Attachment 0002 LSFS-1 Cost Price Template.xlsx
XLSX spreadsheet 122 KB Posted
- Attached to
- ACC-RSA Logistic Support Facility Services (LSFS-1) Federal contract opportunity
- Solicitation number
- W58RGZ-22-R-0090
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
On each TAB, enter the requested data in the yellow highlighted cells. The offeror may edit the worksheet to accomodate the offeror's normal accounting and estimating practices but the general format shall remain intact for evaluation and contract administration purposes. TABs have been pre-populated with formulas to aid the offeror in calculating the proposed price. The offeror is responsible for ensuring that all calculations within each TAB are accurate and reflective of the offeror's proposed price.
| STEP 1 | TAB CPFF Labor Category Mapping: | The labor category mapping is intended for use in populating the offeror's proposed base labor rates into the Prime CPFF Labor Rate Table. |
| Instructions: | ||
| 1. Provide the offeror's contractor fiscal year (CFY) from and to dates. | ||
| 2. Provide the proposed mapping of RFP provided IDIQ labor categories to the offeror's contractor/corporate labor categories with minimum education and experience to demonstrate that the offeror is proposing qualified CPFF personnel for the effort. There are 75 rows available for detailing the offeror's contractor/corporate labor categories etc. If more than 75 rows are needed, insert additional rows ensuring the formulas for calculating the "Base Direct Labor Rates" are updated to include the added rows. Also, verify the added rows are included in the calculation of the total of the allocation percentages in the "Percentage Total" row at the bottom of the Labor Category Mapping Total. | ||
| 3. If a particular CPFF IDIQ labor category is a composite of more than one of the offeror’s contractor/corporate labor categories, the offeror shall provide the calculation of the composite with the assigned weightings, identifying percentages the contractor/corporate labor categories are anticipated to work in the RFP labor categories. If a particular CPFF IDIQ labor category is comprised of only one contractor/corporate labor category, the offeror shall provide the crosswalk to the offeror’s single contractor/corporate labor category and assign a weighting of 100 percent. Ensure the "Percentage Total" equals 100%. If a "No" is identified in the "Percentage Total = 100" row, ensure: (i)the allocation percentages are correctly identified to contractor/corporate labor categories and (ii)the calculation of the allocation percentage, in the "Percentage Total" row, includes any added rows. | ||
| 4. Provide the offeror's proposed base labor rate by contract year for every CPFF IDIQ labor category identified. | ||
| 5. The labor rates, identified in the "Base Direct Labor Rates" row shall be used to populate the Prime CPFF Labor Rate Table. |
| STEP 2 | TAB Prime CPFF Labor Rate Table | The prime contractor's proposed direct labor base rates (unburdened labor rates) on CPFF orders shall not exceed the base labor rates by contract year/calendar year proposed as part of the basic IDIQ contract and as identified in this table. The Prime CPFF Labor Rate Table shall contain prime direct labor costs only. No subcontract costs or non-labor costs shall be included in the Labor Rate Tables. |
| Instructions: | ||
| 1. Identify the applicable CFYs for proposed base labor rates and allocation by CFY used to calculate Calendar Year (CY) 2023 base labor rates. | ||
| 2. Provide the offeror's proposed escalation for each contract year. | ||
| 3. Input formulas into the worksheet to show how the CPFF base labor rates from the row "Base Direct Labor Rates" of TAB Category Mapping are utilized to calculate base labor rates by contract year. Formulas shall link the TAB Labor Category Mapping to TAB CPFF Labor Rate Table. | ||
| 4. This TAB has been prepopulated with formulas to apply the proposed base labor rate by IDIQ labor category to the RFP provided labor hours. |
| STEP 3 | TAB Prime FFP Labor Rate Table | The prime contractor's proposed direct labor base rates (unburdened labor rates) on FFP orders shall not exceed the base labor rates by contract year proposed as part of the basic IDIQ contract and as identified in this table. The Prime FFP Labor Rate Table shall contain prime direct labor costs only. No subcontract costs or non-labor costs shall be included in the Labor Rate Tables. |
| Instructions: | ||
| 1. Provide the offeror's proposed base labor rate by contract year for every FFP IDIQ labor category identified. | ||
| 2. This TAB has been prepopulated with formulas to apply the proposed base labor rate by IDIQ labor category to the RFP provided labor hours. |
| STEP 4 | TAB Prime Wrap Rate Tables | INDIRECT RATE TABLE Instructions: This table shall be used to show the conversion of indirect rates/burdens and FCCOM by CFY to contract year. |
| 1. Input the offeror's CFY from and to dates. | ||
| 2. Provide the offeror's proposed indirect rates/burdens and FCCOM by CFY, identifying the CFY (change the "X" in "CFY X" to the actual CFY year) in the INDIRECT RATE TABLE The offeror shall ensure that its proposed indirect rates are proposed in accordance with the offeror's normal accounting practices. | ||
| 3. Input formulas to show the conversion of CFY rates to the contract year rates/calendar year rates. The resulting contract year rates are the rates that shall be used in the FCCOM Rate Table and used in the build-up of proposed wrap rates. |
| IDIQ RATE TABLE- PRIME'S DIRECT LABOR WRAP RATES Instructions: The prime contractor's proposed direct labor wrap rates on orders shall not exceed the wrap rates by contract year proposed as part of the basic IDIQ contract and as identified in this IDIQ Rate Table. |
| 1. Provide the build-up of the offeror's proposed direct labor wrap rate. The wrap rate shall include all indirect rates to be applied to direct labor costs but shall exclude fee/profit. Applying the Direct Labor Wrap Rate by contract year to direct labor costs shall yield the total fully burdened labor costs for that contract year. |
| 2. Use formulas to link the indirect rates by contract year from the INDIRECT RATE TABLE to the IDIQ RATE TABLE for the Direct Labor Wrap Rate to show the build-up of the proposed wrap rate. |
| The prime contractor's proposed direct labor wrap rates on orders shall not exceed the wrap rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below. |
| IDIQ RATE TABLE- PRIME'S ODC/MATERIAL WRAP RATES Instructions: The prime contractor's proposed Material/ODC wrap rates on orders shall not exceed the wrap rates by contract year proposed as part of the basic IDIQ contract and as identified in this IDIQ Rate Table. |
| 1. Provide the build-up of the offeror's proposed ODC/Material wrap rate. The wrap rate shall include all indirect rates to be applied to Material/ODC but shall exclude fee/profit. Applying the Material/ODC Wrap Rate by contract year to non-labor costs shall yield the total Material/ODC costs for that contract year. |
| 2. Use formulas to link the indirect rates by contract year from the INDIRECT RATE TABLE to the IDIQ RATE TABLE for the Material/ODC Wrap Rate to show the build-up of the proposed wrap rate. |
| IDIQ RATE TABLE- PRIME'S FCCOM RATE Instructions: The prime contractor's proposed FCCOM rates on orders shall not exceed the FCCOM rates by contract year proposed as part of the basic IDIQ contract and as identified in this IDIQ Rate Table. |
| 1. Provide the offeror's proposed FCCOM rate. |
| 2. Use formulas to link the indirect rates by contract year from the INDIRECT RATE TABLE to the IDIQ RATE TABLE for the FCCOM Rate. |
| STEP 5 | TAB Prime Profit-Fee-Storage Tables | IDIQ RATE TABLE- PRIME CPFF Fee % Instructions: The prime contractor's fee percentages proposed on CPFF orders shall not exceed the fee percentage proposed as part of the the basic IDIQ contract and as identified in this table. |
| 1. Input the offeror's CPFF fee percentage by contract year. |
| IDIQ RATE TABLE- PRIME FFP Profit % Instructions: The prime contractor's profit percentages proposed on FFP orders shall not exceed the profit percentage proposed as part of the the basic IDIQ contract and as identified in this table. |
| 1. Input the offeror's FFP profit percentage by contract year |
| IDIQ RATE TABLE- PRIME STORAGE RATE Instructions: The prime contractor's storage rates proposed on FFP orders shall not exceed the storage rate proposed as part of the basic IDIQ contract and as identified in this table. |
| 1. Input the offeror's storage rate ($/square foot) by contract year |
| 2. This table has been pre-populated with formulas to apply the proposed storage rate ($/square foot) to the RFP provided square feet for USG evaluation purposes. |
STEP 6 TAB Total Proposed The TAB has been pre-polulated with formulas to calculate the Total Proposed Price from the IDIQ Rate Tables. The offeror is responsible for ensuring that all calculations within each TAB are accurate and reflective of the offeror's proposed price.
1. CPFF Labor Category Mapping
| Labor Category Mapping |
| LSF-1 |
| Offeror Name: |
| Offeror CAGE: |
STEP 1: CPFF Labor Category Mapping
| This labor mapping mapping table is intended for use in the development of the Prime CPFF Labor Rate Table. |
| The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price. |
Red text is shown as an example only. The offeror shall ensure that red text amounts are not included in the offeror's proposed price.
| Contractor Fiscal Year (CFY) | |||||||||||||||||||||||||||||||||||||||||||||||||
| From: | 1 January 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||
| To: | 31 December 2023 | Base Direct Labor Rates = | $ 12.50 | $ 15.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Contractor/Corporate Labor Category | Contractor/Corporate Labor Category Description | Years of Experience | Education | Labor Rate | RFP Lbr Categories | Example Category- Analyst II | Example Category- Engineer | Program Manager | Program Manager II | Program Manager III | Program Manager IV | Program Analyst I | Program Analyst II | Program Analyst III | Engineering Manager | Mechanical Engineer I | Mechanical Engineer II | Mechanical Engineer III | Stress Analyst | Systems Analyst I | Systems Analyst II | Systems Engineer | Technical Writer | Configuration Mgmt Analyst | Configuration Data Manager | Electrical Engineer I | Electrical Engineer II | Electrical Engineer Lead/III | Engineering Aide | Manufacturing Engineer | ILS Manager | Parts Clerk | Material Handler | Warehouse Specialist (Warehouse Worker) | Shipping/Receiving/ Supply/Stock Clerk | Warehouse Supervisor | Production Supervisor | Production Control Clerk (01270) | Structural Installer | Structural Installer Lead | Structural Fabricator | Structural Fabricator Lead | Aerospace Structural Welder | Laser Machine Operator | Aircraft Mechanic | Aircraft Mechanic II | Aircraft Mechanic Lead | Avionics Mechanic | Avionics Mechanic Lead |
| Example- Analyst Category 1 | Example Description | 5 | Bachelor's | $12.00 | 50% | ||||||||||||||||||||||||||||||||||||||||||||
| Example- Analyst Category 2 | Example Description | 4 | Bachelor's | $13.00 | 50% | ||||||||||||||||||||||||||||||||||||||||||||
| Example- Engineer 2 | Example Description | 8 | Bachelor's | $15.00 | 100% |
| Percentage Total | 100% | 100% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Percentage Total = 100% | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No | No |
2. Prime CPFF Labor Rate Table
| Prime CPFF Labor Rate Table |
| LSF-1 |
| Prime Offeror Name: |
| Prime Offeror CAGE: |
STEP 2: Prime CPFF Labor Rate Table
The prime contractor's proposed direct labor base rates (unburdened labor rates) on CPFF orders shall not exceed the base labor rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below.
The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price.
| Red text is shown as an example only. The offeror shall ensure that red text amounts are not included in the offeror's proposed price. | |
| EXAMPLE IDIQ RATE TABLE | |
| CY 2023 | |
| Labor Category | Base Labor Rate |
Author: Author: The rates in this column shall match those calculated in the TAB Labor Category Mapping for each RFP labor category.
| Input formulas to link the rates in this column to the TAB Labor Category Mapping. | Base Labor Rate ($/Hr) | Composite Base Labor Rate |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
2.00% Author: Author:
Offeror's Proposed Escalation Rate Insert applicable contractor fiscal year (CFY)>>>> 0.67 Author: Author:
Offeror's CFY 1 allocation
CFY 2023 CFY 2024 0.33
Author: Author:
Offeror's CFY 2 allocation
| Example Category- Analyst II | $12.50 | $12.75 | $12.58 | 11000.00 | $138,417 |
| Example Category- Engineer | $15.00 | $15.30 | $15.10 | 8000.00 | $120,800.00 |
IDIQ RATE TABLE-
PRIME CPFF LABOR RATE TABLE
| Calendar Year (CY) 2023 | CY 2024 | CY 2025 | CY 2026 | CY 2027 | CY 2028 | CY 2029 | CY 2030 | |
| IDIQ Labor Category | Base Labor Rate |
Author: Author: The rates in this column shall match those calculated in the TAB Labor Category Mapping for each RFP labor category.
| Input formulas to link the rates in this column to the TAB Labor Category Mapping. | Base Labor Rate ($/Hr) | Composite Base Labor Rate |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
| ($) | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | CPFF Prime Labor |
0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate 0.00% Author: Author:
Offeror's Proposed Escalation Rate Insert applicable contractor fiscal year (CFY)>>>> 0.00 Author: Author:
Offeror's CFY 1 allocation
CFY XXXX CFY XXXX 0.00
Offeror's CFY 2 allocation
Offeror's Proposed Escalation Rate Author: Author:
Offeror's Proposed Escalation Rate Author: Author:
Offeror's Proposed Escalation Rate Author: Author:
Offeror's Proposed Escalation Rate Author: Author: The rates in this column shall match those calculated in the TAB Labor Category Mapping for each RFP labor category.
Input formulas to link the rates in this column to the TAB Labor Category Mapping.
Author: Author:
Offeror's Proposed Escalation Rate Author: Author:
Offeror's Proposed Escalation Rate Author: Author:
Offeror's Proposed Escalation Rate Author: Author:
Offeror's CFY 1 allocation Author: Author:
Offeror's CFY 2 allocation
Author: Author:
Offeror's Proposed
| Escalation Rate | Program Manager | $0.00 | $0.00 | $0.00 | 2557.50 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5280.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 |
| Program Manager II | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Program Manager III | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Program Manager IV | $0.00 | $0.00 | $0.00 | 306.90 | $0 | $0.00 | 613.80 | $0 | $0.00 | 633.60 | $0 | $0.00 | 613.80 | $0 | $0.00 | 613.80 | $0 | $0.00 | 306.90 | $0 | $0.00 | 306.90 | $0 | $0.00 | 306.90 | $0 | |
| Program Analyst I | $0.00 | $0.00 | $0.00 | 2046.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4224.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | |
| Program Analyst II | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Program Analyst III | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Engineering Manager | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Mechanical Engineer I | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Mechanical Engineer II | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Mechanical Engineer III | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Stress Analyst | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Systems Analyst I | $0.00 | $0.00 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | |
| Systems Analyst II | $0.00 | $0.00 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | |
| Systems Engineer | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Technical Writer | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Configuration Mgmt Analyst | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Configuration Data Manager | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Electrical Engineer I | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Electrical Engineer II | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Electrical Engineer Lead/III | $0.00 | $0.00 | $0.00 | 153.45 | $0 | $0.00 | 306.90 | $0 | $0.00 | 316.80 | $0 | $0.00 | 306.90 | $0 | $0.00 | 306.90 | $0 | $0.00 | 153.45 | $0 | $0.00 | 153.45 | $0 | $0.00 | 153.45 | $0 | |
| Engineering Aide | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Manufacturing Engineer | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| ILS Manager | $0.00 | $0.00 | $0.00 | 767.25 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1584.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 767.25 | $0 | $0.00 | 767.25 | $0 | $0.00 | 767.25 | $0 | |
| Parts Clerk | $0.00 | $0.00 | $0.00 | 2046.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4224.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | |
| Material Handler | $0.00 | $0.00 | $0.00 | 4603.50 | $0 | $0.00 | 9207.00 | $0 | $0.00 | 9504.00 | $0 | $0.00 | 9207.00 | $0 | $0.00 | 9207.00 | $0 | $0.00 | 4603.50 | $0 | $0.00 | 4603.50 | $0 | $0.00 | 4603.50 | $0 | |
| Warehouse Specialist (Warehouse Worker) | $0.00 | $0.00 | $0.00 | 2557.50 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5280.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | |
| Shipping/Receiving/ Supply/Stock Clerk | $0.00 | $0.00 | $0.00 | 2557.50 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5280.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | |
| Warehouse Supervisor | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Production Supervisor | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Production Control Clerk (01270) | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Structural Installer | $0.00 | $0.00 | $0.00 | 6138.00 | $0 | $0.00 | 12276.00 | $0 | $0.00 | 12672.00 | $0 | $0.00 | 12276.00 | $0 | $0.00 | 12276.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6138.00 | $0 | |
| Structural Installer Lead | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Structural Fabricator | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Structural Fabricator Lead | $0.00 | $0.00 | $0.00 | 409.20 | $0 | $0.00 | 818.40 | $0 | $0.00 | 844.80 | $0 | $0.00 | 818.40 | $0 | $0.00 | 818.40 | $0 | $0.00 | 409.20 | $0 | $0.00 | 409.20 | $0 | $0.00 | 409.20 | $0 | |
| Aerospace Structural Welder | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Laser Machine Operator | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Aircraft Mechanic | $0.00 | $0.00 | $0.00 | 7161.00 | $0 | $0.00 | 14322.00 | $0 | $0.00 | 14784.00 | $0 | $0.00 | 14322.00 | $0 | $0.00 | 14322.00 | $0 | $0.00 | 7161.00 | $0 | $0.00 | 7161.00 | $0 | $0.00 | 7161.00 | $0 | |
| Aircraft Mechanic II | $0.00 | $0.00 | $0.00 | 6649.50 | $0 | $0.00 | 13299.00 | $0 | $0.00 | 13728.00 | $0 | $0.00 | 13299.00 | $0 | $0.00 | 13299.00 | $0 | $0.00 | 6649.50 | $0 | $0.00 | 6649.50 | $0 | $0.00 | 6649.50 | $0 | |
| Aircraft Mechanic Lead | $0.00 | $0.00 | $0.00 | 3069.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6336.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | |
| Avionics Mechanic | $0.00 | $0.00 | $0.00 | 5115.00 | $0 | $0.00 | 10230.00 | $0 | $0.00 | 10560.00 | $0 | $0.00 | 10230.00 | $0 | $0.00 | 10230.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | |
| Avionics Mechanic Lead | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Ground Support Equipment Mechanic | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Aircraft Painter | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Electrical Fabricator | $0.00 | $0.00 | $0.00 | 4092.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 8448.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | |
| Electrical Fabricator Lead | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Wire Marker Machine Operator I | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Aircraft Quality Inspector | $0.00 | $0.00 | $0.00 | 4092.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 8448.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 8184.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | |
| Aircraft Quality Supervisor | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Quality Inspector | $0.00 | $0.00 | $0.00 | 3069.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6336.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 6138.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | |
| Quality Supervisor | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| ECO/HAZMAT Inspector | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| ALSE Technicians | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Sr Provisioning Specialist | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| CNC Technician | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Maintenance Test Pilot (MTP) | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Standardization/Maintenance Test Pilot | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Director of Safety/Instructor Pilot | $0.00 | $0.00 | $0.00 | 255.75 | $0 | $0.00 | 511.50 | $0 | $0.00 | 528.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | $0.00 | 255.75 | $0 | |
| Flight Operations Technician | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Airplane / Helicopter Pilot | $0.00 | $0.00 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | |
| Flight Instructor/Flight Examiner | $0.00 | $0.00 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | |
| Flight Mechanic/Crew Chief | $0.00 | $0.00 | $0.00 | 2046.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4224.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 4092.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | |
| Pilot/Non-MTP (Platform Specific ) | $0.00 | $0.00 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | $0.00 | 1.00 | $0 | |
| Material/Production Planner | $0.00 | $0.00 | $0.00 | 2557.50 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5280.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 5115.00 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | $0.00 | 2557.50 | $0 | |
| Training Manager | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Training Project Manager | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Senior Instructor/SME I | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Senior Instructor/SME II | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Instructor/SME | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| SME | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| NDI Technician | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| NDI Technician Level II | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| NDI Technician Level III | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Integrated Master Scheduler I | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Integrated Master Scheduler II | $0.00 | $0.00 | $0.00 | 1023.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2112.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 2046.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | |
| Integrated Master Scheduler III | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| Aircraft Servicer (23060) | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Admin Clerk | $0.00 | $0.00 | $0.00 | 1534.50 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3168.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 3069.00 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | $0.00 | 1534.50 | $0 | |
| Computer Operator | $0.00 | $0.00 | $0.00 | 511.50 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1056.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 1023.00 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | $0.00 | 511.50 | $0 | |
| 103430.30 | $0 | 206855.60 | $0 | 213528.20 | $0 | 206855.60 | $0 | 206855.60 | $0 | 103430.30 | $0 | 103430.30 | $0 | 103430.30 | $0 |
3. Prime FFP Labor Rate Table
| Prime FFP Labor Rate Table |
| LSF-1 |
| Prime Offeror Name: |
| Prime Offeror CAGE: |
STEP 3: Prime FFP Labor Rate Table
The prime contractor's proposed direct labor base rates (unburdened labor rates) on FFP orders shall not exceed the base labor rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below.
The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price.
| Red text is shown as an example only. The offeror shall ensure that red text amounts are not included in the offeror's proposed price. | |
| EXAMPLE IDIQ RATE TABLE |
| Labor Category | Base Labor Rate | |
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor |
| Example Category- Analyst II | $54.00 | 11000.00 | $ 594,000 |
| Example Category- Engineer | $70.00 | 8000.00 | $ 560,000 |
IDIQ RATE TABLE-
PRIME FFP LABOR RATE TABLE
| Calendar Year (CY) 2023 | CY 2024 | CY 2025 | CY 2026 | CY 2027 | CY 2028 | CY 2029 | CY 2030 | ||
| IDIQ Labor Category | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor | |||||||
| ($) | Base Labor Rate | ||||||||
| ($/Hr) | RFP Provided Labor Hours for USG Evaluation Purposes | FFP Prime Labor |
| Program Manager | 2557.50 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 2557.50 | $0 | 2557.50 | $0 | 2557.50 | $0 |
| Program Manager II | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Program Manager III | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Program Manager IV | 306.90 | $0 | 613.80 | $0 | 613.80 | $0 | 613.80 | $0 | 613.80 | $0 | 306.90 | $0 | 306.90 | $0 | 306.90 | $0 |
| Program Analyst I | 2046.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 |
| Program Analyst II | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Program Analyst III | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Engineering Manager | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Mechanical Engineer I | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Mechanical Engineer II | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Mechanical Engineer III | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Stress Analyst | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Systems Analyst I | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 |
| Systems Analyst II | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 |
| Systems Engineer | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Technical Writer | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Configuration Mgmt Analyst | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Configuration Data Manager | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Electrical Engineer I | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Electrical Engineer II | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Electrical Engineer Lead/III | 153.45 | $0 | 306.90 | $0 | 306.90 | $0 | 306.90 | $0 | 306.90 | $0 | 153.45 | $0 | 153.45 | $0 | 153.45 | $0 |
| Engineering Aide | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Manufacturing Engineer | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| ILS Manager | 767.25 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 | 767.25 | $0 | 767.25 | $0 | 767.25 | $0 |
| Parts Clerk | 2046.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 |
| Material Handler | 4603.50 | $0 | 9207.00 | $0 | 9207.00 | $0 | 9207.00 | $0 | 9207.00 | $0 | 4603.50 | $0 | 4603.50 | $0 | 4603.50 | $0 |
| Warehouse Specialist (Warehouse Worker) | 2557.50 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 2557.50 | $0 | 2557.50 | $0 | 2557.50 | $0 |
| Shipping/Receiving/ Supply/Stock Clerk | 2557.50 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 2557.50 | $0 | 2557.50 | $0 | 2557.50 | $0 |
| Warehouse Supervisor | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Production Supervisor | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Production Control Clerk (01270) | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Structural Installer | 6138.00 | $0 | 12276.00 | $0 | 12276.00 | $0 | 12276.00 | $0 | 12276.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 6138.00 | $0 |
