Attachment 02 - 534-24-902 - Project Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- 36C24726B0002
About this file
These are bid documents for a Temporary Compounding Area renovation project at Ralph H. Johnson VA Health Care System in Charleston, South Carolina (Project Number 534-24-902). The documents consist of architectural, mechanical, and electrical drawings prepared by the consultant Mizzan Molnar, with an issue date of August 8, 2025.
The project scope encompasses renovation of approximately 1,005 square feet to create a temporary pharmaceutical compounding facility. Key work includes demolition of existing equipment and finishes within the designated area, installation of new HVAC systems including a Greenheck Vektor-H-10 high-plume exhaust fan (LEF-3) with variable frequency drive, provision of a Baker SG404 Biological Safety Cabinet (Class II Type A2), construction of a negative pressure room with specific air flow relationships (330 CFM supply, 430 CFM exhaust), installation of a bag-in/bag-out HEPA filter housing system, electrical connections to support new mechanical equipment, and control systems integration with the existing Siemens Desigo DDC system. The facility must maintain negative pressure of -0.01 to -0.03 inches water gauge relative to the wet lab. The project is fully sprinklered and includes ICRA (Infection Control Risk Assessment) containment measures during construction. Specifications require coordination with government-provided equipment, compliance with VA technical standards, and provision of complete operating and maintenance manuals within thirty days of acceptance.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
GI001
SHEET
NO.
DRAWING TITLE
GENERAL
GI002
ARCHITECTURAL
SHEET
NO.
COVER SHEET
LEGENDS, ABBREVIATIONS AND NOTES
FIRST FLOOR PLANAE101
TEMPORARY COMPOUNDING AREA
PROJECT NUMBER: 534-24-902
BID DOCUMENTS
RALPH H. JOHNSON VA HEALTH CARE SYSTEM
CHARLESTON, SC
FIRST FLOOR PLAN - DEMOLITIONAD101
MECHANICAL
MECHANICAL LEGEND, ABBREVIATIONS, AND NOTESM001
FIRST FLOOR AND ENLARGED MECHANICAL DEMOLITION PLANMD101
FIRST FLOOR AND ENLARGED MECHANICAL NEW WORK PLANM101
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
PROJECT LOCATION PROJECT LOCATION
TRUE
NORTH
PLAN
NORTH
FIRST FLOOR REFLECTED CEILING PLAN - DEMOLITIONAD111
ROOF PLAN - DEMOLITIONAD121
FIRST FLOOR REFLECTED CEILING PLANAE111
ROOF PLANAE121
TRUE
NORTH
PLAN
NORTH
DRAWING TITLE
ELECTRICAL
ELECTRICAL GENERAL NOTES AND ABBREVIATIONSE001
ELECTRICAL LEGENDE002
ELECTRICAL FIRST FLOOR DEMO PLANED101
ELECTRICAL FIRST FLOOR PLANE101
ELECTRICAL ROOF PLANE102
MECHANICAL NOTESM002
ROOF PLAN AND SECTIONS - MECHANICAL NEW WORK PLANM102
M501 MECHANICAL DETAILS
VA STATION GENERAL CONTROL NOTES AND LEGENDM800
CONTROL SCHEMATIC, SEQUENCE OF CONTROL, AND CONTROL POINT - MECHANICALM801
GI003 LIFE SAFETY AND ICRA FLOOR PLANS
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
COVER SHEET
GI0018-08-25
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT JSN NUMBER
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF MASONRY
• FACE OF WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE HOLES IN EXISTING WALLS
AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH
HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC.
WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL,
THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND
FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF
THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR
APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.
F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE
DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .
H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE
REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE
EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF
MATERIALS.
I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST
WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA
AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL
TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A
HAZARD TO PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF
HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE
WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF
HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA
TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,
DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR
AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE
WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY
WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND
FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT
OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S
FULL RANGE OF COLORS.
L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER
PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.
M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT
AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION
OCCURS.
N. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA
DURING PERFORMANCE OF THE WORK.
O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
P. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID
NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO
COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR
SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH
THE WORK.
Q. COORDINATE WORK WITH EQUIPMENT SUPPLIER/ INSTALLER CONTRACTED SEPARATELY WITH
THE GOVERNMENT.
R. THE CONSTRUCTION AREA SHALL BE PROVIDED WITH A TEMPORARY FIRE EXTINGUISHER AT
ALL TIMES.
S. HIGH NOISE WORK SHALL ONLY OCCUR AFTER HOURS/WEEKENDS.
A ACCESSORY TYPE
ACCESSIBILITY REQUIREMENTS
FRONT APPROACHES
HINGE-SIDE APPROACHES
LATCH-SIDE APPROACHES
USE EITHER
OPTION 1 OR
OPTION 2
ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE
INDICATED MINIMUM CLEARANCES AS APPLICABLE.
1'-0" IF DOOR HAS BOTH
A CLOSER AND A
LATCH
5' -0
1'-6"
3' -6
4'-6"
4' -0
O P
TI
O
N
5' -0
OPTION 1
3'-0"
O P
TI
O
N
4' -6
OPTION 2
3'-6"
2'-0"
4' -0
2'-0"
3' -6
4' -0
4' -6
W / C
LO
S
E R
4' -0
W / C
LO
S
E R
W /C
LO
S
E R
A N
D L
A
TC
H
ALL WORK SHALL COMPLY WITH FEDERAL ABA,
LOCAL, AND STATE ACCESSIBILITY CODES AND
REQUIREMENTS.
DOOR LOCATIONS
TYPICAL DETAILS
TYP DOOR LOCATION
SEE DOOR SCHEDULE
4"
TYP
TYPICAL SIGNAGE MOUTING HEIGHTS
A A
5' -0
4' -9
EQ EQ
UL DETAIL W-L-2038
ANY UL ASSEMBLY MEETING CRITERIA MAY BE UTILIZED. ASSEMBLIES
INDICATED ON THIS SHEET ARE FOR INFORMATION ONLY.
WALL
FLOOR
AND
WALL
FLOOR
AND
WALL
UL DETAIL C-AJ-1254
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
LEGENDS, ABBREVIATIONS AND NOTES
GI0028-08-25
ABCDE
C.5E.5
WET LAB
DD171
TEMPORARY
COMPOUNDING
ROOM
DD172
LAB
SUPPORT
DD173
187'- 4"
FEC
KEY PLAN
NTS
PROJECT AREA
ICRA PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
LIMITS OF CONSTRUCTION
NEW CONSTRUCTION
ICRA PLAN KEY NOTES #
1 EXISTING DOOR AND FRAME ASSEMBLY TO REMAIN.
PROVIDE SEALS AND SWEEP AS REQUIRED AND KEEP DOOR CLOSED
AT ALL TIMES DURING CONSTRUCTION ACTIVITIES.
PROVIDE TEMPORARY ICRA CONTAINMENT WALL & DOOR IN
CONFROMANCE WITH ICRA 1.3 (VERSION)
THE CONSTRUCTION AREA SHALL BE PROVIDED WITH A TEMPORARY
FIRE EXTINGUISHER AT ALL TIMES.
INFECTION CONTROL BARRIER
WITH ACCESS DOOR.
ICRA GENERAL NOTES
A. PROVIDE ICRA BARRIERS AND ENTRANCE DOORS AS REQUIRED AND
INDICATED ON FLOOR PLAN. COORDINATE ICRA CATEGORY LEVEL AND
LOCATIONS WITH COR. BASIS OF DESIGN: STARC REALWALL.
B. HIGH NOISE WORK TO OCCUR AFTER HOURS/WEEKENDS.
C. HEPA FILTRATION REQUIRED CONTINUOUS MONITORING.
D. ICRA NEASURES ARE TO BE INSTALLED IN ACCORDANCE WITH ICRA 1.3
(VERSION)
A. DURING CONSTRUCTION, MEET OR EXCEED RECOMMENDED CONTROL
MEASURES OF ANSI/SMACNA 008-2008, CHAPTER 3.
B. PROTECT STORED ON-SITE AND INSTALLED ABSORPTIVE MATERIALS
FROM MOISTURE DAMAGE.
C. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING
CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY
REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR
GRILLE, AS DETERMINED BY ASHRAE STANDARD 52.2-1999 (WITH
ERRATA BUT WITHOUT ADDENDA). REPLACE ALL FILTRATION MEDIA
IMMEDIATELY PRIOR TO OCCUPANCY.
D. PERFORM BUILDING FLUSH-OUT AS FOLLOWS:
1. AFTER CONSTRUCTION ENDS, PRIOR TO OCCUPANCY AND WITH
INTERIOR FINISHES INSTALLED, PERFORM A BUILDING FLUSH-OUT
BY SUPPLYING A TOTAL VOLUME OF 14000 CU. FT. OF OUTDOOR
AIR PER SQ. FT. OF FLOOR AREA WHILE MAINTAINING AN INTERNAL
TEMPERATURE OF AT LEAST 60 DEGREES FAHRENHEIT AND A
RELATIVE HUMIDITY NO HIGHER THAN 60 PERCENT. OR
2. IF OCCUPANCY IS DESIRED PRIOR TO FLUSH-OUT COMPLETION,
THE SPACE MAY BE OCCUPIED FOLLOWING DELIVERY OF A
MINIMUM OF 3500 CU. FT. OF OUTDOOR AIR PER SQ. FT. OF FLOOR
AREA TO THE SPACE. ONCE A SPACE IS OCCUPIED, IT MUST BE
VENTILATED AT A MINIMUM RATE OF 0.30 CFM PER SQ. FT. OF
OUTSIDE AIR OR DESIGN MINIMUM OUTSIDE AIR RATE DETERMINED
UNTIL A TOTAL OF 14000 CU. FT./SQ. FT. OF OUTSIDE AIR HAS BEEN
DELIVERED TO THE SPACE. DURING EACH DAY OF FLUSH-OUT
PERIOD, VENTILATION MUST BEGIN A MINIMUM OF THREE HOURS
PRIOR TO OCCUPANCY AND CONTINUE DURING OCCUPANCY.
FIELD QUALITY CONTROL NOTES
TEMPORARY PATH OF TRAVEL
LIFE SAFETY LEGEND
TOTAL TRAVEL DISTANCE
TRAVEL DISTANCE TO EXIT = 187' - 4" < 200' - 0"
EXIST EXIT SIGN
AB
WET LAB
DD171
TEMPORARY
COMPOUNDING
ROOM
DD172
LAB
SUPPORT
DD173
2M A
T
HEPA
FEC
BSC-A2
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
LIFE SAFETY AND ICRA FLOOR PLANS
GI003
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"GI003
1 FIRST FLOOR LIFE SAFETY PLAN
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
1/4" = 1'-0"GI003
2 ENLARGED ICRA PLAN - PROJECT AREA
BSC-B2
8-08-25
DEMOLITION PLAN LEGEND
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
LIMITS OF CONSTRUCTION
DEMOLITION PLAN GENERAL NOTES
A. COORDINATE DEMOLITON WORK OF ALL DISIPLINES AS REQUIRED FOR NEW WORK..
B. THE CONTRACTOR SHALL REMOVE ALL EXISTING CONSTRUCTION AS INDICATED OR REQUIRED
AND SHALL DISPOSE OF ALL REMOVED MATERIALS IN AN APPROVED, OFFSITE LANDFILL EXCEPT
WHERE OTHERWISE REQUIRED FOR SALVAGE OR RECYCLING.
C. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION.
CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING DIMENSIONS OF INSTALLED
CONSTRUCTION PRIOR TO COMMENCING WITH THE WORK. IN THE EVENT THAT ANY
DISCREPANCIES BETWEEN THE INDICATED DEMOLITION WORK AND EXISTING CONDITIONS ARE
DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION
PRIOR TO PROCEEDING WITH THE WORK.
DEMOLITION PLAN KEY NOTES #
REMOVE, RELOCATE AND STORE EXISTING LOOSE EQUIPMENT TO BE TURNED OVER TO THE VA
TO A COR APPROVED LOCATION.
REMOVE EXISTING SIGN.
REMOVE, RELOCATE AND STORE EXISTING METRO STARSYS STORAGE CABINET TO BE TURNED
OVER TO THE VA TO A COR APPROVED LOCATION.
ABCDE
8.5
C.5E.5
10' - 10" 25' - 4" 12' - 2" 12' - 10" 25' - 0" 25' - 4"
TISSUE
CULTURE
ROOM
DD172
WET LAB
DD171
LAB
SUPPORT
DD173
TISSUE
CULTURE
ROOM
DD167
WET LAB
DD166
LAB
SUPPORT
DD168
TISSUE
CULTURE
ROOM
DD176
WET LAB
DD174
LAB
SUPPORT
DD175
OFFICE
DD177
OFFICE
DD179
BREAK
ROOM
DD178
STORAGE
DD121A
EXAM
DD124
EXAM
DD122
EXAM
DD128
EXAM
DD129
JAN
DD126
EXAM
DD127
EXAM
DD125
EXAM
DD123
EXAM
DD133
EXAM
DD135
EXAM
DD137
EXAM
DD131
EXAM
DD132
TOILET
DD130
EXAM
DD139
EXAM
DD140
EXAM
DD142
EXAM
DD145
EXAM
DD146
OFFICE
DD147
OFFICE
DD148
EXAM
DD143
EXAM
DD141
EXAM
DD134
EXAM
DD136
EXAM
DD138
TOILET
DD144
GROUP
THERAPY
DD113
GROUP
THERAPY
DD114
TOILET
DD110
GROUP
THERAPY
DD109
OFFICE
DD111
EXAM
DD115
OFFICE
DD112
TOILET
DD116
EXAM
DD117
EXAM
DD118
EXAM
DD119
EXAM
DD120
ADMIN
SUPPORT
DD121
OFFICE
DD160
OFFICE
DD161
OFFICE
DD162
TOILET
DD169
TOILET
DD170
LAB
SUPPORT
DD165
TISSUE
CULTURE
ROOM
DD164
WET LAB
DD163
WET LAB
DD159
LAB
SUPPORT
DD158
TISSUE
CULTURE
ROOM
DD157
STORAGE
DD156
WAREHOUSE
HOLDING
DD155
COMM.
DD154
MECHANICAL
ROOM
DD149
CONNECTION
CORRIDOR
DD183
LOBBY
DD150
LOBBY
DD102
CORR
DD103
CORR
DD105
CORR
DD106
CORR
DD104
CORR
DD107
CORR
DD108
CORR
DD153
CORR
DD152
CORR
DD151
CLOSET
DD113A
MECH CLOSET
DD182
DN
DN
DESK
DESKDESK
AD101
AB
TISSUE
CULTURE
ROOM
DD172
WET LAB
DD171
LAB
SUPPORT
DD173
WET LAB
DD174
DESK
DESK
DESK
C A
B
IN
E T
FI
LE
BSC-B2
TYP.
EXISTING BIOSAFETY
CABINET TO REMAIN
KEY PLAN
NTS
PROJECT AREA
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
FIRST FLOOR PLAN - DEMOLITION
AD101
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AD101
1 FIRST FLOOR DEMO PLAN
1/4" = 1'-0"AD101
2 ENLARGED FIRST FLOOR DEMO PLAN
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
DEMOLITION RCP LEGEND
SUPPLY DIFFUSER/ RETURN
AIR GRILLE TO BE REMOVED
EXIST ACCESS PANEL
TO REMAIN
ACOUSTICAL CEILING TO
BE REMOVED
EXIST GWB/PLASTER
CEILING TO REMAIN
S EXIST PUBLIC ADDRESS
SPEAKER TO REMAIN
EXIST SECURITY MOTION
DETECTOR TO REMAIN
M
EXIT LIGHTING TO REMAIN
LAY-IN LIGHT FIXTURE TO BE
REMOVED AND REINSTALLED
SPRINKLER HEAD TO REMAIN
EXIST SMOKE
DETECTOR TO REMAIN
AREA OF ACOUSTICAL CEILING TILE
SYSTEM TO BE REMOVED
EXIST SUPPLY DIFFUSER/ RETURN
AIR GRILLE TO REMAIN
EXIST LAY-IN LIGHT FIXTURE
TO REMAIN
EXIST WIFI TO REMAIN
SD
LIMITS OF CONSTRUCTION
DEMOLITION RCP GENERAL NOTES
A. COORDINATE DEMOLITON WORK OF ALL DISIPLINES AS REQUIRED FOR NEW WORK.
B. REMOVE AND STORE CEILING DEVICES, EQUIPMENT, ETC. FOR REINSTALLATION.
C. DURING CEILING INSTALLATION, FOLLOW THE MEDICAL CENTER'S ILSM REQUIREMENTS
FOR SPRINKLER OUTAGE.
REMOVE TWO EXISTING ACOUSTICAL CEILING GRIDS AND ASSOCIATED SUPPORTS
INDICATED AS REQUIRED TO INSTALL WORK. REMOVE AND STORE CEILING PANELS.
REMOVE PARTIAL AREA OF EXIST ACOUSTICAL CEILING TILE SYSTEM, LIGHTS AND CEILING
DEVICES AS REQUIRED AND STORE FOR REINSTALLATION AFTER HVAC WORK. REFER TO
OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL INFORMATION.
DEMOLITION RCP KEY NOTES #
ABCDE
C.5E.5
SD
SDS
SD
M
M
S
M
S
S
S
SD
M
S
S
M
M
S SD
M
S
AD111
AB
SD
SDS
SD
M
M
S
M
KEY PLAN
NTS
PROJECT AREA
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
FIRST FLOOR REFLECTED CEILING PLAN -
DEMOLITION
AD111
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AD111
1 FIRST FLOOR DEMO RCP
1/4" = 1'-0"AD111
2 ENLARGED FIRST FLOOR DEMO RCP
0' 2' 4' 8' 12'
DN
ABCDE
C.5E.5
RDRD
OD OD
RD
OD
RD
OD
RD
OD
RD
OD
/8
2'
7/
8"
3' - 8 1/8" 6'
3/
8" 6'
3/ 8"
AD121
KEY PLAN
NTS
PROJECT AREA
DEMOLITION ROOF PLAN GENERAL NOTES
A. REMOVE ROOF SYSTEM DOWN TO EXISTING ROOF SLAB AS REQUIRED TO INSTALL WORK.
B. MINIMIZE DEMOLITION AREA TO PRESERVE INTEGRITY OF EXISTING ROOF. ALL ROOF SYSTEM
DEMOLITION MUST BE COORDINATED WITH ROOF MANUFACTURERS WARRANTY REQUIREMENTS.
CUT 16" ROOF OPENING AS INDICATED AND REQUIRED TO INSTALL WORK. REFER TO OTHER
DISCIPLINE DRAWINGS FOR ADDITIONAL INFORMATION.
DEMOLITION ROOF PLAN KEY NOTES #
AB
RD
OD
3' - 8 1/8"
6'
3/
8" 6'
3/ 8"
2'
7/
8"
/8
DEMOLITION ROOF PLAN LEGEND
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
LIMITS OF CONSTRUCTION
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
ROOF PLAN - DEMOLIITION
AD121
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AD121
1 ROOF DEMO PLAN
1/4" = 1'-0"AD121
2 ENLARGED ROOF DEMO PLAN
0' 2' 4' 8' 12'
FLOOR PLAN LEGEND
EXISTING CONSTRUCTION TO REMAIN
CONSTRUCTION
LIMITS OF CONSTRUCTION
FLOOR PLAN GENERAL NOTES
A. COORDINATE WORK INDICATED ON THIS DRAWING WITH OTHER DISCIPLINES DOCUMENTS.
B. PATCH EXISTING RETAINED CONSTRUCTION ADJACENT TO WORK.
VA PROVIDED AND INSTALLED BIOSAFETY CABINET. BASIS OF DESIGN : THE BAKER
COMPANY, STERILGARD E3, CLASS II TYPE A2 BIOLOGICAL SAFETY CABINET.
MODEL #: SG404.
FLOOR PLAN KEY NOTES
2 PROVIDE ROOM SIGNAGE TO MATCH EXISTING SIGNAGE SYSTEM. SEE
DETAIL 3/AE101. REFER TO SHEET GI002 FOR MOUNTING HEIGHT.
ABCDE
C.5E.5
10' - 10" 25' - 4" 12' - 2" 12' - 10" 25' - 0" 25' - 4"
TEMPORARY
COMPOUNDING
ROOM
DD172
TISSUE
CULTURE
ROOM
DD167
WET LAB
DD166
LAB
SUPPORT
DD168
TISSUE
CULTURE
ROOM
DD176
WET LAB
DD174
LAB
SUPPORT
DD175
OFFICE
DD177
OFFICE
DD179
BREAK
ROOM
DD178
STORAGE
DD121A
EXAM
DD124
EXAM
DD122
EXAM
DD128
EXAM
DD129
JAN
DD126
EXAM
DD127
EXAM
DD125
EXAM
DD123
EXAM
DD133
EXAM
DD135
EXAM
DD137
EXAM
DD131
EXAM
DD132
TOILET
DD130
EXAM
DD139
EXAM
DD140
EXAM
DD142
EXAM
DD145
EXAM
DD146
OFFICE
DD147
OFFICE
DD148
EXAM
DD143
EXAM
DD141
EXAM
DD134
EXAM
DD136
EXAM
DD138
TOILET
DD144
GROUP
THERAPY
DD113
GROUP
THERAPY
DD114
TOILET
DD110
GROUP
THERAPY
DD109
OFFICE
DD111
EXAM
DD115
OFFICE
DD112
TOILET
DD116
EXAM
DD117
EXAM
DD118
EXAM
DD119
EXAM
DD120
ADMIN
SUPPORT
DD121
OFFICE
DD160
OFFICE
DD161
OFFICE
DD162
TOILET
DD169
TOILET
DD170
LAB
SUPPORT
DD165
TISSUE
CULTURE
ROOM
DD164
WET LAB
DD163
WET LAB
DD159
LAB
SUPPORT
DD158
TISSUE
CULTURE
ROOM
DD157
STORAGE
DD156
WAREHOUSE
HOLDING
DD155
COMM.
DD154
MECHANICAL
ROOM
DD149
CONNECTION
CORRIDOR
DD183
LOBBY
DD150
LOBBY
DD102
CORR
DD103
CORR
DD105
CORR
DD106
CORR
DD104
CORR
DD107
CORR
DD108
CORR
DD153
CORR
DD152
CORR
DD151
CLOSET
DD113A
MECH CLOSET
DD182
DN
DN
WET LAB
DD171
LAB
SUPPORT
DD173
AE101
AB
TEMPORARY
COMPOUNDING
ROOM
DD172WET LAB
DD171
LAB
SUPPORT
DD173
12' - 5 1/4"
BSC-A2
AE121
BSC-B2
KEY PLAN
NTS
PROJECT AREA
NOT TO SCALE
BASIS OF DESIGN: TO MATCH EXISTING SIGNAGE SYSTEM
PROVIDE (1) TYPE 1 SIGN.
9" INSIDE FRAME DIMENSION
9"
IN
S
ID
E F
R A
M E
D
IM
E N
S
IO
N
3" 6" 5"
8"
.060" ROOM NUMBER PANEL
FIRST SURFACE PAINTED WITH RAISED
NUMBERS AND BRAILLE
3/16" ACRYLIC BACKER (CLEAR)
MAGNET TAPE BACKING FOR MOUNTING
SIMPLY PREMIER FRAME
BEVELED EDGE
STANDARD DEPTH
METAL INSIDE
.060" GLOSSY PETG FACE
FIRST SURFACE PAINTED WITH VINYL
MASKED WINDOW
.118" CLEAR PETG WINDOW SPACER
.060" WINDOW BACK
BACK PAINTED WITH MAGNET TAPE FOR
MOUNTING
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
FIRST FLOOR PLAN
AE101
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AE101
1 FIRST FLOOR PLAN
1/4" = 1'-0"AE101
2 ENLARGED FIRST FLOOR PLAN
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
AE101
3 SIGN TYPE 1
RCP LEGEND
SUPPLY DIFFUSER/ RETURN
AIR GRILLE
EXIST ACCESS PANEL
2'X2' ACOUSTICAL CEILING
EXIST GWB/PLASTER
S EXIST PUBLIC ADDRESS SPEAKER
EXIST SECURITY MOTION DETECTOR M
EXIT LIGHTING
LAY-IN LIGHT FIXTURE TO BE
REINSTALLED
SPRINKLER HEAD
EXIST SMOKE DETECTOR
EXIST SUPPLY DIFFUSER/ RETURN
AIR GRILLE
EXIST LAY-IN LIGHT
AREA OF ACOUSTICAL CEILING TILE
SYSTEM TO BE REINSTALLED
EXIST WIFI
2'X4' ACOUSTICAL CEILING
SD
LIMITS OF CONSTRUCTION
RCP GENERAL NOTES
A. COORDINATE WORK INDICATED ON THIS DRAWING WITH ALL DISCIPLINES DOCUMENTS.
B. PATCH EXISTING RETAINED CONSTRUCTION ADJACENT TO WORK.
C. REINSTALL EXISTING CEILING EQUIPMENT AND DEVICES IN ITS ORIGINAL LOCATION.
PROVIDE 2'X4' ACOUSTIC CEILING TILE SYSTEM AND CUT OPENING AS INDICATED
AND REQUIRED TO INSTALL WORK. REORIENT DIRECTION OF GRID TO ALLOW
OPENING TO PENETRATE A FULL TILE. REFER TO OTHER DISCIPLINES DRAWINGS
FOR ADDITIONAL INFORMATION.
REUSE AND REINSTALL EXIST 2'X2' ACOUSTIC CEILING PANEL AT REMOVED RETURN
AIR GRILLE TO MATCH ADJACENT CEILING TILE.
REINSTALL EXIST ACOUSTICAL CEILING TILE SYSTEM, LIGHTS AND DEVICES IN
THEIR ORIGINAL LOCATION.
RCP KEY NOTES
ABCDE
C.5E.5
SD
SDS
SD
M
M
S
M
S
S
S
SD
M
S
S
M
M
S SD
M
S
AE111
AB
SD
SDS
SD
M
M
S
M
KEY PLAN
NTS
PROJECT AREA
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
FIRST FLOOR REFLECTED CEILING PLAN
AE111
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AE111
1 FIRST FLOOR RCP
1/4" = 1'-0"AE111
2 ENLARGED FIRST FLOOR RCP
0' 2' 4' 8' 12'
DN
ROOF PLAN GENERAL NOTES
A. THE CONTRACTOR SHALL NOT DRILL, CORE, MECHANICALLY FASTEN
(EXPANSION ANCHOR/SCREWS), CHEMICALLY ANCHOR (EPOXY ANCHOR) OR
POWDER DRIVEN FASTEN TO DOUBLE TEE STEMS DURING INSTALLATION OF
NEW WORK.
B. CORING OF DOUBLE TEES SHALL ONLY BE CONSTRUCTED IN THE LOCATION(S)
SHOWN. DO NOT CUT WEB OF T'S IN ANY CIRCUMSTANCES.
C. PATCH AND REPAIR EXISTING ROOFING/FLASHING AS REQUIRED TO INSTALL
WORK. PROTECT ADJACENT EXISTING ROOF TOP EQUIPMENT FROM
CONSTRUCTION ACTIVITIES.
D. COORDINATE ROOF EQUIPMENT LOCATION AND ROOF PENETRATION WITH ALL
OTHER DISCIPLINES' DRAWINGS.
ROOF PLAN KEY NOTES
PROVIDE HEPA FILTER HOUSING SUPPORTS AND ASSOCIATED CURBS. SEE
DETAIL 4/AE121. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
PROVIDE ROOF CURB FOR DUCT PENETRATION THROUGH ROOF AS INDICATED.
REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
PROVIDE DUCTWORK SUPPORTS MAX. 10'-0" OC AND ASSOCIATED CURBS.
SEE DETAIL 5/AE121. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
LIMITS OF CONSTRUCTION
ROOF PLAN LEGEND
ABCDE
C.5E.5
RDRD
OD OD
RD
OD
RD
OD
RD
OD
RD
OD
AE121
TYP. TYP.
KEY PLAN
NTS
PROJECT AREA
FIRST LEVEL
0"
ROOF LEVEL
13'-9 3/8"
TOP/PANEL
17'-0"
AE121
THE BAKER COMPANY,
STERILGARD E3, CLASS II
TYPE A2 BIOLOGICAL SAFETY
CABINET
MODEL #: SG404
2'X4' ACOUSTICAL CEILING
PANEL SYSTEM
MECHANICAL DUCTWORK -
SEE MECHANICAL
OPENING
1' - 4"
OPENING
1' - 4"
EXIST CONCRETE DOUBLE
TEE ROOF DECK TO
REMAIN, UNO
PRE-MANUFACTURED
ROOF CURB
GAF PVC MEMBRANE
SYSTEM TO REMAIN, UNO
EXIST SAFETY RAILS TO
REMAIN, UNO
EXIST 3" CONCRETE
TOPPER TO REMAIN, UNO
EXIST CONCRETE DOUBLE TEE
ROOF DECK
PROVIDE PRE-MANUFACTURED CURB ATTACHED TO
EXISTING STRUCTURE FOR WIND AND SEISMIC FORCES
ACCORDING TO ASCE 7-16.
- SEE MECHANICAL
WELDED SEAM TO BE COMPATIBLE WITH
EXISTING ROOFING MEMBRANE
PATCH TO BE COMPATIBLE WITH EXISTING
ROOFING MEMBRANE TURN UP AT CURB
FLASHING TO BE COMPATIBLE WITH
EXISTING ROOFING MEMBRANE
MECHANICAL DUCTWORK -
SEE MECHANICAL
1'
0"
OPENING
1' - 4"
6"
COVER BOARD
INFILL TO MATCH EXISTING
TAPERED RIGID INSULATION
SUBSTRATE BOARD
NOTE:
REPAIR EXISTING ROOF SYSTEM AS REQUIRED TO INSTALL NEW CURB SUPPORT PER MANUFACTURE'S
INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARRANTED INSTALLATION.
EXIST 3" CONCRETE TOPPER
EXIST ROOF ASSEMBLY
NOTE:
1. THE EXISTING ROOF MEMBRANE IS GAF PVC MEMBRANE SYSTEM.
2. REPAIR EXISTING ROOF SYSTEM AS REQUIRED TO INSTALL NEW DUCT SUPPORTS
PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY
WARANTED INSTALLATION. DESIGN ALL DUCT SUPPORT ANCHORAGE IN
ACCORDANCE TO ASCE 7-16.
PREFABRICATED DUCT SUPPORT
ANCHORS
BASE SUPPORT
FLASH AS REQUIRED
PREFABRICATED CURB
ROOF TOP MECHANICAL EQUIPMENT. SEE OTHER
DISCIPLINES FOR ADDITONAL INFO.
WELDED SEAM TO BE COMPATIBLE WITH EXISTING
ROOFING MEMBRANE
PATCH TO BE COMPATIBLE WITH EXISTING
ROOFING MEMBRANE TURN UP AT CURB
FLASHING TO BE COMPATIBLE WITH EXISTING
ROOFING MEMBRANE
COVER BOARD
INFILL TO MATCH EXISTING
TAPERED RIGID INSULATION
SUBSTRATE BOARD
EXIST CONCRETE ROOF DECK
M
IN
1'
-0
6"
NOTE:
1. THE EXISTING ROOF MEMBRANE IS GAF PVC MEMBRANE SYSTEM.
2. REPAIR EXISTING ROOF SYSTEM AS REQUIRED TO INSTALL NEW DUCT SUPPORTS
PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY
WARANTED INSTALLATION. DESIGN ALL DUCT SUPPORT ANCHORAGE IN
ACCORDANCE TO ASCE 7-16.
