This document outlines a cost and software data reporting plan for an Abrams Expedited Active Protection System Mounting Kit contract. The contractor will provide Trophy Kits and spare parts for M1A2 Abrams vehicles over five ordering years. Key reporting elements include a CWBS dictionary, DD Form 1921 reports, and a contractor business data report submitted annually. The contractor must maintain the CWBS dictionary and submit updates when elements change. Pre- and post-deployment kits must be detailed in the dictionary along with quantities. Final reports are due when over 95% of costs are incurred after delivery of the final end item.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PD MBTS
8. PREPARING
ORGANIZATION
Form Approved OMB No. 0704-0188
A-15-F-C9
10. APPROVED PLAN
NUMBER
martin.l.hogan.civ@mail.mil
6d. E-MAIL ADDRESS
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
2. WBS SYSTEM TYPE
Electronic System
4. CURRENT SUBMISSION DATE
20181108
(YYYYMMDD)3. SUBMISSION TYPE
CHANGE
INITIALX
5. LAST APPROVED PLAN DATE (YYYYMMDD)
Abrams ExAPS Mounting Kit
C-FRP
C-LRIP
B
A
X
O&S
Pre-A
c. PRIME MISSION PRODUCTb. PHASE/MILESTONE
1. MAJOR PROGRAM M1A2 Abramsa. NAME
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)
Martin Hogan 6501 E 11 Mile Road, SFAE-GCS-MB #506 Warren, MI, 48397-5000
586-282-8203
6b. TELEPHONE NUMBER (Include Area Code)
7. PLAN TYPE
CONTRACT (SUB)
CONTRACT (PRIME)PROGRAM X
586-282-8253
6c. FAX NUMBER (Include Area Code)
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
9a. CONTRACTOR NAME/ADDRESS
i. PERFORMING ORGANIZATION ii. DIVISION
9b. CONTRACT NUMBER 9c. APPROPRIATION
RDT&E
PROCUREMENTX
O&M
(X if applicable)
13. REPORTS REQUIRED
DD 1921-3 (CBDR): X EVM Reporting:
h. IPMR FORMAT 1f. EAC
g. SRDR
FORMATS
DD 1921-1 / 1921-5 EAC: X
e. DD 1921-5
(SFCHR)
d. DD 1921-2
(PCR)
b. DD 1921
(CDSR)
a. CWBS
DICTIONARY
11. WBS ELEMENT CODE
a. PROGRAM/
CONTRACT/
SUBCONTRACT
12.
WBS REPORTING ELEMENTS
b. CONTRACT/ SUBCONTRACT c. DD 1921-1
(FCHR)
CCDR
1.0 1.0 Abrams Expidited Active Protection System (APS) Mounting Kit X X X X
1.1 1.1 ExAPS Mounting Kit X X X X
1.1.1 1.1.1 Subsystem Integration, Assembly, Test, and Checkout X X X X
1.1.2 1.1.2 Energy Storage Unit (ESU) X X X X
1.1.3 1.1.3 Power Distribution Box (PDB) X X X X
1.1.4 1.1.4 Attachments X X X X
1.1.4.1 1.1.4.1 Pre-Deployment kits X X X X
1.1.4.2 1.1.4.2 Post-Deployment kits X X X X
1.1.5 1.1.5 Ballast Kit X X X X
1.2 1.2 Platform Integration, Assembly, Test and Checkout X N/A
1.3 1.3 System Engineering X X X X
1.4 1.4 Program Management X X X X
1.4.1 1.4.1 Software Program Management X N/A
1.4.2 1.4.2 Integrated Logistics Support (ILS) Program Management X X X X
1.4.3 1.4.3 Cybersecurity Management X X X X
1.4.4 1.4.4 Core Program Management X X X X
1.4.5 1.4.5 Other Program Management X X X X
1.5 1.5 System Test and Evaluation X N/A
1.6 1.6 Training X N/A
1.7 1.7 Data X X X X
1.7.1 1.7.1 Data Deliverables X X X X
1.7.2 1.7.2 Data Repository X X X X
1.7.3 1.7.3 Data Rights X X X X
1.8 1.8 Peculiar Support Equipment X X X X
1.8.1 1.8.1 Test and Measurement Equipment X X X X
1.8.2 1.8.2 Support and Handling Equipment X X X X
1.9 1.9 Common Support Equipment X X X X
Page 1 of 4DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
(X if applicable)
13. REPORTS REQUIRED
DD 1921-3 (CBDR): X EVM Reporting:
h. IPMR FORMAT 1f. EAC
g. SRDR
FORMATS
DD 1921-1 / 1921-5 EAC: X
e. DD 1921-5
(SFCHR)
d. DD 1921-2
(PCR)
b. DD 1921
(CDSR)
a. CWBS
DICTIONARY
11. WBS ELEMENT CODE
a. PROGRAM/
CONTRACT/
SUBCONTRACT
12.
