Attachment 0017 Annex A Maintenance PRS.pdf
PDF 459 KB Posted
- Attached to
- EAGLE West Point NY W519TC-23-R-0017
- Solicitation number
- W519TC23R0017
About this file
This document outlines quality assurance standards for materiel maintenance services at an Army installation. Key requirements include performing equipment repairs according to technical manuals and estimated task times, meeting minimum rejection rates for mechanical and electrical repairs, and maintaining performance metrics for base operations. Allied trades such as welding and painting must be completed to military and industry standards. Harbor craft maintenance and dry dock services are also in scope. The related solicitation is for materiel maintenance services at West Point, New York under solicitation number W519TC23R0017 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. Acceptable quality levels and random sampling methods are defined for assessing conformance with requirements.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task/Requirement Standard Sampling Method, Lot & Acceptable
Quality Level (AQL)
MATERIEL MAINTENANCE – GENERAL
5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.
Quality: Lateral transfers processed IAW local directives, AR 710-2, DA PAM 710-2-1 and ISM Operating Manual.
Random sampling (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.1.4 Perform technical inspections in accordance with the maintenance request.
Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work orders, files, logs, and SOPs at time of surveillance.
AQL: 95%
MATERIEL MAINTENANCE – PROGRAMS/EFFORTS
5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.
Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.
Random sampling
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.
Quality: IAW AR 750-1, Appendix B-11, paragraphs (a-d)
Random (shop/activity scheduled periodically)
Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.
AQL: 97% for mechanical AQL: 98% for electrical
5.2.12 Perform all air conditioning & refrigeration maintenance / repair services.
Quality: IAW40 CFR, Part 82, and applicable state and federal regulations, and the installation environmental regulations and directives. Quality: Special measurement items ordered IAW directive IAW AR 700-84.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
MATERIEL MAINTENANCE SUPPORT
5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.
Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.
Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.3.8 Maintain, repair, and replace tires on rims.
Quality: IAW TM 9-2610-200-14 periodically)
Lot: The number of line items on receipts processed on the day of surveillance.
5.3.9 Provide wheel alignment support.
Quality: IAW applicable TMs and standards.
Random (shop/activity scheduled periodically)
Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).
5.3.10 Perform glass repairs for vehicles.
Quality: Glass shall be installed to original design configurations with seals that are air and watertight.
Random (shop/activity scheduled periodically)
Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.
AQL: 95%
5.3.11 Perform maintenance and services of sensitive items.
Quality: IAW AR 750-1.
Monthly
Lot: All parts/items in process
AQL: 100%
5.3.12 Management of Small Arms Repair Parts (SARP).
Quality: IAW AR 750-1
Lot: All parts in process
5.3.12 Supply functions consists of the issue, turn-in, and accountability of arms room weapons, optics, night vision devices, bayonets, and other equipment; as well as the ordering, stocking, issuing, and inventory or arms room repair parts, tools, and cleaning supplies.
Timeliness: Receipts processed the same day items are received.
Quality: Receipt documents processed
IAW AR 710-2, DA PAM 710-2-1, AR
190-11, and local directives.
Surveillance activity report.
Lot: Inspect all sensitive/special controlled item receipt documents processed at the time of surveillance.
AQL: 100%
ALLIED TRADES
5.4.1 Perform welding, and Non-destructive testing as required.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders;
NDI performed by ANSI/ASNT CP-189 certified persons.
periodically)
Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.
5.4.2 Perform metal machining, and fabrication operations and Non-destructive testing as required.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work performed IAW work request and applicable military and industry standards. NDI performed by ANSI/ASNT CP-189 certified persons.
Random (shop/activity scheduled periodically)
Lot: All in process and completed metal machining and fabrication work as well as all existing logs and files at time of surveillance.
AQL: 95%
5.4.3 Prepare and paint supported equipment and components as required to perform materiel maintenance.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work completed IAW AR 750- 1, applicable equipment TM 43-0139, TB 43-0209 and industry standard.
Random (shop/activity scheduled periodically)
Lot: All in process and completed body shop work as well as all existing logs and
5.4.3.1 Operate and maintain Materiel Maintenance paint booths and breathing air machines.
Quality: IAW OSHA 29 CFR 1910-107, AR 200-1
Periodic
Lot: All materiel maintenance paint booths and breathing air machines at time of surveillance.
5.4.4 Perform body repair services.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work completed IAW AR 750- 1, applicable equipment TM, and industry standard.
Random (shop/activity scheduled periodically)
Lot: All in process and completed body shop work as well as all existing logs and
REPAIR PARTS AND MATERIEL MANAGEMENT TASKS
5.5.1 Perform shop supply services;
use the automated Army supply system as the primary means of attaining materiel.
Quality: IAW AR 750-1, AR 710-2, DA
PAM 25-30, AR 725-50, DA PAM 710-2-
2; AR 740-1; AR 735-5; AR 710-1; AR
710-3; DA Pam 710-7; AR 710-3, DA Pam 710-2-1; FEDLOG; and LIS user’s manual
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work orders, requisitions, requests, files, records, SOPs, and stockage at time of surveillance.
5.5.6 Manage Standard Pricing (SP) items.
Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.
Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.
Periodic
Lot: The numbers of SP items processed during the period at time of surveillance.
PRODUCTION CONTROL
5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.
Random
Lot: All in process and completed work as well as all existing logs and files at time of surveillance
AQL: 95%
Harbor Craft Maintenance
5.7.1 Perform all above water non-maritime specific maintenance on harbor craft vessels, docking and gangways.
Timeliness – Work completed IAW time estimates provided.
Quality – Work completed IAW customer’s request
Lot: 100% of all work orders submitted for non-maritime services.
AQL: 95%
5.7.2 Dry dock harbor craft vessels, docks and gangways during winter months lifting out of the water and replacing vessels, docks and gangways back in the water in the spring.
Timeliness – Work completed IAW time estimates provided.
Random
Lot: 100% of vessels, docks and gangways lifted from the water in the winter and placed back in the water in the spring.
5.7.3 Provide maintenance support thru allied trade services, welding, canvas repair, glass shop and battery service.
Timeliness – Work completed IAW time estimates provided.
Lot: 100% of all work orders submitted requesting Allied Trade Services
File details come from the government source that posted it. Updated .