Attachment 0014 Sample Order 2.pdf

PDF 509 KB Posted

Attached to
ACC-RSA Logistic Support Facility Services (LSFS-1) Federal contract opportunity
Solicitation number
W58RGZ-22-R-0090
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to ACC-RSA Logistic Support Facility Services (LSFS-1), newest first.
File Type Posted
Consolidated Draft RFP Questions_Answers-Responses_01Sep2022_Clean.pdf PDF
W58RGZ-22-R-0090 DRAFT RFP Revised 25 Jul 2022.pdf PDF
Exhibit A Contract Data Requirements List (CDRL).pdf PDF
Attachment 0007 Section M-Evaluation Factors for Award.pdf PDF
Attachment 0003 DD254 Security Classification (Draft).pdf PDF
W58RGZ-22-R-0090 DRAFT RFP.pdf PDF
Attachment 0008 Section C - Description_Specification.pdf PDF
Atttachment 0016 Pre-Award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Attachment 0009 Past Performance Questionnaire.docx DOCX document
Attachment 0005 LSFS-1 Labor Category Requirement.xlsx XLSX spreadsheet
Attachment 0001 Document Summary List (DSL).pdf PDF
Attachment 0015 Cage Code and Cognizant DCMA_DCAA Info.xlsx XLSX spreadsheet
Attachment 0013 Sample Order 1.pdf PDF
Attachment 0012 LSFMA Performance Cost Report.pdf PDF
Attachment 0011 Draft RFP Questions_Answers Form.xlsx XLSX spreadsheet
Attachment 0010 Industry Questions.xlsx XLSX spreadsheet
Attachment 0006 Section L- Instructions_ Conditions and Notices to Offerors.pdf PDF
Attachment 0004 Performance Work Statement.pdf PDF
Attachment 0002 LSFS-1 Cost Price Template.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

UH-60A Unique FMS

Enhanced Phase Maintenance Inspection (PMI) Program

9 February 2022

REVISION DATE PARAGRAPH CHANGE

1.0 CONTRACT OBJECTIVES

The Contractor(s) shall produce refurbished UH-60A in support of the upcoming Foreign Military Sales (FMS) mission.

The Government intends to award the refurbishment of five (5) UH-60A aircraft in support of FMS requirement.

1.0 SCOPE

This Performance Work Statement (PWS) describes the reconditioning efforts (i.e., Enhanced Phase Maintenance Inspection (E-PMI)). The E-PMI efforts include: induction of aircraft at the contractor’s facility either by flight or via line-haul; conduct an initial aircraft assessment/inspection; harvest parts; perform controlled exchange of components; transport aircraft; and/or induct the aircraft into the reconditioning program which includes stripping paint;

PMI I and II; clean airframe and components; corrosion prevention (e.g., prime and paint);

apply/integrate Modification Work Orders (MWO); ensure all required safety and maintenance messages have been complied with; store parts; ship parts; conduct scheduled and unscheduled maintenance; aircraft storage; and the delivery and transportation of five (5) H-60A aircraft. All United States Government (USG) interfaces shall be conducted at the contractor’s primary facility, not including items that are coordinated for repair by the Government.

2.0 APPLICABLE PUBLICATIONS

Applicable publications are listed but not limited to those in Appendix A, Reference Publications. Other publications and directives may be applicable and are the responsibility of the contractor to identify and comply with the latest versions of all publications as required or as directed by the Government. The Government will assist in providing publications upon request.

3.0 PROGRAM MANAGEMENT

The contractor shall implement and perform all program management functions to ensure successful completion of this effort, to include the Integrated Product Team (IPT) process in accordance with (IAW) the contractor’s established program management processes and procedures. The contractor shall provide a dedicated Program Manager responsible for IPT, monthly reporting of cost and schedule, and serving as the single point of contact for the Government. The contractor shall track all touch labor and cost on a per aircraft basis in accordance with the defined Contract Line-Item Number (CLIN) structure. The Program Management Plan shall be submitted IAW DI-MGMT-81797, Contract Data Requirements List (CDRL) A001.

