Attachment 05 - EHRM Madison - Drawings - Building 01 - Part 4.pdf
PDF 15 MB Posted
- Attached to
- 36C77623B0011 - Solicitation - EHRM Infrastructure Upgrades - Madison, WI Federal contract opportunity
- Solicitation number
- 36C77623B0011
About this file
This solicitation is seeking bids for an EHRM Infrastructure Upgrades project at the Madison VA Medical Center in Madison, Wisconsin. The Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central is soliciting a single Firm-Fixed-Price contract for general construction and the replacement of all telecommunications cable, outlets, and associated equipment for multiple buildings on the Madison VA campus. The work will be performed according to provided drawings and specifications. The agency issuing this solicitation is the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S D
ATS
S D
SB SB
ATS
F
T
F
T
DN
F
T
F
T
F T
F T
F T
F T
F
T
F
T
TELEPHONE SWITCH ROOM
C125
690 SF
T E
L E
-U P
S -2
C125-UPS
C
5- E
Q -R
E C
UPS
C121A
OFFICE
C121
T E
L E
-U P
S -5
T E
L E
-U P
S -4
C125-UPS-B
M T
S -C
5-
U P
S -A
B01
UPS-C125-B
UPS EQUIPMENT
C129
225 SF
BREAK ROOM
C127A
STORAGE
C128
OFFICE
C130
UPS-C125-A
SWBD-EQ SWBD-1A
M T
S -C
5-
E Q
1 3 4
TYP.
CRAC-04
CRAC-03
1" RL
1" RL
1 1/4" RS
1 1/4" RS
1 1/4" RS
1 1/4" RS
1" RL
1" RL
SERVER ROOM
B108A
740 SF
UPS ORANGE PANEL
UPS BLUE PANEL
B21
GF-1A
EM-9A
UPS-1
UPS-2
PRINTER ROOM
C166C
136 SF
OFFICE
C166A
247 SF
OFFICE
C166
837 SF
B01
UPS-A ORANGE
UPS-B BLUE
B18
CRAC-CU-02
CRAC-CU-01
TYP.
CRAC-CU-03 CRAC-CU-04
2 3 4 2 3 4
CRAC-01
CRAC-02
1" RL
1" RL
1 1/4" RS
1 1/4" RS
1 1/4" RS
1 1/4" RS
1" RL
1" RL
1" RL
1" RL
1 1/4" RS
1 1/4" RS
1 1/4" RS
1 1/4" RS
1" RL
1" RL
B18
B01
B01
2 3 2 34 4
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/2
/2
:0
:3
P
M
01M-401CD
MECHANICAL ENLARGED PLANS - GROUND
LEVEL - SERVER ROOMS
607-21-700
07/22/2022 K. Luke G. Weaver
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
Revisions: Date:
SCALE: 1/4" = 1'-0"
F1
MECHANICAL ENLARGED PLAN -
GROUND LEVEL - ROOM C125 - DEMO
AND NEW
SCALE: 1/4" = 1'-0"
F5
MECHANICAL ENLARGED PLAN -
GROUND LEVEL - ROOM B108A -
DEMO AND NEW
SCALE: 1/4" = 1'-0"
F3
MECHANICAL ENLARGED PLAN - B18
ROOF - DEMO AND NEW
1. EXISTING INDOOR COMPUTER ROOM AIR CONDITIONER (CRAC) UNIT TO BE
REPLACED WITH NEW UNIT. MATCH EXISTING PARAMETERS, COORDINATE WITH
COR.
2. EXISTING OUTDOOR COMPUTER ROOM AIR CONDITIONER (CRAC) UNIT TO BE
REPLACED WITH NEW UNIT. MATCH EXISTING PARAMETERS, COORDINATE WITH
COR.
3. NEW CRAC UNITS SHALL BE REPLACED IN TWO (2) PHASES, ONE COMPLETE
SYSTEM AT A TIME. CONTRACTOR SHALL PROVIDE 30 TON CAPACITY
TEMPORARY COOLING DURING CRAC UNIT REPLACEMENT TO MAINTAIN
COOLING REDUNDANCY.
4. NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC
CONTROLS BUILDING MANAGEMENT SYSTEM.
5. COORDINATE THE DEMO AND NEW PIPING BETWEEN THE INDOOR AND
OUTDOOR UNITS. MATCH PENETRATIONS TO THE FIRE RATING ON THE
PENETRATION.
07/22/202207 /22
/20
TELECOM ROOM
D1221A
196 SF
ELEVATOR
B3165
95 SF
EXAM
D1316
131 SF
EXAM
D1222
152 SF
7 9 15
IU-D1221-01
IU-D1221-02
3/4" CD
IU-D1221-03
1/4" RL
1/2" RS
3/4" RS
1" CD
3/8" RL
1/4" RL
1/2" RS
3/4" CD
EXISTING STORAGE
D1221A
107 SF
EXAM
D1222
152 SF
EXAM
D1316
131 SF
ELEVATOR
B3165
95 SF
EXISTING TELE
D1221
107 SF
7 9
TELECOM ROOM
B1121
116 SF
CORRIDOR
B1151
755 SF
CORRIDOR
C1145
395 SF
VENDING
B1122
218 SF
STAIR
SW3
176 SF
IU-B1121-01
IU-B1121-02
TYP.
3/4" CD5
EXISTING I.T.
B1121
59 SF
EXISTING VENDING
B1122
276 SF
TYP.
IU-B1000-01 IU-B1000-02
TELECOM ROOM
B1000
191 SF
MULTIPURPOSE
B1519
1 3 1 3
7 15
3/8" RL
3/4" RS
3/8" RL
3/4" RS
PIPE RISER/DROP
23 3/4" CD
1" CD
IU-B1000-03
1/4" RL
1/2" RS
3/4" CD
OFFICE
B1572
148 SF
TYP.
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:1
P
M
01M-402
MECHANICAL ENLARGED PLANS - FIRST LEVEL 607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
SCALE: 1/2" = 1'-0"
F4
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM D1221A - NEW
SCALE: 1/2" = 1'-0"
C4
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM D1221A - DEMO
SCALE: 1/2" = 1'-0"
C2
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM B1121 - NEW
SCALE: 1/2" = 1'-0"
C1
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM B1121 - DEMO
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM
ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE
COR.
6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN
LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING
WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER
CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN
EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH
FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.
9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.
12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION
LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING
WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.
14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1
HOUR F/S DAMPER
16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.
17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.
18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.
19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH
AND REPAIR SLAB.
20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.
21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.
22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW
TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT
CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.
REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.
23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.
24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.
25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT
SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.
28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.
29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH
EXISTING DUCTWORK.
30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE
INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO
DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT
AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE
INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT
CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.
SCALE: 1/2" = 1'-0"
F1
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - B-TOWER - ROOM
B1000 - NEW
NOT TO SCALE
B7
EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS
Revisions: Date:
SCALE: 1/2" = 1'-0"
F7
MECHANICAL ENLARGED PLAN -
FIRST LEVEL - ROOM B1572 - DEMO
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED - FIRST LEVEL
PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FIRST LEVEL
TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FIRST LEVEL
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
02/09/2023
/09
1 3
7 9
IU-D2201-01
TELECOM ROOM
D2201A
116 SF
CORRIDOR
D2199
677 SF
Room
D2201
170 SF
TOILET
D2202
126 SF
CORRIDOR
D2199
677 SF
3/4" CD
3/4" CD
3/4" CD
IU-D2201-02
1/4" RL
1/2" RS
3/8" RL
3/4" RS
PIPE RISER/DROP
TELECOM ROOM
D2201A
116 SF
TYP.
TYP.
7 9
IU-B2053-01
TELECOM ROOM
B2053
112 SF
3/4" CD
IU-B2053-02
3/4" CD
PIPE RISER/DROP
3/8" RL
3/4" RS
TELECOM ROOM
B2053
112 SF
TYP.
TYP.
IU-B2000-01 IU-B2000-02
TELECOM ROOM
B2000
191 SF
OFFICE
B2135
UTILITY, CLEAN
B2134
1 3 1 3
7 15
PIPE RISER/DROP
3/8" RL
3/4" RS
1/4" RL
1/2" RS
3/4" CD
3/4" CD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:2
P
M
01M-403
MECHANICAL ENLARGED PLANS - SECOND
LEVEL
607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
SCALE: 1/2" = 1'-0"
F6
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM D2201A -
NEW
SCALE: 1/2" = 1'-0"
C6
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM D2201A -
DEMO
SCALE: 1/2" = 1'-0"
F8
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM B2053 - NEW
SCALE: 1/2" = 1'-0"
C8
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - ROOM B2053 - DEMO
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM
ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE
COR.
6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN
LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING
WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER
CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN
EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH
FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.
9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.
12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION
LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING
WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.
14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1
HOUR F/S DAMPER
16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.
17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.
18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.
19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH
AND REPAIR SLAB.
20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.
21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.
22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW
TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT
CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.
REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.
23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.
24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.
25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT
SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.
28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.
29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH
EXISTING DUCTWORK.
30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE
INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO
DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT
AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE
INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT
CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.
SCALE: 1/2" = 1'-0"
F2
MECHANICAL ENLARGED PLAN -
SECOND LEVEL - B-TOWER - B2000 -
NEW
NOT TO SCALE
B1
EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS
Revisions: Date:
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED - SECOND LEVEL
PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON SECOND LEVEL
TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON SECOND LEVEL
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
02/09/2023
/09
7 9
TELECOM ROOM
B3110A
111 SF
ENTRY WAY
B3114
622 SF
IU-B3110-01
3/4" CD
IU-B3110-02
3/4" CD
3/4" CD
PIPE RISER/DROP
3/4" RS
3/8" RL
TELECOM ROOM
B3110A
111 SF
TELECOM ROOM
B3000
191 SF
IU-B3000-01 IU-B3000-02
1 3 1 3
7 15
NOURISH
B3081A
NURSE STATION
B3081
PIPE RISER/DROP
3/8" RL
3/4" RS
1/4" RL
1/2" RS
3/4" CD
3/4" CD
IU-D3000-01
IU-D3000-02
TELECOM ROOM
D3000
164 SF
WAITING ROOM
D3228
ELEVATOR
LOBBY ELEVATOR
D3200
7 15
3/4" RS
3/8" RL
3/4" RS
3/8" RL
1/4" RL
1/2" RS
3/4" CD
3/4" CD
3/4" CD
1/4" RL
1/2" RS
PIPE RISER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:2
P
M
01M-404
MECHANICAL ENLARGED PLANS - THIRD LEVEL 607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM
ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE
COR.
6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN
LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING
WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER
CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN
EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH
FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.
9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.
12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION
LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING
WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.
14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1
HOUR F/S DAMPER
16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.
17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.
18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.
19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH
AND REPAIR SLAB.
20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.
21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.
22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW
TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT
CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.
REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.
23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.
24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.
25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT
SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.
28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.
29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH
EXISTING DUCTWORK.
30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE
INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO
DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT
AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE
INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT
CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.
SCALE: 1/2" = 1'-0"
F8
MECHANICAL ENLARGED PLAN -
THIRD LEVEL - ROOM B3110A - NEW
SCALE: 1/2" = 1'-0"
C8
MECHANICAL ENLARGED PLAN -
THIRD LEVEL - ROOM B3110A - DEMO
SCALE: 1/2" = 1'-0"
F4
MECHANICAL ENLARGED PLAN -
THIRD LEVEL - B-TOWER - B3000 -
NEW
SCALE: 1/2" = 1'-0"
F1
MECHANICAL ENLARGED PLAN -
THIRD LEVEL - D-TOWER - ROOM
D3000 - NEW
NOT TO SCALE
B1
EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS
Revisions: Date:
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED - THIRD LEVEL
PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON THIRD LEVEL
TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON THIRD LEVEL
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
02/09/2023
/09
B4110A
101 SF
7 9
IU-B4110-01
3/4" CD
IU-B4110-02
3/4" CD
3/4" CD
3/8" RL
3/4" RS
TYP.
TYP.
TELECOM ROOM
B4110A
TELECOM ROOM
B4000
191 SF
IU-B4000-01 IU-B4000-02
1 3 1 3
7 15
MED PREP
B4137
REHAB UNIT
B4136
PIPE RISER/DROP
1/4" RL
1/2" RS
BC-3
3/4" CD
3/4" CD
1 1/4" RL
1 1/2" RS
3/8" RL
3/4" RS
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
PIPE RISER
IU-D4000-01
IU-D4000-02
TELECOM ROOM
D4000
165 SF
7 15
IU-D4000-03
ELEVATOR
D7282
CONFERENCE ROOM
D4253
ELEVATOR LOBBY
D4200
3/4" CD
1/4" RL
3/4" CD
1/2" RS
1/4" RL
1/2" RS
3/4" CD
1" CD
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
1 1/2" RS
1 1/4" RL
3/8" RL
3/4" RS
PIPE RISER/DROP
BC-1
NUCLEAR CARDIOLOGY
C4109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:2
P
M
01M-405
MECHANICAL ENLARGED PLANS - FOURTH
LEVEL
607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
SCALE: 1/2" = 1'-0"
F8
MECHANICAL ENLARGED PLAN -
FOURTH LEVEL - ROOM B4149 - NEW
SCALE: 1/2" = 1'-0"
C8
MECHANICAL ENLARGED PLAN -
FOURTH LEVEL - ROOM B4149 - DEMO
SCALE: 1/2" = 1'-0"
F4
MECHANICAL ENLARGED PLAN -
FOURTH LEVEL - B-TOWER - B4000 -
NEW
SCALE: 1/2" = 1'-0"
F1
MECHANICAL ENLARGED PLAN -
FOURTH LEVEL - D-TOWER - ROOM
D4000 - NEW
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM
ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE
COR.
6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN
LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING
WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER
CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN
EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH
FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.
9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.
12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION
LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING
WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.
14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1
HOUR F/S DAMPER
16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.
17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.
18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.
19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH
AND REPAIR SLAB.
20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.
21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.
22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW
TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT
CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.
REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.
