans, profile, sections, details, and all accessories, such as, anchors, expansion loops/joints, valves, manholes, capped and flanged connections, interface between the new and existing work (if any). Clearly indicate interferences (if any) with the existing utilities and/or landscape elements on outside piping layout drawings. Show rerouting any utilities, cuttings of roads, pavements, trees, etc., and the extent of new and demolition work. Outside utility drawings shall be based on the study of the latest site drawings, discussions with engineering personnel, and actual site inspection of the existing utility.

10. Show all duct detectors, control valves/dampers static pressure sensors, differential pressure control assemblies, etc., whose actual physical location is critical for the intended sequence of operation on floor plans.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Fire Protection

VA MINOR CHECKLIST

Reviewer: Andrew Peter, Jennifer Fong, Bob Haffeman

A/E

Confirm DD A/E Confirm CD A/E

Confirm Fire Protection Narrative¹:

Fire and smoke separation Yes

Fire sprinkler/standpipe system Yes

Size of fire pumps Yes

Water supply available/max. demand Yes

Water flow testing results Yes

Fire alarm systems² Yes

Existing to be modernized Yes

Base loop system for interface of new construction Yes

Kitchen extinguishing systems N/A

Size of air handling unit N/A

Exit paths from each zone Yes

Distances to stairs Yes

Occupancy of each area Yes

Exit calculations for each floor Yes

Smoke control features N/A Floor Plans/Drawings³⁴:

Sprinkler zones Yes

Fire alarm zones N/A

Smoke zones N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Building water supply Yes

Interior sprinkler supply lines Yes

Standpipes Yes

Fire extinguisher cabinets Yes Yes Yes

Fireproofing of structural members Yes

Sprinkler/standpipe riser supply piping Yes Yes

Termination of sprinkler main and inspector test drains Yes Yes

Sprinkler alarm valves Yes Yes

Waterflow and tamper switches Yes Yes

Sprinkler system fire department connections No No

Sprinkler design hazards per NFPA 13 Yes Yes

Exit signs and emergency lighting Yes Yes

Occupied areas not protected by automatic sprinklers Yes Yes

Calculations No No No

Estimated capacities for proposed air handling units in cubic meters (cubic feet) per minute

N/A N/A

Location of:

Fire alarm system Yes Yes

Annunciator panels No No

Pull stations Yes Yes

Flow switches Yes Yes

Audio-visual devices Yes Yes

Smoke detectors No No

Duct smoke detectors No No

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Smoke dampers No No

Fire dampers No No

Fire alarm risers⁵ Yes Yes

Exit signs Yes Yes

Emergency lighting Yes

Fire sprinklers Yes

Standpipes Yes Yes

Fire hydrants No

Fire pumps No

Post indicator valves N/A N/A

Sectional valves No

Fire extinguisher cabinets Yes Yes

Electromagnetic door-hold open devices No

Wall sections indicating fire resistive ratings Yes

Staff sleeping rooms No

Excavation plan signage Yes

Door and window schedule with fire rating or fire-rated glazing No

Zoning of each fire alarm initiating device Yes

Details

Fire pump system (capacity and pressure) No

Elevation and isometric view of fire pump No

Stairwell sign Yes

Annunciator panel Yes

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Interconnection of fire alarm system with:

Smoke dampers No

Air handlers No

Elevator controls No

Kitchen fire extinguishing and fire pump system No

HVAC system with smoke duct detectors No

Single line riser diagram for fire alarm system Yes

Height/configuration of storage racks and shelving No

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

NOTES:

1. Indicate NFPA 220 and UBC fire resistive rating of the building, NFPA 101 occupancy type, and fire protection code analysis to access compliance with NFPA 101.

2. Determine type, features, age, reliability, compliance with present day codes, capacity, zoning, supervision, control panel and power supplies, initiating devices and circuits, and auxiliary functions for existing fire alarm system. Indicate manufacturer, model number, voltage, and wiring style of existing alarm systems and devices. Provide recommendations for the proposed fire alarm work.

3. Provide information to meet JCAHO requirements, e.g., location of all fire rated barriers, smoke barriers, exit signs, fire extinguishers, manual pull stations, smoke detectors, and sprinkler flow switches. Show all interim life safety measures such as temporary systems Fire Alarm, Sprinkler, and Smoke.

4. At DD Submission, add room names, room numbers, door locations and swings, smoke and fire rated partitions, sprinkler/standpipe risers to floor plans. Identify psychiatric areas on drawings so areas for institutional type heads are identified. Add location of all valves (post indicator, sectional) and backflow preventer if provided.

5. Show new equipment and/or the necessary changes involved if modification to the existing system is required. Include any recommendations where certain requirements of VA criteria might be waived, in order to allow the existing equipment to be reused.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

PLUMBING

VA MINOR CHECKLIST

Reviewer: Andrew Peter

A/E

Confirm DD A/E Confirm CD A/E

Confirm Narrative:

Existing plumbing systems to be used and necessary modifications Yes Yes Yes

New plumbing systems Yes Yes Yes

New or modified water treatment N/A N/A N/A Floor Plans/Drawings. Identify:

Room names Yes Yes Yes

Existing plumbing fixtures w/ VA numbering systems Yes N/A N/A

New plumbing fixture w/ VA numbering systems N/A N/A N/A

Existing equipment N/A N/A N/A

New equipment N/A N/A N/A

New medical gas outlets N/A N/A

New laboratory gas outlets N/A N/A

Plumbing piping Yes Yes Yes

Size of pipe Yes Yes

Equipment schedule N/A N/A

Fire & smoke partitions N/A N/A N/A

Demolition plans N/A N/A

Riser diagrams Yes

Legends, notes, and details Yes Other:

Location and size of sprinkler riser, standpipes, and fire pumps (see fire protection)

Yes Yes

Location of emergency eyewash and shower equipment N/A N/A

Calculations (equipment & piping) Yes Yes

List of required contract specifications Yes Yes

Contract Specifications Yes

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics phase.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch).

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Sanitary

VA MINOR CHECKLIST

Reviewer: Andrew Peter

A/E

Confirm DD A/E Confirm CD A/E

Narrative:

Existing sanitary systems: underground water, sanitary sewers, storm sewers, & fuel gas with sources, disposal methods, storage pressures, condition, etc.

Yes Yes

New sanitary systems Yes Yes Yes

Provide water analysis & expected yield if well required N/A N/A N/A

Circulation study to assess emergency vehicle access N/A N/A N/A

Install test well, if well is required N/A Utility Plans/Drawings showing existing and new sanitary systems:

Size of pipes Yes Yes Yes

Invert elevations of sewers Yes Yes Yes

Locate/size:

Pumps N/A N/A N/A

Storage facilities N/A N/A N/A

Treatment equipment N/A N/A N/A

Fire hydrants No No

Sectional and post indicator valves No No

Backflow preventer Yes Yes

Areas of new irrigation system N/A

New irrigation system N/A

Profiles of sanitary and storm sewers N/A

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Demolition plans Yes Yes

Legends, notes, and details Yes Other:

Point of connection to sprinkler system Yes Yes Yes

Calculations No No

List of specifications Yes

Contract specifications Yes

* Submit utility drawings at same scale as provided for Site Development drawings.

** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the schematics phase.

*** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all of the revisions required by comments from the design development phase. Submit legend, notes, and details at a scale not less than 1:100 (1/8 inch).

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Electrical

VA MINOR CHECKLIST

Reviewer: Bob Haffeman

A/E

Confirm DD A/E Confirm CD A/E

Confirm Narrative:

Design Yes

Life cycle analysis for electrical systems N/A Location and size of:

Electrical equipment Yes

Electrical closets N/A

Telephone closets N/A

Signal closets N/A

Electrical distribution equipment Yes

Primary distribution switchgear/switchboard N/A Yes

Engine-generator sets N/A N/A

Substation/padmounted transformer N/A N/A

Manholes N/A N/A

Location of smoke dampers and duct smoke detectors N/A

Interconnection of electrical control equipment with HVAC equipment (see fire protection)

Yes

Smoke partitions and fire alarm zones N/A N/A N/A

Fire alarm and signal riser diagrams (see fire protection) Yes Yes

Calculations for emergency generator(s)

Yes N/A

Bruce W. Carter VA Medical Center, Miami, FL

Floor Plans/Drawings. Identify:

Electrical plot plan of existing and proposed underground power (including manholes)

N/A N/A N/A

Telephone systems N/A N/A N/A

Signal inter-building systems N/A Yes Yes

Proposed electrical system Yes Yes Yes

Electric symbols Yes Yes Yes

Lighting fixture schedule No Yes Yes

Symbols, note, abbreviations Yes Yes

List of specialty areas N/A

Method of short-circuit calculations Yes

Method of voltage drop and demand calculations Yes

Utility company correspondence N/A

Utility company requirements N/A N/A

Load calculations for normal & emergency use Yes Yes Yes

Lighting layouts Yes Yes

Power layouts Yes Yes

Signal layouts Yes Yes

Specialty area layouts N/A N/A

Demolition plans No No

Riser diagrams Yes Yes

Branch circuit wiring (typ.) No Yes Other:

Phasing scheme N/A N/A

Electrical details Yes

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

ELECTRICAL NOTES:

1. Include basic assumptions, points of interconnection, impact of new construction to existing electrical distribution system, current demand loading (high voltage switchgear and primary feeder), and projected load of new construction. Propose various feasible electrical systems for project and provide advantages/disadvantages.

2. Include means and clearances for installation, maintenance, and removal/replacement of equipment.

3. Electrical, signal and telephone closets must stack vertically.

4. Include high voltage and low voltage switchgear, transformers, and low voltage main.

Bruce W. Carter VA Medical Center, Miami, FL

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Specifications

VA MINOR CHECKLIST

Reviewer: Jennifer Fong/Michael Tootle/Stephen Morgan/Bob Haffeman/David Brooks/Mark Akin

A/E

Confirm DD A/E Confirm CD A/E

Specifications (All Disciplines) 1,2,3 Yes ⁴,⁵ Yes

1. Submit for all technical disciplines the original VA Master Specification section drafts marked-up with pencil showing the editing for the project. Clearly identify modifications, deletions, and insertions. Assure the specification drafts have been edited and tailored in their application to represent accurate coordination between drawings and specifications.

2. When no VA Master Construction Specification exists for a "unit of work", prepare the specification section consistent with VA Master Construction Specifications format.

a. Use generic or non-proprietary specifications describing the minimal acceptable product criteria level where no "Standard" exists to define quality and workmanship levels.

b. Use applicable "Standards" to define quality and workmanship when these publications exist. List complete designation and title of each publication used in Part 1; follow format in VA Master Construction Specifications for Applicable Publications.

c. Do not use proprietary specifications or systems that restrict competition unless authorization in writing has been received from the VA Project Manager for such proprietary specification. See the Federal Acquisition Regulation (FAR) Part 10, Part 14, and Part 36.

d. Do not use trade names or manufacturers brand names, except as previously noted.

e. When a deviation is requested, define, and specify the minimum acceptable levels of essential criteria in descriptive, physical, functional, or performance requirements.

3. Type specifications in final format and content including any desk copy changes made by the VAMC staff at the previous review. Submit a complete set of the typed specifications for review. Include one set of full size final drawings of all disciplines, fully coordinated.

4. Return all draft specifications reviewed at DD review to aid the final bid document review. These draft specifications will later be returned to the A/E.

Bruce W. Carter VA Medical Center, Miami, FL Contract 36C24819D0021, 36C24823N0259, Project 546-23-105

Estimating

VA MINOR CHECKLIST

Reviewer: OCMI, Inc. (NOTE: cost estimate delivered under separate cover)

A/E

Confirm DD A/E Confirm CD A/E

Cost estimate in compliance with Manual for Preparation of Estimates (Separate estimates for new construction and alteration work)

Yes Yes Yes

Level "A" Summary Sheets for building Yes Yes

Level "A" Summary Sheets for sitework Yes Yes

Building gross area computation (new) Yes Yes

Building gross area computation (alteration work) Yes Yes

Project Data Sheet 1 Yes

Project Data Sheet 1 and 2 Yes Yes

Asbestos abatement N/A N/A

Detailed estimate take-off sheets Yes

Level "B" Summary Sheets for buildings Yes

Level "B" Summary Sheets for sitework Yes

Supplement A to SF 252 Yes

Detail Market Analysis Yes

Facilities Management Services DESIGN REVIEW / INSPECTION COMMENT SHEET

Project:

Number:

Facility:

Submittal Received:

Review Completed:

Design Phase

Design Phase Dwg/Spec/ Reference

Description Government Comments Gov. Reviewer AE Response/Actions A/E

Reviewer Government Back Check

Comments

DRAWINGS AND STUDY REPORT

DD1 - 35% AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET Existing Chilled Water System

• 2 CTs with 2 Cells (Aerial View Shows 6 cells) with 1 Cell standby. Please explain how each CT cell is tied into the Chiller Loop. What is your Cooling Tower configuration?

•3 Chillers (1 Standby)
•4 Chilled Water Pumps (2 primary pumps). Please explain how each Chiller is

tied into the System. What is your Chiller configuration?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET Existing vs. Proposed Please provide single line block diagram to help explain existing conditions and separate single line block diagram to show the proposed configuration. (Ref.

Table 1A and 1B in the report)

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How did you arrive at the campus actual tonnage/flow demand of 4,024.17 tons and 9,658 GPM, respectively (Ref. Table 3A)?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How was the Design Demand Flow determined in Table 3B per individual building/zone? Drawing M701G - Chilled Water and Condenser Flow Diagram Area G, Utility Plant, November 3, 2003 was referenced. Was field verification performed? Have they added anything to the system since then? Did the A/E confirm design loads at the air handlers?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement

546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.

The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.

AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.

VISN Project Scope:

9/29/23

35% Schematic Design

546 - Miami

Number:

Facility:

Submittal Received:

Review Completed:

Design Phase

Design Phase Dwg/Spec/ Reference

Description Government Comments Gov. Reviewer AE Response/Actions A/E

Reviewer Government Back Check

Comments

546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement

546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.

The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.

AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.

VISN Project Scope:

9/29/23

35% Schematic Design

546 - Miami

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET What is the existing loads and how were they calculated for each Building (Building 1, Building 7 and Building 10)? What is the maximum demand for all of those buildings? (Ref. Table 3A).

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET On Table 4C. How did you arrive at future consumption numbers?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report BLOCK COMMENT ON ADOBE DRAWING SHEET How was the actual 9,658 gpm in the primary loop and the 7,835 gpm in the secondary loop determined?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report Are you stating that the limiting factor is the secondary loop (size of the pipes and pumps)? With your proposed design of 12,000 gpm (4 chillers running) that the secondary loop does not have the capacity (existing conditions) to distribute these 12,000 gpm?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

Number:

Facility:

Submittal Received:

Review Completed:

Design Phase

Design Phase Dwg/Spec/ Reference

Description Government Comments Gov. Reviewer AE Response/Actions A/E

Reviewer Government Back Check

Comments

546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement

546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.

The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted. Transmitted by VA to AKEA Design on 10/16/2023.

AKEA Design has done our best to transcribe comments received in Adobe comment format to this review sheet.

VISN Project Scope:

9/29/23

35% Schematic Design

546 - Miami

AS101 Study Report Was the actual flow determined based on actual needs for each air handler? Is your design load of the building based on actual flow rates needs?

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

AS101 Study Report Summary and Recommendations section: Paragraph 1.a. Does not represent actual conditions.

Architectural Site Plan - comment not relevant to drawing.

Study Report: See Progress Questions Responses October 17, 2023 to September 19, 2023 VAMC email.

See revisions in Study Report included with Design Analysis Report.

LS101 Life-Safety Plan AE to confirm using only one chiller and second chiller space for future use design

MH Confirmed per November 30, 2023 site visit meeting. Only one chiller will be designed to be redundant to the existing three chillers.

Design shown will be revised at 65% DD.

NONE AT 35% SPECIFICATIONS

- - - - - - - - - - - - - - - - Only proposed specifications Table of Contents included with Design Analysis Report at 35% SD submittal. No comments were received.

DESIGN ANALYSIS REPORT

DD1 - 35% Title Page Please refer to scope of work this is not the correct title. It should be Create Redundancy cCpacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement.

DR Corrected. Title of project will be changed per MOD P0001 to contract.

Number:

Facility:

Submittal Received:

Review Completed:

Design Phase

Design Phase Dwg/Spec/ Reference

Description Government Comments Gov. Reviewer AE Response/Actions A/E

Reviewer Government Back Check

Comments

546-23-105 Create Redundancy Capacity in Chiller Plant System/Chilled and Condensed Water System Repair/Replacement

546-23-105 This project will create redundancy capacity in the chillers plant system and chilled and condensed water system; repair or replace existing cooling tower and auxiliary and associated equipment. The design of this project shall address, but will not be limited to, the placement of the ancillary equipment related to the chillers and cooling towers and associated chiller, condensed water system and electrical/electronic components needed to create redundancy capacity.

The following comments are compiled from AKEA Design files (Adobe PDFs), with VA comments inserted.