3.1 PROGRAM INITIATION

3.1.1 KICKOFF MEETING

The contractor shall conduct a kick-off meeting at the contractor’s facility within 15 days after receipt of order (ARO). Not later than (NLT) ten (10) days prior to the kick-off meeting, the contractor shall coordinate a detailed agenda with the Government Project Lead, and deliver agenda IAW DI-ADMN-81249, CDRL A002, and deliver meeting minutes IAW DI-ADMN-

81250, CDRL A003. A copy of all briefings shall include any corrections made during the meeting in accordance with applicable CDRL. The contractor shall identify its Project Lead for this effort at the kick-off meeting. All contractor personnel responsible for the requirements within the scope of the PWS shall be present to discuss their approach to successful completion of this PWS.

3.1.2 INTEGRATED PRODUCT TEAM (IPT) COORDINATION

The contractor shall implement an IPT process with defined membership roles and responsibilities and participate in Government led IPT meetings. The contractor’s Project Lead, or his designee, shall be empowered to make decisions for the contractor in all matters related to the conduct of this PWS. The contractor (and sub-contractor, if applicable) project leads or subject matter experts shall participate to discuss progress, requirements, issues/concerns, and anything related to project execution. IPT meetings minimum frequency will be once per month; cost, schedule, performance, and identified risks shall be covered. Meeting minutes shall be submitted IAW DI-ADMN-81250, CDRL A003.

3.2 COST AND PERFORMANCE REPORTING

The contractor shall prepare and deliver a Monthly Status Report IAW DI-MGMT-80368, CDRL A004. The contractor shall prepare and deliver financial reports IAW the Logistics Support Facility Management Activity (LSFMA) Multi Award Indefinite Delivery Indefinite Quantity (MAIDIQ) CDRL LSFS001.

4.0 REQUIREMENTS

4.1 INSPECTIONS

4.1.1 AIRCRAFT INDUCTION

The contractor shall depopulate aircraft, provide onsite secure indoor climate-controlled hangar space, ship, receive, maintain accountability of all required components for inspection, and perform reinstallation. Engines and blades will be inspected at an external facility and provided to the contractor as Government Furnished Equipment (GFE). GFE will be delivered to the contractor’s primary facility.

4.1.2 The contractor shall maintain and update all aircraft forms and records in accordance with DA PAM 738-751. The contractor shall make aircraft records available for inspection and delivery as required by the Government.

4.1.3 The contractor shall strip the aircraft of exterior paint, not to include composite surfaces.

Stripping shall occur prior to conducting airframe inspections associated with PMI. The contractor shall conduct a thorough airframe inspection noting any corrosion, cracks or airframe faults; the contractor shall notify the Government (UHPO) via EMAIL of any major structural and or maintenance issues found on the airframe after removal of paint.

4.1.4 The contractor shall conduct PMI I and II, IAW TM 1- 1520-237-PMI.

4.1.4.1 In conjunction with the PMI I and II, the contractor shall conduct a thorough aircraft cleaning and apply Corrosion Prevention Compound (CPC) to all applicable areas exposed during maintenance to include but not limited to the following areas: crew seat adjust cables, fuel cell components, tail rotor control cables, avionics boxes and seams, grounding studs and all common hardware within the avionics locations, battery compartment and connectors, tail landing gear lock pin hardware, stabilator attachment hardware, all main transmission attachment hardware and flight control alignment points, gust lock and gear, and to all water traps, in particular, traps caused by upper fairing rails and the traps on the input modules.

4.2 PERFORM REPAIRS

The contractor shall correct all deficiencies and perform required repairs which were noted during the inspection phase of the E-PMI, i.e. repair cracks, corrosion, leaks, replace faulty or low time between overhaul (TBO) components, etc. to correct all write-ups (For proposal purposes assume 480 hours). The contractor shall apply required safety and maintenance messages per the appropriate maintenance manuals and directives. For proposal purposes the contractor shall assume that all safety and maintenance messages have been complied with. The contractor shall provide dedicated production personnel (operations) and Quality Control personnel. The contractor shall, in regard to the repair portion of this requirement, conduct daily production coordination meetings which will include, at a minimum, Production, Quality and Defense Contract Management Agency (DCMA) representatives.

4.3 PARTS AND MATERIAL

The contractor shall procure all consumables and hazmat parts and components from vendors, Original Equipment Manufacturers (OEMs) and/or Post Blackhawk Exchange and Sales Transaction (BEST) sources, to meet maintenance requirements. If parts are unavailable, lead times impact schedule, or costs associated with contractor procured parts are unreasonable, the contractor shall notify the Government representative for guidance and to coordinate for Government Furnished Material/Equipment (GFM/GFE). Non-Consumable parts will be provided as GFE by the Government. The contractor is responsible as an alternate source of supply for items not available through the Government supply chain. For proposal purposes the contractor shall provide a bill of materials (BOM) and pricing for contractor provided consumables.

4.4 RE-POP AND INSTALL COMPONENTS

The contractor shall repopulate, install equipment, modifications IAW TM 1-1520-237-PMI, Electronic Manual (EM0613), and IAW Appendix A. Deviations will be directed by the Government.

4.4.1 The contractor shall install/re-install parts, components and systems to configure the aircraft as directed by the Government.

4.5 FMS UNIQUE CONFIGURATION PROCUREMENT OF KITS AND/OR MWO

APPLICATIONS

Utilizing USG Approved Installation Instructions, the contractor shall conduct the installation of Garmin 750, Cobham 5000, ARC 220(V3), Improved Durability Gearbox (IDGB), and Improved Flight Controls for five (5) aircraft. The contractor shall provide commercially available components to support the installations. For proposal purposes utilize MWO 1-1520- 237-50-AFG1 for installs.

The Government will provide five (5) each Improved Durability Gearbox Kits and five (5) each Improved Flight Control Kits. The contractor shall procure commercially available components to support five (5) installations of the FMS Unique Configuration Installation Instructions and/or MWO Applications.

5.0 AIRCRAFT PAINT

5.1 The Contractor shall paint the five (5) UH-60A aircraft. The Contractor shall reference Army Technical Manual TM 1- 1500-345-23 for additional safety markings pertinent to UH-60A/L aircraft. For proposal purposes use a Single-Color Chemical Agent Resistant Coating (CARC)-F paint scheme.

5.2 The final paint inspection will be conducted by the Government utilizing the Paint Inspection Criteria listed below. Completed paint will be evaluated based on the type of discrepancies that exist and the location of these discrepancies on the aircraft. Critical areas of very high visibility and non-critical areas of mid to low visibility are identified in the aircraft specific checklists.

These will be used to determine cosmetic acceptability of the finished paint.

Critical areas (fuselage top, sides and nose, engine nacelles, upper wings and lower surfaces of the horizontal stab) shall be inspected. Critical areas shall only be allowed small amounts of debris. The acceptable discrepancy is no more than 5 particles per a 10 square foot area and the aircraft must be cosmetically acceptable from 10 feet. Non-critical areas shall be inspected. The following discrepancies are the only discrepancies allowed:

• Small amounts of debris are acceptable, but no more than 10 particles per a 10 square foot area. Must be cosmetically acceptable from 10 feet.

• Inspection to be conducted with adequate lighting as directed by the inspector.

• Minor scratches or abrasions shall be touched up to present a cosmetically acceptable appearance from 10 feet.

• Slight color variation is acceptable. Must be cosmetically acceptable from 10 feet.

• Slight orange peel is acceptable. Must be cosmetically acceptable from 10 feet.

• Minimal flooding is acceptable if not visible from 10 feet.

Runs are acceptable only if they are not visible from 10 feet and are limited to 2 per 10 square feet.

6.0 POWER-ONS, MAINTENANCE OPERATIONAL CHECKS (MOCS),

MAINTENANCE FLIGHTS AND ACCEPTANCE

The contractor shall perform power-on, MOCs, Acceptance Test Procedures (ATPs), Ground runs, and maintenance flight tests. The contractor shall have dedicated Quality Control and Pilot Support.

6.1 AIRCRAFT STORAGE

At the direction of the Government, the contractor shall store aircraft in “Flyable Storage”. The contractor shall perform all scheduled maintenance activities called out in the technical manuals

TM 1-1520-237 Series to include 14 day run-ups while the aircraft is in flyable storage. For proposal purposes assume five (5) aircraft to be stored in flyable status and all aircraft will be stored for six (6) months.

7.0 OVER AND ABOVE/SPECIAL LABOR:

7.1 OVER AND ABOVE (O&A) will be in accordance with H-29 clause referenced in the Logistic Support Facility Management Activity (LSFMA) Service Indefinite Delivery/Indefinite Quantity (IDIQ) base contract.

7.2 CONTROLLED EXCHANGE

The contractor shall conduct controlled exchange at the direction and approval of the Government.

7.3 AIRCRAFT TRANSPORTATION

The Government will deliver the Aircraft to the contractor’s maintenance facility as GFE. If required at the direction of the Government (UHPO) the contractor may be required to transport aircraft.

7.4 INSTALLATION INSTRUCTIONS OR MWO APPLICATION (IN ADDITION TO

THE PREVIOUSLY REFERRED ITEMS WITHIN THIS PWS)

The contractor shall install components and/or apply MWOs at the direction of the Government.

7.5 SPECIAL LABOR (OVERTIME)

Overtime approval request shall be submitted by the contractor to the Contracting Officer Representative (COR) or Contracting Officer (KO) and the LSFMA Program Integrator (PI) for approval prior to overtime being conducted.

8.0 AIRCRAFT LOADOUT

8.1 At the direction of the Government (UHPO), the contractor shall deliver aircraft to either an Aerial Port of Embarkation or Sea Port of Embarkation. For proposal purposes assume Huntsville International Airport.

8.2 At the direction of the Government (UHPO), the contractor shall conduct load out operations for transport via cargo aircraft or sealift. For proposal purposes assume cargo aircraft.

9.0 INSPECTION AND ACCEPTANCE

Government inspection and acceptance of Origin CLIN’s will be made by DCMA AIMO Eglin Department of Defense Activity Address Code (DoDAAC) S0109A at the Contractor’s facilities.

Government inspection and acceptance of Destination CLIN’s will be submitted in Wide Area Work Flow (WAWF) with the inspection and acceptance DoDAAC W58H0Z.

When Certificate of Conformance is authorized, contractors will "execute" Certificates in WAWF-RA by including the appropriate indicator in the electronic transaction rather than through the inclusion or attachment of the text of the certificate.

10.0 GOVERNMENT FURNISHED EQUIPMENT (GFE)/GOVERNMENT FURNISHED

INFORMATION (GFI)

The Government will provide all the below GFI/GFE items and additional required items upon request by the contractor and approved by the Government.

GFI:

a. Interactive Electronic Technical Manual System (IETMS)

b. Technical Manuals (TM)

c. MWO’s / Installation Instructions

a. MWO 1-1520-237-50-AFG1

b. Installation Instructions for Garmin 750

c. Installation Instructions for Cobham 5000

d. Installation Instructions for ARC 220(V3)

e. Installation Instructions for Improved Durability Gearbox (IDGB)

f. Installation Instructions for Improved Flight Controls

GFE:

a. Aircraft Engines

b. Aircraft Blades

c. Improved Durability Gearbox Kits

d. Improved Flight Control Kits.

11.0 CONTRACTOR FURNISHED FACILITIES AND EQUIPMENT

The contractor shall provide onsite indoor climate controlled hangar space located at the contractor’s primary maintenance facility and the equipment, tools, and test equipment necessary to concurrently store; conduct PMI I and II; apply FMS Unique Configuration; and strip and paint aircraft as directed in this PWS.

12.0 AIRCRAFT SCHEDULE/PERIOD OR PERFORMANCE (POP)

The contractor shall induct the first aircraft within 30 days (Objective)/60 days (Threshold) of contract award. Subsequent aircraft shall be inducted 30 days (Objective)/60 days (Threshold) following prior aircraft. The contractor shall deliver each aircraft to the government 100 days (Objective) / 200 days (Threshold) of induction.

13.0 OPTIONS

13.1 Options for additional aircraft shall be priced on a range quantity cost basis. A total of 10 aircraft can be awarded through options. Option aircraft induction and delivery will be IAW paragraph 12.0. Option The range quantities are as follows:

a. 1-2 aircraft

b. 3-5 aircraft

c. 6-10 aircraft

The period of performance for the options induction is 380 days ARO. The options period shall be valid for 24 months. It is the USG’s objective to award options such that no breaks in production occur.

APPENDIX A, Publications Reference

PUBLICATION TITLE

DOD-STD-1686 Electrostatic Discharge Control Program for Protection of Electrical Parts, Assemblies, and Equipment (Excluding Electrically Initiated Explosive Devices)

MIL-STD-765A General Requirements for Compass Swinging, Aircraft

TM 9-1377-200-20 Unit Maintenance Manual: Cartridges, Cartridge Actuated Devices and Propellant Actuated Devices

Army Regulations

AR 95-1 Army Aviation Flight Regulations w/AMC Supplement 1

AR 385-95 Army Aviation Accident Prevention

AR 700-138 Army Logistics Readiness and Sustainability

AR 700-139 Army Warranty Program Concepts and Policy

AR 750-1 Army Materiel Maintenance Policy and Retail Maintenance Operations

Army Pamphlets

DA PAM 738-751 Functional User’s Manual for The Army Maintenance Management System – Aviation

(TAMMS-A)

Technical Bulletins and Manuals

TB 1-1500-341-01 Aircraft Components Requiring Maintenance Management and Historical Data Reports

TM 1-1520-237-PMI Phased Maintenance Inspection Checklist

TM 1-1500-345-23 Painting And Marking Of Army Aircraft

TM 1-1520-237-PMD Preventive Maintenance Daily (PMD) Services

TM 1-1520-237-PMS Preventive Maintenance Services

APPENDIX B

H-60 STORAGE REQUIREMENTS

PREPARING HELICOPTER FOR STORAGE

Item Name NSN CAGE Code

Aircraft Blades 0 00000

Item Name NSN CAGE Code

Aircraft Engines

10 Each Delivery Date Duration Time Unit Notes

Non-Serialized Item - Line Number: 1

40 Each Delivery Date Duration Time Unit Notes

Serialized Item(s): - Line Number: 2 Item Description Part Num

Quantity Unit Of Measure Unit Acquisition Cost

Comments

Serially Managed Item(s):

Serialized Item(s): - Line Number: 1

Item Description Part Num

Quantity Unit Of Measure Unit Acquisition Cost

Contract Number Type Contract Number Contact DoD Contract (FAR) SAMPLE TASK 2

Program Title

GFP Attachment Status: Saved via Web

GFP Attachment Information:

Attachment Description Attachment Number Attachm Contract Award TBD 2022-05-

Contract Information:

Item Name NSN CAGE Code

Improved 00000000000 00000 Durability Gearbox kit

Item Name NSN CAGE Code

Improved 100000000000 00000 Flight 0 Control kit

Requisitioned Item(s):

Quantity Unit Of Measure Unit Acquisition Cost 5 Each Delivery Date Duration Time Unit Notes

5 Each Delivery Date Duration Time Unit Notes

Non-Serialized Item - Line Number: 2 Item Description Part Num

Improved Flight Control kit

Item Description Part Num

Quantity Unit Of Measure Unit Acquisition Cost

Model Number false Delivery Event mber

Use As-Is

Order Number ment Date

-26

Delivery Event

GOVERNMENT FURNISHED INSFORMATION W58RGZ-22-R-0090

UH-60A Unique FMS 26-May-2022

MWO 1-1520-237-50-

AFG1

Installation Instructions for the Modification of Select Legacy UH-60A for Foreign Military Sales (FMS) Case W5-B-UAQ-

AFGHANISTAN

15-JUN-2020

CAT 1

MWO 1-1520-237-50-

Installation of the HF Communication System AAN/ARC-220(V) and TSEC/KY-100 in UH- 60/L Helicopter

31-MAR-2003

CAT 1

1071922 Shim, Side Bracket Instrument Panel UH-

60A/L AFGHAN MOD

Revision 03

CAT 1

1071923 Radius Block Instrument Panel UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1071924 Shim, .050 Thick Instrument Panel UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1071925 Glare-Shield Assy UH-60A/L AFGHAN MOD Revision 00

CAT 1

1071926 Glare-Shield Shell UH-60A/L AFGHAN MOD Revision 01

CAT 1

1071927 Mounting Pad, Master Warning UH-60A/L

AFGHAN MOD

Revision 00

CAT 1

1071928 Glare-Shield Sub-Assy UH-60A/L AFGHAN

MOD

Revision 01

CAT 1

1071929 Doubler, Pass-Thru, TransitionUH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1071930 Installation Transition Pass-Thru Doubler UH-

60A/L AFGHAN MOD

Revision 00

CAT 1

1071931 Bracket, Wire Support, Drive Shaft Cover UH-

60A/L AFGHAN MOD

Revision 02

CAT 1

1071932 Holder Mount Assy ANTS UH-60A/L

AFGHAN MOD

Revision 00

CAT 1

1071933 Aft Side Bracket Assy Instrument Panel UH-

60A/L AFGHAN MOD

Revision 00

CAT 1

1081379 Kit Collector UH-60A/L AFGHAN MOD Revision 02

CAT 1

1081380 Drawing Tree UH-60A/L AFGHAN MOD Revision 03

CAT 1

1081381 Installation Dual CIV. Comm Radio UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081382 Installation ARC-220, Non-Crypto UH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1081383 Installation ANTS UH-60A/L AFGHAN MOD Revision 04

1081384 Collector Avionics Upgrade UH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1081385 Depopulation/Removal UH-60A/L AFGHAN

MOD

Revision 03

CAT 1

1081386 GTN 750 Kit UH-60A/L AFGHAN MOD Revision 01

CAT 1

1081387 LRU Population Instrument Panel Assy UH-

60A/L AFGHAN MOD

Revision 03

CAT 1

1081388 Aircraft Installation Instrument Panel Assy

UH-60A/L AFGHAN MOD

Revision 06

CAT 1

1081389 Instrument Panel Assy UH-60A/L AFGHAN

MOD

Revision 04

CAT 1

1081390 Instrument Panel UH-60A/L AFGHAN MOD Revision 03

CAT 1

1081391 Support Plate, Assy Inst. Panel, GTN-750

UH-60A/L AFGHAN MOD

Revision 01

CAT 1

1081392 Support Plate Inst. Panel, GTN-750 UH-

60A/L AFGHAN MOD

Revision 01

CAT 1

1081393 Installation Pitot/Static Tubes UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081394 Blanking Plate Instrument Panel UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081395 LRU Population Center Console UH-60A/L

AFGHAN MOD

Revision 04

CAT 1

1081396 Installation, CB CB Panel UH-60A/L AFGHAN

MOD

Revision 03

CAT 1

1081397 Installation, Fuse Holder UH-60A/L AFGHAN

MOD

Revision 03

CAT 1

1081398 Installation, Antenna GTN-750 GPS UH-

60A/L AFGHAN MOD

Revision 04

CAT 1

1081399 Antenna Mount Assy GTN-750 GPS UH-

60A/L AFGHAN MOD

Revision 02

CAT 1

1081400 Antenna Mount GTN-750 GPS UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081401 Antenna Mount Doubler GTN-750 GPS UH-

60A/L AFGHAN MOD

Revision 01

1081402 Decals UH-60A/L AFGHAN MOD Revision 03

1081403 Blanking Plate Assembly UH-60A/L AFGHAN

MOD

Revision 02

CAT 1

1081404 Blanking Plate Center Console UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081405 Forward Side Mount Bracket Instrument Panel UH-60A/L AFGHAN MOD

Revision 03

CAT 1

1081406 Aft Side Mount Bracket Instrument Panel UH-

60A/L AFGHAN MOD

Revision 04

CAT 1

1081407 Installation Ground Stud UH-60A/L AFGHAN

MOD

Revision 02

CAT 1

1081408 Installation Tailcone Wiring UH-60A/L

AFGHAN MOD

Revision 06

CAT 1

1081409 Pass Thru Doubler Tailcone Wiring Doubler

UH-60A/L AFGHAN MOD

Revision 04

CAT 1

1081410 Electrical Kit Collector UH-60A/L AFGHAN

MOD

Revision 01

CAT 1

1081411 Electrical Installation GTN 750 UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081412 Wiring Diagram GTN-750 UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081413 Harness Assembly GTN W1 UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081414 Harness Assembly GTN W2 UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081415 Harness Assembly GTN W3 UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081416 Harness Assembly GTN W4 UH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1081417 Harness Assembly GTN W5 UH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1081418 Harness Assembly GTN W6 UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081419 Harness Assembly GTN W7 UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081420 Loose Wire Kit GTN-750 UH-60A/L AFGHAN

MOD

Revision 03

1081421 Harness Assembly LH VIDS W12 UH-60A/L

AFGHAN MOD

Revision 06

CAT 1

1081422 Harness Assembly LH VIDS W13 UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081423 Harness Assembly LH VIDS W14 UH-60A/L

AFGHAN MOD

Revision 06

CAT 1

1081424 Electrical Installation Relocation Harnesses

UH-60A/L AFGHAN MOD

Revision 01

CAT 1

1081425 Wiring Diagram Relocation Harnesses UH-

60A/L AFGHAN MOD

Revision 01

CAT 1

1081426 Harness Assembly De-Ice W10 UH-60A/L

AFGHAN MOD

Revision 01

CAT 1

1081427 Harness Assembly CAP W11 UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081428 Loose Wire Kit Lighting UH-60A/L AFGHAN

MOD

Revision 01

CAT 1

1081429 Harness Assembly RH VIDS W15 UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081430 Holder Body Assembly ANTS UH-60A/L

AFGHAN MOD

Revision 03

CAT 1

1081431 Holder Body ANTS UH-60A/L AFGHAN MOD Revision 02

CAT 1

1081432 Securing Clip ANTS UH-60A/L AFGHAN

MOD

Revision 02

CAT 1

1081433 Spring Steel Tab ANTS UH-60A/L AFGHAN

MOD

Revision 03

CAT 1

1081434 Mounting Bracket ANTS UH-60A/L AFGHAN

MOD

Revision 04

CAT 1

1081435 Holder Liner ANTS UH-60A/L AFGHAN MOD Revision 02

CAT 1

1081436 Mode Select Panel Spacer UH-60A/L

AFGHAN MOD

Revision 02

CAT 1

1081438 Sleeving, ID Marker Pitot/Static UH-60A/L

AFGHAN MOD

Revision 03

LSFMA-Service Task Order 2

CONTRACT DATA REQUIREMENTS LIST (CDRL)

REV 0

16 Feb 2022

REVISION PAGE

REVISION

NUMBER

REVISION

DATE

CLIN REVISION CHANGE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _ of _ Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001AI A TDP TM _ OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO.

W58RGZ-22-R-0090

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

17. PRICE GROUP

A001 PROGRAM MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AMAM-MFM-S

18. ESTIMATED

TOTAL PRICE

NSP DI-MGMT-81797

PWS para 3.0

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft Final

A D N/A See block 16 Reg Repro

16. REMARKS See Blk #16 0 1 0

Block 8: The government will have 15 days to review and approve / disapprove with comments.

Block 9: The following information shall be applied to this deliverable:

a. Distribution Statement D: Distribution authorized to the Department of Defense US

DoD contractors only Administration or Operational Use, date of determination is 16 February 2022. Other requests for this document shall be referred to Logistics Support Facility Management Activity, 3777 Maintenance Row, Redstone Arsenal, AL 35898.

b. WARNING - This document contains technical data whose export is restricted by the

Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 12 Draft submittal shall be due 15 days after contract award.

Block 13: If disapproved, the contractor shall correct and resubmit within 5 days of the notification of disapproval comments. Updates to the plan shall be due NLT 15 days after there is a change in management structure and/or resources required to complete this effort.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress (https:// XXXXX) Zip files that are too large to upload to CDRLExpress shall be broken down into multiple zip files of smaller size and uploaded.

Email addresses for TO/DO will be provided with the issuance of the formal Request for Offerors Proposals (RFOP)

Data that cannot be delivered Electronically shall be delivered on CD-ROM to the following address.

Logistic Support Facility Management Activity (LSFMA)

AMAM-MFM-S

Bldg 3777, Maintenance Row Redstone Arsenal, AL 35898

15. TOTAL ▬▬▬▬► 1 2 1

G. PREPARED BY

William T. Ferguson j

H. DATE

I. APPROVED BY

Alan Ruzicka

J. DATE

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001AI A TDP TM OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO.

W58RGZ-22-R-0090

F. CONTRACTOR

UH-60A Unique FMS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

NSP DI-ADMIN-81249C

PWS para 3.1.1

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED AS REQ SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final N/A D N/A N/A Reg Repro

16. REMARKS

Contractor format is acceptable.

a. Distribution Statement D: Distribution authorized to the Department of Defense US DoD contractors only Administration or Operational Use, date of determination is 16 February 2022. Other requests for this document shall be referred to Logistics Support Facility Management Activity, 3777 Maintenance Row, Redstone Arsenal, AL 35898.

b. WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 12: Submittal shall be due 10 days prior to meeting/review.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress (https:// XXXXX) Zip files that are too large to upload to CDRLExpress shall be broken down into multiple zip files of smaller size and uploaded.

Email addresses for TO/DO will be provided with the issuance of the formal Request for Offerors Proposals (RFOP)

Data that cannot be delivered Electronically shall be delivered on CD-ROM to the following address.

Logistic Support Facility Management Activity (LSFMA)

Bldg 3777, Maintenance Row Redstone Arsenal, AL 35898

See Blk #16 0 1 0

William T. Ferguson

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001AI A TDP TM OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO.

W58RGZ-22-R-0090

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 MEETING MINUTES

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

NSP DI-ADMN-81250C

PWS para 3.1.1, 3.1.2

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED AS REQ SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF

DATE

13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A D N/A SEE BLOCK 16 Reg Repro

16. REMARKS

Contractor format is acceptable.

Block 8: The government will have 15 days to review and approve / disapprove with comments.

a. Distribution Statement D: Distribution authorized to the Department of Defense US DoD contractors only Administration or Operational Use, date of determination is 16 February 2022.

Other requests for this document shall be referred to Logistics Support Facility Management Activity, 3777 Maintenance Row, Redstone Arsenal, AL 35898.

b. WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 12: The contractor shall provide the meeting minutes NLT 5 days after the meeting ends.

Block 13: If disapproved, the contractor shall correct and resubmit within 5 days of the notification of disapproval comments.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress

Data that cannot be delivered Electronically shall be delivered on CD-ROM to the following address.

Logistic Support Facility Management Activity (LSFMA)

AMAM-MFM-S

Bldg 3777, Maintenance Row

Redstone Arsenal, AL 35898

AMAM-MFM-S 1 1 1

William T. Ferguson

(1 Data Item)

Form Approved OMB No. 0704-

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C.

CATEGORY:

0001AI A TDP

TM OTHER FNCL

D.

SYSTEM/ITEM

E. CONTRACT/PR NO.

W58RGZ-22-R-0090

F. CONTRACTOR

UH-60A Unique

FMS

1. DATA ITEM

NO.

2. TITLE OF DATA ITEM 3.

SUBTITLE

17. PRICE

GROUP

A004 STATUS REPORT

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT

REFERENCE

6. REQUIRING OFFICE

AMAM-MFM-S

18. ESTIMATED

TOTAL

PRICE

NSP DI-MGMT-80368A/T

PWS para 3.2

7. DD 250

REQ

9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT REQUIRED MONTHLY 30 DACA

a.

ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT

SUBM.

Draft Final

A SEE BLK 16 N/A SEE

BLOCK

Reg Repro

16. REMARKS

Contractor format is acceptable.

Block 4: Paragraph 3.2.3 is not required as this information shall be provided in CDRL LSFS001.

Block 9: The following information shall be applied to this deliverable:

a. Distribution Statement D: Distribution authorized to the Department of Defense US DoD contractors only Administration or Operational Use, date of determination is 16 February 2022.

Other requests for this document shall be referred to Logistics Support Facility Management Activity, 3777 Maintenance Row, Redstone Arsenal, AL 35898.

b. WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25.

BLOCK 13: If disapproved, the contractor shall correct and resubmit within 5 days of the notification of disapproval comments.

Block 14: The Contractor shall electronically deliver the data to the Government via CDRLExpress

Data that cannot be delivered Electronically shall be delivered on CD-ROM to the following address.

Logistic Support Facility Management Activity (LSFMA)

Bldg 3777, Maintenance Row

Redstone Arsenal, AL 35898

AMAM-MFM-S 1 1 1

15. TOTAL

1 2 1

G. PREPARED BY

William T. Ferguson

UH60A FMS PMI and Unique Cockpit - FINAL (1).pdf
UH-60A Unique FMS
Enhanced Phase Maintenance Inspection (PMI) Program
9 February 2022
1.0 CONTRACT OBJECTIVES
1.0 SCOPE
2.0 APPLICABLE PUBLICATIONS
Applicable publications are listed but not limited to those in Appendix A, Reference Publications. Other publications and directives may be applicable and are the responsibility of the contractor to identify and comply with the latest versions of all ...
3.0 PROGRAM MANAGEMENT
3.1 PROGRAM INITIATION
3.1.1 Kickoff Meeting
3.1.2 Integrated Product Team (IPT) Coordination
4.0 REQUIREMENTS
4.1 INSPECTIONS
GFM_List.pdf
Table 1
UH-60AL GFI.pdf
Exhibit A Task Order 2 CDRLS 16Feb22.pdf

File details come from the government source that posted it. Updated .