23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.
24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.
25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT
SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.
28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.
29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH
EXISTING DUCTWORK.
30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE
INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO
DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT
AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE
INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT
CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.
NOT TO SCALE
B1
EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS
Revisions: Date:
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED - FOURTH LEVEL
PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FOURTH LEVEL
TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FOURTH LEVEL
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
02/09/2023
/09
B5110
130 SF
7 9 15
IU-B5110-02
3/4" CD
IU-B5110-01
3/4" CD
TYP.
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
1/2" RS
1/4" RL
3/8" RL
3/4" RS
3/8" RL
3/4" RS
3/8" RL
3/4" RS
1 1/2" RS
1 1/4" RL
PIPE RISER
PIPE DROP
BC-2
1/4" RL
1/2" RS
TELECOM ROOM
B5110
130 SF
TELECOM ROOM
B5110
130 SF
TYP.
TELECOM ROOM
B5000
191 SF
IU-B5000-01 IU-B5000-02
1 3 1 3
7 15
OFFICE
B5097
OFFICE
B5094
3/8" RL
3/4" RS
1/4" RL
1/2" RS
PIPE RISER/DROP
3/4" CD
IU-D5000-01
IU-D5000-02
TELECOM ROOM
D5000
165 SF
7 15
ELEVATOR
B3187
LOBBY ELEVATOR
D5200
OFFICE
D5247
3/4" CD
1/4" RL
1/2" RS
1/4" RL
1/2" RS
PIPE RISER/ DROP
3/4" CD
3/8" RL
3/4" RS
PIPE RISER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:2
P
M
01M-406
MECHANICAL ENLARGED PLANS - FIFTH LEVEL 607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO
BEGINNING WORK.
4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH
COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY
THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.
5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM
ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE
ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE
COR.
6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO
DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE
CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN
LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING
WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.
8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER
CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN
EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH
FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.
9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.
10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.
COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER
TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND
LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.
12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING
ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE
INFORMATION.
13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION
LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING
WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.
14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING
AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1
HOUR F/S DAMPER
16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.
17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.
18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.
19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH
AND REPAIR SLAB.
20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.
21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.
22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW
TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT
CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.
REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.
23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.
24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.
25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH
SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL
NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL
CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE
EXISTING NETWORK.
26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT
SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.
27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.
28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.
29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH
EXISTING DUCTWORK.
30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE
INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO
DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT
AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE
INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT
CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.
SCALE: 1/2" = 1'-0"
F8
MECHANICAL ENLARGED PLAN -
FIFTH LEVEL - ROOM B5110 - NEW
SCALE: 1/2" = 1'-0"
C8
MECHANICAL ENLARGED PLAN -
FIFTH LEVEL - ROOM B5110 - DEMO
SCALE: 1/2" = 1'-0"
F4
MECHANICAL ENLARGED PLAN -
FIFTH LEVEL - B-TOWER - B5000 -
NEW
SCALE: 1/2" = 1'-0"
F1
MECHANICAL ENLARGED PLAN -
FIFTH LEVEL - D-TOWER - ROOM
D5000 - NEW
NOT TO SCALE
B1
EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS
Revisions: Date:
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED - FIFTH LEVEL
PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FIFTH LEVEL
TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FIFTH LEVEL
NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM
02/09/2023
/09
7 9 15
IU-B6113-01
TELECOM ROOM
B6113
123 SF
3/4" CD
1/4" RL
1/2" RS
PIPE RISER/DROP
TELECOM ROOM
B6113
123 SF
TELECOM ROOM
B6113
123 SF
TELECOM ROOM
B6000
191 SF
IU-B6000-01 IU-B6000-02
1 3 1 3
7 15
VACANT
B6092
VACANT
B6093
3/8" RL 1/4" RL
1/2" RS
PIPE RISER/DROP
3/4" RS
3/4" CD
IU-D6000-01
IU-D6000-02
TELECOM ROOM
D6000
165 SF
7 15
1/2" RS
3/4" CD
3/4" CD
1/4" RL
1/2" RS
PIPE
RISER/DROP
3/4" RS
3/8" RL
1/4" RL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d .E
H R
M .M
E P
.B
.r v t
/9
/2
:5
:2
P
M
01M-407
MECHANICAL ENLARGED PLANS - SIXTH LEVEL 607-21-700
07/22/2022 K. LUKE N. HARPER
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
NOTE: NOT ALL KEYNOTES ARE
USED ON EACH SHEET
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS
TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR
REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW
MECHANICAL SCOPE
1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.
2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER
AND FROM BRANCH CONTROLLER TO INDOOR UNIT.
3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR
UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH
PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP
IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW
MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION
DRAWINGS FOR EACH DRAIN…
This is the start of the file's text. The full file is on GovTribe.