Attachment 24 - EHRM Madison - Floor to Finish Heights.pdf

PDF 121 KB Posted

Attached to
36C77623B0011 - Solicitation - EHRM Infrastructure Upgrades - Madison, WI Federal contract opportunity
Solicitation number
36C77623B0011
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for the EHRM Infrastructure Upgrades solicitation number 36C77623B0011 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks a single firm-fixed-price contract to furnish all labor, tools, materials, equipment, and supervision for an EHRM Infrastructure Upgrades project at the Madison VA Medical Center in Madison, Wisconsin. The project scope includes general construction and replacement of all telecommunications cable, outlets, and associated equipment for multiple buildings on the VA campus. The document includes floor-to-finish height details in an appendix for reference. Bids are being solicited and the contract will be awarded on a full and open basis.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0011 - Solicitation - EHRM Infrastructure Upgrades - Madison, WI, newest first.
File Type Posted
36C77623B0011 0004_REVISED.pdf PDF
36C77623B0011 0004.pdf PDF
36C77623B0011 0003.pdf PDF
Attachment 27 - Technical Questions and Answers Volume 2.pdf PDF
Attachment 28 - Strengthening of Concrete with FRP.docx DOCX document
Attachment 29 - Sheet 1-S-15 from Ref_Existing - D - Wing_Addition.pdf PDF
Attachment 31 - CATV rack1top.jpg JPG image
Attachment 35 - CATV back of rack.jpg JPG image
Attachment 32 - CATV rack1btm.jpg JPG image
Attachment 33 - CATV rack2top.jpg JPG image
Attachment 34 - CATV rack2btm.jpg JPG image
Attachment 30 - Existing Column Load Summary.pdf PDF
Attachment 23 - Asbestos Survey and Lead Paint Report.pdf PDF
36C77623B0011 0002.pdf PDF
Attachment 25 - EHRM Madison - Attendance Sheet.pdf PDF
Attachment 26 - Technical Questions and Answers.pdf PDF
36C77623B0011 0001.pdf PDF
Attachment 03 - EHRM Madison - Drawings - Building 01 - Part 2.pdf PDF
Attachment 05 - EHRM Madison - Drawings - Building 01 - Part 4.pdf PDF
Attachment 15 - EHRM Madison - Drawings - Building 15.pdf PDF
Attachment 02 - EHRM Madison - Drawings - Building 01 - Part 1.pdf PDF
Attachment 04 - EHRM Madison - Drawings - Building 01 - Part 3.pdf PDF
Attachment 06 - EHRM Madison - Drawings - Building 01 - Part 5.pdf PDF
Attachment 08 - EHRM Madison - Drawings - Building 01 - Part 7.pdf PDF
Attachment 09 - EHRM Madison - Drawings - Building 02.pdf PDF
Attachment 10 - EHRM Madison - Drawings - Building 04.pdf PDF
Attachment 16 - EHRM Madison - Drawings - Building 22.pdf PDF
Attachment 19 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 20 - Dane County - Wage Rates.pdf PDF
Attachment 21 - SOW - EHRM Infrastructure Upgrades - Madison.pdf PDF
Attachment 07 - EHRM Madison - Drawings - Building 01 - Part 6.pdf PDF
S02 - Solicitation - 36C77623B0011 - EHRM Infrastructure Upgrades - Madison.pdf PDF
Attachment 01 - EHRM Madison - Specifications.pdf PDF
Attachment 13 - EHRM Madison - Drawings - Building 07.pdf PDF
Attachment 14 - EHRM Madison - Drawings - Building 12.pdf PDF
Attachment 17 - EHRM Madison - Drawings - IFC - SITE.pdf PDF
Attachment 18 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 22 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - EHRM Madison - Drawings - Building 05.pdf PDF
Attachment 12 - EHRM Madison - Drawings - Building 06.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM Infrastructure Upgrades - Madison, WI. - 607-21-700 Technical Question and Response #57 -

"Please provide floor to finish heights and floor to structure heights for buildings 02, 04, 05, 06, 07, 12, 15, 22."

Response:

Floor to Finish Clg Floor Top to Floor Top Above (or roof deck)

Bldg 2 grd flr Open 14'-0" flr 1 9'-0" 11'-0" flr 2 8'-2" and 9'-0" 11'-0' (top of roof deck) to 16'-8" (top of flr) flr 3 9'-0" 16'-8" (top of roof deck)

Bldg 4

NA NA NA

Bldg 5 bsmt 8'-2" -/+ 9'-5" flr 1 8'-4" +/- 9'-5" flr 2 8'-4" 9'-2" =/- (top of flr to top of roof deck)

Bldg6 flr 1 8'-4" +/- 9'-7" flr 2 8'-4" 9'-2" =/- (top of flr to top of roof deck)

Bldg 7

Bsmt 8'-0" 9'-3" flr 1 8'-0" 9'-2" =/- (top of flr to top of roof deck)

Bldg 12 flr 1 8'-0" 12'-2" (top of flr to top of roof deck)

Mech Roof Open 13'-4" (top of roof deck to top of roof deck)

Bldg 15 lower level open 11'-8" level 1 open 11'-8" level 2 open 11'-8" level 3 open 15'-0" (top of stairwell roof deck)

Bldg 22 flr 1 9'-0" 12'-0" flr 2 9'-0" 12'-0" flr 3 9'-0" +/- 11'-8" (top of flr to top of steel)

Note: All floor heights noted above are approximate and shall be verified by the GC.

File details come from the government source that posted it. Updated .