Attachment 0012 Request for Use of Prohibited Material Attachment.doc

DOC document 47 KB Posted

Attached to
Trophy Kits
Solicitation number
W56HZV-19-R-0209
Issued by

About this file

This document contains a request for use of prohibited materials attachment related to a federal contract solicitation for Trophy Kits. The Army Contracting Command-Detroit Arsenal proposes to award an indefinite delivery/indefinite quantity contract for five years to procure Trophy Kits and spare parts for the M1A2 SEPv2 and M1A2 SEPv3 Abrams Family of Vehicles. Interested offerors must request attachments by email with company name and CAGE code by August 2nd, 2021 to receive the technical data package, which requires active joint certification program status. Questions will be accepted until 5:00 PM Eastern on the same date.

View the file

Other files

File Type Posted
Attachment 0006 CUI. Pricing Attachment.xlsx XLSX spreadsheet
W56HZV19R0209-0006.pdf PDF
Trophy Kits Solicitation Questions 63 -65 .pdf PDF
W56HZV19R0209-0005.pdf PDF
Trophy Kits Solicitation Questions 63 -65 .pdf PDF
Attachment 0015 Special Packaging Instructions 57K7302-201.pdf PDF
Attachment 0014 Special Packaging Instructions 57K7302-101.pdf PDF
Trophy Kit Solicitation Questions 61-62.pdf PDF
W56HZV19R0209-0004.pdf PDF
Trophy Kit Solicitation Questions 1-60 Final Q and A.pdf PDF
Industry Request For Information.pdf PDF
Attachment 0013 SPARE PARTS (CLIN 1009).xlsx XLSX spreadsheet
W56HZV19R0209-0003.pdf PDF
W56HZV19R0209-0002.pdf PDF
W56HZV19R0209-0001.pdf PDF
Attachment 0006-Pricing Attachment AMD 0001.xlsx XLSX spreadsheet
Attachment 0006 (002).xlsx Attachment 0006.xlsx XLSX spreadsheet
Attachment 0004 - Resource Distribution Table.xlsx XLSX spreadsheet
Attachment 0010 - Certification Statement .docx DOCX document
Attachment 0009 SBP-WorkbookInstructions.docx DOCX document
ATTACHMENT 0011- SPECIAL PACKAGING INSTRUCTIONS .doc DOC document
Attachment 0003 OPSEC Plan 2019.pdf PDF
Attachment 0008 SBP-Workbook.xlsx XLSX spreadsheet
Attachment 0005 Cost and Software Data Reporting Plan.pdf PDF
W56HZV19R0209 Solicitation Trophy Kits.pdf PDF
Attachment 0007 - Use of Existing Government-Furnished Property (002).xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0012

Request for Use of Prohibited Materials

04 June 2012 Distribution Statement A – Approved for Public Release; distribution unlimited

1. General Information

Requesting Company

Date of Request

Point of Contact

Prohibited material for which waiver is requested

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery. Indicate the specific variant(s) the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).

4. Analysis of Alternatives

Instructions: Identify all alternatives which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.

5. Technical Justification

Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.

6. Program Risk

Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get Well Plan

Instructions: Explain if and how you would eliminate the use of this prohibited material during the production phase of the program.

File details come from the government source that posted it. Updated .