SINGLE-PLY ROOF FLASHING
CONT SEALANT
STAINLESS STEEL CLAMPING RING
WELDED SEAM
GAF PVC SINGLE-PLY ROOF MEMBRANE
4"
METAL FLASHING WHERE REQUIRED BY MFR
COVER BOARD
RIGID INSULATION
SUBSTRATE BOARD
ROOF DECK
NOTE:
1. THE EXISTING ROOF MEMBRANE IS GAF PVC MEMBRANE SYSTEM.
2. REPAIR EXISTING ROOF SYSTEM AS REQUIRED TO INSTALL NEW PENETRATIONS PER
MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARANTED
INSTALLATION.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SV SJ/KB
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
ROOF PLAN
AE121
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"AE121
1 ROOF PLAN
3/4" = 1'-0"AE121
2 ROOF PENETRATION SECTION
1 1/2" = 1'-0"AE121
3 TYPICAL ROOF CURB DETAIL
1 1/2" = 1'-0"AE121
5 TYPICAL DUCT SUPPORT DETAIL
1 1/2" = 1'-0"AE121
4 TYPICAL EQUIPMENT CURB DETAIL
1 1/2" = 1'-0"AE121
6 TYP CONDUIT/PIPE PENETRATION
PIPING SYMBOLS AND ABBREVIATIONSHVAC SYMBOLS AND ABBREVIATIONS
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
RECTANGULAR SUPPLY/OUTSIDE AIR
DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR
DUCT RISE
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR
DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP ROUND EXHAUST/RELIEF AIR DUCT RISE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
CONNECT NEW TO EXISTING
EXISTING PIPE TAG
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
PIPE SIZE TAG (DIAMETER)
LIMIT OF DEMOLITION
NEW WORK NOTES
DEMOLISHED WORK NOTES
ACCESS DOOR ON TOP OF DUCT
ACCESS DOOR ON SIDE OF DUCT
ACCESS DOOR ON BOTTOM OF DUCT
SHEET NOMENCLATURE
M P # # #
SERIES
0 - SYMBOLS AND NOTES
1 - PLAN VIEWS
3 - ELEVATIONS AND SECTIONS
4 - LARGE SCALE - PLANS AND SECTIONS
5 - SCHEMATICS AND DETAILS
6 - SCHEDULES
8 - CONTROLS
EQUIPMENT
TAG
EQUIPMENT TAG
SYMBOL
TYPE (SEE SCHEDULE)
CFM
ACTIVE SLOT LENGTH
(PLENUM LENGTH)
GRILLES, REGISTERS & DIFFUSERS TAG
DAMPER TAGS AND ABBREVIATIONS
PROJECT ABBREVIATIONS
DATA DEVICE TAGS AND ABBREVIATIONS
MECHANICAL EQUIPMENT TAGS
CONDENSER WATER SUPPLY (FROM TOWER)
CONDENSER WATER RETURN (TO TOWER)
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PUMPED CONDENSATE DISCHARGE
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
STEAM VENT PIPE
REFRIGERANT SUCTION AND REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MAKE-UP WATER
DRAIN PIPING
CONDENSATE DRAIN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
BOILER BLOWOFF
FEEDWATER SAMPLE (FROM DEAERATOR)
OVERFLOW
COMPRESSED AIR
NATURAL GAS MAIN FUEL
NATURAL GAS IGNITER FUEL
FUEL OIL SUPPLY
FUEL OIL RETURN
SOFTENED WATER
SUPPLY
DIFFUSER
NECK SIZE
CFM
RETURN
GRILLE
EXHAUST
GRILLE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
DESCRIPTION DESCRIPTION
M
VALVE SYMBOLS AND ABBREVIATIONS
SCHEMATIC VIEW ELEVATION VIEW NAME AND ABBREVIATIONS
GATE VALVE - GV
GLOBE VALVE - GLBV
CHECK VALVE - CV
ANGLE GLOBE VALVE - AGLBV
BUTTERFLY VALVE - BFV
BALL VALVE - BV
THREE WAY VALVE - TWV
PRESSURE REGULATING VALVE - PRV
PRESSURE SAFETY VALVE - PSV
PLUG VALVE - PV
WYE STRAINER
WYE STRAINER (WITH BALL VALVE
AND HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN
AND QUICK-COUPLE HOSE CONNECTOR
FLEXIBLE CONNECTION
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY
VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL
VALVE
THREE-WAY TWO POSITION CONTROL
VALVE
AUTOMATIC BALANCING CONTROL
VALVE
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
GATE VALVE WITH GLOBE-VALVED
BYPASS
CONTROL VALVE (CV) - FLOAT-
OPERATED
WATER LEVEL CONTROLLER
FLOW METER
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
UNION
SYMBOLS SYMBOLS NAME
LPS
LPR
MPS
MPR
HPS
HPR
PCD
SV
HWS
GHS
HWR
GHR
RS/RL
CWS
CWR
CHS
CHR
MW
D
CD
FWPD
FWPS
CTPD
CTPS
BO
CBD
BWS
FWS
OFL
A
G
G(I)
FOS
FOR
SW
DCW
DHW
(E) 2"
(E) 2"
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
HUMIDITY SENSOR
HUMIDISTAT
TEMPERATURE & HUMIDITY
SENSOR
DISPLAY
THERMOSTAT
SENSOR
PRESSURE SENSOR
RTU-XX
TU-XX
(E)RTU-XX
(E)TU-XX
VAV BOX
48"x2 1/2"
(E)LINEAR BAR
GRILLE
6"Ø A
8"Ø
B
6"x6" C
Room
22"x8"
22"/8"
22"Ø
(E)22"Ø
FD
SD
AVD
MVD
BDD
FSD
MANUAL VOLUME
DAMPER
BACKDRAFT DAMPER
COMBINATION
FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
AUTOMATIC VOLUME
DAMPER
AD
TH
S
DIS
T
H
CO2
CO
HS
NO2
PS
IRH INFRARED HEATER
IU INDUCTION UNIT
JB JUNCTION BOX
JL JUSTIFIED LEFT
JR JUSTIFIED RIGHT
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LOOP LOCK ONLY OPEN POSITION
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOCP MINIMUM OVERCURRENT PROTECTION
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
QNTY QUANTITY
RA RETURN AIR
RAF RETURN AIR FAN
RAT RETURN AIR TEMPERATURE
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS/RL REFRIGERANT SUCTION AND
REFRIGERANT LIQUID
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SEA SMOKE EXHAUST AIR
SEN SENSIBLE HEAT
SF SUPPLY FAN
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
V VENT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VP VACUUM PUMP
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
Wb WET-BULB (TEMPERATURE)
WFMS WATER FLOW MEASURING STATION
WG WATER GAGE
WPD WATER PRESSURE DROP
YR YEAR
EJ EXPANSION JOINT
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FCU FAN COIL UNIT
FD FLOOR DRAIN
FF FINAL FILTER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FLAT ON TOP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HTX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL DAMPER
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
AS AIR SEPARATOR
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BBR BASE BOARD RADIATOR
BE BOTTOM ELEVATION
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CV CONSTANT AIR VOLUME
CC COOLING COIL
CD COOLING COIL CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CHS/R CHILLER WATER
CL CENTER LINE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER
REPRESENTATIVE
CP CONDENSATE PUMP
CST CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CWP CONDENSER WATER PUMP
DDC DIRECT DIGITAL CONTROLS
DIA DIAMETER
DI DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ES EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
NECK SIZE
CFM
NECK SIZE
CFM
(S) STEAM
(H) HVAC
(P) PIPING
(D) DEMO
MECHANICAL
SERIES
LC
EXPANTION LOOP - SEE SCHEDULE AND DETAIL
STEAM TRAP INCLUDING PIPING ACCESSORIES
SEE DETAIL
THERMOMETER
PRESSURE GAGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENTMV
QUICK-COUPLE HOSE CONNECTOR
EL-00
DST-00
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS JSW
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
MECHANICAL LEGEND, ABBREVIATIONS, AND
NOTES
M001
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET TITLE
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES
M002 MECHANICAL NOTES
MD101 FIRST FLOOR AND ENLARGED MECHANICAL DEMOLITION PLAN
M101 FIRST FLOOR AND ENLARGED MECHANICAL NEW WORK PLAN
M102 ROOF PLAN AND SECTIONS - MECHANICAL NEW WORK PLAN
M501 MECHANICAL DETAILS
M800 VA STATION GENERAL CONTROL NOTES AND LEGEND
M801 CONTROL SCHEMATIC, SEQUENCE OF CONTROL, AND CONTROL POINT – MECHANICAL
¢¢ft 08/08/2025
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS JSW
534-24-902
08-08-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
MECHANICAL NOTES
M002
A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS, BOTH
EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS WELL AS
THOSE WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT
LIMITED TO ARCHITECTURAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND
OTHER SYSTEMS INVOLVED ON THIS PROJECT.
B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM AND
SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN THE UNITED
STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION
LIBRARY, INCLUDING BUT NOT LIMITED TO THE PHYSICAL SECURITY MANUAL,
HVAC DESIGN MANUAL, AND STEAM, HEATING HOT WATER, AND OUTSIDE
DISTRIBUTION SYSTEM DESIGN MANUAL. ALL WORK SHALL ALSO CONFORM
TO ALL FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO
THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR
RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A LEVEL OF
QUALITY AND WORKMANSHIP CONSISTENT WITH THESE DOCUMENTS. ANY
DEVIATIONS BETWEEN THE INSTALLATION INSTRUCTIONS AND THESE
DOCUMENTS WILL BE BROUGHT TO THE ATTENTION TO THE COR BEFORE ANY
COURSE OF ACTION BY THE CONTRACTOR IS INITIATED, INCLUDING
PURCHASE OF EQUIPMENT.
D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND ILLUSTRATED
IN THESE DRAWINGS. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS
INDICATED ON THESE DRAWINGS ARE APPROXIMATE AND SUBJECT TO
ADJUSTMENTS IN THE FIELD. OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT
AS REQUIRED TO AVOID INTERFERENCE AND CONFLICTS IN THE FIELD.
COORDINATE DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH
PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING
STRUCTURAL MEMBERS.
E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO
BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE
SITE AND COMPLETE MEASURED SURVEY AND CREATE LAYOUT DRAWINGS AS
REQUIRED BY THE SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL
LAYOUT DRAWINGS ARE APPROVED BY THE COR.
F. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS. WHERE
DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO
ACCOMMODATE LINER.
G. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.
H. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING
STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL MEMBERS
WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.
I. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED APPURTENANCES
SHALL NOT RESTRICT EQUIPMENT SERVICE AND MAINTENANCE ACCESS.
EXISTING SUPPORTS SHALL BE MODIFIED TO PROVIDE FOR EQUIPMENT
SERVICE AND MAINTENANCE ACCESS.
J. DUCT SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH SMACNA HVAC
DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE -SECOND EDITION
EXCEPT THAT HANGER WIRE SHALL NOT BE USED TO SUPPORT DUCTS OR
EQUIPMENT, AND HANGERS THAT REQUIRE PENETRATION OF DUCT WITH
BOLTS, RIVETS, SCREWS, WIRES OR ANY OTHER FASTENER SHALL NOT BE
USED.
K. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER SUPPORT FOR
DUCT AND PIPING TO COORDINATE WITH NEW EQUIPMENT AND WALL
LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS, ETC) AT EQUIPMENT AND ON
EACH SIDE OF NEW WALLS SO FULL WEIGHT OF DUCT AND PIPING IS
SUPPORTED FROM STRUCTURE AND EQUIPMENT AND NEW WALLS BEAR NO
WEIGHT.
L. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL EQUIPMENT,
DEVICES, AND ALL APPURTENANCES REQUIRING POWER TO THE COR FOR
REVIEW AND APPROVAL AS PART OF COORDINATION FOR THIS PROJECT. LIST
ALL ELECTRICAL REQUIREMENT CHARACTERISTICS, INCLUDING BUT NOT
LIMITED TO VOLTAGE, AMPERAGE, PHASE, DISCONNECTING MEANS, OVER
CURRENT PROTECTION AND ALL CHARACTERISTICS FOR A FULLY
FUNCTIONAL AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS
FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
M. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT SHALL BE
RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT RESULTS IN A
FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM. CONTRACTOR SHALL
RELOCATE ALL EXISTING CONTROLS, SENSORS, PROBES, OR OTHER DEVICES
AND PROVIDE NEW WIRING, CONDUIT, AND/OR TUBING TO EXTEND SUCH
DEVICES AS NECESSARY TO PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL
OR BETTER THAN EXISTING. PROTECT AND STORE ALL SUCH RELOCATED
DEVICES.
GENERAL MECHANICAL NOTES DEMOLITION MECHANICAL NOTES
A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE
PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL
CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS, ACCESSORIES AND
ALL APPURTENANCES THAT ARE RENDERED USELESS OR ABANDONED BY
THE REMOVAL OF THE INDICATED EQUIPMENT.
B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK, PIPING,
EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR SHALL
PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM DAMAGE.
CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT, PIPING, EQUIPMENT,
AND ANY OTHER DEVICE FROM CONSTRUCTION DUST AND DEBRIS.
C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT IS IN-
SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY
INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS TO THE
SATISFACTION OF THE COR AND HOSPITAL STAFF.
A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION OF THE HOSPITAL.
B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE WORK OF
THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF NO LONGER THAN
ONE HOUR. CONTRACTOR SHALL GIVE REASONABLE NOTICE TO COR
BEFORE ANY SUCH SHUTDOWN OR INTERRUPTION.