WBS REPORTING ELEMENTS
b. CONTRACT/ SUBCONTRACT c. DD 1921-1
(FCHR)
CCDR
1.9.1 1.9.1 Test and Measurement Equipment X X X X
1.9.2 1.9.2 Support and Handling Equipment X X X X
1.10 1.10 Operational/Site Activation X N/A
1.11 1.11 Contractor Logistics Support (CLS) X X X X
1.12 1.12 Industrial Facilities X N/A
1.13 1.13 Initial Spares and Repair Parts X X X X
Subtotal Cost X X
Reporting Contractor G&A X X
Reporting Contractor Undistributed Budget X X
Reporting Contractor Management Reserve X X
Reporting Contractor FCCM X X
Total Cost X X
Reporting Contractor Profit/Loss or Fee X X
Total Price X X
Page 2 of 4DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE c.
EVENT
b.
FORM(S)
a.
SUBMISSION
14. CSDR SUBMISSION DATES
e. AS OF DATE
(YYYYMMDD)
f. DUE DATE
(YYYYMMDD)
d.
REPORT TYPE
1 CWBS Dictionary CWBS Dictionary - FY18 Initial 20190615 20190814
2 1921, 1921-1 Initial FY18 Report (USA) Initial 20190615 20190814
4 1921, 1921-1 Final FY18 Report (USA) Final 20200115 20200316
5 CWBS Dictionary CWBS Dictionary - FY19 Final 20201231 20210228
6 1921, 1921-1 Final Option FY19 Report (USA) Final 20201231 20210228
15. REMARKS
NON-RECURRING/RECURRING DEFINITIONS
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921 and 1921-1 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the precontract or post contract award conference.
COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
1921-3 CONTRACTOR BUSINESS DATA REPORT
a.The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b.Reports are submitted annually at the end of the contractor's fiscal year.
c.Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
Final Cost Report
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each End Item (see Block 18) has been incurred.
PAC
Per DFARS #242.503, a Post-Award Conference (PAC) is required for all contract awards. The objective is to have a collaborative discussion between industry and the government with respect to industry's approach to fulfilling contractual obligations with the CSDR Contract Plan and CSDR policy as well as the government's expectations for each CSDR submission. The Contractor is to demonstrate how their accounting system will feed the CSDR reports with minimal allocation, and to identify any revisions needed to the CSDR plan(s).
Quantity Breakout
The total Army Abrams ExAPS Mounting A Kits of 376 includes 28 spare kits.
Page 3 of 4DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
CWBS Configuration Management
The CWBS Dictionary is a living document and must match the technical content, cost content, and work content of each WBS elements for each CCDR submissions.
The reporting contractor must maintain and update the CWBS Dictionary throughout the life of the contract. IAW DI-MGMT-81334D, if changes to the CWBS occur, the contractor is required to submit an updated CWBS Index and Dictionary with the next affected Cost Software Data Reports.
When submitting an updated CWBS Dictionary, the Contractor is instructed to track changes by adding a column next to the Definition column in the most recently accepted dictionary. For each WBS elements whose scope/definition has changed, explain the change in the new column.
For WBS elements where the definition is not changing, put "No Change" in the new column.
Pre- and Post- Deployment kits
The contractor will provide a matrix by WBS of the items included in the Pre- and Post- Deployment kits in the CWBS Dictionary. This will include quantities of items as well.
Page 4 of 4DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE