Attachment 12 ED101 ELECTRICAL FIRST FLOOR DEMO PLAN.pdf
PDF 673 KB Posted
- Solicitation number
- 36C24726B0002
About this file
This document is an electrical first floor demolition plan for a temporary compounding area project at a Veterans Affairs facility in Charleston, South Carolina. The project is identified as Phase 534-24-902, with bid documents prepared by the Office of Construction and Facilities Management. The architectural and engineering firm of record is identified as Mizrahi Molnar, located at 512 Means Street NW, Suite 400, Atlanta, Georgia 30318.
The electrical demolition plan specifies the removal of existing receptacles and associated electrical infrastructure, including conductors and conduits, with metal cover plates to be installed following removal. The contractor is directed to repurpose circuit 'EQLAB4-11' for new connections and extend conductors and conduit as needed. Existing wiremold is to remain in place. The drawings include a first floor demo power plan at 1/8" = 1'-0" scale with an enlarged detail plan at 1/4" = 1'-0" scale. The document notes that the facility is fully sprinklered and instructs the contractor to field verify existing conditions. Reference is made to additional electrical general notes, abbreviations, and legend contained in drawings E001 and E002, as well as mechanical drawings for additional requirements and information.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TISSUE
CULTURE
ROOM
DD172
WET LAB
DD171
LAB
SUPPORT
DD173
TISSUE
CULTURE
ROOM
DD167
WET LAB
DD166
LAB
SUPPORT
DD168
TISSUE
CULTURE
ROOM
DD176
WET LAB
DD174
LAB
SUPPORT
DD175
OFFICE
DD177
OFFICE
DD179
BREAK
ROOM
DD178
STORAGE
DD121A
EXAM
DD124
EXAM
DD122
EXAM
DD128
EXAM
DD129
JAN
DD126
EXAM
DD127
EXAM
DD125
EXAM
DD123
EXAM
DD133
EXAM
DD135
EXAM
DD137
EXAM
DD131
EXAM
DD132
TOILET
DD130
EXAM
DD139
EXAM
DD140
EXAM
DD142
EXAM
DD145
EXAM
DD146
OFFICE
DD147
OFFICE
DD148
EXAM
DD143
EXAM
DD141
EXAM
DD134
EXAM
DD136
EXAM
DD138
TOILET
DD144
GROUP
THERAPY
DD113
GROUP
THERAPY
DD114
TOILET
DD110
GROUP
THERAPY
DD109
OFFICE
DD111
EXAM
DD115
OFFICE
DD112
TOILET
DD116
EXAM
DD117
EXAM
DD118
EXAM
DD119
EXAM
DD120
ADMIN
SUPPORT
DD121
OFFICE
DD160
OFFICE
DD161
OFFICE
DD162
TOILET
DD169
TOILET
DD170
LAB
SUPPORT
DD165
TISSUE
CULTURE
ROOM
DD164
WET LAB
DD163
WET LAB
DD159
LAB
SUPPORT
DD158
TISSUE
CULTURE
ROOM
DD157
STORAGE
DD156
WAREHOUSE
HOLDING
DD155
COMM.
DD154
MECHANICAL
ROOM
DD149
CONNECTION
CORRIDOR
DD183
LOBBY
DD150
LOBBY
DD102
CORR
DD103
CORR
DD105
CORR
DD106
CORR
DD104
CORR
DD107
CORR
DD108
CORR
DD153
CORR
DD152
CORR
DD151
CLOSET
DD113A
MECH CLOSET
DD182
DN
DN
DESK
DESKDESK
ABCDE
C.5
C.5
E.5
ED101
KEY PLAN
NTS
PROJECT AREA
TISSUE
CULTURE
ROOM
DD172
WET LAB
DD171
LAB
SUPPORT
DD173
DESK
DESK
DESK
C A
B
IN
E T
F
IL
E
BSC-B2
TYP.
EXISTING BIOSAFETY
CABINET TO REMAIN
AB
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
534-24-902
03-31-2025REVISIONS:
A
B
C
D
E
F
TEMPORARY COMPOUNDING AREA
CHARLESTON, SC
ELECTRICAL FIRST FLOOR DEMO PLAN
ED101
CB TD
SHEET NOTES:
1. REFER TO E001 & E002 FOR ELECTRICAL GENERAL NOTES,
ABBREVIATIONS & LEGEND.
2. REFER TO MECHANICAL DRAWING FOR MORE INFORMATION
AND REQUIREMENT.
KEYNOTES:
1. EXISTING RECEPTACLE TO BE DEMOLISHED. REMOVE THE
RECEPTACLE AND REMOVE ASSOCIATED CONDUCTORS AND
CONDUITS . PROVIDE AND INSTALL METAL COVER PLATE.
CONTRACTOR SHALL REPURPOSE CIRCUIT 'EQLAB4-11' FOR
NEW CONNECTION. EXTEND CONDUCTORS AND CONDUIT AS
NEEDED.
2. EXISTING WIREMOLD TO BE REMAIN.
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"1/8" = 1'-0"ED101
1 FIRST FLOOR DEMO POWER PLAN
TRUE
NORTH
PLAN
NORTH
1/4" = 1'-0"ED101
2 ENLARGED FIRST FLOOR DEMO POWER PLAN
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS.
8/8/2025
| Sheets |
| ED101 - ELECTRICAL FIRST FLOOR DEMO PLAN |
File details come from the government source that posted it. Updated .