Attachment 05 - EHRM Madison - Drawings - Building 01 - Part 4.pdf

PDF 15 MB Posted

Attached to
36C77623B0011 - Solicitation - EHRM Infrastructure Upgrades - Madison, WI Federal contract opportunity
Solicitation number
36C77623B0011
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking bids for an EHRM Infrastructure Upgrades project at the Madison VA Medical Center in Madison, Wisconsin. The Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central is soliciting a single Firm-Fixed-Price contract for general construction and the replacement of all telecommunications cable, outlets, and associated equipment for multiple buildings on the Madison VA campus. The work will be performed according to provided drawings and specifications. The agency issuing this solicitation is the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0011 - Solicitation - EHRM Infrastructure Upgrades - Madison, WI, newest first.
File Type Posted
36C77623B0011 0004_REVISED.pdf PDF
36C77623B0011 0004.pdf PDF
36C77623B0011 0003.pdf PDF
Attachment 27 - Technical Questions and Answers Volume 2.pdf PDF
Attachment 32 - CATV rack1btm.jpg JPG image
Attachment 33 - CATV rack2top.jpg JPG image
Attachment 34 - CATV rack2btm.jpg JPG image
Attachment 30 - Existing Column Load Summary.pdf PDF
Attachment 28 - Strengthening of Concrete with FRP.docx DOCX document
Attachment 29 - Sheet 1-S-15 from Ref_Existing - D - Wing_Addition.pdf PDF
Attachment 31 - CATV rack1top.jpg JPG image
Attachment 35 - CATV back of rack.jpg JPG image
Attachment 24 - EHRM Madison - Floor to Finish Heights.pdf PDF
36C77623B0011 0002.pdf PDF
Attachment 25 - EHRM Madison - Attendance Sheet.pdf PDF
Attachment 26 - Technical Questions and Answers.pdf PDF
Attachment 23 - Asbestos Survey and Lead Paint Report.pdf PDF
36C77623B0011 0001.pdf PDF
Attachment 03 - EHRM Madison - Drawings - Building 01 - Part 2.pdf PDF
Attachment 15 - EHRM Madison - Drawings - Building 15.pdf PDF
S02 - Solicitation - 36C77623B0011 - EHRM Infrastructure Upgrades - Madison.pdf PDF
Attachment 01 - EHRM Madison - Specifications.pdf PDF
Attachment 13 - EHRM Madison - Drawings - Building 07.pdf PDF
Attachment 14 - EHRM Madison - Drawings - Building 12.pdf PDF
Attachment 17 - EHRM Madison - Drawings - IFC - SITE.pdf PDF
Attachment 18 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 22 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - EHRM Madison - Drawings - Building 05.pdf PDF
Attachment 12 - EHRM Madison - Drawings - Building 06.pdf PDF
Attachment 02 - EHRM Madison - Drawings - Building 01 - Part 1.pdf PDF
Attachment 04 - EHRM Madison - Drawings - Building 01 - Part 3.pdf PDF
Attachment 06 - EHRM Madison - Drawings - Building 01 - Part 5.pdf PDF
Attachment 08 - EHRM Madison - Drawings - Building 01 - Part 7.pdf PDF
Attachment 09 - EHRM Madison - Drawings - Building 02.pdf PDF
Attachment 10 - EHRM Madison - Drawings - Building 04.pdf PDF
Attachment 16 - EHRM Madison - Drawings - Building 22.pdf PDF
Attachment 19 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 20 - Dane County - Wage Rates.pdf PDF
Attachment 21 - SOW - EHRM Infrastructure Upgrades - Madison.pdf PDF
Attachment 07 - EHRM Madison - Drawings - Building 01 - Part 6.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S D

ATS

S D

SB SB

ATS

F

T

F

T

DN

F

T

F

T

F T

F T

F T

F T

F

T

F

T

TELEPHONE SWITCH ROOM

C125

690 SF

T E

L E

-U P

S -2

C125-UPS

C

5- E

Q -R

E C

UPS

C121A

OFFICE

C121

T E

L E

-U P

S -5

T E

L E

-U P

S -4

C125-UPS-B

M T

S -C

5-

U P

S -A

B01

UPS-C125-B

UPS EQUIPMENT

C129

225 SF

BREAK ROOM

C127A

STORAGE

C128

OFFICE

C130

UPS-C125-A

SWBD-EQ SWBD-1A

M T

S -C

5-

E Q

1 3 4

TYP.

