Attachment 02 SRD V1 13Oct22.pdf

PDF 696 KB Posted

Attached to
AN/TRN-41 MP TACAN Replacement Federal contract opportunity
Solicitation number
FA8102-23-R-2000
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to AN/TRN-41 MP TACAN Replacement, newest first.
File Type Posted
1 MP TACAN QnA 21Dec22.pdf PDF
FINAL AF PreProposal Conference Provisioning 9 Dec 22.pptx PPTX presentation
FINAL DLA DLIS Pre-Guidance Conf 09Dec22.pptx PPTX presentation
FA810223R2000_______0001 06 Dec 22.pdf PDF
Attachment 04 Section L ITO Risk Price 5Dec22.pdf PDF
EXHIBIT H CDRL B0XX CDRLs 5Dec22.pdf PDF
EXHIBIT D CDRL A0XX CDRLs 5Dec22.pdf PDF
EXHIBIT D CDRL A0XX CDRLs 27Oct22.pdf PDF
EXHIBIT E CDRL B026 27Oct22.pdf PDF
EXHIBIT B CDRL A028 27Oct22.pdf PDF
EXHIBIT G CDRL B047 27Oct22.pdf PDF
Attachment 10 Wage Determination 2015-5105.pdf PDF
Attachment 09 Wage_Determination_2015-5489.pdf PDF
Attachment 05 Section M Risk Price 7 Nov 22.pdf PDF
EXHIBIT F CDRL B028 27Oct22.pdf PDF
FA810223R2000 18Nov22.pdf PDF
EXHIBIT C CDRL A047 27Oct22.pdf PDF
Attachment 04 Section L ITO Risk Price 15Nov22.pdf PDF
Attachment 03 Delivery Locations Basic List.pdf PDF
Attachment 14 DO 1 Location Min Order.pdf PDF
Attachment 06 AFMC Form 158.pdf PDF
Attachment 13 WarrantyTrackingInformation_V2.6.xlsx XLSX spreadsheet
Attachment 01 MP_TACAN_SOW_11_Nov_ 22.pdf PDF
EXHIBIT H CDRL B0XX CDRLs 27Oct22.pdf PDF
Attachment 11 Wage_Determination_2015-5487.pdf PDF
Attachment 15 AFMC Form 718.docx DOCX document
EXHIBIT A CDRL A026 27Oct22.pdf PDF
Attachment 12 Warranty Tracking Info.pdf PDF
Attachment 07 AFMC Form 158 Attmnt Vendor Packaging Inst.pdf PDF
Appendix 3 Pricing Matrix 14Nov22.xlsx XLSX spreadsheet
Appendix 2 CDRL Assertion Matrix 27Oct22.xlsx XLSX spreadsheet
Attachment 08 AFMC Form 807 19 Apr 22.pdf PDF
Appendix 1 SRD Cross Reference 13Oct22.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

System Requirements Document

For the

Man-Portable TACAN Replacement

Document Number: 23-001

Version: 1 Version Date: 13 October 2022

Prepared By:

AFLCMC/HBAA

3580 D Avenue, Building 201W, Room 74

Tinker AFB, OK 73145-9155

Approved By: Approved By:

MARY M. COOLEY, NH-IV, DAF JAMES B. ROBERTS, GS-15, DAF

Chief, ATCALS Sustainment and Modernization Director, Programs and Requirements Branch HQ AFFSA Aerospace Management Systems Division

COOLEY.MARY.M

ARGARET.108076

Digitally signed by

COOLEY.MARY.MARGARET.108

0761089 Date: 2022.10.13 15:42:34 -05'00'

ROBERTS.JAME

S.B.1089422945

Digitally signed by

ROBERTS.JAMES.B.1089422945

Date: 2022.10.14 11:39:01 -05'00'

Version: 1, October 6, 2022 Page ii of ii

SRD MP TACAN Replacement

RECORD OF CHANGES

REVISIONS

REV DESCRIPTION DATE APPROVED

Version: 1, October 13, 2022 Page 1 of 20

1. SCOPE

1.1 SYSTEM IDENTIFICATION. The existing Man-Portable (MP) Tactical Air Navigation (TACAN) system for the United States Air Force (USAF) is the AN/TRN-41. The USAF is replacing it the AN/TRN 41. This document will support this acquisition effort known as the MP TACAN Replacement.

1.2 SYSTEM OVERVIEW. The AN/TRN-41 is a ground-based system that provides a TACAN signal which can be used by any aircraft with a TACAN receiver to help navigate. The AN/TRN- 41 is small and easily transportable versus the various fixed-base systems found at many airports around the world. The existing AN/TRN-41 was fielded back in the 1970s so is maintenance- intensive with insufficient quantities available to meet mission needs, resulting in a requirements gap.

1.3 DOCUMENT OVERVIEW. This System Requirements Document (SRD) provides performance requirements for procuring a replacement for the existing AN/TRN-41 MP TACAN.

1.4 REQUIREMENTS ORIGIN. Headquarters Air Force Flights Standards Agency (HQ AFFSA) provided a Replacement of MP TACAN Requirements Memorandum dated 16 December 2020 from which this document is based. In addition, AFFSA provided a document entitled HQ AFFSA MP- TACAN System Requirements Memorandum Change, dated 3 Nov 2021, which documents changes to requirements. The requirement document was reviewed to ensure its applicability and accuracy. This SRD version contains the current Air Force requirements to support procurement of the AN/TRN-41 MP TACAN Replacement system.

2. APPLICABLE DOCUMENTS

2.1 GENERAL. The applicable documents listed form a prerequisite to meet the requirements contained within this SRD.

2.2 GOVERNMENT DOCUMENTS. The following government documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.

2.3 CURRENT SYSTEM TECHNICAL ORDERS. These documents are to be used to determine the current configuration, procedures or anything related to use of the current fielded systems.

Table 2.3.1

Number Title Date 31R4-2TRN41-2-WA-1 Organizational Maintenance Instruction – Navigational Set, TACAN, ANTRN-41, PN 131500-100

07/08/2020

31R4-2TRN41-4-WA-1 Illustrated Parts Breakdown – Navigational Set, TACAN, ANTRN-41, PN 131500-100

09/22/2021

31R4-2TRN41-5-WA-1 Combined Manual – Depot Maintenance and Circuit Diagrams - Navigational Set, TACAN, AN-TRN-41, PN 131500-100

04/28/2020

31R4-2TRN41-6WC-1-

WA-1

Scheduled Periodic Inspection Workcards – TACAN Navigational Set, ANTRN-41, PN 131500-100 (E-Systems, Inc., Montek Division)

05/30/2014

Version: 1, October 13, 2022 Page 2 of 20

2.4 General Technical Orders.

Table 2.4.1

00-25-234 General Shop Practice Requirements for the Repair, Maintenance, and Test of Electrical Equipment 10/27/2021

The following general Technical Orders are REFERENCE documents:

31-10-24 Installation Practices, Communications Systems grounding, Bonding, and Shielding 11/15/2011 reinstated

12/09/2019 31Z3-822-2 ATCALS Site Requirements 08/12/2019

2.5 Instructions and Manuals.

Table 2.5.1

AFMAN 91-203 Air Force Occupational and Environmental Safety, Fire

Protection and Health (AFOSH) Standards 03/25/2022

AFMAN 11-225(1)/

FAA Order 8200.1D

US Standard Flight Inspection Manual/ US Standard Flight Inspection Manual (USSFIM) with CHG 1

02/06/2019

11/05/2016 AFMAN 11-231 Computed Air Release Point Procedures 11/18/2020 DoDI 4650.01 Policy and Procedures for Management and Use of the

Electromagnetic Spectrum 10/17/2017

FAA Order 6820.10 VOR, VOR/DME, and VORTAC Siting Criteria 04/17/1986 TM 3-34.43 Materials Testing 04/2015 NTIA Manual Manual of Regulations and Procedures for Federal Radio

Frequency Management (Redbook) 01/01/2021

The following Instructions and Manuals are REFERENCE documents: You are to use the latest date as of the date of proposal.

AFMAN17-

1203_AFGM2020-01

Information Technology Asset Management

09/13/2022

AFI 17-101 Risk Management Framework (RMF) for Air Force Information Technology (IT) as amended by Department of the Air Force Guidance Memorandum (DAFGM) to Air Force Instruction (AFI) 17-101, RMF for Department of The Air Force Information for Department of the Air Force Information Technology (IT)

02/05/2020 as amended 06/10/2022

AFI 17-130 Air Force Cybersecurity Program Management 02/13/2020 AFI 63-101/20-101 Integrated Life Cycle Management 06/30/2020 AFMCI 63-1201 Implementing Operational Safety Suitability and Effectiveness

(OSS&E) and Life Cycle Systems Engineering (LCSE) 03/28/2017 as certified current, 09/12/2018

AFMAN 13-204,

Vol 4

Radar, Airfield, and Weather Systems 07/22/2020

AFPD 13-2 Air Traffic, Airfield, Airspace and Range Management 01/03/2019 AFPD 17-1 Information Dominance Governance and Management 04/12/2016 DoDI 8510.01 Risk Management Framework (RMF) for DoD Systems 07/19/22

Version: 1, October 13, 2022 Page 3 of 20

Public Law No: 113-

SUBCHAPTER II--

INFORMATION

SECURITY

Federal Information Security Modernization Act of 2014

(FISMA 2014)

12/18/2014

2.6 Specifications, Standards, Orders and Advisory Circulars.

Table 2.6.1

The following Government Standard documents are MANDATORY and REQUIRE COMPLIANCE. The solution will be tested to or using the following Standards. You are to use the latest date as of the date of proposal.

MIL-HDBK-454C General Guidelines for Electronic Equipment, Note: Particular attention to be given to Guidelines 1, 5, 9, 15 & 66

09/21/2021

MIL-STD-

129R_Chg2

Military Marking for Shipment and Storage 02/18/2014 09/27/19

MIL-STD-130N Chg

Identification Marking of U.S. Military Property (Notice 1) 12/17/2007 08/26/2019

MIL-STD-1472H Human Engineering 09/15/2020

ANSI/ESD S20.20-

Protection Of Electrical And Electronic Parts, Assemblies And Equipment (Excluding Electrically Initiated Explosive Devices)

MIL-STD-188-124B Grounding, Bonding and Shielding (Notice 4) 12/18/2000 04/04/2013

MIL-STD-291C Standard Tactical Air Navigation Signal (Notice 2) 02/10/1998 05/10/2019

MIL-STD-2073-

1E_Chg-4

DoD Standard Practice for Military Packaging 04/22/2019

MIL-STD-810H Test Method Standard: Environmental Engineering Considerations and Laboratory Tests

05/18/2022

MIL-STD-461G Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

12/11/2015

MIL-STD-464D Electromagnetic Environmental Effects Requirements for Systems 12/01/2010 12/24/2020

MIL-STD-882E System Safety (w/Notice 1, 10 Feb 22) 05/11/2012 02/10/22

EPA Title III, EPA 550-B-021-001

List of Lists, Consolidated List of Chemicals Subject to the Emergency Planning and Community Right-To-Know Act (EPCRA) and Section 112(r) of the Clean Air Act

04/2022

FAA AC 00-31A United States (U.S.) National Aviation Standard for the Very High Frequency Omni-directional Radio Range (VOR) / Distance Measuring Equipment (DME) / Tactical Air Navigation (TACAN) Systems

09/19/1982

TM-86-01R

Air Force Technical Manual Contract Requirements (TMCR)

06/01/2020

The following Military Standard documents are REFERENCE documents.

MIL-HDBK-310 Global Climatic Data for Developing Military Products 06/23/1997

Version: 1, October 13, 2022 Page 4 of 20

MIL-HDBK-419A Grounding, Bonding and Shielding for Electronic Equipment and Facilities, Volume 1 (Basic Theory) and Volume 2 (Applications)

- w/Notice 1, 20 Feb 2014)

12/29/1987 02/20/2014

2.7 International Agency Documents. Unless otherwise noted, the “latest” is as of the date of the proposal.

Table 2.7.1

ICAO Annex 10 Vol 1 7th Edition

International Civil Aviation Organization (ICAO) International Standards and Recommended Practices, Aeronautical Telecommunications. Volume I - Radio Navigational Aids

07/2018

The following document is for REFERENCE:

ICAO 8071 Vol I Manual on testing of Radio Navigation Aids (Latest)

2.8 NON-GOVERNMENT DOCUMENTS. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. You are to use the latest date as of the date of proposal.

Table 2.8.1

EN 55024 Information Technology Equipment – Immunity Characteristics –

Limits and Methods of Measure (Latest)

EN 55032 Electromagnetic Compatibility of Multimedia Equipment (Latest) NFPA-70 National Electrical Code, National Fire Protection Agency (Latest) NFPA-77 Recommended Practice on Static Electricity (Latest)

The following practices are REFERENCE documents:

IEEE Std 142-1991 Institute of Electrical and Electronics Engineers, Recommended

Practices for Grounding of Industrial and Commercial Power Systems

(Latest)

IEEE Std 1100-

Recommended Practices for Powering and Grounding of Electronic Equipment

(Latest)

IEEE Std 519-2014 Recommended Practice and Requirements for Harmonic Control in Electric Power Systems

(Latest)

SAE 8090A Mobility, Towed Aerospace Ground Equipment, General Requirements For

(Latest)

2.9 SYSTEM REQUIREMENTS. The replacement MP TACAN system shall consist of all necessary subsystems to ensure the proper signal-in-space to provide navigational guidance to aircraft operating within the realm of the operational control of a deployed MP TACAN system. In addition, it shall provide all equipment needed to meet the following Performance Criteria.

2.10 REQUIRED STATES AND MODES. The requirements will show two states for the replacement MP TACAN system, operational and non-operational. Operational shall be the typical operational state for the system as it is performing its mission to emit a TACAN signal. Non-operational shall be when the system is turned off for reasons such as storage, transport, setup, maintenance, etc.

2.11 SYSTEM FUNCTIONAL REQUIREMENTS. System functional requirements are identified below within the specific topics.

Version: 1, October 13, 2022 Page 5 of 20

2.12 SYSTEM EXTERNAL INTERFACE REQUIREMENTS.

2.12.1 Interface Identification and Diagrams. No specific system or subsystem interfaces required.

2.12.2 Project-Unique Identifier of Interface.

Table 2.12.2.1

No. Description Requirement Threshold (T)

EINT-1 External Power a. The system shall operate utilizing 100-250 VAC, 48-62Hz, single phase power.

b. The system shall be compatible (mating connector is readily available commercially) with multiple types of power sources to include (but not limited to): Commercial power, solar power, generator power, and battery power.

T

EINT-2 Very High Frequency Omni-Directional Range (VOR) Compatibility

The system shall be compatible with VOR systems to include ID synchronization.

T

EINT-3 Worldwide Deployability

a. The system shall be capable of setup and operations in worldwide austere locations in all course-grained and fine-grained soil conditions as defined in TM 3-34.43, Materials Testing, App B, Unified Soil Classification System without requiring permanent foundations (e.g., concrete, cement, etc.).

b. The system shall be capable of setup and operation on permanent foundations (e.g., concrete, cement, etc.) in which no anchors or tie-downs are available.

T

EINT-4 Airborne TACAN Equipment

System shall be compatible with all airborne TACAN interrogators/transponders currently in use.

T

2.13 SYSTEM INTERNAL INTERFACE REQUIREMENTS.

Table 2.13.1

IINT-1 Battery Power a. Interchangeable and rechargeable battery packs shall be included as part of each system.

Version: 1, October 13, 2022 Page 6 of 20

IINT-1

(cont)

b. Each system shall include 1 battery pack that will be included into size, weight and carry considerations for the system and 2 spare battery packs that will be excluded from these considerations.

c. While the system is powered by an external power source and operational, the batteries shall be recharged.

d. System shall operate using VDC power for a minimum of 5 hours on the included battery pack at 0°C.

e. Batteries shall be capable of being recharged external to the system from any of the external power sources listed in EINT-1.

IINT-2 Communication with

RCSU

a. Remote Control Status Unit (RCSU) shall be capable of wireless and wired connectivity (connections/interface only).

b. RCSU shall connect and properly communicate locally at the TACAN as well as from a distance of at least 10,000 feet from the TACAN location using twisted pair copper wire.

c. All wire needed to make the connection with the RCSU shall be provided by the contractor along with system delivery.

2.14 SYSTEM INTERNAL DATA REQUIREMENTS. There are no unique internal data requirements for this system

2.15 ADAPTATION REQUIREMENTS. No adaptation requirements need to be specified.

2.16 ENVIRONMENTAL, SAFETY, AND OPERATIONAL HEALTH (ESOH) REQUIREMENTS.

2.16.1

No. Description Requirement Threshold (T)

ESOH-1 HAZMAT The use of toxic chemicals, hazardous substances, or ozone depleting chemicals (ODCs) shall be avoided, whenever feasible. EPA Title III, List of Lists, EPA 550-B-21-001, provides a listing of toxic chemicals to be avoided.

Version: 1, October 13, 2022 Page 7 of 20

ESOH-2 MSDS The supplier shall provide copies of Material Safety

Data Sheets (MSDS) for all hazardous or toxic materials being supplied at least 120 days prior to the first delivery.

T

ESOH-3 Preferred Materials Recycled, recovered, or environmentally preferable materials shall be used to the maximum extent possible provided that the material meets or exceeds the operational and maintenance requirements, and promotes economically advantageous life cycle costs.

T

ESOH-4 OSHA System shall comply with all OSHA requirements per

AFMAN 91-203.

T

ESOH-5 NFPA-70 (NEC) All electrical systems shall comply with the National Electrical Code (NEC).

T

ESOH-6 Grounding Protection a. System shall meet the requirements of MIL-STD- 188-124B for grounding, bonding, and shielding though the government will be responsible for providing the appropriate ground rod for the delivered systems.

b. System shall meet the requirements of NFPA-77 for static electricity.

Note: The contractor shall appropriately ground the system for all testing performed at contractor facilities.

T

ESOH-7 System Safety The TACAN system shall meet the requirements of MIL-STD-882E, Section 4.

T

ESOH-8 Internal Chassis Ground

A ground terminal or equivalent function shall be provided on all TACAN system Line Replaceable Units (LRUs) within the equipment. The ground terminal shall be located on the input power connector or on the equipment terminal board and shall connect to the internal chassis by means of conductors at least equal in size to one of the power input conductors. Safety grounding within the equipment shall terminate on the ground terminal.

Grounds and AC return lines shall be separated.

T

ESOH-9 External Chassis Ground

A ground conductor shall be included with the TACAN system power conductors and shall connect to the ground terminal of individual units when power is routed externally between individual units of the equipment.

T

ESOH-10 Safety Shielding System protective shields shall be provided to protect personnel from accidental contact with parts in excess of 30V RMS or 30V DC during operation or maintenance actions.

T

ESOH-11 Electromagnetic Radiation Hazards

a. Hazard of Electromagnetic Radiation to Ordinance (HERO) safe separation distances shall be determined and documented for the TACAN in accordance with MIL-STD-464D Appendix A, paragraph A.5.9.3.

Version: 1, October 13, 2022 Page 8 of 20

ESOH-11

b. Hazard of Electromagnetic Radiation to People (HERP) safe separation distances shall be determined and documented for the TACAN in accordance with MIL-STD-464D, Appendix A, paragraph A.5.9.1.

c. Hazard of Electromagnetic Radiation to Fuel (HERF) safe separation distances shall be determined and documented for the TACAN in accordance with MIL-STD-464D, Appendix A, paragraph A.5.9.2.

2.17 SECURITY AND PRIVACY REQUIREMENTS.

Table 2.17.1

SEC-1 Operating System The operating system for all computers shall be fully compatible and required to run on the current Security Technical Implementation Guide (STIG) version from Defense Information Systems Agency’s (DISA).

T

SEC-2 Highly Secure a. For Windows based devices, computers and software shall meet the standards for a highly secure environment published by Microsoft which lists the minimum hardware and software requirements at: https://docs.microsoft.com/en-us/windows-hardware/design/device-experiences/oem-highly-secure.

b. For Linux devices, computers and software shall meet the following standards:

Confirm SeLinux is enabled.

Operating in enforcing mode.

A targeted policy is being used.

Reference:

https://access.redhat.com/documentation/en-us/red_hat_enterprise_linux/7/html/selinux_ users_and_administrators_guide/index

T

SEC-3 BitLocker All computers and software shall function with BitLocker (or equivalent) encryption enabled.

T

SEC-4 Encryption Level All remote connections between the TACAN and the RCSU shall meet AES 256-bit or higher-level encryption.

T

SEC-5 Network The RCSU connection to the TACAN shall function as a stand-alone network only. No external network connections shall be required for system operation.

Bluetooth and Wireless Fidelity (Wi-Fi) enabled

Version: 1, October 13, 2022 Page 9 of 20 mobile device connections are prohibited.

SEC-6 User Level Control a. Any maintenance software shall include user Identification (ID) and password controls to prevent unauthorized access.

b. System/User accounts shall have a minimum of three tiers of access (one allowing viewing status only, one allowing full maintenance functionality and one with administrative access that allows all functionality and assigning of usernames and passwords).

T

SEC-7 Password Complexity All passwords shall meet the below minimum requirements:

a. Be at least 14 characters in length.

b. Must contain at least 1 uppercase, 1 lowercase, 1 number, and 1 special character (~!@#$%^&*_-

c. May not contain the account name associated with the password.

d. May not contain more than 2 consecutive characters.

e. Password complexity filter must be enabled to disallow use of passwords not meeting these requirements.

2.18 SYSTEM ENVIRONMENT REQUIREMENTS.

Table 2.18.1

ENV-1 CBRNE

Survivability, Decontamination

a. Decontamination of the system shall not cause the system to become inoperable (system is assumed to be off air during decontamination) and shall not induce any safety hazards.

b. The system shall continue to operate when exposed to an environment of chemical and biological contamination.

T

ENV-2 Temperature a. Operating: -40°C to +71°C.

b. Non-operating (outdoor): -40°C to +71°C.

c. Non-operating (indoor)/Storage/Transport: -40°C to

+71°C.

Version: 1, October 13, 2022 Page 10 of 20

ENV-3 Temperature

Shock

a. Non-Operating: -40°C to +24°C and +18°C to +71°C.

b. Storage/Transport: -40°C to +71°C.

ENV-4 Relative Humidity

Operating/Non-Operating: 5 to 100% with ambient temperatures above 27°C, maximum dew point of 27°C, including condensation due to temperature change.

T

ENV-5 Altitude a. Operating/Non-Operating: Sea level to 13,100 feet (3.1 km).

b. Storage/Transport: Sea level to 45,900 feet (12.2 km), ENV-6 Rapid Decompression

No safety hazard resulting from rapid decompression from 8,000 ft to 40,000 ft in less than 15 s.

T

ENV-7 Wind and Ice Operating/Non-Operating: 50 mph (43 knots) steady state and 71 mph (62 knots) gusts with no ice and with ½-in glaze ice mix (in accordance with MIL-HDBK- 310 for 1% location at 3m (10 ft) off the ground).

T

ENV-8 Snow Up to 50 pounds per square foot on all horizontal surfaces (in accordance with MIL-HDBK-310 for “semi-permanent equipment”).

T

ENV-9 Solar Radiation and UV Resistance

External surfaces and materials, including cables, shall be resistant to the effects of solar radiation at a rate of 1120 W/m2.

T

ENV-10 Sand and Dust a. Blowing Sand:

- Concentration: 0.18 g/m3, -0.0/+0.2 g/m3.

- Particle Size: 150 to 850

- Air Velocity: 18 m/s.

b. Blowing Dust:

- Concentration: 10.6 ±7 g/m3.

- Particle Size: <149

- Air Velocity: 8.9 ± 1.3 m/s.

T

ENV-11 Salt Atmosphere Withstand exposure to a salt fog atmosphere with a salt concentration of at least 5%.

T

ENV-12 Fungus Show no signs of fungal growth after prolonged exposure to fungus growth as encountered in tropical climates.

T

ENV-13 Rain 1.2 inches/hour (in accordance with MIL-HDBK-310 for the 0.5% frequency of occurrence for rainfall).

T

ENV-14 Shock a. When packaged for transport, withstand the loading and unloading from vehicles, aircraft, rail, and ship without suffering damage.

b. Operate without malfunction or performance degradation following exposure to the shock environment encountered during transit drops to the extent of the package size and weight.

T

ENV-15 Vibration When transported via fixed-wing and rotary wing aircraft, ocean-going ship, rail, and ground vehicles operating in Type IV and Type V as defined in SAE 8090A mobility conditions, or a combination of these conditions, the system shall withstand the vibration encountered with no damage.

Version: 1, October 13, 2022 Page 11 of 20

2.19 COMPUTER RESOURCE REQUIREMENTS.

2.19.1 Computer Hardware Requirements.

2.19.1.1

No. Description Requirement Threshold (T)

COMP-1 Computer Hardware

The Contractor shall determine and configure specific computer hardware in order to meet the performance requirements below for a STIG compliant operating system and installed contractor software.

a. Average computer boot/re-boot times less than 2 minutes.

b. Response times average less than 2 seconds.

2.19.2 Computer Hardware Resource Utilization Requirements. No specific utilization requirements are required. The Contractor is to determine optimum resource utilization to meet requirements specified in Table 2.20.1.

2.20 COMPUTER SOFTWARE REQUIREMENTS. All references to “Real Time” refer to when a connection has been established locally to the system using the provided equipment and/or software designated for maintenance and/or monitoring and shall provide real-time status, control and diagnostics.

Table 2.20.1

RMM-1 Maintenance Status

a. All system parameters required for maintenance and monitoring actions shall be available at the TACAN site.

b. The communicated data shall be displayed in the correct engineering units requiring no conversion by the technician.

c. Units of monitored electronic parameters shall follow the International Standard (SI) convention.

d. Units for monitored non-electronic parameters shall be available in the English Standard.

T

RMM-2 Remote Monitoring & Maintenance

(RMM)

a. System shall include a Remote Control and Status Unit (RCSU).

b. RCSU shall remotely monitor status of the system and provide reset capability as a minimum.

Version: 1, October 13, 2022 Page 12 of 20

RMM-3 Fault Isolation a. The equipment shall be provided with enough self-diagnostics tools to troubleshoot the equipment down to each specific LRU.

b. At least 95% of all detected faults shall be isolated to one LRU.

T

RMM-4 Frequency of Diagnostics

a. System shall perform diagnostics that identifies issues and potential problems and shall store this information per RMM-9.

b. Diagnostics shall be performed at start-up and then periodically every 90 seconds).

c. The Remote Monitoring and Maintenance (RMM) equipment shall have self-diagnosis ability to identify faults within the software subsystem.

T

RMM-5 System Information Availability

System shall provide all information “Real Time” as it pertains to site ID, system status, system configuration, equipment settings, equipment status (ON/OFF), equipment performance and parameters, and test results.

T

RMM-6 Alarm Information

System shall provide information “Real Time” as it pertains to alarm conditions (ON/OFF), alarm status (Enabled/Disabled) and alarm thresholds.

T

RMM-7 Alarm & Fault Control

System shall provide “Real Time” control and feedback as it pertains to all alarm activation and threshold adjustment, alarm bypass, alarm response, alarm reset, fault limit settings, fault conditions, fault checks, and fault reset.

T

RMM-8 Fault Information a. System shall provide all information “Real Time” as it pertains to fault conditions and fault limits.

b. Fault limits shall be differentiated by Green (operational/online), Yellow (degraded), and Red (failure/offline).

T

RMM-9 Archived Information

a. System shall provide historical data on fault conditions, alarms, and maintenance actions.

b. A minimum of 96 hours of historical shall be available (e.g. Error on Friday available for viewing on Monday).

c. This data shall be stored with the system.

Version: 1, October 13, 2022 Page 13 of 20

RMM-9

d. The contractor shall provide the equipment to access this data.

RMM-10 Real Time Clock The clock/calendar shall be adjustable for initial setup as well as to ensure accuracy later.

T

RMM-11 Master Reset/Startup

System software shall have a master reset/startup and a master shutdown function to start or stop TACAN operation locally and remotely.

T

RMM-12 Default Parameters

The system and its software shall maximize the use of default parameters in an effort to minimize user required input for initial setup.

T

RMM-13 Messages a. A priority alarm message shall be generated when a failure occurs within a TACAN subsystem which causes a loss of service to the user (i.e. shutdown).

b. Non-priority messages shall be generated to alert for either fault or alert conditions.

c. All alarm notifications shall also be transmitted to a

RCSU.

T

RMM-14 Non-Volatility All control settings, operational parameters and limits, initialization data, data files and fault history shall be stored locally with enough power backup capacity to ensure non-volatility.

T

RMM-15 Software/RCSU Failure

a. Failures within the software subsystem shall not degrade the capability of the TACAN to provide signal in space (azimuth/bearing) information.

b. Failures of the RCSU or its connections shall not degrade the capability of the TACAN to provide signal in space (azimuth/bearing) information.

T

RMM-16 Continuous Monitoring

System shall provide continuous monitoring of critical parameters and cause shutdown of the system in the event any one of the parameters fall outside of its specified tolerance. This requirement shall be met for both internally caused failures (e.g. LRU fault) and externally caused failures (e.g. shift of tripod).

Note: Critical parameters shall be any parameter that contributes to the radiated signal including the azimuth/bearing, Distance Measuring Equipment (DME) signal and Identification (ID) information.

2.20.2 Computer Communication Requirements. Communication requirements are specified as part of the interface requirements in Table 2.13.1, INT-2.

Version: 1, October 13, 2022 Page 14 of 20

2.21 SYSTEM QUALITY FACTORS.

Table 2.21.1

QLT-1 Signal-in- Space

Provided equipment shall emit, as a minimum, the appropriate TACAN signal per MIL-STD-291C and ICAO Annex 10, Volume 1, Attachment C, Figure C-20 with the following exceptions due to a system operating with a short aperture antenna:

a. Harmonic content of 15 Hz modulation component (0° to +6° elevation)

1. Root Mean Square (RMS) sum of 2nd through 6th harmonics: 30%.

2. RMS sum of 7th through 11th harmonics (except 9th harmonic): 25%.

3. Individual amplitude of 7th through 11th harmonics (except 9th harmonic): < 30%.

b. Harmonic content of 135 Hz modulation component (0° to +6° elevation)

1. RMS sum of 2nd through 6th harmonics: <

15%.

c. 15 Hz modulation

1. 21% ±9% modulation from -2° to +10° elevation.

2. 5% modulation from +10° to +30° elevation.

d. 135 Hz modulation

1. 12% to 36% modulation from -2° to +10° elevation

2. 5% modulation from +10° to + 25° elevation.

QLT-2

(KPP)

Flight Check System shall pass a FAA flight check per FAA Order 8200.1D or ICAO with a satisfactory rating.

T

QLT-3 Reply Efficiency

The system shall provide identification, distance measurement and azimuth information to at least 100 aircraft simultaneously with 80% reply rate in X-mode and 75% reply rate in Y-mode to interrogating aircraft transponders with a receive signal level of -90dBm. The TACAN system shall be capable of “On Request Mode” of operation.

T

QLT-4 Capacity System shall be capable of fully supporting at least 100 aircraft simultaneously and providing azimuth and identity information to an unlimited number of aircraft.

Version: 1, October 13, 2022 Page 15 of 20

QLT-5 Transmitter Power Out

a. The system shall be capable of transmitting enough watts RF peak power to reach a distance of 75 nm at 0.5 degree while adhering to MIL-STD-291C and ICAO Annex 10.

b. The TACAN transmitter shall be adjustable to lower power settings to include as a minimum a 50% power setting.

T

QLT-6 Lock-on Continuous lock-on (azimuth and distance measurement) for 15 nautical miles within plus or minus 5 degrees or less of the approach course.

T

QLT-7 Standby Mode of Operation

a. Standby condition until interrogated by the using aircraft.

b. When interrogation occurs, full power should automatically be transmitted within 60 seconds.

T

QLT-8 Course Alignment

Within plus or minus 3.5 degrees of the correct magnetic bearing with the exception of the approach courses which will be within plus or minus 2.5 degrees.

T

QLT-9 Radial Roughness and Scalloping

The radial roughness and scalloping will be within plus or minus 4.0 degrees of the radial.

T

QLT-10 Radial Course Bends

The radial course bends will be within plus or minus 4.0 degrees of the correct magnetic bearing.

T

QLT-11 Polarization Effect

The polarization effect will be within plus or minus 4.0 degrees.

T

QLT-12 Unlock No more than one condition of azimuth and/or distance measurement unlock of not more than two search cycles will be permissible in any five nautical miles of radial flight with a ground speed of 150 knots.

T

QLT-13 Power Spectrum

Output power spectrum shall meet FAA, ICAO and MIL- STD-291C requirements at maximum output per FAA Advisory Circular 00-31A.

T

QLT-14 TACAN

Antenna Performance

The MP TACAN antenna shall provide performance equal to or better than the following:

a. Frequency Range: 962 to 1213 MHz (transmit); 1025 to 1150 MHz (receive).

b. Channels: 1X through 126X; 1Y through 126Y.

c. VSWR: 962 MHz to 1213 MHz less than 2.0 to 1.

d. Gain (peak): +3.0 dBi (main lobe); -1.0 dBi (horizon).

e. Energy radiated below horizon: < 25% of total radiated energy.

f. The peak signal occurs between +15° and +35° above the horizon (main lobe).

Version: 1, October 13, 2022 Page 16 of 20

QLT-15 Mean-Time- To-Repair

(MTTR)

The MTTR for the system and all major subsystems shall be 30 minutes or less at field level.

T

QLT-16 Maximum Time to Repair (MaxTTR)

The MaxTTR for the system and all major subsystems th percentile at field level.

T

QLT-17 Mean-Time- Between Failure

(MTBF)

The MTBF for the system and all major subsystems shall be greater than or equal to 10,000 hrs.

T

QLT-18 Service Life All requirements stated within this specification shall be maintainable over the minimum expected service life of 20 years.

2.22 DESIGN AND CONSTRUCTION CONSTRAINTS.

2.22.2

No. Description Requirement Threshold (T)

DES-1 Anchoring System shall be equipped (or come with) an anchoring system that will anchor the system in the environmental conditions presented in Para 3.9 and in locations as presented in Para EINT-3 (worldwide deployability).

T

DES-2 Transport-ability to Include: Low Velocity Airdrop (LVAD) and 463L pallet requirement

a. When packaged for transport, withstand Low Velocity Airdrop from an altitude not to exceed 1000 feet and operate without malfunction or performance degradation in accordance with AFMAN 11-231.

b. When packaged for transport, the combined envelope of the complete system (Antenna Kit, Beacon Transponder Kit, RCSU Kit, and Assembly System Kit) shall not exceed the usable dimensions of one 463L pallet.

T

DES-3 Adjustments System shall require no adjustments subsequent to being placed in operation and all tuning controls utilized prior to deployment will include locking devices to hold the control firmly in place once it is set.

T

DES-4 TACAN

Antenna Type

a. System shall include a mechanically or electronically scanned antenna with a scanning speed of 900 RPM ±0.015%.

b. The Antenna shall include a support stand capable of adjustment from 3 feet to 5 feet.

DES-5 Electrostatic Discharge

(ESD)

Identification markings including ESD warning labels shall be affixed on all ESD-sensitive subassemblies to be visible to maintenance personnel prior to maintenance handling of the equipment. Enclosures, assemblies, and subassemblies containing class 1 or class 2 ESD sensitive components (as defined by ANSI/ESD S20.20-2021), shall be appropriately marked using the documentation in ANSI/ESD S20.20-2021 as an example.

Version: 1, October 13, 2022 Page 17 of 20

DES-6 Internal Wiring To the maximum extent possible, all multi-conductor wiring and cable design shall follow the guidelines of MIL-HDBK-454C, Guideline 66.

T

DES-7 Workmanship General workmanship acceptance criteria shall be based on best commercial practice. The contractor’s workmanship practices will be evaluated based on MIL- HDBK-454C, Guidelines 1, 5, 9 and 15 and USAF Technical Manual T.O. 00-25-234.

T

DES-8 Commercial Standards

A listing of the contractor’s “best commercial standards” shall be provided to the Government that includes all the standards to which the equipment was designed to (or referenced during the design). These standards shall be physically or electronically be available for review by the Government minimally at the supplier’s facility.

T

DES-9 Controls and Indicators

System equipment controls and indicators shall be designed in accordance with MIL-STD-1472H.

T

DES-10 Electromagnetic Environment

System shall meet its operational performance requirements in its intended operational Electromagnetic Environment (EME) without causing or suffering any unacceptable performance degradation due to unintentional Electromagnetic Interference (EMI) to or from other equipment in the same environment.

T

DES-11 Corrosion Protection

System shall have a corrosion protection finish preferably in a desert tan color (other subdued colors acceptable).

2.23 PERSONNEL-RELATED REQUIREMENTS.

Table 2.23.1

PER-1

(KPP)

Portability a. The system components shall comply with the lift and carry criteria defined in Section 5.20.2 of MIL-STD- 1472H.

b. The weight of the components shall accommodate the Low Body Weight criteria stated in Paragraph

5.20.2.3.5.2.3 of MIL-STD-1472H both in and outside of the transport cases with 2 person lifts allowed.

c. The system (with the transport cases) shall be transportable across all terrain types for a distance of up to 1.25 miles by no more than 2 persons in 2 trips.

Shall include soft carrying case with carrying handles and/or with adjustable straps

Version: 1, October 13, 2022 Page 18 of 20

PER-1

d. For system components which do not meet the portability requirements (shown above in bullets a-c), transport aids (e.g. carts with run-flat all-terrain tires) are an acceptable means to support them and shall be provided with each system. Any transportation aid will be included total system envelope of one 463L pallet

PER-2 Set Up The TACAN system design and construction shall permit setup, leveling, aligning, and operational ready to transmit ready for flight inspection in no more than 75 minutes by two trained and qualified Radar, Airfield, and Weather Systems (1C853, 5-skill level, Journeyman) personnel.

Note: Set up time does not include personnel wearing Mission Oriented Protective Posture (MOPP) Level 4 attire.

T

PER-3 Mission Oriented Protective Posture

(MOPP)

The system shall be able to be set up, maintained in the field, and operated by personnel wearing MOPP Level 4 attire.

2.24 TRAINING-RELATED REQUIREMENTS. Training-related requirements will be addressed within the Statement of Work (SOW).

2.25 LOGISTICS-RELATED REQUIREMENTS.

Table 2.25.1

LOG-1 Support/Test Equipment

a. Unique support and test equipment shall not be required unless analysis determines that no common equipment exists that can perform the function.

b. Any unique equipment as well as basic COTS/NDI equipment that is to be used for field level maintenance shall be identified and provided with each system.

Note: Unique equipment would include any equipment that is unique to the system being provided and is not readily available for purchase in the commercial marketplace from multiple vendors.

2.26 OTHER REQUIREMENTS. No requirement categorized as “other” are identified in this document.

Version: 1, October 13, 2022 Page 19 of 20

2.27 PACKAGING REQUIREMENTS.

Table 2.27.1

PAK-1 Identification Plates//Labels/ Markings

a. Identification plates, labels or markings shall be located in conspicuous spaces on all assemblies, LRUs, external cables and all other components, exceptions shall be noted.

b. Plates/labels/markings shall provide the necessary information to uniquely identify the unit or subassembly and IAW MIL-STD-130N.

c. I.D. marking plates/labels/markings shall be durable and legible over the intended service life of the equipment.

T

PAK-2 Packaging Packaging of systems, subsystems and LRUs for delivery to the government shall be per MIL-STD- 2073-1E Change 4.

T

PAK-3 Marking of Packaging

Marking of packaging shall be in accordance with MIL- STD-129R Change 2.

2.28 STATUTORY, REGULATORY, AND CERTIFICATION REQUIREMENTS.

2.28.2 Statutory Requirements. No specific statutory requirements.

2.28.3 Regulatory Requirements. No specific regulatory requirements.

2.28.4 Certification Requirements.

2.28.3.1

No. Description Requirement Threshold (T)

CERT-1 Spectrum Management

System spectrum management and use shall be in accordance with DoDI 4650.01, Policy and Procedures for Management and Use of the Electromagnetic Spectrum.

T

CERT-2 Spectral Emissions

System emission spectra shall conform to the applicable sections of the National Telecommunication and Information Administration (NTIA) Manual of Regulations and Procedures for Federal Radio Frequency Management (Redbook).

T

CERT-3 Certification Spectrum dependent system equipment shall be capable of:

a. Receiving an approved stage 3 Defense Department (DD) Form 1494 thru the NTIA spectrum supportability certification process in support of system testing.

b. Receiving a frequency assignment, in support of system testing, thru the NTIA spectrum supportability

Version: 1, October 13, 2022 Page 20 of 20 certification process.

CERT-3

(cont)

c. Receiving an approved stage 3 Defense Department (DD) Form 1494 thru the NTIA spectrum supportability certification process in support of system testing.

d. Receiving a frequency assignment, in support of system testing, thru the NTIA spectrum supportability certification process.

e. Receiving an approved stage 4 DD Form 1494 thru the NTIA spectrum supportability certification process in support of operational activities.

f. Receiving a frequency assignment, in support of operational activities, thru the NTIA spectrum supportability certification process.

CERT-4 EMI/EMC

Compliance

System shall be certified to applicable EMI/Electromagnetic Compatibility (EMC) requirements of either MIL-STD-461G, EN55032/EN55024, or equivalent commercial EMI/EMC standard.

2.29 PRECEDENCE AND CRITICALITY OF REQUIREMENTS. There are 2 Key Performance Parameters (KPPs) identified within the requirements above. These are requirements QLT-2 and PER-1. These requirements are of the highest importance and are expected to be the basis for the new MP TACAN system. All other requirements are Key System Attributes (KSAs) and shall be considered of equal ranking below the ranking of the KPPs.

2.30 DEMILITARIZATION AND DISPOSAL. A demilitarization and disposal plan is required with more details provided within the SOW.

3 VERIFICATION PROVISIONS. Appendix A shows a Requirements Verification Matrix that associates a means to verify each of the requirements shown in Section 3 of this SRD. The contractor may propose alternative verification methods with associated justification at any point prior to approved test plan. The Contracting Officer shall approve this alternative means in writing prior to Contractor’s use of alternative method.

APPENDIX A

Requirements Verification Matrix

For Man-Portable TACAN Replacement

For the

Man-Portable TACAN Replacement

Document Number: 23-001A

Version: A Version Date: 13 October 22

Prepared By:

AFLCMC/HBAA

3580 D Avenue, Building 201W, Room 74

Tinker AFB, OK 73145-9155

RECORD OF CHANGES

REVISIONS

REV DESCRIPTION DATE APPROVED

A Original Release 13 Oct 22 MMC, JBR

Version A Page 2

1. SCOPE

1.1 SYSTEM IDENTIFICATION. The existing Man-Portable (MP) Tactical Air Navigation (TACAN) system for the Air Force is the AN/TRN-41. The Air Force is planning its replacement. This document will support this acquisition effort known as the Man-Portable (MP) TACAN Replacement.

1.2 DOCUMENT OVERVIEW. This Requirements Verification Matrix documents the means each requirement documented within the System Requirements Document (SRD) is to be verified.

The contractor may offer alternative verification methods with associated justification.

2. REQUIREMENTS VERIFICATION

2.1 MATRIX. Table 1 shows the Requirements Verification Matrix. The Requirement No. and Description match that within the SRD. The Verification Method provides the means that will be used to verify each requirement. The timing for the verification is during the execution of the contract.

Table 1 – Requirements Verification Matrix

Requirement No.

Description Verification Method

EINT-1 External Power a. Inspection of analytical or test documentation

b. Inspection of design documentation

EINT-2 Very High Frequency Omni-Directional Range (VOR) Compatibility

Inspection of analytical or test documentation

EINT-3 Worldwide Deployability a & b. Inspection of system and/or design documentation

EINT-4 Airborne TACAN Equipment

IINT-1 Battery Power a. Inspection of system

b. Inspection of system

c. Inspection of design documentation

d. Inspection of analytical or test documentation

e. Inspection of design documentation and/or demonstration IINT-2 Communication with

RCSU

a. Inspection of design documentation

b. Inspection of analytical or test documentation

c. Inspection of test system

ESOH-1 HAZMAT Inspection of document proving compliance ESOH-2 MSDS Inspection of documentation at time due ESOH-3 Preferred Materials Inspection of document proving compliance ESOH-4 OSHA Inspection of document proving compliance ESOH-5 NFPA-70 (NEC) Inspection of design documentation or other documents proving compliance ESOH-6 Grounding Protection a & b. Inspection of design documentation or other documents proving compliance

Version A Page 3

ESOH-7 System Safety Inspection of system safety process or other documentation proving compliance

ESOH-8 Internal Chassis Ground

Inspection of design documentation

ESOH-9 External Chassis Ground

ESOH-10 Safety Shielding Inspection of design documentation and/or system ESOH-11 Electromagnetic

Radiation Hazards a - c. Inspection of documentation proving compliance

SEC-1 Operating System Inspection of test documentation and/or government test on an early production system, government determines method during EoC

SEC-2 Highly Secure a & b. Inspection of system SEC-3 BitLocker Inspection of test documentation and/or government test on an early production system, government determines method during EoC

SEC-4 Encryption Level Inspection of system or documentation SEC-5 Network Inspection of system or design documentation SEC-6 User Level Control a & b. Demonstration SEC-7 Password Complexity a - e. Demonstration ENV-1 CBRNE Survivability, Decontamination a & b. Inspection of analytical or test documentation

ENV-2 Temperature a - c. Inspection of test results (test per MIL-STD- 810)

ENV-3 Temperature Shock a & b. Inspection of test results (test per MIL-STD-

ENV-4 Relative Humidity Inspection of test results (test per MIL-STD-810) ENV-5 Altitude a & b. Inspection of test results (test per MIL-STD-

ENV-6 Rapid Decompression Inspection of test results (test per MIL-STD-810) ENV-7 Wind and Ice Inspection of test results (test per MIL-STD-810) ENV-8 Snow Inspection of test results (test per MIL-STD-810) ENV-9 Solar Radiation and

UV Resistance Inspection of test results (test per MIL-STD-810)

ENV-10 Sand and Dust a & b. Inspection of test results (test per MIL-STD-

ENV-11 Salt Atmosphere Inspection of test results (test per MIL-STD-810) ENV-12 Fungus Inspection of test results (test per MIL-STD-810).

Inspection of analysis if required.

ENV-13 Rain Inspection of test results (test per MIL-STD-810) ENV-14 Shock a & b. Inspection of test results (test per MIL-STD-

ENV-15 Vibration Inspection of test results (test per MIL-STD-810) COMP-1 Computer Hardware a & b. Demonstration RMM-1 Maintenance Status a. Inspection of analytical or test documentation

b. Demonstration

c. Demonstration

d. Demonstration

Version A Page 4

RMM-2 Remote Monitoring & Maintenance (RMM)

a. Inspection of system

b. Demonstration

RMM-3 Fault Isolation a & b. Inspection of analytical or test documentation RMM-4 Frequency of

Diagnostics a - c. Demonstration

RMM-5 System Information Availability

Demonstration

RMM-6 Alarm Information Demonstration RMM-7 Alarm & Fault

Control Demonstration

RMM-8 Fault Information a & b. Demonstration RMM-9 Archived Information a. Demonstration

b. Inspection of analytical or test documentation

c. Demonstration

d. Demonstration

RMM-10 Real Time Clock Demonstration RMM-11 Master Reset/Startup Demonstration RMM-12 Default Parameters Demonstration RMM-13 Messages a - c. Demonstration RMM-14 Non-Volatility Inspection of analytical or test documentation RMM-15 Software/RCSU

Failure a & b. Demonstration

RMM-16 Continuous Monitoring

QLT-1 Signal-in-Space a - d. Inspection of analytical or test documentation

QLT-2

Flight Check Inspection of test documentation.

Government may also perform testing on an early production system (EoC)

QLT-3 Reply Efficiency Inspection of analytical or test documentation QLT-4 Capacity Inspection of analytical or test documentation QLT-5 Transmitter Power

Out

a. Inspection of analytical or test documentation

b. Demonstration as part of Flight Check

QLT-6 Lock-on Inspection of analytical or test documentation QLT-7 Standby Mode of

Operation a & b. Inspection of analytical or test documentation

QLT-8 Course Alignment Inspection of analytical or test documentation QLT-9 Radial Roughness and

Scalloping

QLT-10 Radial Course Bends Inspection of analytical or test documentation QLT-11 Polarization Effect Inspection of analytical or test documentation QLT-12 Unlock Inspection of analytical or test documentation QLT-13 Power Spectrum Inspection of analytical or test documentation QLT-14 TACAN Antenna

Performance a - f. Inspection of analytical or test documentation

QLT-15 Mean-Time-To- Repair (MTTR)

Version A Page 5

QLT-16 Maximum Time to Repair (MaxTTR)

QLT-17 Mean-Time-Between Failure (MTBF)

QLT-18 Service Life Inspection of analytical DES-1 Anchoring Inspection of design documentation DES-2 Transportability to include Low Velocity Airdrop (LVAD) and 463L pallet

DES-3 Adjustments Demonstration DES-4 TACAN Antenna

Type

DES-5 Electrostatic Discharge (ESD)

Inspection of design documentation and system

DES-6 Internal Wiring Inspection of design documentation and/or system DES-7 Workmanship Inspection per MIL-HDBK-454C, Guidelines 1, 5, 9 and 15 and USAF Technical Manual T.O. 00-25-234 DES-8 Commercial Standards Inspection of list and standards DES-9 Controls and

Indicators

DES-10 Electromagnetic Environment

DES-11 Corrosion Protection Inspection of design documentation

PER-1

Portability a. Inspection of design documentation

c. Inspection of analytical or test documentation

d. Inspection of design documentation

PER-2 Set Up Documentation & Demonstration PER-3 Mission Oriented

Protective Posture

(MOPP)

LOG-1 Support/Test Equipment

b. Inspection of system and TOs

PAK-1 Identification Plates//Labels/ Markings

a. Inspection of design documentation

c. Inspection of design documentation including specifications for materials used PAK-2 Packaging Inspection of Logistics Plan PAK-3 Marking of Packaging Inspection of Logistics Plan CERT-1 Spectrum

Management

CERT-2 Spectral Emissions Inspection of analytical or test documentation CERT-3 Certification a - f. Inspection of analytical or test documentation

CERT-4 EMI/EMC

Compliance

Version A Page 6

2.2 RESOURCES TO SUPPORT VERIFICATION. All documentation, equipment, supplies and facilities needed to support the government during the verification process shall be provided by the contractor except as noted below. The contractor shall also provide any manpower needed to support the government during the verification process. The government will provide the manpower to perform the actual verification. To accommodate Requirement PER-2, the government will provide a location and personnel for a demonstration of system setup. If the government decides to perform government testing for Requirement QLT-2, the government will provide for a location and personnel to setup as well as arranging for and providing the flight check aircraft.

Requirements Verification Matrix

For the

Man-Portable TACAN Replacement

Document Number: 23-001A

Prepared By:

AFLCMC/HBAA 3580 D Avenue, Building 201W, Room 74 Tinker AFB, OK 73145-9155