Attachment 06 534-24-902 Brand Name J-A - Fire Sprinkler - Dampers_Redacted.pdf

PDF 539 KB Posted

Attached to
Z1DA--534-24-902 - Temporary Compounding Area (DD Bldg) - Construction (VA-26-00009675)
Solicitation number
36C24726B0002
Issued by

About this file

This is a Single Source Justification for Simplified Acquisition Procedures (SAP) under the Simplified Acquisition Threshold (SAT) for the Department of Veterans Affairs.

The Ralph H. Johnson VA Medical Center (VISN 07) requires specific fire sprinkler and fire damper products to maintain compatibility with existing hospital equipment and ensure compliance with Factory Mutual and Underwriter's Laboratory certifications, NFPA standards, and VA Fire Protection Design Manual requirements. The procurement includes Type D upright sprinkler heads (Tyco TY3151, Reliable Model G, Viking QR VK300/VK350 Brass Upright, or Victaulic Model V27 Upright) and Type A semi-recessed ordinary coverage sprinkler heads (Tyco TY3251, Reliable Model FI Head & Model G-FI Escutcheon, Viking QR VK302/VK352 Pendent, or Victaulic Model 34), along with Ruskin Fire-Smoke Dampers and actuators. The fire dampers must integrate with the existing Gamewell FCI fire alarm control panel system. The estimated contract value is not exceeding the SAT threshold of $250,000. No market research was conducted because the specified equipment is necessary to form a unified, cohesive, and compliant fire protection and fire alarm system where only one responsible source can satisfy agency requirements per FAR 6.302-1. The Contracting Officer, Kenyon Dulaney, certified approval on May 19, 2026, and is required to document price reasonableness in accordance with FAR 13.106-3.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

Revision: 01 Effective Date: 11/15/2024 Page 2 of 2 Acquisition ID#:

(Factory Mutual and Underwriter Laboratories). In order to maintain certifications that these systems meet code and VA design manual requirements, particular equipment must be installed to maintain certifications that the system will function properly and save life and property when activated.

4. Description of market research conducted and results or statement why it was not conducted:

Market research was not conducted because the supplies listed are necessary to form a unified, cohesive, and compliant fire protection and fire alarm system.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Note: COs are required to make a determination of price reasonableness IAW FAR 13.106-3. See the

S19 Open Market (FAR13) Award Documentation Form with Abstract to document price reasonableness.

Kenyon Dulaney Date Contracting Officer

2026-05-19T17:13:45-0400
KENYON DULANEY

File details come from the government source that posted it. Updated .