CRAC-04

CRAC-03

1" RL

1" RL

1 1/4" RS

1 1/4" RS

1 1/4" RS

1 1/4" RS

1" RL

1" RL

SERVER ROOM

B108A

740 SF

UPS ORANGE PANEL

UPS BLUE PANEL

B21

GF-1A

EM-9A

UPS-1

UPS-2

PRINTER ROOM

C166C

136 SF

OFFICE

C166A

247 SF

OFFICE

C166

837 SF

B01

UPS-A ORANGE

UPS-B BLUE

B18

CRAC-CU-02

CRAC-CU-01

TYP.

CRAC-CU-03 CRAC-CU-04

2 3 4 2 3 4

CRAC-01

CRAC-02

1" RL

1" RL

1 1/4" RS

1 1/4" RS

1 1/4" RS

1 1/4" RS

1" RL

1" RL

1" RL

1" RL

1 1/4" RS

1 1/4" RS

1 1/4" RS

1 1/4" RS

1" RL

1" RL

B18

B01

B01

2 3 2 34 4

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/2

/2

:0

:3

P

M

01M-401CD

MECHANICAL ENLARGED PLANS - GROUND

LEVEL - SERVER ROOMS

607-21-700

07/22/2022 K. Luke G. Weaver

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

Revisions: Date:

SCALE: 1/4" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

GROUND LEVEL - ROOM C125 - DEMO

AND NEW

SCALE: 1/4" = 1'-0"

F5

MECHANICAL ENLARGED PLAN -

GROUND LEVEL - ROOM B108A -

DEMO AND NEW

SCALE: 1/4" = 1'-0"

F3

MECHANICAL ENLARGED PLAN - B18

ROOF - DEMO AND NEW

1. EXISTING INDOOR COMPUTER ROOM AIR CONDITIONER (CRAC) UNIT TO BE

REPLACED WITH NEW UNIT. MATCH EXISTING PARAMETERS, COORDINATE WITH

COR.

2. EXISTING OUTDOOR COMPUTER ROOM AIR CONDITIONER (CRAC) UNIT TO BE

REPLACED WITH NEW UNIT. MATCH EXISTING PARAMETERS, COORDINATE WITH

COR.

3. NEW CRAC UNITS SHALL BE REPLACED IN TWO (2) PHASES, ONE COMPLETE

SYSTEM AT A TIME. CONTRACTOR SHALL PROVIDE 30 TON CAPACITY

TEMPORARY COOLING DURING CRAC UNIT REPLACEMENT TO MAINTAIN

COOLING REDUNDANCY.

4. NEW CRAC UNITS SHALL BE INTEGRATED WITH FACILITY AUTOMATED LOGIC

CONTROLS BUILDING MANAGEMENT SYSTEM.

5. COORDINATE THE DEMO AND NEW PIPING BETWEEN THE INDOOR AND

OUTDOOR UNITS. MATCH PENETRATIONS TO THE FIRE RATING ON THE

PENETRATION.

07/22/202207 /22

/20

TELECOM ROOM

D1221A

196 SF

ELEVATOR

B3165

95 SF

EXAM

D1316

131 SF

EXAM

D1222

152 SF

7 9 15

IU-D1221-01

IU-D1221-02

3/4" CD

IU-D1221-03

1/4" RL

1/2" RS

3/4" RS

1" CD

3/8" RL

1/4" RL

1/2" RS

3/4" CD

EXISTING STORAGE

D1221A

107 SF

EXAM

D1222

152 SF

EXAM

D1316

131 SF

ELEVATOR

B3165

95 SF

EXISTING TELE

D1221

107 SF

7 9

TELECOM ROOM

B1121

116 SF

CORRIDOR

B1151

755 SF

CORRIDOR

C1145

395 SF

VENDING

B1122

218 SF

STAIR

SW3

176 SF

IU-B1121-01

IU-B1121-02

TYP.

3/4" CD5

EXISTING I.T.

B1121

59 SF

EXISTING VENDING

B1122

276 SF

TYP.

IU-B1000-01 IU-B1000-02

TELECOM ROOM

B1000

191 SF

MULTIPURPOSE

B1519

1 3 1 3

7 15

3/8" RL

3/4" RS

3/8" RL

3/4" RS

PIPE RISER/DROP

23 3/4" CD

1" CD

IU-B1000-03

1/4" RL

1/2" RS

3/4" CD

OFFICE

B1572

148 SF

TYP.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:1

P

M

01M-402

MECHANICAL ENLARGED PLANS - FIRST LEVEL 607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

SCALE: 1/2" = 1'-0"

F4

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM D1221A - NEW

SCALE: 1/2" = 1'-0"

C4

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM D1221A - DEMO

SCALE: 1/2" = 1'-0"

C2

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM B1121 - NEW

SCALE: 1/2" = 1'-0"

C1

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM B1121 - DEMO

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM

ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE

COR.

6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN

LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER

CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN

EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH

FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.

9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.

12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION

LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING

WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.

14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1

HOUR F/S DAMPER

16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.

17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.

18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.

19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH

AND REPAIR SLAB.

20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.

21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.

22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW

TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT

CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.

REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.

23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.

24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.

25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS

SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT

SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.

28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.

29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH

EXISTING DUCTWORK.

30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE

INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO

DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT

AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE

INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT

CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.

SCALE: 1/2" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - B-TOWER - ROOM

B1000 - NEW

NOT TO SCALE

B7

EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS

Revisions: Date:

SCALE: 1/2" = 1'-0"

F7

MECHANICAL ENLARGED PLAN -

FIRST LEVEL - ROOM B1572 - DEMO

SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING

MATERIAL TO BE REMOVED - FIRST LEVEL

PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FIRST LEVEL

TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FIRST LEVEL

NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM

02/09/2023

/09

1 3

7 9

IU-D2201-01

TELECOM ROOM

D2201A

116 SF

CORRIDOR

D2199

677 SF

Room

D2201

170 SF

TOILET

D2202

126 SF

CORRIDOR

D2199

677 SF

3/4" CD

3/4" CD

3/4" CD

IU-D2201-02

1/4" RL

1/2" RS

3/8" RL

3/4" RS

PIPE RISER/DROP

TELECOM ROOM

D2201A

116 SF

TYP.

TYP.

7 9

IU-B2053-01

TELECOM ROOM

B2053

112 SF

3/4" CD

IU-B2053-02

3/4" CD

PIPE RISER/DROP

3/8" RL

3/4" RS

TELECOM ROOM

B2053

112 SF

TYP.

TYP.

IU-B2000-01 IU-B2000-02

TELECOM ROOM

B2000

191 SF

OFFICE

B2135

UTILITY, CLEAN

B2134

1 3 1 3

7 15

PIPE RISER/DROP

3/8" RL

3/4" RS

1/4" RL

1/2" RS

3/4" CD

3/4" CD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:2

P

M

01M-403

MECHANICAL ENLARGED PLANS - SECOND

LEVEL

607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

SCALE: 1/2" = 1'-0"

F6

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM D2201A -

NEW

SCALE: 1/2" = 1'-0"

C6

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM D2201A -

DEMO

SCALE: 1/2" = 1'-0"

F8

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM B2053 - NEW

SCALE: 1/2" = 1'-0"

C8

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - ROOM B2053 - DEMO

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM

ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE

COR.

6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN

LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER

CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN

EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH

FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.

9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.

12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION

LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING

WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.

14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1

HOUR F/S DAMPER

16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.

17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.

18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.

19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH

AND REPAIR SLAB.

20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.

21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.

22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW

TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT

CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.

REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.

23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.

24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.

25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS

SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT

SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.

28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.

29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH

EXISTING DUCTWORK.

30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE

INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO

DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT

AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE

INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT

CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.

SCALE: 1/2" = 1'-0"

F2

MECHANICAL ENLARGED PLAN -

SECOND LEVEL - B-TOWER - B2000 -

NEW

NOT TO SCALE

B1

EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS

Revisions: Date:

SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING

MATERIAL TO BE REMOVED - SECOND LEVEL

PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON SECOND LEVEL

TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON SECOND LEVEL

NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM

02/09/2023

/09

7 9

TELECOM ROOM

B3110A

111 SF

ENTRY WAY

B3114

622 SF

IU-B3110-01

3/4" CD

IU-B3110-02

3/4" CD

3/4" CD

PIPE RISER/DROP

3/4" RS

3/8" RL

TELECOM ROOM

B3110A

111 SF

TELECOM ROOM

B3000

191 SF

IU-B3000-01 IU-B3000-02

1 3 1 3

7 15

NOURISH

B3081A

NURSE STATION

B3081

PIPE RISER/DROP

3/8" RL

3/4" RS

1/4" RL

1/2" RS

3/4" CD

3/4" CD

IU-D3000-01

IU-D3000-02

TELECOM ROOM

D3000

164 SF

WAITING ROOM

D3228

ELEVATOR

LOBBY ELEVATOR

D3200

7 15

3/4" RS

3/8" RL

3/4" RS

3/8" RL

1/4" RL

1/2" RS

3/4" CD

3/4" CD

3/4" CD

1/4" RL

1/2" RS

PIPE RISER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:2

P

M

01M-404

MECHANICAL ENLARGED PLANS - THIRD LEVEL 607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM

ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE

COR.

6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN

LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER

CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN

EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH

FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.

9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.

12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION

LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING

WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.

14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1

HOUR F/S DAMPER

16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.

17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.

18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.

19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH

AND REPAIR SLAB.

20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.

21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.

22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW

TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT

CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.

REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.

23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.

24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.

25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS

SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT

SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.

28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.

29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH

EXISTING DUCTWORK.

30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE

INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO

DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT

AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE

INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT

CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.

SCALE: 1/2" = 1'-0"

F8

MECHANICAL ENLARGED PLAN -

THIRD LEVEL - ROOM B3110A - NEW

SCALE: 1/2" = 1'-0"

C8

MECHANICAL ENLARGED PLAN -

THIRD LEVEL - ROOM B3110A - DEMO

SCALE: 1/2" = 1'-0"

F4

MECHANICAL ENLARGED PLAN -

THIRD LEVEL - B-TOWER - B3000 -

NEW

SCALE: 1/2" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

THIRD LEVEL - D-TOWER - ROOM

D3000 - NEW

NOT TO SCALE

B1

EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS

Revisions: Date:

SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING

MATERIAL TO BE REMOVED - THIRD LEVEL

PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON THIRD LEVEL

TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON THIRD LEVEL

NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM

02/09/2023

/09

B4110A

101 SF

7 9

IU-B4110-01

3/4" CD

IU-B4110-02

3/4" CD

3/4" CD

3/8" RL

3/4" RS

TYP.

TYP.

TELECOM ROOM

B4110A

TELECOM ROOM

B4000

191 SF

IU-B4000-01 IU-B4000-02

1 3 1 3

7 15

MED PREP

B4137

REHAB UNIT

B4136

PIPE RISER/DROP

1/4" RL

1/2" RS

BC-3

3/4" CD

3/4" CD

1 1/4" RL

1 1/2" RS

3/8" RL

3/4" RS

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

PIPE RISER

IU-D4000-01

IU-D4000-02

TELECOM ROOM

D4000

165 SF

7 15

IU-D4000-03

ELEVATOR

D7282

CONFERENCE ROOM

D4253

ELEVATOR LOBBY

D4200

3/4" CD

1/4" RL

3/4" CD

1/2" RS

1/4" RL

1/2" RS

3/4" CD

1" CD

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

1 1/2" RS

1 1/4" RL

3/8" RL

3/4" RS

PIPE RISER/DROP

BC-1

NUCLEAR CARDIOLOGY

C4109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:2

P

M

01M-405

MECHANICAL ENLARGED PLANS - FOURTH

LEVEL

607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

SCALE: 1/2" = 1'-0"

F8

MECHANICAL ENLARGED PLAN -

FOURTH LEVEL - ROOM B4149 - NEW

SCALE: 1/2" = 1'-0"

C8

MECHANICAL ENLARGED PLAN -

FOURTH LEVEL - ROOM B4149 - DEMO

SCALE: 1/2" = 1'-0"

F4

MECHANICAL ENLARGED PLAN -

FOURTH LEVEL - B-TOWER - B4000 -

NEW

SCALE: 1/2" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

FOURTH LEVEL - D-TOWER - ROOM

D4000 - NEW

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM

ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE

COR.

6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN

LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER

CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN

EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH

FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.

9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.

12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION

LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING

WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.

14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1

HOUR F/S DAMPER

16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.

17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.

18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.

19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH

AND REPAIR SLAB.

20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.

21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.

22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW

TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT

CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.

REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.

23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.

24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.

25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS

SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT

SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.

28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.

29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH

EXISTING DUCTWORK.

30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE

INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO

DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT

AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE

INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT

CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.

NOT TO SCALE

B1

EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS

Revisions: Date:

SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING

MATERIAL TO BE REMOVED - FOURTH LEVEL

PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FOURTH LEVEL

TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FOURTH LEVEL

NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM

02/09/2023

/09

B5110

130 SF

7 9 15

IU-B5110-02

3/4" CD

IU-B5110-01

3/4" CD

TYP.

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

1/2" RS

1/4" RL

3/8" RL

3/4" RS

3/8" RL

3/4" RS

3/8" RL

3/4" RS

1 1/2" RS

1 1/4" RL

PIPE RISER

PIPE DROP

BC-2

1/4" RL

1/2" RS

TELECOM ROOM

B5110

130 SF

TELECOM ROOM

B5110

130 SF

TYP.

TELECOM ROOM

B5000

191 SF

IU-B5000-01 IU-B5000-02

1 3 1 3

7 15

OFFICE

B5097

OFFICE

B5094

3/8" RL

3/4" RS

1/4" RL

1/2" RS

PIPE RISER/DROP

3/4" CD

IU-D5000-01

IU-D5000-02

TELECOM ROOM

D5000

165 SF

7 15

ELEVATOR

B3187

LOBBY ELEVATOR

D5200

OFFICE

D5247

3/4" CD

1/4" RL

1/2" RS

1/4" RL

1/2" RS

PIPE RISER/ DROP

3/4" CD

3/8" RL

3/4" RS

PIPE RISER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:2

P

M

01M-406

MECHANICAL ENLARGED PLANS - FIFTH LEVEL 607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION

DRAWINGS FOR EACH DRAIN LINE INSTALLATION PER 01 33 23 PRIOR TO

BEGINNING WORK.

4. PROVIDE NEW DEDICATED THERMOSTAT, COORDINATE FINAL LOCATION WITH

COR AND EXISTING AND NEW CONDITIONS. THE THERMOSTAT SHALL DISPLAY

THE SPACE TEMPERATURE AND SHALL BE CONTROLLED THROUGH THE BMS.

5. PROVIDE BACNET CONTROLLER MOUNTED ADJACENT TO UNIT IN TELECOM

ROOM. CONNECT WITH UTP CABLE TO LOCAL FMS CONTROLLER TO BE

ADDRESSABLE ON VA NETWORK/HVAC FMS, COORDINATE LOCATION WITH THE

COR.

6. PROVIDE NEW PUMPED CONDENSATE LINE, DROP DOWN ON WALL TO

DISCHARGE OVER EXISTING SINK BELOW, SECURE PIPING TO WALL, PIPE TO BE

CUT AT 45 DEGREE ANGLE AT OUTLET. CONTRACTOR TO FIELD VERIFY DRAIN

LOCATION AND COORDINATE LOCATION WITH COR PRIOR TO COMMENCING

WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR CONTEXT.

8. PROVIDE POWER SUPPLY TO CONDENSING UNIT FROM EMERGENCY POWER

CIRCUIT. PROVIDE CIRCUIT BREAKER IN EMERGENCY POWER PANEL IN

EXISTING ELECTRICAL CLOSET. PROVIDE FUSIBLE DISCONNECT SWITCH WITH

FUSES SIZED PER EQUIPMENT SUPPLIER'S REQUIREMENTS FOR SPLIT UNIT.

9. EXISTING FACILITY HOUSE AIR THERMOSTAT TO REMAIN, PROTECT IN PLACE.

10. EXISTING SUPPLY AND RETURN AIR TERMINALS TO REMAIN.

COORDINATE WITH REMOVAL OF EXISTING GYPSUM CEILING AND ALL OTHER

TRADES, RESUPPORT AIR TERMINAL AS REQUIRED ABOVE CABLE TRAY AND

LIGHTING. SEE SHEET E-501 AND ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

11. EXISTING 4" DOMESTIC HOT WATER PIPING TO REMAIN, PROTECT IN PLACE.

12. PROVIDE CRICKET WITH NEW EQUIPMENT CURB, COORDINATE WITH EXISTING

ROOFING SYSTEM. REFER DETAIL F7/A-501 AND F6/M501 FOR MORE

INFORMATION.

13. PIPING ROUTED UP THROUGH ROOF ABOVE, COORDINATE PENETRATION

LOCATION WITH ALL EXISTING AND NEW CONDITIONS PRIOR TO COMMENCING

WORK. SEE SHEET 01M-500 FOR ADDITIONAL INFORMATION.

14. CONTRACTOR SHALL PROVIDE RATED PENETRATION TO MATCH WALL RATING

AT THIS LOCATION. SEE DETAILS ON M-500 SERIES SHEETS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

15. REBALANCE AIRFLOW AFTER CONSTRUCTION IS COMPLETED. PROVIDE NEW 1

HOUR F/S DAMPER

16. EXISTING INDOOR MECHANICAL UNIT AND THERMOSTAT TO BE DEMOLISHED.

17. EXISTING DUCTING TO REMAIN, PROTECT IN PLACE.

18. DEMOLISH EXISTING SUPPLY AND RETURN AIR TERMINALS.

19. DEMOLISH EXISTING FLOOR DRAIN. CAP PIPING AND SEAL BELOW SLAB, PATCH

AND REPAIR SLAB.

20. DEMOLISH EXISTING EXHAUST GRILLE AND DUCT BACK TO MAIN.

21. EXISTING DUCT TO BE REMOVED BACK TO THE MAIN, CLEAN AND CAP.

22. REMOVE EXISTING LOW WALL MECHANICAL UNIT TO COORDINATE WITH NEW

TELECOM ROOM. REMOVE BRANCH PIPING BACK TO MAIN WITHIN 2.5D, CUT

CLEAN AND CAP. PATCH AND REPLACE EXISTING FINISHES TO MATCH EXISTING.

REBALANCE EXISTING HOUSE SUPPLY AIR TERMINAL UNIT.

23. PROVIDE 2' x 2' ACCESS PANEL FOR MECHANICAL PIPING CHASE.

24. VERTICAL DUCTING TO REMAIN, PROTECT IN PLACE.

25. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM

HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS

SYSTEM HARDWARE (TE-200A) AND SOFTWARE IN ACCORDANCE WITH

SPECIFICATION SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL

NEW MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL

CENTER. ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE

EXISTING NETWORK.

26. CMY-Y102SS-G2 BRANCH JOINT FEEDING INDOOR UNIT. 1/2" REFRIGERANT

SUCTION PIPE AND, 1/4" REFRIGERANT LIQUID PIPE INTO INDOOR UNIT.

27. REMOVE AND REPLACE CHASE PARTITION AS REQUIRED.

28. CONTRACTOR TO PROVIDE ROOF ACCESS FOR NEW CONDENSING UNIT.

29. PROVIDE NEW SUPPLY AND RETURN AIR TERMINALS. COORDINATE WITH

EXISTING DUCTWORK.

30. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS CONTAINING PIPE

INSULATION FROM STEAM PIPES. ABATEMENT CONTRACTOR REQUIRED TO

DEMO TO ACCESS. SEE ARCHITECTURAL SHEETS FOR HAZARDOUS ABATEMENT

AND QUANTITIES. ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE

INSULATION AS MARKED BY GENERAL CONTRACTOR. ABATEMENT

CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION TO ACCESS.

SCALE: 1/2" = 1'-0"

F8

MECHANICAL ENLARGED PLAN -

FIFTH LEVEL - ROOM B5110 - NEW

SCALE: 1/2" = 1'-0"

C8

MECHANICAL ENLARGED PLAN -

FIFTH LEVEL - ROOM B5110 - DEMO

SCALE: 1/2" = 1'-0"

F4

MECHANICAL ENLARGED PLAN -

FIFTH LEVEL - B-TOWER - B5000 -

NEW

SCALE: 1/2" = 1'-0"

F1

MECHANICAL ENLARGED PLAN -

FIFTH LEVEL - D-TOWER - ROOM

D5000 - NEW

NOT TO SCALE

B1

EXISTING WINDOW MOUNTED FAN COIL UNITS TO BE DEMOLISHED, SEE M-400 SERIES SHEETS

Revisions: Date:

SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING

MATERIAL TO BE REMOVED - FIFTH LEVEL

PIPE INSULATION/FITTINGS 60 LF - 1 MECHANICAL UNIT TO BE REMOVED ON FIFTH LEVEL

TRANSITE 25 SF - 1 MECHANICAL UNIT TO BE REMOVED ON FIFTH LEVEL

NOTE: ABATEMENT CONTRACTOR REQUIRED DEMO TO ACCESS ACM

02/09/2023

/09

7 9 15

IU-B6113-01

TELECOM ROOM

B6113

123 SF

3/4" CD

1/4" RL

1/2" RS

PIPE RISER/DROP

TELECOM ROOM

B6113

123 SF

TELECOM ROOM

B6113

123 SF

TELECOM ROOM

B6000

191 SF

IU-B6000-01 IU-B6000-02

1 3 1 3

7 15

VACANT

B6092

VACANT

B6093

3/8" RL 1/4" RL

1/2" RS

PIPE RISER/DROP

3/4" RS

3/4" CD

IU-D6000-01

IU-D6000-02

TELECOM ROOM

D6000

165 SF

7 15

1/2" RS

3/4" CD

3/4" CD

1/4" RL

1/2" RS

PIPE

RISER/DROP

3/4" RS

3/8" RL

1/4" RL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E

H R

M I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d .E

H R

M .M

E P

.B

.r v t

/9

/2

:5

:2

P

M

01M-407

MECHANICAL ENLARGED PLANS - SIXTH LEVEL 607-21-700

07/22/2022 K. LUKE N. HARPER

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH

OTHER TRADES IN ADVANCE OF INSTALLATION.

C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-

CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED

SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE

ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND

BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION

AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND

TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO

NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE

CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS

AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.

REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.

D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED

TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA

FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT

ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE

DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY

RENOVATION.

E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING

CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO

COMPLETE THIS PROJECT.

F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE

FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.

G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND

ELEVATIONS.

H. EXISTING CEILINGS WILL REQUIRE REMOVAL AND REPLACEMENT OF SECTIONS

TO INSTALL NEW MECHANICAL PIPING. CONTRACTOR IS RESPONSIBLE FOR

REPLACING AND REPAIRING ALL EXISTING FINISHES IMPACTED BY NEW

MECHANICAL SCOPE

1. NEW INDOOR UNIT. ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO CONDENSER UNIT.

2. NEW OUTDOOR UNIT, ROUTE REFRIGERANT PIPING TO BRANCH CONTROLLER

AND FROM BRANCH CONTROLLER TO INDOOR UNIT.

3. PROVIDE CONDENSATE PUMP, TO BE MOUNTED HIDDEN WITHIN THE INDOOR

UNIT, CAPABLE OF LIFTING UP 50 FEET WITH 8 FEET SUCTION AND 10 GPH

PUMPING CAPACITY. PROVIDE ELECTRICAL SERVICE FOR CONDENSATE PUMP

IF NOT FED FROM INDOOR UNIT. PROVIDE NEW CONDENSATE LINE FOR NEW

MECHANICAL EQUIPMENT, COORDINATE WITH VA. PROVIDE COORDINATION