This is a Contractor's Quality Control Report (QCR) form (SAM Form 696) used for documenting daily quality control activities on federal construction contracts. The form is prescribed under Engineering Regulation (ER) 1180-1-6 and is designated for the 1180 Series Engineer Contracts functional code, with an estimated monthly usage of 1,500 forms.

The form captures essential daily reporting elements including contract number and contractor identification, work description and location, weather classification (Classes A through E), temperature, and precipitation data. It requires documentation of contractor and subcontractor activities with specific responsibility areas, detailed descriptions of work performed by prime and subcontractors, inspection types (preparatory, initial, or follow-up), and test results required by contract plans and specifications. The form also includes sections for recording verbal instructions from Government personnel regarding construction deficiencies and retesting requirements, general remarks covering plan conflicts, material acceptability, work progress, delays, and safety infractions with corrective actions. The contractor's authorized representative must certify that the report is complete and accurate, confirming all materials, equipment, work performed, and tests were in strict compliance with contract plans and specifications except as noted. The form requires signatures from both the Government inspector and the contractor's approved authorized representative.

View the file

Other files

File Type Posted
36C24826R0028 0004.pdf PDF
fact_sheet_acc_7.pdf PDF
S4100-1031.pdf PDF
VA Hydrant Inspection Report_out of date.pdf PDF
h6-a-dome-camera-datasheet.pdf PDF
36C24826R0028 0003.pdf PDF
03 SD-100.pdf PDF
04 SC-100.pdf PDF
06 SW-100.pdf PDF
00_CCG_MIAMI_VAMC_B44_IR_E1 30 X 42 - GRID-Key_Planning.pdf PDF
avigilon-unity-h6a-h6x-bullet-camera-datasheet-en.pdf PDF
RFIs Combined 546-23-105 SO.xlsx XLSX spreadsheet
SARGENT_10X_Line_Catalog.pdf PDF
SARGENT_10X_Line_Sell_Sheet.pdf PDF
avigilon-nvr6-form-d-fips- datasheet-en.pdf PDF
013323a Submittal Register Form.pdf PDF
36C24826R0028 0002.pdf PDF
ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105 R1.pdf PDF
36C24826R0028 0001.pdf PDF
S02 - 36C24826R0028 - R1 - Final.pdf PDF
ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105.pdf PDF
ATTACHMENT 9 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 7 - Specialized Experience Form.pdf PDF
ATTACHMENT 6 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT - 3 100 Bid Drawings 546-23-105.zip ZIP file
ATTACHMENT 2 - 100 CIH Report 546-23-105.zip ZIP file
ATTACHMENT 4 - GEO Tech Report.zip ZIP file
S02 - 36C24826R0028 - Final.pdf PDF
ATTACHMENT 5 - DBA Wage Determination FL20260215.pdf PDF
ATTACHMENT 8 - EMR.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S QUALITY CONTROL REPORT (QCR)

D A T E: R E P O R T N O.:

C O N T R A C T N U M B E R A N D N A M E O F C O N T R A C T O R: D E S C R I P T I ON A N D L O C A T I O N O F T H E W O R K:

W E A T H E R C L A S S I F I C A T I O N :

CLASS A

CLASS B

CLASS C

CLASS D

CLASS E

OTHER

C L A S S I F I C A T I O N :

C L A S S

T E M P E R A T U R E :

M A X M I N

P R E C I P I T A T I O N :

I N C H E S

(ER 1180-1-6)

No interruptions of any kind from weather conditions occurring on this or previous shifts.

Weather occurred during this shift that caused a complete stoppage of all work.

Weather occurred during this shift that caused a partial stoppage of work.

Weather overhead excellent or suitable during shift. Work completely stopped due to results of previous adverse weather.

Weather overhead excellent or suitable during shift but work partially stopped due to previous adverse manner.

Explain.

CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of items of equipment either idle or working as appropriate.)

1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.)

3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

SAM 696FORM

1 SEP 79 Previous Edition May Be Used Until Exhausted

PURPOSE: Contractors Daily QC Report. Revision necessitated by EIG recommendation

MONTHLY USAGE: 1,500

PRESCRIBING DIRECTIVE: ER 1180-1-6

FUNCTIONAL CODE: 1180 Series - Engineer Contracts a.

b.

c.

d.

e.

f.

g.

vacobofint Rectangle vacobofint Rectangle vacobofint Sticky Note Accepted set by vacobofint

4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies.

retesting required, etc., with action to be taken.)

5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials: offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)

6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel.

Specify corrective action taken.)

CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period were in strict compliance with the contract plans and specifications except as noted above.

INSPECTOR

CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE

17-R-0002 Amendment 0003 Volume I (Phase II)
Amendment 0003 Narrative
Phase Two - Volume 1 of 3
Table of Contents
Bidding Requirements
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00
LIST OF PERMITS REQUIRED
PROJECT SIGNS
WAGE RATES
01 00 01.02 DoVA CEMP
01 10 10 DESIGN REQUIREMENTS
1 DESCRIPTION OF FACILTIY AND SCOPE
2 DESIGN REQUIREMENTS
3 GENERAL REQS for PERMITTING, LIFE SAFETY and SECURITY REQUIREMENTS
4 SITE
5 ARCHITECTURE
6 CONVEYING SYSTEMS
7 INTERIOR DESIGN, SIGNAGE & F, F & E
8 STRUCTURAL DESIGN
9 HVAC
10 (not used)
11 PLUMBING
12 (not used)
13 FIRE PROTECTION & LIFE SAFETY
14 (not used)
15 ELECTRICAL
16 SECURITY SYSTEMS
17 COMMUNICATIONS
18 CORROSION AND CATHODIC PROTECTION
19 ENVIRONMENTS - HAZARDOUS MATERIALS
20 SUSTAINABLE DESIGN
21COMMSSIONING
01 10 12 DESIGN AFTER AWARD
01 14 00 WORK RESTRICTIONS
01 32 00.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
Submittal Register
Standard Form 4025
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00.10 QUALITY CONTROL
QCR-SAM FORM 696
01 45 00.15.01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVINROMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
17-R-0002 Amendment 0003 Volume II (Phase II)
Phase Two - Volume 2 of 3
Table of Contents
APPENDIX A - WORK RESTRICITIONS DOCUMENTS
APPENDIX B - PRESCIPTIVE SPECIFICATIONS
01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS
01 81 16 HEALTHCARE SUSTAINABLE DESIGN REQUIREMENTS
01 81 21 IAQ MANAGEMENT DURING CONSTRUCTION
01 81 22 IAQ PROTECTION BEFORE OCCUPANCY
01 91 00 GENERAL COMMISSIONING REQUREMENTS
07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING
14 21 00 ELECTRIC TRACTION ELEVATOR
14 24 00 HYDRAULIC ELEVATOR
14 92 19 SIX (6") PNEUMATIC TUBES
21 09 00 COMMSSIONING OF FIRE SUPPRESION SYSTEM
22 08 00 COMMSSIONING OF PLUMBING SYSTEM
23 08 00 COMMSSIONING OF HVAC SYSTEM
26 08 00 COMMSSIONING OF ELECTRICAL SYSTEM
26 09 13 ELECTRICAL POWER MONITORING AND CONTROL
26 09 14 SCADA MONITORING SYSTEM
27 08 00 COMMSSIONING OF COMMUNICATIONS SYSTEMS
28 08 00 COMMSSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS
33 08 00 COMMISSIONING OF SITE UTILITY SYSTEMS
APPENDIX C - SITE ANALYSIS CONTEXT DRAWINGS
APPENDIX D - 2015 VA CFM PHYSICAL SECURITY DESIGN MANUAL
APPENDIX E - SPACE PROGRAM FOR DESIGN AND ROOM GUIDEPLATES
APPENDIX F - CONCEPTUAL PLANNING DIAGRAMS
APPENDIX G - LEGACY MEDICAL CENTER SYSTEMS TIE-IN MATRIX
APPENDIX H - 2014 TRANSPORTATION AND LOGISTICS REPORT & PNEUMATIC TUBE SYSTEM
APPENDIX I - LEED OWNER'S PROJECT REQUIREMENTS
17-R-0002 Amendment 0003 Volume III (Phase II)
Phase Two - Volume 3 of 3
Table of Contents
APPENDIX J - SITE PHASING & CPM SCHEDULE
APPENDIX K - 2014 SITE BOUNDARY, TOPOGRAPHIC AND UTILITY SURVEYS
APPENDIX L - GEOTECHNICAL & GEOPHYSICAL REPORTS
APPENDIX M - HVAC UTILITY SYSTEM CONNECTIONS
APPENDIX N - FIRE PROTECTION
APPENDIX O - WATER QUALITY REPORTS, WELL TESTS and CIVIL SITE POTABLE & SANITARY PLAN
APPENDIX P - EXISTING SITE UTILITY INFORMATION
APPENDIX Q - CIVIL SITE LIFT STATION INFORMATION
APPENDIX R - SITE ELECTRICAL / IT/COMMUNICATIONS & SECURITY SYSTEMS
APPENDIX S - EXISTING BUILDING 54 GENERATOR PLANT -
APPENDIX T - EXISTING BUILDING 1 - HAZARDOUSE MATERIALS DRAWINGS
APPENDIX U - EQUIPMENT INFORMATION
APPENDIX V - INTERIOR DESIGN INFORMATION
APPENDIX W - EXISTING EXTERIOR SIGNAGE INFORMATION
APPENDIX X - ENVIRONMENTAL INFORMATION
APPENDIX Y - INDEX OF ELECTRONIC EXISITNG BUILDING INFORMATION
APPENDIX Z - LARGE FORMAT SITE AND BUILDING DRAWINGS