Attachment 0004_2026-0211_Appendix D - CD Debris Submittal Form.xls
XLS spreadsheet 176 KB Posted
- Solicitation number
- W519TC-26-R-A044
About this file
This file is a Construction and Demolition (C&D) Debris Submittal Form template designed for the Rock Island Arsenal Garrison Consolidation Project (Project Number 2026-0211). The form serves as an appendix to the solicitation and is intended to track non-hazardous construction and demolition debris management throughout the project lifecycle.
The form is divided into two phases: Phase I for C&D Planning Data and Phase II for C&D Reporting Data. It requires contractors to document estimated and actual weights for numerous material categories across four functional areas—Civil, Architectural, Electrical, and Mechanical—including items such as asphalt, concrete, structural steel, wood, drywall, aluminum, copper, transformers, and various piping materials. For each material type, contractors must provide estimated percentages and weights for landfilling, recycling, and diversion, along with actual performance data including landfill destinations, recycler information, diversion vendor details, and confirmation of receipt of weight tickets. This template is a planning and reporting mechanism rather than a statement of work or technical requirements document, and does not address specific contract pricing, timelines, or deliverables beyond debris management documentation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
Sheet 1
| Non-Hazardous Construction and Demolition Debris Submittal | ||||||||||||
| Project Title: Rock Island Arsenal Garrison Consolidation | ||||||||||||
| Project Number: 2026-0211 | ||||||||||||
| Contractor Name: | ||||||||||||
| Contracting Officer's Representative: | ||||||||||||
| PHASE I:C&D Plan Data | PHASE II:C&D Report Data | |||||||||||
| Material | Estimated Weight | Estimated Percent to be Landfilled | Estimated Percent to be Recycled | Estimated Percent to be Diverted | TOTAL Weight | Weight landfilled | Landfill | Weight recycled | Recycler | Weight Diverted | Diversion | Weight tickets received |
| (pounds) | (%) | (%) | (%) | (pounds) | (pounds) | (vendor/ company name) | (pounds) | (vendor/ company name) | (pounds) | (vendor/ company name) | Y or N | |
| CIVIL | ||||||||||||
| Asphalt | ||||||||||||
| Concrete | ||||||||||||
| Gravel | ||||||||||||
| Soil | ||||||||||||
| Structural Steel | ||||||||||||
| Structural Wood | ||||||||||||
| Other Wood | ||||||||||||
| Other Steel/Metal | ||||||||||||
| Top Soil | ||||||||||||
| Sub Soil | ||||||||||||
| Trees | ||||||||||||
| Crushed Stone/Base | ||||||||||||
| ARCHITECTURAL | ||||||||||||
| Aluminum | ||||||||||||
| Brick | ||||||||||||
| Carpet | ||||||||||||
| Ceiling Tile | ||||||||||||
| CMU | ||||||||||||
| Copper | ||||||||||||
| Doors | ||||||||||||
| Drywall | ||||||||||||
| Glass | ||||||||||||
| Insulation Materials | ||||||||||||
| Iron | ||||||||||||
| Metal Studs | ||||||||||||
| Misc Metal | ||||||||||||
| Paper | ||||||||||||
| Plastic | ||||||||||||
| Roofing Materials | ||||||||||||
| Sheet Metal | ||||||||||||
| Stone | ||||||||||||
| Vinyl Base | ||||||||||||
| Vinyl Flooring | ||||||||||||
| Windows | ||||||||||||
| Wood Studs | ||||||||||||
| ELECTRICAL | ||||||||||||
| Ballasts | ||||||||||||
| Light Fixtures | ||||||||||||
| Transformers | ||||||||||||
| Wire | ||||||||||||
| Conduit | ||||||||||||
| MECHANICAL | ||||||||||||
| Cast Iron Pipe | ||||||||||||
| Copper Pipe | ||||||||||||
| Steel Pipe | ||||||||||||
| HVAC Equipment | ||||||||||||
| White Goods | ||||||||||||
| Plumbing Fixtures | ||||||||||||
| RPZ/DCD | ||||||||||||
| Insulation |