Attachment 0006_2026-0211_Submittal Register.pdf

PDF 146 KB Posted

Attached to
Bldg Repair & Renovation - Garrison Consolidation
Solicitation number
W519TC-26-R-A044
Issued by

About this file

This is a Submittal Register form for the Rock Island Arsenal Garrison Consolidation project, dated January 1996. The document serves as a tracking system for all contractor submissions required throughout the construction project lifecycle, organized by Construction Specification Institute (CSI) division and specification section numbers.

The register identifies over 200 individual submittal items across 28 CSI divisions, spanning preconstruction through closeout phases. Submittals are classified by type—including Shop Drawings (SD-02), Product Data (SD-03), Samples (SD-04), Design Data (SD-05), Test Reports (SD-06), Certificates (SD-07), Manufacturer's Instructions (SD-08), Operation and Maintenance Data (SD-10), and Closeout Submittals (SD-11)—with each item cross-referenced to specific specification paragraphs. Key submission categories include safety and environmental plans (demolition, hazardous materials, accident prevention), structural and architectural components (concrete, steel, wood, windows, doors), mechanical systems (HVAC, plumbing, insulation), electrical systems (lighting, fire alarm, telecommunications), and finishes (tile, flooring, paint, carpet). The form includes columns for tracking contractor action dates, approval authority assignments, material needed dates, and routing to multiple reviewers, enabling project managers to monitor compliance with submittal schedules and coordinate reviews among government agencies and consultants throughout project execution.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 19 PAGES

Rock Island Arsenal Garrison Consolidation

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 GAccident Prevention Plan (APP)

SD-07 Certificates

1.8 GActivity Hazard Analysis (AHA)

GStandard Lift Plan 01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

01 57 19 SD-01 Preconstruction Submittals GContractor Hazardous Material

Inventory Log Regulatory Notifications Dirt and Dust Control Plan Certificate of Competency

SD-11 Closeout Submittals

3.2.2.1 GHazardous Waste/Debris

Management

3.2.2.3 GDisposal Documentation for

Hazardous and Regulated Waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 19 PAGES

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan 01 78 00 SD-03 Product Data

1.3.2Warranty Tags SD-10 Operation and Maintenance Data

3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

As-Built Record of Equipment Warranted Equipment and Materials

01 78 23 SD-10 Operation and Maintenance Data

3.1.1 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

1.5.5.7 GRecord Drawings And Utility

Systems 01 91 00.15 SD-06 Test Reports

3.6 GCompleted Construction

Observation Checklists

SD-07 Certificates

1.10 GCertificate of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 19 PAGES

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.7Existing Conditions

SD-11 Closeout Submittals 3.3.2Receipts

02 42 91 SD-01 Preconstruction Submittals

1.2 GWork Plan

02 81 00 SD-03 Product Data

3.1 GHazardous Waste Management

Plan GOnsite Hazardous Waste

Management SD-07 Certificates Certificates of Disposal

02 82 00 SD-06 Test Reports

3.2.10.2 GEncapsulation Test Patches

3.3.3.2 GAsbestos Disposal Quantity

Report SD-07 Certificates

GEmployee Training

1.3.7 GAsbestos Hazard Abatement

Plan

1.3.8 GWaste Shipment Records

1.3.9 GTransporter Certification

1.5.2 GWorker's License

1.5.3 GContractor's License

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 19 PAGES

02 82 00 2.1 GEncapsulants SD-11 Closeout Submittals

1.3.3 GPermits and Licenses

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

GInitial Sample Results

SD-03 Product Data

2.1 GMaterials and Equipment

SD-07 Certificates

1.5.1.3 GTesting Laboratory

3.1.1.1 GOccupant Notification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

GTurn-In Documents or Weight Tickets

3.5.2.1 GNonhazardous Manifest

3.5.2.1 GBill Of Lading

03 01 00 SD-01 Preconstruction Submittals 1.5.3Work Plan 1.6.1Work Plan

03 30 53 SD-02 Shop Drawings

1.5 GInstallation Drawings

SD-03 Product Data 2.2.2.1Air-Entraining Admixture

Accelerating Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 19 PAGES

03 30 53 2.2.2.2Water-Reducing or Retarding Admixture

2.2.6Curing Materials Expansion Joint Filler Strips, Premolded

Joint Sealants - Field Molded Sealants

2.3 GMix Design Data

SD-06 Test Reports Aggregates

SD-07 Certificates 2.2.1Cementitious Materials

05 40 00 SD-02 Shop Drawings GFraming Components

SD-03 Product Data 2.1Studs, 06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies SD-03 Product Data

GFascias and Trim SD-07 Certificates

1.6.1.1 GCertificates of Grade

2.1.3 SCertified Sustainably Harvested

Wood for Trim and Frames 06 41 16.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 19 PAGES

06 41 16.00 10 1.4.3Shop Drawings 2.8Shop Drawings

SD-03 Product Data GRecycled Content GCertified Wood GLow-Emitting Adhesives and

Sealants

2.4 GCabinet Hardware

2.3 GHigh Pressure Decorative

Laminate SD-04 Samples

2.4 GCabinet Hardware

2.3 GHigh Pressure Decorative

Laminate 06 61 16 SD-02 Shop Drawings

GDetail Fabrication Drawings

3.1 GInstallation

SD-04 Samples

2.1 GMaterial

SD-10 Operation and Maintenance Data

GQuartz surfacing Material 07 84 00 SD-03 Product Data

2.1 GFirestopping Materials

SD-07 Certificates

GInstaller Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 19 PAGES

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.5 GFrames

2.3Accessories

SD-03 Product Data

2.1 GDoors

SRecycled Content for Steel Door Product

2.5 GFrames

SRecycled Content for Steel

Frame Product 2.3Accessories

08 11 16 SD-02 Shop Drawings

1.4.1 GDoor and Frame Assembly

SD-03 Product Data

1.4.1 GDoor and Frame Assembly

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 19 PAGES

08 14 00 1.4Warranty

2.1.2 GSound Transmission Class

Rating GFire Resistance Rating

SD-04 Samples

2.3.5.2 GDoor Finish Colors

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.7Fabrication Drawings

SD-03 Product Data

2.1 GWindows

1.8 GWindow Performance

2.3 GThermal-Barrier Windows

2.4 GMullions

2.5 GWindow Cleaners' Bolts

2.1.3 GWeatherstripping

2.2.7 GAccessories

2.2.3Adhesives

1.8.5 GThermal Performance

SD-05 Design Data

2.1 GStructural Calculations for

Deflection SD-06 Test Reports

1.3.5Minimum Condensation Resistance Factor

Resistance to Forced Entry

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 19 PAGES

08 51 13 GStandard Airblast Test 1.8.8Windborne-Debris-Impact

Performance

SD-10 Operation and Maintenance Data

2.1Windows 08 56 53 SD-02 Shop Drawings

1.3.2 GWindows

1.7Fabrication Drawings

SD-03 Product Data

2.1 GWindow Units

2.2Weatherstripping

SD-05 Design Data 1.3.4Structural Calculations for

Deflection 1.3.4Design Analysis

SD-08 Manufacturer’s Instructions 2.3Glass

08 71 00 SD-02 Shop Drawings

1.5 GHardware Schedule

2.3.8 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 19 PAGES

08 71 00 SD-11 Closeout Submittals 1.6.1Key Bitting

08 81 00 SD-03 Product Data Insulating Glass

1.3Glazing Accessories 2.3.1.1Sealants

SD-07 Certificates Insulating Glass

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

SD-11 Closeout Submittals 1.6.1Insulated Glass Units

09 01 90.50 SD-03 Product Data

1.2 GWork Plan

1.2Materials

09 29 00 SD-03 Product Data 2.1.1Gypsum Board

09 30 10 SD-03 Product Data GPorcelain Tile GGlazed Ceramic Wall Tile

2.1 GTransition Strips

2.5.1 GTransition Strips

2.5.2 GMetal Strips

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 19 PAGES

09 30 10 2.1 GTile

2.1 GAccessories

2.4.3 GGrout

SD-08 Manufacturer’s Instructions 3.7Manufacturer's Approved

Cleaning Instructions 09 51 00 SD-03 Product Data

GAcoustical Ceiling Systems SD-04 Samples

GAcoustical Ceiling Tiles SD-06 Test Reports

GFire Resistive Ceilings 09 65 00 SD-03 Product Data

2.1Sheet Vinyl Flooring SRecycled content for Sheet Vinyl

Flooring Wall Base Stair Treads, Risers, and Stringers

SD-04 Samples

2.8 GResilient Flooring and

Accessories SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

09 68 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 19 PAGES

09 68 00 2.1 GCarpet SD-04 Samples

2.1 GCarpet

GTextile Composite Carpet

SD-07 Certificates

2.1.3 SIndoor Air Quality for Carpet

09 90 00 SD-02 Shop Drawings 3.10Piping Identification

SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.3 GColor

SD-07 Certificates 1.5.4Indoor Air Quality for Paints and

Primers SD-10 Operation and Maintenance Data

2.1Coatings 10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2 GCabinets

SD-03 Product Data 2.1.1Fire Extinguishers Part 2Accessories Part 2Cabinets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 19 PAGES

10 44 16 2.2.2Wall Brackets 12 21 00 SD-02 Shop Drawings

3.3Installation SD-03 Product Data

2.1 GWindow Blinds

SD-04 Samples

2.1 GWindow Blinds

SD-06 Test Reports

2.1Window Blinds SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance Data

2.1 GWindow Blinds

22 00 00 SD-03 Product Data

2.4Fixtures 2.4.1Kitchen Sinks

2.4.2 GDrinking-Water Coolers

2.3.1Point-Of-Use Mixing Valve

SD-06 Test Reports 3.4Tests, Flushing and Disinfection

23 05 15 SD-02 Shop Drawings

1.2 GRecord Drawings

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 19 PAGES

23 05 93 SD-01 Preconstruction Submittals

1.6 GTAB Firm And Personnel

Qualifications

1.9 GTAB Pre-Field Engineering Plan

23 07 00 SD-02 Shop Drawings 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 2.3.1Recycled content for insulation materials SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SD-07 Certificates 2.2.1Indoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

23 08 00 SD-03 Product Data

2.1 GTest Equipment

SD-06 Test Reports

1.4 GPipe Flushing, Testing, And

Water Treatment Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 19 PAGES

23 08 00 3.3 GCompleted Pre-Functional Checklists

SD-07 Certificates

1.5 GCertificate Of Readiness

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2 GFinal As-Built Drawings

SD-03 Product Data

2.2 GManufacturer's Product Data

SD-06 Test Reports

3.4.2 GStart-Up Testing Report

3.5.1 GPVT Procedures

3.5.3 GPVT Report

23 30 00 SD-03 Product Data

2.5.1.1 GInsulated Nonmetallic Flexible

Duct Runouts

2.5.4.1 GDiffusers

2.5.4.2 GRegisters and Grilles

2.6.1.1 GVariable Volume, Single Duct

Terminal Units

2.5.1 GIndoor Air Quality for Duct

Sealants

2.5.3 GDuct Liner

SD-07 Certificates 1.4.3Ozone Depleting Substances

Technician Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 19 PAGES

23 30 00 SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions SD-10 Operation and Maintenance Data

2.6.1.1 GVariable Volume, Single Duct

Terminal Units

SD-11 Closeout Submittals

3.8 GIndoor Air Quality During

Construction 23 82 00.00 20 SD-03 Product Data

2.1Unit Heaters SD-10 Operation and Maintenance Data

2.1Unit Heaters 25 08 10 SD-06 Test Reports

3.1.1 GPVT Plan

3.1.2.1 GPVT Phase I Report

3.1.2.2 GPVT Phase II Report

SD-07 Certificates

1.4 GTest Instrumentation Calibration

Certificates 26 05 19.00 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

26 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 19 PAGES

26 20 00 3.1.5.1 GMarking Strips SD-03 Product Data

2.8 GReceptacles

2.9 GEnclosed Circuit Breakers

26 51 00 SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

1.6.1 GLuminaire Warranty

1.6.2 GLighting Controls Warranty

GLocal Area Controller

2.5.1.2.1 GLighting Control Panel

2.5.2.1 GSwitches

GWall Box Dimmers

2.5.2.2 GOccupancy/Vacancy Sensors

2.5.2.3 GPhotosensors

2.6.1 GExit Signs

2.6.3 GEmergency Drivers

SD-06 Test Reports

1.5.1 GANSI/IES LM-79 Test Report

1.5.2 GANSI/IES LM-80 Test Report

1.5.3 GANSI/IES TM-21 Test Report

1.5.4 GANSI/IES TM-30 Test Report

3.2.1.1 GOccupancy/Vacancy Sensor

Verification Test

3.2.1.1 GPhotosensor Verification Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 19 PAGES

26 51 00 SD-10 Operation and Maintenance Data

1.7.1 GLighting System

1.7.2 GLighting Control System

27 10 00 SD-03 Product Data

2.3 GTelecommunications Cabling

(Backbone and Horizontal)

2.4 GTelecommunications

Outlet/Connector Assemblies SD-06 Test Reports

3.6.1 GTelecommunications Cabling

Testing

SD-11 Closeout Submittals

1.9.1 GRecord Documentation

28 31 76 SD-02 Shop Drawings

1.8.1.2 GNameplates

1.8.1.3 GWiring Diagrams

1.8.1.4 GSystem Layout

1.8.1.5 GNotification Appliances

1.8.1.6 GInitiating devices

1.8.1.7Amplifiers

1.8.1.8 GBattery Power

1.8.1.9 GVoltage Drop Calculations

SD-03 Product Data

2.3 GManual Stations

1.8.1.5 GNotification Appliances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 19 PAGES

28 31 76 SD-06 Test Reports

3.4.1 GTest Procedures

SD-07 Certificates

3.4.2.1 GVerification of Compliant

Installation

3.4.2.2 GRequest for Government Final

Test SD-11 Closeout Submittals

1.8.1.11As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .