Attachment 02 Grindstone - Final Plans - signed.pdf

PDF 50 MB Posted

Attached to
Grindstone Recreation Area Wastewater Treatment Plant Replacement
Solicitation number
12445126B0007
Issued by

About this file

This is a Final Plans document for the Grindstone Recreation Area Wastewater Treatment Plant Replacement project being conducted by the Department of Agriculture Forest Service R8-Southern Region. The plans detail the design specifications and construction requirements for rehabilitating the existing Grindstone Campground sanitary sewer system and replacing the lagoon-based treatment system with a modern alternative.

The project scope encompasses construction of over 4,300 linear feet of 8-inch gravity sewer line, installation of 20 or more manholes, installation of sewer laterals, and construction of a new treatment system with drip field and associated site improvements. The existing lagoon system will be fully removed and decommissioned as part of the work. The awarded contractor is responsible for furnishing all materials, personnel, and equipment necessary to execute the work in accordance with the final construction documents, plans, and specifications contained within this attachment and related solicitation documents.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .