Attachment 0004 - Resource Distribution Table.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
Trophy Kits
Solicitation number
W56HZV-19-R-0209
Issued by

About this file

This document contains a resource distribution table template and instructions for a federal contract to procure Trophy Kits and spare parts. The Army Contracting Command-Detroit Arsenal proposes to award an indefinite delivery/indefinite quantity contract for five years to procure Trophy Kits for the M1A2 SEPv2 and M1A2 SEPv3 Abrams Family of Vehicles. The contractor shall utilize the provided worksheets to provide a resource distribution table deliverable with cost and subcontractor data, including any subcontractors anticipated to exceed $20 million. Subcontractors must be identified along with the percentage of work and location if costs are expected to surpass $20 million. The deliverable is due in accordance with the contract data requirements list and description cited.

View the file

Other files

File Type Posted
Attachment 0006 CUI. Pricing Attachment.xlsx XLSX spreadsheet
W56HZV19R0209-0006.pdf PDF
Trophy Kits Solicitation Questions 63 -65 .pdf PDF
Trophy Kits Solicitation Questions 63 -65 .pdf PDF
Attachment 0015 Special Packaging Instructions 57K7302-201.pdf PDF
Attachment 0014 Special Packaging Instructions 57K7302-101.pdf PDF
Trophy Kit Solicitation Questions 61-62.pdf PDF
W56HZV19R0209-0005.pdf PDF
W56HZV19R0209-0004.pdf PDF
Trophy Kit Solicitation Questions 1-60 Final Q and A.pdf PDF
Industry Request For Information.pdf PDF
Attachment 0013 SPARE PARTS (CLIN 1009).xlsx XLSX spreadsheet
W56HZV19R0209-0003.pdf PDF
W56HZV19R0209-0002.pdf PDF
Attachment 0006-Pricing Attachment AMD 0001.xlsx XLSX spreadsheet
W56HZV19R0209-0001.pdf PDF
Attachment 0012 Request for Use of Prohibited Material Attachment.doc DOC document
Attachment 0009 SBP-WorkbookInstructions.docx DOCX document
Attachment 0010 - Certification Statement .docx DOCX document
ATTACHMENT 0011- SPECIAL PACKAGING INSTRUCTIONS .doc DOC document
Attachment 0008 SBP-Workbook.xlsx XLSX spreadsheet
Attachment 0007 - Use of Existing Government-Furnished Property (002).xlsx XLSX spreadsheet
Attachment 0005 Cost and Software Data Reporting Plan.pdf PDF
Attachment 0003 OPSEC Plan 2019.pdf PDF
W56HZV19R0209 Solicitation Trophy Kits.pdf PDF
Attachment 0006 (002).xlsx Attachment 0006.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDT Instructions

CUI

Metadata Reference
File Name1.aAttachment 0004 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0004
Contract Number2.b0
Last Updated MOD2.c0
Instructions1The contractor shall utilize the worksheets titled "Metadata" and "RDT Data" within this attachment as a template to provide the Resource Distribution Table deliverable.
2Other than cells marked, "(optional)" the contractor shall enter data in all yellow highlighted cells as indicated on each worksheet and in accordance with these instructions.
3Fill in the required data on the worksheet titled "Metadata" which provides data about the contract, the CDRL deliverable, who prepared the CDRL deliverable, and when the CDRL deliverable was prepared.
4Fill in the required data on the worksheet titled "RDT Data" as instructed below (see the NOTONAL EXAMPLE in columns E and F on "RDT Data" worksheet for two example subcontractor columns):
a)The total of the "Price" row (5.c) shall equal the contractor's total contract price when all options are exercised.
b)Total contract price (row 5.c) shall be broken down into:
i.Costs plus profit/fee incurred to preform work internally by the prime contractor, reported in "Prime Contractor" column.
ii.Costs incurred to pay subcontractors to provide hardware, software, or other services, reported in columns "All Other Subcontractors" thru "Subcontractor n".
iii.Subcontractor costs shall be provided for each subcontractor (row 5.c, columns "Subcontractor 1" thru "Subcontractor n") if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised). Insert and label additional columns between "Subcontractor 1" and "Subcontractor n" as required to provide data for each subcontractor.

A subcontract is any agreement, purchase order, or instrument other than a prime contract calling for work or for the material required for the performance of one or more prime contracts. It usually covers procurement of major components or subsystems that require the subcontractor to do extensive design, development, engineering, and testing to meet a prime contractor’s procurement specifications. (Via DoD Manual 5000.04 - Cost and Software Data Reporting (CSDR) Manual)

iv.Costs associated with all subcontractors not anticipated to exceed $20M may be combined and reported in the row labeled 5.c, column "All Other Subcontractors".
c)The following information is required, by subcontractor, if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised).
i.In the row labeled 5.a, enter the company name of the subcontractor who will be providing the part, software, or service. If the subcontractor is not yet known, enter "TBD".
ii.In the row labeled 5.b, enter the city and state (and country if not the United States) the subcontract is located in. If the subcontractor has multiple locations, enter the location the part or software is produced or the service is being completed. If the subcontractor is not yet known, enter "TBD".
iii.For each WBS identified in section 5.g and for each of the "Subcontractor 1" thru "Subcontractor n" columns, enter an "X" in the cell at the subcontractor-WBS intersection if the subcontractor identified in the column is completing work associated with the WBS identified in the row. If the subcontractor is not completing work associated with the WBS, enter "-".
iv.(Optional) In row labeled 5.d, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a commercially available item, according to the contractor's assessment (note: only the government's Procuring Contractor Officer makes all final commerciality assessments). The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of commercial items divided by price of all items) not as a function of quantity.

For more info on commerciality, see "https://www.acq.osd.mil/dpap/dars/pgi/docs/DoD_Guidebook_PartA_Commercial_Item_Determination_07_10_19.pdf"

v.(Optional) In row labeled 5.e, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a competitively sourced item. An item is considered competitively sourced if the prime contractor has received two or more quotes from independent subcontracts in order to provide the item. The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of competitively sourced items divided by price of all items) not as a function of quantity.
vi.USG USE ONLY: In row 5.f, enter the OSD(CAPE) Waiver Number associated with the subcontractor and commercial product in question if a waiver has been previously issued by OSD(CAPE).
CUI

Formatting

UNCLASSIFIED // CUI

Metadata Reference
File Name1.aAttachment 0004 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0004 - Resource Distribution Table.xlsx
Contract Number2.b0
Last Updated MOD2.c0

The Contractor shall only enter values in cells that are colored light yellow (as shown here) unless otherwise noted:

Cells formatted in this color require contractor input unless otherwise noted.

UNCLASSIFIED // CUI

Change Log

UNCLASSIFIED // CUI

This worksheet documents changes to this attachment between contract modifications (except changes to the 'Change Log' itself, which are self-evident).

Change # Date MOD Number Range Changed Change Description

UNCLASSIFIED // CUI

Revision Log

CUI

Metadata Reference
File Name1.aAttachment 0004 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0004 - Resource Distribution Table.xlsx
Contract Number2.b0
Last Updated MOD2.c0
Complete one row per submission.
Submission NumberResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.DateChange Description
(1…n)(0…n)(YYYY-MM-DD)(Description of changes)
(add additional rows as necessary)
CUI

Metadata

CUI

1. Deliverable Metadata1.aFile NameAttachment 0004 - Resource Distribution Table.xlsx
1.bWorksheet TitleMetadata
1.cData TypeRDT
1.dReport As of Date(YYYY-MM-DD)
1.eReport Submission Date(YYYY-MM-DD)
1.fSubmission Number(1…n)
1.gResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.(0…n)
1.hSubmission Remarks
1.iProprietary Markings and/or Disclosures
1.jDistribution Statement
1.kContains Proprietary DataYes
1.lSecurity ClassificationUnclassified
1.mData Version2021_1
2. Contract & Program Metadata2.aReference AttachmentAttachment 0002
2.bContract Number
2.cLast Updated MOD
2.dSolicitation NumberW56HZV-20-R-0210
2.eReference SOWC.3.2.2
2.fReference CDRLDI-FNCL-81565C
2.gReference DIDDI-FNCL-81565C
2.hApproved CSDR Plan NumberA-15-F-C13
2.iProgram NameTrophy Active Protection System (APS)
2.jProgram PhaseC-FRP
2.kPrime Mission ProductImproved Turret Motor
3. Preparation Metadata3.aReporting Organization Type

Author: - Enter "Contractor" if the reporiting entity is the prime contractor.

- Enter "Subcontractor" if the reporting entity is a subcontractor.

3.bOrganization Name
3.cOrganization Address Line 1
3.dOrganization Address Line 2 (optional)
3.eOrganization Address City
3.fOrganization Address State
3.gOrganization Address Zip
3.hDivision Name (optional)
3.iDivision Address Line 1 (optional)
3.jDivision Address Line 2 (optional)
3.kDivision Address City (optional)
3.lDivision Address State (optional)
3.mDivision Address Zip (optional)
3.nPrincipal Preparer Name
3.oPrincipal Preparer Phone
3.pPrincipal Preparer Email
4. Additional Fields4.a(Custom Field 01 (optional))
4.b(Custom Field 02 (optional))
4.c(Custom Field 03 (optional))
4.d(Custom Field 04 (optional))
4.e(Custom Field 05 (optional))
4.f(Custom Field 06 (optional))
4.g(Custom Field 07 (optional))
4.h(Custom Field 08 (optional))
4.i(Custom Field 09 (optional))
4.j(Custom Field 10 (optional))
CUI

RDT Data

CUI

Worksheet Metadata1.aFile NameAttachment 0004 - Resource Distribution Table.xlsx
2.aReference Attachment2
2.bContract Number0
2.cLast Updated MOD0
--- NOTIONAL EXAMPLE DATA ---
5. RDT DataSubcontractor 1Subcontractor 2Prime ContractorAll Other SubcontractorsSubcontractor 1Subcontractor 2…Subcontractor n
5.aSubcontractor NameVandelay IndustriesKruger Industrial SmoothingN/AVarious
5.bSubcontractor LocationNew York, NYNew York, NYN/AVarious
5.cPrice$ 21,000,000.00$ 25,000,000.00
5.dPercent Commercially Available (optional)50.0%45.0%N/A
5.ePercent Competitively Sourced (optional)90.0%40.0%N/A
5.fOSD(CAPE) Subcontractor Waiver NumberN/AN/A
5.gWBS ELEMENT CODEWBS REPORTING ELEMENTS
1.0Electronic System/Generic System--
1.1Trophy A-Kit--
1.1.1Improved Turret Motor (ITM)--
1.1.2ITM Integration Kit--
1.1.3Weldment Fixture Kit--
1.1.4Power Distribution Unit (PDU)--
1.1.5Other Trophy A-KitX-
1.2Abrams Tank Integration, Assembly, Test, and Checkout--
1.3Systems Engineering--
1.3.1Software Systems Engineering--
1.3.2Integrated Logistics Support (ILS) Systems Engineering--
1.3.3Cybersecurity Systems Engineering--
1.3.4Core Systems Engineering--
1.3.5Other Systems Engineering 1...n (Specify)--
1.4Program Management--
1.4.1Software Program Management--
1.4.2Integrated Logistics Support (ILS) Program Management--
1.4.3Cybersecurity Management--
1.4.4Core Program Management--
1.4.5Other Program Management 1...n (Specify)--
1.5System Test and Evaluation--
1.5.1Development Test and Evaluation--
1.5.2Operational Test and Evaluation--
1.5.3Cybersecurity Test and Evaluation-X
1.5.4Mock-ups/System Integration Labs (SILs)--
1.5.5Test and Evaluation Support--
1.5.6Test Facilities--
1.6Training--
1.6.1Equipment--
1.6.2Services--
1.6.3Facilities--
1.6.4Training Software 1...n (Specify)--
1.7Data--
1.7.1Data Deliverables 1...n (Specify)--
1.7.2Data Repository--
1.7.3Data Rights 1...n (Specify)--
1.8Peculiar Support Equipment--
1.8.1Test and Measurement Equipment--
1.8.2Support and Handling Equipment--
1.9Common Support Equipment--
1.9.1Test and Measurement Equipment--
1.9.2Support and Handling Equipment--
1.10Operational/Site Activation by Site--
1.10.1System Assembly, Installation, and Checkout on Site--
1.10.2Contractor Technical Support--
1.10.3Site Construction--
1.10.4Site/Ship/Vehicle Conversion--
1.10.5Interim Contractor Support (ICS)--
1.11Contractor Logistics Support (CLS)--
1.12Industrial FacilitiesX-
1.12.1Construction/Conversion/Expansion--
1.12.2Equipment Acquisition or Modernization--
1.12.3Maintenance (Industrial Facilities)--
1.13Initial Spares and Repair Parts--
1.13.1Trophy A-Kit Spare and Repair 1...n (Specify)--
1.13.2Support Equipment Spare and Repair Parts--
1.13.3Training Equipment Spare and Repair Parts--
1.13.4Packaging, Handling, Storage, and Transportation (PHS&T)X-