| Structural Installer Lead | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Structural Fabricator | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Structural Fabricator Lead | 409.20 | $0 | 818.40 | $0 | 818.40 | $0 | 818.40 | $0 | 818.40 | $0 | 409.20 | $0 | 409.20 | $0 | 409.20 | $0 |
| Aerospace Structural Welder | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Laser Machine Operator | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Aircraft Mechanic | 7161.00 | $0 | 14322.00 | $0 | 14322.00 | $0 | 14322.00 | $0 | 14322.00 | $0 | 7161.00 | $0 | 7161.00 | $0 | 7161.00 | $0 |
| Aircraft Mechanic II | 6649.50 | $0 | 13299.00 | $0 | 13299.00 | $0 | 13299.00 | $0 | 13299.00 | $0 | 6649.50 | $0 | 6649.50 | $0 | 6649.50 | $0 |
| Aircraft Mechanic Lead | 3069.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 |
| Avionics Mechanic | 5115.00 | $0 | 10230.00 | $0 | 10230.00 | $0 | 10230.00 | $0 | 10230.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 |
| Avionics Mechanic Lead | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Ground Support Equipment Mechanic | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Aircraft Painter | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Electrical Fabricator | 4092.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 |
| Electrical Fabricator Lead | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Wire Marker Machine Operator I | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Aircraft Quality Inspector | 4092.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 8184.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 |
| Aircraft Quality Supervisor | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Quality Inspector | 3069.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 6138.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 |
| Quality Supervisor | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| ECO/HAZMAT Inspector | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| ALSE Technicians | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Sr Provisioning Specialist | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| CNC Technician | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Maintenance Test Pilot (MTP) | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Standardization/Maintenance Test Pilot | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Director of Safety/Instructor Pilot | 255.75 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 | 255.75 | $0 | 255.75 | $0 | 255.75 | $0 |
| Flight Operations Technician | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Airplane / Helicopter Pilot | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 |
| Flight Instructor/Flight Examiner | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 |
| Flight Mechanic/Crew Chief | 2046.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 4092.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 |
| Pilot/Non-MTP (Platform Specific ) | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 | 1.00 | $0 |
| Material/Production Planner | 2557.50 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 5115.00 | $0 | 2557.50 | $0 | 2557.50 | $0 | 2557.50 | $0 |
| Training Manager | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Training Project Manager | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Senior Instructor/SME I | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Senior Instructor/SME II | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Instructor/SME | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| SME | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| NDI Technician | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| NDI Technician Level II | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| NDI Technician Level III | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Integrated Master Scheduler I | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Integrated Master Scheduler II | 1023.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 2046.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 |
| Integrated Master Scheduler III | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| Aircraft Servicer (23060) | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Admin Clerk | 1534.50 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 3069.00 | $0 | 1534.50 | $0 | 1534.50 | $0 | 1534.50 | $0 |
| Computer Operator | 511.50 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 1023.00 | $0 | 511.50 | $0 | 511.50 | $0 | 511.50 | $0 |
| 103430.30 | $0 | 206855.60 | $0 | 206855.60 | $0 | 206855.60 | $0 | 206855.60 | $0 | 103430.30 | $0 | 103430.30 | $0 | 103430.30 | $0 |
4. Prime Wrap Rate Tables
| Prime Wrap Rate Table |
| LSF-1 |
| Offeror Name: |
| Offeror CAGE: |
STEP 3: Prime Wrap Rate Tables
The prime contractor's proposed direct labor wrap rates on orders shall not exceed the wrap rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below.
The prime contractor's proposed ODC/Material wrap rates on orders shall not exceed the wrap rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below.
The prime contractor's proposed FCCOM rates on orders shall not exceed the FCCOM rates by contract year proposed as part of the basic IDIQ contract and as identified in the IDIQ Rate Table below.
| The offeror is responsible for ensuring that all calculations within this worksheet are accurate and reflective of the offeror's proposed price. |
| Red text is shown as an example only of how to convert Contractor Fiscal Year (CFY) rates to contract year rates. The offeror shall ensure that red text amounts are not included in the offeror's proposed price. |
| EXAMPLE CFY | ||||||||||||
| From: | 1 January | |||||||||||
| To: | 31 December | |||||||||||
| EXAMPLE INDIRECT RATE TABLE | ||||||||||||
| Contractor Fiscal Year (CFY) | Contract Year Rates | |||||||||||
| Indirect Burden | CFY 2023 | CFY 2024 | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | CFY X | Calendar Year (CY) 2023 | |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2024 |
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
CY 2025
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
CY 2026
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
| CY 2027 | |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate theI DIQ Rate Tables below. | CY 2028 |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2029 |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2030 |
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
| Example- Fringe Rate | 10.00% | 9.00% | 9.67% |
| Example- Overhead Rate | 8.50% | 8.00% | 8.33% |
| Example- Material/Sub Overhead | 5.00% | 4.50% | 4.83% |
| Example- G&A Rate | 3.00% | 3.20% | 3.07% |
| Example- FCCOM | 0.1000% | 0.1000% | 0.10000% |
| Contractor Fiscal Year (CFY) | ||||
| From: | Day Month | |||
| To: | Day Month | |||
| INDIRECT RATE TABLE | ||||
| Contractor Fiscal Year (CFY) (%) | Contract Year Rates (%) | |||
| Indirect Rate/Burden (to include FCCOM) |
Author: Identify the indirect rates/burdens and FCCOM (when applicable) used to develop the ceiling rate tables below.
| CFY X | |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | CFY X |
| Author: Input proposed rate by CFY used to calculate contract year rates. | Calendar Year (CY) 2023 |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2024 |
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
CY 2025
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
CY 2026
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
| CY 2027 | |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate theI DIQ Rate Tables below. | CY 2028 |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2029 |
| Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below. | CY 2030 |
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
| Indirect Rate/Burden (Please Identify) |
IDIQ RATE TABLE-
PRIME'S DIRECT LABOR WRAP RATES
Detail of Wrap Rate Author: Proposed Contract Year Rates in this table shall be taken from the INDIRECT RATE TABLE above.
| Description of Indirect Rate's Allocation Base | Calendar Year (CY) 2023 | |
| (%) | CY 2024 | |
| (%) | CY 2025 | |
| (%) | CY 2026 | |
| (%) | CY 2027 | |
| (%) | CY 2028 | |
| (%) | CY 2029 | |
| (%) | CY 2030 |
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| DIRECT LABOR WRAP RATE (applied to prime's direct labor costs) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
IDIQ RATE TABLE-
PRIME'S ODC/MATERIAL WRAP RATES
Detail of Wrap Rate Author: Proposed Contract Year Rates in this table shall be taken from the INDIRECT RATE TABLE above.
| Description of Indirect Rate's Allocation Base | Calendar Year (CY) 2023 | |
| (%) | CY 2024 | |
| (%) | CY 2025 | |
| (%) | CY 2026 | |
| (%) | CY 2027 | |
| (%) | CY 2028 | |
| (%) | CY 2029 | |
| (%) | CY 2030 |
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| Indirect Rate/Burden (Please Identify) | ||||||||
| ODC/MATERIAL WRAP RATE (applied to prime's non-labor costs) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
IDIQ RATE TABLE-
PRIME'S FCCOM RATES (IF APPLICABLE)
FCCOM Factor Author: Proposed Contract Year Rates in this table shall be taken from the INDIRECT RATE TABLE above.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate theI DIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Identify the indirect rates/burdens and FCCOM (when applicable) used to develop the ceiling rate tables below.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input proposed rate by CFY used to calculate contract year rates.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Proposed Contract Year Rates in this table shall be taken from the INDIRECT RATE TABLE above.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate theI DIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
Author: Input formulas to show the conversion of proposed rates by CFY to contract year rates. The contract year rates shall be used to populate the IDIQ Rate Tables below.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .