Appendix 2 CDRL Assertion Matrix 27Oct22.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- AN/TRN-41 MP TACAN Replacement Federal contract opportunity
- Solicitation number
- FA8102-23-R-2000
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CDRL No. | Authority | CDRL Title - Subtitle | Government Rights | ||||
| 10/27/22 | Contractors Assertion | Distro Code | Submission Time | 1st Rework Submission | 2nd Gov Review Complete | ||
| A001/B001 | DI-MGMT-80004A | Management Plan | |||||
| Government Purpose | B | 30 DAC | |||||
| A002/B002 | DI-MGMT-81928/T | Contractor's Progress Status and Management Report | Government Purpose | B | 10th of Each Month beginning month after CA | ||
| A003/B003 | DI-MGMT-81861C/T | Integrated Program Management Data and Analysis Report (IPMDAR) - Integrated Master Schedule (IMS) (IMS) | |||||
| Government Purpose | B | 20 DAC and 10th of each month thereafter | |||||
| A004/B004 | DI-ADMN-81249C/T | Meeting Agenda |
| Government Purpose | B | As Required | |
| A005/B005 | DI-ADMN-81250C | Meeting Minutes |
| Government Purpose | B | As Required | |||
| A006/B006 | DI-AVCS-80700A | Computer Software Product End Items | |||
| Unlimited Rights | B | 10 Days Prior to TRR | |||
| A007/B007 | DI-IPSC-81442A | Software Version Description (SVD) | |||
| Unlimited Rights | B | 60 DAC | |||
| A008/B008 | DI-SESS-81785A | Systems Engineering Management Plan (SEMP) | Government Purpose | B | 30 DAC |
| A009/B009 | DI-SESS-80858D | Supplier's Configuration Management Plan | Government Purpose | B | 30 DAC |
| A010/B010 | DI-SESS-80639E | Engineering Change Proposal (ECP) | |||
| Government Purpose | B | As Required | |||
| A011/B011 | DI-SESS-80640E | Request for Variance (RFV) | |||
| Government Purpose | B | As Required | |||
| A012/B012 | DI-SESS-81022E | Configuration Audit Summary Report & Certification | |||
| Government Purpose | B | 10 Days After PCA & FCA | |||
| A013/B013 | DI-NDTI-80603A/T | Test Procedures - Qualification Test and Evaluation (QT&E) and Factory Acceptance Test (FAT) Procedures | Unlimited Rights | B | QT&E - 30 Days prior to testing |
PAT: 60 days prior to first PAT
| A014/B014 | DI-NDTI-80809B/T | Test/Inspection Report - Qualification Test and Evaluation (QT&E) and Factory Acceptance Test (FAT) Report | Unlimited Rights | B | QT&E: 14 days after testing PAT: 7 days after each PAT | |
| A015/B015 | DI-SAFT-80101C | System Safety Hazard Analysis Report (SSHAR) | ||||
| Government Purpose | B | 90 DAC | ||||
| A016/B016 | DI-SAFT-81626 | System Safety Program Plan | ||||
| (SSPP) | Government Purpose | B | 60 DAC | |||
| A017/B017 | DI-ENVR-81840 | Programmatic Environmental Safety and Health Evaluation (PESHE) Plan | Unlimited Rights | B | 90 DAC | |
| A018/B018 | DI-ILSS-80095/T | Integrated Logistics Support Plan (ILSP) | ||||
| Government Purpose | B | 45 DAC | ||||
| A019/B019 | DI-PSSS-81970 | Common Repairable Item Identification Listing | Government Purpose | C | 45 days prior to Depot Activation Meeting | |
| A020/B020 | DI-MGMT-81948 | Diminishing Manufacturing Sources and Material Shortages (DMSMS ) Management Plan | Unlimited Rights | C | As Required | |
| A021/B021 | DI-MGMT-81949 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan | Unlimited Rights | C | As Required | |
| A022/B022 | DI-SESS-81758A/T | Logistics Product Data | Unlimited Rights | C | IAW AFMC Form 718 | |
| A023/B023 | DI-SESS-81874/T | Engineering Data For Provisioning (EDFP) | Unlimited Rights | C | As Required | |
| A024/B024 | DI-PSSS-80134B | Proposed Spare Parts List | Government Purpose | B | 30 DAC | |
| A025/B025 | DI_SESS-80255B | Failure Summary and Analysis Report | Government Purpose | B | 1st report due after Delivery of 1st MP TACAN | |
| A026/B026 | DI-SESS-81000F/T | Product Engineering Design Data and Associated Lists | Unlimited Rights | B | 90 DAC | |
| A027/B027 | MIL-DTL-38804F | Manuals, Technical-Time Compliance Technical Order (TCTO) and TCTO Supplements | ||||
| Government Purpose | C | As Required | ||||
| A028/B028 | TM-86-01R (TMCR) | Technical Order (TO) | Unlimited Rights | A | Field Level |
30% - 1st TDR 70% - 2nd TDR 90% - at OUE 100% - Before Production
A029/B029 DI-PSSS-82354/T Training Materials
| Government Purpose | B | 45 Days Prior to First Training Class | |||
| A030/B030 | DI-SESS-81759A | Logistics Product Data Summaries | Government Purpose | C | As Required |
| A031/B031 | DI-SESS-81248B | Interface Control Document (ICD) | |||
| Unlimited Rights | C | 60 DAC | |||
| A032/B032 | DI-PACK-80120D/T | Preservation and Packing Data | Government Purpose | D | One time 30 days after completion of Spares/Provisioning Conference, no later than 90 days prior to the schedule shipment date of each item |
| A033/B033 | DI-PACK-80121C/T | Special Packaging Instructions (SPI) Drawing/Narrative Instructions | Government Purpose | B | 30 Days After completion of Spares/Provisioning Conferences; no later than 90 days prior to the scheduled shipment date of each item |
| A034/B034 | DI-PACK-80683E | Container Design Retrieval System (CDRS) Research Request | Government Purpose | D | 30 Days of the completion of the Spares/Provisioning Conference, no less than 120 days prior to scheduled shipment of identified items |
| A035/B035 | DI-PACK-80684E | Container Design Retrieval System (CDRS) Data Input | Government Purpose | D | 120 days prior to schedule delivery for each item |
| A036/B036 | DI-PACK-81059B | Performance Oriented Packaging (POP) Test Report | Government Purpose | B | 30 Days after completion of the Spares/Provisioning Conference. |
| A037/B037 | DI-SAFT-81640B/T | Ammunition & Explosives (A&E) Demilitarization (DEMIL) Plan | Government Purpose | C | 15 Days After OUE/Flight Check |
| A038/B038 | DI-IPSC-82249A/T | Software Assurance Evaluation Report (SAER) | Government Purpose | B | As Required |
| A039/B039 | DI-EMCS-81827/NOT 2 | Spectrum Certification Spectral Characteristic Data - DD Form 1494 | Government Purpose | B | 30 DAC |
| A040/B040 | DI-MGMT-81642 | Small Business Subcontractor Report | |||
| Government Purpose | B | 90 DAC | |||
| A041/B041 | DI-MISC-81454D | Computer Program Identification Number (CPIN) Catalog Information | |||
| Government Purpose | B | As Required | |||
| A042/B042 | DI-MGMT-81803A | Item Unique Identification (IUID) Marking Plan | Government Purpose | C | 60 DAC |
| A043/B043 | DI-SESS-81254D | Request for Nomenclature | Government Purpose | B | As Required |
| A044/B044 | DI-MGMT-82247 | Contractor's System Security Plan & Associated Plans of Action to Impletment (NIST SP800-171 on a Contractor's Internal Unclassified Infformation System | Government Purpose | B | As Required |
| A045/B045 | DI-PSSS-81872A/NOT 1 | Level of Repair Analysis (LORA) Report | Government Purpose | B | 10 Days before Provisioning Conference |
| A046/B046 | DI-MGMT-81605/T | Briefing Materials | Government Purpose | B | 10 Days before Kickoff Meeting, Program Management Reviews, Techincal Interchange Meetings and Technical Data Reviews |
| A047/B047 | TM-86-01R (TMCR) | Technical Order (TO) | Unlimited Rights | A |
Depot Level 30/70/90/100% will be delivered at a date TBD at TOGC.
| A048/B048 | DI-ATTS-80041A/T | Test Requirements Document | Government Purpose | C | Once at delivery |
| A049/B049 | DI-SESS-81639B/T | Warranty Performance Reports | Government Purpose | B | Annually or as Required |
&"-,Bold"&12NAVAIDS FOS CDRL Status Sheet
&"Times New Roman,Regular"&10Page &P of &N
Sheet2
Sheet3
File details come from the government source that posted it. Updated .