C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE WORK
DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL SCHEDULE THE
EVENT A MINIMUM OF 3 WEEKS PRIOR TO COMMENCING WORK. ALL SUCH
SHUTDOWNS AND INTERRUPTIONS SHALL BE MINIMIZED AND SHALL UTILIZE
WEEKENDS, FEDERAL HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL
OPERATIONS ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE
COR.
D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE
HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED
CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE DOCUMENTS.
AS PART OF SCHEDULING AN INTERRUPTION OR SHUTDOWN, THE
CONTRACTOR SHALL PROVIDE THE COR WITH A DETAILED SHUTDOWN PLAN
INDICATING THE SYSTEMS AFFECTED, INCLUDING BUT NOT LIMITED TO
ARCHITECTURAL, ELECTRICAL, MECHANICAL, PLUMBING, FIRE PROTECTION,
AND OTHER SYSTEMS INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO
BE PERFORMED, THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING
AND MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS
CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE
PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE THE
EVENT FOR APPROVAL.
E. CONTROL OF ALL CONSTRUCTION-ASSOCIATED HAZARDS THAT AFFECT
FACILITIES, OCCUPANTS OR SERVICES SHALL BE ADDRESSED BY THE
CONTRACTOR AS PART OF THE PRE-CONSTRUCTION RISK ASSESSMENT.
CONTRACTOR SHALL COORDINATE ALL WORK WITH THE FACILITY SAFETY
MANAGER/OFFICER. CONTRACTOR SHALL FURNISH ALL MATERIALS AND
MEANS AND METHODS TO MEET THE REQUIREMENTS IN SPECIFICATION
SECTION 013526 SAFETY REQUIREMENTS, INCLUDING FILTRATION,
MAINTAINING NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, DUST
CONTROL, AND USE OF A PORTABLE CEILING ACCESS MODULE IN AREAS
OUTSIDE THE CONSTRUCTION AREA. THE CONTRACTOR SHALL SUBMIT PLAN
IN ACCORDANCE WITH THESE DOCUMENTS.
PHASING MECHANICAL NOTES
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
A. DATA LINK COMMUNICATION IS ETHERNET (ISO 8802-3) AND BACNET/IP.
B. GROUND CABLE SHIELDS, DRAIN CONDUCTORS, AND EQUIPMENT TO
ELIMINATE SHOCK HAZARD AND TO MINIMIZE GROUND LOOPS, COMMON-
MODE RETURNS, NOISE PICKUP, CROSS TALK, AND OTHER IMPAIRMENTS.
C. CABLE CONDUCTORS SHALL PROVIDE PROTECTION AGAINST INDUCTION IN
CIRCUITS. CROSSTALK ATTENUATION WITHIN THE SYSTEM SHALL BE IN
EXCESS OF -80 DB THROUGHOUT ALL FREQUENCY RANGES USED.
D. CABLE RUNS: KEEP CABLE RUNS AS SHORT AS POSSIBLE. ALLOW EXTRA
LENGTH FOR CONNECTING TO THE TERMINAL BOARD. DO NOT BEND FLEXIBLE
COAXIAL CABLES IN A RADIUS LESS THAN TEN TIMES THE CABLE OUTSIDE
DIAMETER.
E. LABEL SYSTEM’S CABLES ON EACH END. TEST AND CERTIFY CABLES IN
WRITING TO THE VA BEFORE CONDUCTING PROOF-OF-PERFORMANCE
TESTING. MINIMUM CABLE TEST REQUIREMENTS ARE FOR IMPEDANCE
COMPLIANCE, INDUCTANCE, CAPACITANCE, SIGNAL LEVEL COMPLIANCE,
OPENS, SHORTS, CROSS TALK, NOISE, AND DISTORTION, AND SPLIT PAIRS ON
ALL CABLES IN THE FREQUENCY RANGES USED. MAKE AVAILABLE ALL CABLE
INSTALLATION AND TEST RECORDS AT THE DEMONSTRATION TO THE VA.
F. POWER WIRING SHALL NOT BE RUN IN CONDUIT WITH COMMUNICATIONS
TRUNK WIRING OR SIGNAL OR CONTROL WIRING OPERATING AT 100 VOLTS
OR LESS.
G. PROVIDE NEMA 4 ENCLOSURE FOR EXTERIOR LOCATIONS.
H. PROVIDE BACNET-COMPLIANT ROUTER, BRIDGE, SWITCH, HUB, MODEM,
GATEWAY, INTERFACE, AND SIMILAR COMMUNICATION EQUIPMENT TO
INTEGRATE INTO THE EXISTING SYSTEM.
I. FIT ALL EQUIPMENT CONTAINED IN CABINETS OR PANELS WITH SERVICE
LOOPS, EACH LOOP BEING AT LEAST 300 MM (12 INCHES) LONG. EQUIPMENT
FOR FIBER OPTICS SYSTEM SHALL BE RACK MOUNTED, AS APPLICABLE, IN
VENTILATED, SELF-SUPPORTING, CODE GAUGE STEEL ENCLOSURE. CABLES
SHALL BE SUPPORTED FOR MINIMUM SAG.
J. OPTICAL DIGITAL COMMUNICATION FIBER, IF USED, SHALL BE MULTIMODE OR
SINGLE MODE FIBER, 50/125 MICRON FOR MULTIMODE OR 10/125 MICRON FOR
SINGLE MODE MICRON WITH SC OR ST CONNECTORS AS SPECIFIED IN
TIA-568-C.1. TERMINATIONS, PATCH PANELS, AND OTHER HARDWARE SHALL
BE COMPATIBLE WITH THE SPECIFIED FIBER. FIBER-OPTIC CABLE SHALL BE
SUITABLE FOR USE WITH THE 100BASE-FX OR THE 100BASE-SX STANDARD (AS
APPLICABLE) AS DEFINED IN IEEE STD 802.3.
GENERAL CONTROL ELEMENT REQUIREMENT
A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR TO THE
PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE MECHANICAL OR
ANY OTHER SUBCONTRACTOR.
B. PRIOR STARTING WORK, THE CONTRACTOR SHALL PROVIDE A TEST REPORT
OF EXISTING SYSTEMS THAT ARE MODIFIED BY THIS SCOPE OF WORK.:
1. AHU-1
TEST AND BALANCE MECHANICAL NOTES
A. DURING CONSTRUCTION, MEET OR EXCEED RECOMMENDED CONTROL
MEASURES OF ANSI/SMACNA 008-2008, CHAPTER 3.
B. PROTECT STORED ON-SITE AND INSTALLED ABSORPTIVE MATERIALS FROM
MOISTURE DAMAGE.
C. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING
CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY REPORTING
VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR GRILLE, AS
DETERMINED BY ASHRAE STANDARD 52.2-1999…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .