Attachment 0005_2026-0211_Appendix E - Periodic Report and Asbestos Survey.pdf

PDF 813 KB Posted

Attached to
Bldg Repair & Renovation - Garrison Consolidation
Solicitation number
W519TC-26-R-A044
Issued by

About this file

This is a Periodic Monitoring/Control Report and Asbestos Survey for Building 104 at Rock Island Arsenal, prepared by the US Army Garrison Directorate of Public Works, Engineering and Services Division. The report documents the inspection of Building 104 conducted on May 22, 2025, and provides comprehensive documentation of asbestos-containing building materials (ACBM) and remediation activities spanning from 2002 through May 2025.

The report identifies asbestos-containing materials located throughout Building 104, including mastic under floor tiles (12,036 sq. ft. on the first floor east and 336 sq. ft. in the basement northwest), and thermal system insulation (TSI) on various steam and DCW lines in the basement totaling approximately 2,690 linear feet. All identified ACBM materials are assigned hazard rankings between 1 and 2, indicating good condition with minimal to moderate potential for damage. The Asbestos Response Action Report documents extensive removal, repair, and encapsulation activities conducted over 23 years, with cumulative removal totaling approximately 520 linear feet and 1,600+ square feet of materials. The Sampling/Testing Log confirms that recent testing from April 2024 identified minimal asbestos content in mastic materials (2% by PLM analysis, less than 1% by TEM analysis) and no asbestos detected in floor tiles. The final recommendation states that all remaining asbestos-containing materials are in good condition and requires continuation of regular monitoring protocols.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rock Island Arsenal Scope of Work

PR# 2026-0211

B104 Garrison Consolidation

30 April 26

Appendix E – Periodic Monitoring/Control Report & Asbestos Survey

US Army Garrison‐Rock Island Arsenal Directorate of Public Works

Engineering and Services Division

AMIM-RIP-G

1 Rock Island Arsenal Rock Island, IL 61299‐5000

PERIODIC MONITORING/CONTROL REPORT AND ASBESTOS SURVEY UPDATE

BUILDING 104

PERIODIC MONITORING/CONTROL REPORT

Building 104 was inspected on May 22, 2025. This report contains four sections: the Periodic Monitoring/Control Report, the Response Action Log, the Sampling/Testing Log, and Recommendations for Control Actions.

The Monitoring/Control Report lists the type, amount, location, and hazard ranking of asbestos containing building materials.

Also included in this table are the amounts of material removed or repaired. A hazard ranking was assigned to each area of ACBM, which is listed in the last column of the Periodic Monitoring/Control table. ACBM in good condition received a hazard ranking of 1,2 or 3 depending on the potential for damage. The higher the potential for damage the higher the hazard ranking.

ACBM in fair condition received hazard rankings of 4,5 or 6. ACBM in poor condition received a hazard ranking of 7.

The Asbestos Response Action Log provides detailed information about ACBM removal and repair.

The Sampling/Testing Log is a list of all samples taken of suspect asbestos containing materials in addition to those taken during Asbestos Survey.

The report concludes with a list of Recommended Control Actions for this building.

Note: Annotated floor plans, attached to each building report, show location of materials listed in the first column of the Monitoring/Control report and exact location of ACBM removal and repair listed in Response Action Report.

LOCATION AND TYPE OF

MATERIAL

ACBM

Type

Homogenous Material Description

Quantity Friable Amt.

Removed

Amt.

Repaired

Hazard Ranking

First floor east – mastic under floor tile

M(VAT) MASTIC UNDER 12X12

GREEN AND WHITE

CHECKED FLOOR TILE

12,036 sq. ft. N 32 0 2

Basement NW – Floor tile under carpet

M(VAT) 12x12 Beige w/white floor tile

336 N 336 0 2

Basement – pipe insulation TSI CHALKY TSI ON DCW

LINE

450 lin. ft. N 0 0 1

Basement – pipe insulation TSI MAG TSI ON 10 PSI

STEAM LINE

1200 lin. ft. N 2 10 1

Basement – pipe insulation TSI MAG TSI ON 140 PSI

STEAM LINE

320 lin. ft. N 0 16 1

Basement – pipe insulation TSI MAG TSI ON 30 PSI

STEAM LINE

590 lin. ft. N 0 8 1

Basement – pipe insulation TSI TSI ON DCW LINE –

CHALKY INTERIOR

130 lin. ft. N 30 0 1

ASBESTOS RESPONSE ACTION REPORT

DATE W0/IJO BUILDING TYPE OF

ASBESTOS

LIN. FT.

REMOVED

SQ. FT.

REMOVED

AREA

REPAIRED

AREA CLND. &

ENCAPSULATED

LIN. FT SQ. FT.

1/7/02 213-0001 104-g TSI 0 0 4 0

1/24/02 22-2812 104-g TSI 2 0 0 0

4/17/03 23-4544 104-1st M(VAT) 0 2 0 0

5/4/02 22-4305 104 TSI 2 0 0 0

4/17/2003 23-4544 104-1st M(VAT) 0 2 0 0

4/23/2003 213-0001 104 TSI 0 0 1 0

5/3/2003 23-5134 104 TSI 2 0 0 0

(continued on following page)

BUILDING 104 (continued)

LIN. FT.

REMOVED

SQ. FT.

REMOVED

AREA

REPAIRED

AREA CLND. &

ENCAPSULATED

LIN. FT SQ. FT.

8/7/2003 213-0001 104 TSI 0 0 9 0

8/7,8,/03 23-7594 104 TSI 30 0 0 0

4/7/2004 10-000001 104 TSI 0 0 10 0

6/5/2004 2004-6248 104-1ST M(VAT) 0 32 0 0

12/8/2004 05-1868 104 M (Win.

Glazing) 0 2 0 0

12/28/2004 05-2500 104 TSI 2 0 0 0

2/3/2005 5515-10-1 104-b TSI 0 0 2 0

3/10/2005 05-4350 104 M(VAT) 0 12 0 0

4/30/2005 05-5866 104 TSI 2 0 0 0

5/21/2005 05-6352 104 TSI 2 0 0 0

10/19/2004 06-0424 104 TSI 2 0 0 0

2/16/2006 06-4334 104 TSI 2 0 0 0

2/24/2006 5515-12-1 104 TSI 0 0 5 0

3/27/2006 06-4861 104 M(VAT) 0 336 0 0

3/30/2006 06-5532 104 TSI 2 0 0 0

10/31/2006 06-10865 104-conf M(VAT) carpet tack 0 2 0 300

11/4/2006 06-11350 104-1 M(VAT) 0 70 0 0

1/18/2007 5515-13-1 104 TSI 0 0 2 0

3/1/2007 07-4676 104-3 M (window glaze) 0 2 2 0

3/22/2007 5515-13-1 104-b TSI 0 9 0 0

10/28/2007 07-9070ijo 104 M (Floor covering) 0 32 0 0

11/14/2007 07-11606 104-1 M (carp. Tack) 0 2 0 0

LIN. FT.

REMOVED

SQ. FT.

REMOVED

AREA

REPAIRED

AREA CLND. &

ENCAPSULATED

LIN. FT SQ. FT.

10/7/2008 5515-15-1 104-b TSI 0 0 1 0

1/13/2009 09-3289 104 TSI 2 0 0 0

1/21/10 5515-17-1 104 TSI 5 0 0 0

2/10/2010 10-4727 104-B TSI 3 0 0 0

2/13/2010 10-4727 104-B TSI 20 0 0 0

10/18/2010 11-0447 104 M (Window glazing) 0 2 0 0

2/9/2011 11-4226 104--3 M(window) 0 0 0 0

6/17/2011 11-8126 104 M(windows) 0 2 0 0

10/13/2011 12-203 104 TSI 2 0 0 0

10/19/2012 1504-126-1 104 TSI 0 0 0 20

1/9/2014 14-1503 104 M (win. glaz.) 1 0 0 0

3/8/2014 14-2587 104 1st ,East M(vat) 0 180 0 0

6/28/2014 14-3978 104 M (win. glaz.) 0 2 0 0

6/29/2014 14-2486 104 M(vat) 0 2 0 0

10/4/2014 14-6480 104 M (win. glaz.) 0 2 0 0

11/6/2014 14-5456 104 M(vat) 0 178 0 0

1/15/2015 15-1706 104 M (VAT) 0 3 0 24

6/12/2015 15-4282 104 m (win glaz) 0 2 0 0

6/24/2014 1504-226-1 104 carp tack 0 0 0 100

10/5/2015 1504-226-1 104 TSI 0 0 1 40

10/26/15 1504-326-1 104-tunnel TSI 0 0 1 100

1/8/2016 16-1442 104-bas.,east TSI 18 0 0 0

5/28 6/1 16-4191 104 TSI 42 0 0 0

LIN. FT.

REMOVED

SQ. FT.

REMOVED

AREA

REPAIRED

AREA CLND. &

ENCAPSULATED

LIN. FT SQ. FT.

5/29-6/1 16-4192 104 TSI 46 0 0 0

5/30-6/1 16-4193 104 TSI 38 0 0 0

5/30-6/1 16-4417 104 TSI 38 0 0 0

5/30-6/1 16-4417 104 TSI 14 0 0 0

7/27/2016 16-5536 Bldg. 104 TSI 68 0 0 0

8/27/2016 16-5696 Bldg. 104 TSI 72 0 0 0

9/26/2016 16-3746 ijo 104-2 M (floor tile) 0 80 0 0

10/4/2017 17-4751 104-2 M(vat) 0 180 0 15

5/25/19 19-0992 104-2 M(vat) 0 28 0 2

7/9/20 20-4036 104-3 M (win glaz) 0 2 0 0

7/22/20 1504-1126- 1 104-B M (win glaz) 0 2 0 0

5/1/21 21-2787 104-B M (win glaz) 0 2 0 0

6/27/21 1326-01 104 TSI 0 0 2 20

9/11-10/24 24-3898 104-1 Misc. (VAT) 0 85 sf VAT 280 sf mastic 0 0

5/22/25 104AAR 104-b TSI 0 5 0 0

ASBESTOS SAMPLING/TESTING LOG (PLM)

SAMPLE # DATE MATERIAL TYPE BLDG.#. AREA RESULTS S.O.

104-3-CM1 3/17/2005 Carpet mastic 104 Bldg. 104, Ground floor.

East

No Asbestos Detected

5515- 11-02

104-3-M1 3/172005 Miscellaneous debris 104 Bldg. 104, Ground floor.

East

No Asbestos Detected

5515- 11-02

104-5-1 5/17/2005 Mud insulation around valve and elbow 104 Bldg. 104, Basement, North, Main steam line 25% Asbestos

(Chrysotile) 05-

104-5-1 5/17/2005 Mud insulation around valve and elbow 104 Bldg. 104, Basement, North, Main steam line 25% Asbestos

(Chrysotile) 05-

104-5-1 5/17/2005 Mud insulation around valve and elbow 104 Bldg. 104, Basement, North, Main steam line 25% Asbestos

(Chrysotile) 05-

104-10-L1 10/12/2005 Linoleum 104 104, Ground, SE - Self service entrance

No Asbestos Detected

06-

104-10-L2 10/12/2005 Linoleum 104 104, Ground, SE - Self service entrance

No Asbestos Detected

06-

104-2-FT1 2/27/2006 Tan 12x12 Floor tile 104 Bldg. 104, Southeast, Merle Jones office

No Asb.

Detected (pos by TEM)

5515- 12-02

104-2-M1 2/27/2006 Mastic associated with above 104 Bldg. 104, Southeast, Merle Jones office

No Asbestos Detected

5515- 12-02

104-2-FT2 2/27/2006 Tan 12x12 Floor tile 104 Bldg. 104, Southeast, Merle Jones office

No Asb.

Detected (pos by TEM)

5515- 12-02

104-2-M2 2/27/2006 Mastic associated with above 104 Bldg. 104, Southeast, Merle Jones office

No Asbestos Detected

5515- 12-02

104-2-FT3 2/27/2006 Tan 12x12 Floor tile 104 Bldg. 104, Southeast, Merle Jones office

No Asb.

Detected (pos by TEM)

5515- 12-02

104-2-M3 2/27/2006 Mastic associated with above 104 Bldg. 104, Southeast, Merle Jones office

No Asbestos Detected

5515- 12-02

104R-15- CNS1 9/25/2015 White/green/black roofing shingles 104 Bldg. 104, roof, North court yard

No Asbestos Detected

1504- 326-3

104R-15- CNFP1 9/25/2015 Black felt paper under shingles 104 Bldg. 104, roof, North court yard

No Asbestos Detected

1504- 326-3

104R-15- CES2 9/25/2015 White/green/black roofing shingles 104 Bldg. 104, roof, East court yard

No Asbestos Detected

1504- 326-3

104R-15- CEFP2 9/25/2015 Black felt paper under shingles 104 Bldg. 104, roof, East court yard

No Asbestos Detected

1504- 326-3

104R-15- CWS3 9/25/2015 White/green/black roofing shingles 104 Bldg. 104, roof, West court yard

No Asbestos Detected

1504- 326-3

104R-15- CWFP3 9/25/2015 Black felt paper under shingles 104 Bldg. 104, roof, West court yard

No Asbestos Detected

1504- 326-3

104-16-RT1 10/9/2015 Roofing tar with flashing around roof access way 104 Bldg. 104, roof qccess, NW

No Asbestos

Detected 1504- 326-3

104-16-RT2 10/9/2015 Roofing tar with flashing around roof access way 104 Bldg. 104, roof qccess, NW

No Asbestos

Detected 1504- 326-3

104-16-RT3 10/9/2015 Roofing tar with flashing around roof access way 104 Bldg. 104, roof qccess, NW

No Asbestos

Detected 1504- 326-3

104-24-FT1 4/22/2024 12x12 Gray with dark streaks floor tile 104 Bldg. 104, 1st floor, east wing No Asbestos

Detected 353

104-24-M1 4/22/2024 Mastic associated w/above 104 Bldg 104, 1st floor, east wing

PLM 2% Asb.

TEM < 1% Asb. 353

104-24-FT2 4/22/2024 12x12 Gray with dark streaks floor tile 104 Bldg 104, 1st floor, east wing No Asbestos

Detected 353

104-24-M2 4/22/2024 Mastic associated w/above 104 Bldg 104, 1st floor, east wing

PLM 2% Asb.

TEM < 1% Asb. 353

ASBESTOS SAMPLING TESTING LOG (TEM)

SAMPLE # DATE MATERIAL TYPE BLDG.#. AREA RESULTS S.O.

104-6-FT1-

TEM 6/18/2004 12x12 Tan floor tile 104 Bldg. 104, 1st floor, NE No Asbestos

Detected 2004-

104-2-FT1-

TEM 2/28/2006 12x12 Tan floor tile 104 Bldg. 104, bas. SE, Merle Jones office 16% Asbestos

(Chrysotile) 06-

104-5-FT1 5/10/2006 Beige/Gray 12x12 floor tile 104

Bldg. 104, 3rd floor, hallway in front of

Whitmore conference room

No Asbestos detected

06-

104-5-FT2 5/10/2006 Black 12x12 floor tile 104

Bldg. 104, 3rd floor, hallway in front of

Whitmore conference room

No Asbestos detected

06-

104-5-FT3 5/10/2006 Red 12x12 floor tile 104

Bldg. 104, 3rd floor, hallway in front of

Whitmore conference room

No Asbestos detected

06-

RECOMMENDATIONS

All asbestos containing materials are in good condition. Continue regular monitoring.

B104 Periodic Report.pdf
PERIODIC MONITORING/CONTROL REPORT

File details come from the government source that posted it. Updated .