Attachment 0003_2026-0211_Appendix B - Plans.pdf
PDF 19 MB Posted
- Solicitation number
- W519TC-26-R-A044
About this file
This file is a comprehensive set of architectural and construction plans (Appendix B) for the Building 104 Garrison Consolidation project at Rock Island Arsenal in Rock Island, Illinois. The drawings, prepared by the U.S. Army Garrison Directorate of Public Works, document renovation work on a three-story building with basement totaling 161,805 square feet with mixed occupancy (Business Group B and Storage S-1).
The project includes extensive demolition and renovation work across multiple building zones, with detailed plans showing removal of existing aluminum storefronts, carpet, VCT flooring, historical wood handrails, and cast iron balustrades; installation of new rectified porcelain tile flooring, aluminum storefront doors with laminated glass, cedar handrails, and various finish work. Key construction requirements include hazardous material handling (the building contains known lead paint and asbestos-containing materials documented in comprehensive hazard plans), phased construction to maintain continuous egress through exit stairs, dust suppression during concrete demolition, and temporary construction containment systems to allow continued building occupancy. The work involves mechanical, electrical, plumbing, and architectural trades with specifications for fire-rated walls, new water bottle filling stations, HVAC modifications, lighting demolition and installation, and comprehensive painting and wall surface preparation. General notes emphasize contractor responsibility for field verification of dimensions, protection of existing items, coordination with the Contracting Officer's Representative regarding crane usage and dumpster placement, compliance with UFC and IBC codes, and proper disposal of hazardous materials in accordance with federal, state, and local requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROCK ISLAND ARSENAL
FY: 2026
PR NO: 2026-0211
PROJECT:
GARRISON CONSOLIDATION
APPENDIX B
G-001
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B
Y:
J.
F
AV
EL
A
D R
AW
N
B Y:
J.
FA
VE
LA
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
C O
VE
R
S H
EE
T
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
SCALE: NOT TO SCALE
VICINITY MAPD1
SCALE: NOT TO SCALE
BUILDING 104 LOCATION MAPA1
NORTH
SCALE: NOT TO SCALE
AEREAL MAP OF ROCK ISLAND ARSENALD4
NORTH
PROJECT LOCATION
BUILDING 104
G-002
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B
Y:
J.
F
AV
EL
A
D R
AW
N
B Y:
J.
FA
VE
LA
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
PR
O
JE
C
T
LO
C
AT
IO
N
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
STREET
AutoCAD SHX Text
CHESTNUT AVENUE
AutoCAD SHX Text
STREET
AutoCAD SHX Text
SECOND
AutoCAD SHX Text
THIRD
AutoCAD SHX Text
RODMAN
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
GILLESPIE
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
EAST
AutoCAD SHX Text
IOWA
AutoCAD SHX Text
ILLINOIS
AutoCAD SHX Text
MISSOURI
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text
DAVENPORT
AutoCAD SHX Text
MOLINE
AutoCAD SHX Text
CHICAGO
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
ROCK ISLAND
AutoCAD SHX Text
WISCONSIN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MILES
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
ROCK ISLAND
AutoCAD SHX Text
ARSENAL
AutoCAD SHX Text
BETTENDORF
G-003
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B
Y:
J.
F
AV
EL
A
D R
AW
N
B Y:
J.
F
AV
EL
A C
H
EC
KE
D
B Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
IN
D
EX
O
F D
R
AW
IN
G
S
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
SHEET
ID. TITLE OF DRAWING
G-001 COVER SHEET
GENERAL
G-002 LOCATION MAP
G-003 INDEX OF DRAWINGS
AD101
AD103
AD104
AD102
G-004 ABBREVIATIONS & GENERAL NOTES
AD105
AD106
AD107
AD108
AD109
A-101 A-102 A-103 A-104 A-105 A-106 A-107 A-108 A-109 A-201
A-303 A-601 A-602 A-603 A-604
I-101
A-301 A-302
I-102 I-103 I-104
INTERIOR FURNITURE
LIFE SAFETY
GI001 LIFE SAFETY PLAN - BASEMENT
GI002 LIFE SAFETY PLAN - 1ST FLOOR
SHEET
ID. TITLE OF DRAWING
M-001 MECHANICAL SYMBOLS ABBREVIATIONS AND GENERAL NOTES
MECHANICAL
M-002 MECHANICAL NOTES
MD101
ELECTRICAL
MD102 MECH. SHEET METAL DEMOLITION PLAN 1ST FLOOR SOUTHEAST
MD105
MD103 MECH. SHEET METAL DEMOLITION PLAN 1ST FLOOR NORTHWEST
MD104 MECH. SHEET METAL DEMOLITION PLAN 1ST FLOOR SOUTHWEST
MECH. PIPING DEMOLITION PLAN BASEMENT NORTHEAST SECTION
MD106 MECH. PIPING DEMOLITION PLAN BASEMENT SOUTHEAST SECTION
MD107 MECH. PIPING DEMOLITION PLAN BASEMENT NORTHWEST SECTION
MD108 MECH. PIPING DEMOLITION PLAN BASEMENT SOUTHWEST SECTION
MD109 MECH. PIPING DEMOLITION PLAN 1ST FLOOR NORTHEAST SECTION
MD110 MECH. PIPING DEMOLITION PLAN 1ST FLOOR SOUTHEAST SECTION
MD111 MECH. PIPING DEMOLITION PLAN 1ST FLOOR NORTHWEST SECTION
MD112 MECH. PIPING DEMOLITION PLAN 1ST FLOOR SOUTHWEST SECTION
M-101
MECH. SHEET METAL NEW WORK PLAN 1ST FLOOR SOUTHEAST
MECH. SHEET METAL NEW WORK PLAN 1ST FLOOR NORTHWEST
MECH. SHEET METAL NEW WORK PLAN 1ST FLOOR SOUTHWEST
MECH. SHEET METAL DEMOLITION PLAN 1ST FLOOR NORTHEAST
MECH. SHEET METAL NEW WORK PLAN 1ST FLOOR NORTHEAST
M-102
M-105
M-103 M-104
MECH. PIPING NEW WORK PLAN BASEMENT NORTHEAST SECTION
M-106 MECH. PIPING NEW WORK PLAN BASEMENT SOUTHEAST SECTION
M-107 MECH. PIPING NEW WORK PLAN BASEMENT NORTHWEST SECTION
M-108 MECH. PIPING NEW WORK PLAN BASEMENT SOUTHWEST SECTION
M-109 MECH. PIPING NEW WORK PLAN 1ST FLOOR NORTHEAST
MECH. PIPING NEW WORK PLAN 1ST FLOOR SOUTHEAST
MECH. PIPING NEW WORK PLAN 1ST FLOOR NORTHWEST
MECH. PIPING NEW WORK PLAN 1ST FLOOR SOUTHWEST
M-110 M-111 M-112
MECHANICAL DETAILSM-501
MECHANICAL DETAILSM-601
MECHANICAL EQUIPMENT SCHEDULES & DDC POINT SCHEDULESM-602
E-001 ELECTRICAL SYMBOLS ABBREVIATIONS AND GENERAL NOTES
DOOR, FRAME & HARDWARE SCHEDULE
B104 1ST FLOOR SOUTHWEST PARTIAL CONSTRUCTION PLAN
B104 1ST FLOOR NORTHWEST PARTIAL CONSTRUCTION PLAN
B104 1ST FLOOR SOUTHEAST PARTIAL CONSTRUCTION PLAN
B104 1ST FLOOR NORTHEAST PARTIAL CONSTRUCTION PLAN
B104 1ST FLOOR SOUTHWEST PARTIAL FURNITURE PLAN
B104 1ST FLOOR NORTHWEST PARTIAL FURNITURE PLAN
B104 1ST FLOOR SOUTHEAST PARTIAL FURNITURE PLAN
B104 1ST FLOOR NORTHEAST PARTIAL FURNITURE PLAN
ROOM FINISH SCHEDULE AND FINISH LEGEND
ROOM FINISH SCHEDULE
DOOR TYPE, DETAILS AND FRAMES
B104 1ST FLOOR SOUTHWEST PARTIAL DEMOLITION PLAN
B104 1ST FLOOR NORTHWEST PARTIAL DEMOLITION PLAN
B104 1ST FLOOR SOUTHEAST PARTIAL DEMOLITION PLAN
B104 1ST FLOOR NORTHEAST PARTIAL DEMOLITION PLAN
B104 PARTIAL BASEMENT EAST & WEST DEMOLITION PLAN
B104 1ST FLOOR NORTHEAST REFLECTED CEILING PLAN DEMOLITION
B104 1ST FLOOR SOUTHEAST REFLECTED CEILING PLAN DEMOLITION
B104 1ST FLOOR NORTHWEST REFLECTED CEILING PLAN DEMOLITION
B104 1ST FLOOR SOUTHWEST REFLECTED CEILING PLAN DEMOLITION
B104 1ST FLOOR NORTHEAST REFLECTED CEILING PLAN CONSTRUCT
B104 1ST FLOOR SOUTHEAST REFLECTED CEILING PLAN CONSTRUCT
B104 1ST FLOOR NORTHWEST REFLECTED CEILING PLAN CONSTRUCT
B104 1ST FLOOR SOUTHWEST REFLECTED CEILING PLAN CONSTRUCT
B104 PARTIAL BASEMENT EAST & WEST CONSTRUCTION PLAN
B104 NORTH AND SOUTH ELEVATIONS
INTERIOR ELEVATIONS & DETAILS - STOREFRONT
INTERIOR ELEVATIONS - CASEWORK
INTERIOR SECTIONS AND ELEVATIONS
E-002 ELECTRICAL KEYNOTES
ED101 ELECTRICAL LIGHTING DEMOLITION PLAN BSMT FLOOR NORTHEAST
ED102
ED103
ELECTRICAL LIGHTING DEMOLITION PLAN BSMT FLOOR SOUTHEAST
ELECTRICAL LIGHTING DEMOLITION PLAN BSMT FLOOR NORTHWEST
ED104 ELECTRICAL LIGHTING DEMOLITION PLAN BSMT FLOOR SOUTHWEST
ED105 ELECTRICAL LIGHTING DEMOLITION PLAN 1ST FLOOR NORTHEAST
ED106
ED107
ELECTRICAL LIGHTING DEMOLITION PLAN 1ST FLOOR SOUTHEAST
ELECTRICAL LIGHTING DEMOLITION PLAN 1ST FLOOR NORTHWEST
ED108 ELECTRICAL LIGHTING DEMOLITION PLAN 1ST FLOOR SOUTHWEST
ED109 ELECTRICAL POWER DEMOLITION PLAN 1ST FLOOR NORTHEAST
ED110 ELECTRICAL POWER DEMOLITION PLAN 1ST FLOOR SOUTHEAST
ED111 ELECTRICAL POWER DEMOLITION PLAN 1ST FLOOR NORTHWEST
ED112 ELECTRICAL POWER DEMOLITION PLAN 1ST FLOOR SOUTHWEST
SHEET
ID. TITLE OF DRAWING
ELECTRICAL
H-101 HAZARDOUS AREAS PLAN BASEMENT LEVEL
H-102 HAZARDOUS AREAS PLAN 1ST FLOOR
E-501 ELECTRICAL DETAILS
E-602 ELECTRICAL LIGHTING CONTROLS
ED113 ELECTRICAL SYSTEMS DEMOLITION PLAN 1ST FLOOR NORTHEAST
ED114 ELECTRICAL SYSTEMS DEMOLITION PLAN 1ST FLOOR SOUTHEAST
ED115 ELECTRICAL SYSTEMS DEMOLITION PLAN 1ST FLOOR NORTHWEST
ED116 ELECTRICAL SYSTEMS DEMOLITION PLAN 1ST FLOOR SOUTHWEST
ELECTRICAL LIGHTING NEW WORK PLAN BSMT FLOOR NORTHEASTEL-101
ELECTRICAL LIGHTING NEW WORK PLAN BSMT FLOOR SOUTHEAST
ELECTRICAL LIGHTING NEW WORK PLAN BSMT FLOOR NORTHWEST
ELECTRICAL LIGHTING NEW WORK PLAN BSMT FLOOR SOUTHWEST
ELECTRICAL LIGHTING NEW WORK PLAN 1ST FLOOR NORTHEAST
EL-102
EL-103
EL-104
EL-105
EL-106
EL-107
ELECTRICAL LIGHTING NEW WORK PLAN 1ST FLOOR SOUTHEAST
ELECTRICAL LIGHTING NEW WORK PLAN 1ST FLOOR NORTHWEST
EL-108 ELECTRICAL LIGHTING NEW WORK PLAN 1ST FLOOR SOUTHWEST
EL-109 ELECTRICAL LIGHTING ZONES PLAN 1ST FLOOR NORTHEAST
EL-110 ELECTRICAL LIGHTING ZONES PLAN 1ST FLOOR SOUTHEAST
EL-111 ELECTRICAL LIGHTING ZONES PLAN 1ST FLOOR NORTHWEST
EL-112 ELECTRICAL LIGHTING ZONES PLAN 1ST FLOOR SOUTHWEST
ELECTRICAL POWER NEW WORK PLAN 1ST FLOOR NORTHEAST
ELECTRICAL POWER NEW WORK PLAN 1ST FLOOR SOUTHEAST
ELECTRICAL POWER NEW WORK PLAN 1ST FLOOR NORTHWEST
ELECTRICAL POWER NEW WORK PLAN 1ST FLOOR SOUTHWEST
EP-101
EP-102
EP-103
EP-104
ES-101
ES-102
ELECTRICAL SYSTEMS NEW WORK PLAN BSMT FLOOR NORTHEAST
ELECTRICAL SYSTEMS NEW WORK PLAN 1ST FLOOR SOUTHEAST
ELECTRICAL SYSTEMS NEW WORK PLAN BSMT FLOOR SOUTHEAST
ELECTRICAL SYSTEMS NEW WORK PLAN BSMT FLOOR NORTHWEST
ELECTRICAL SYSTEMS NEW WORK PLAN BSMT FLOOR SOUTHWEST
ES-103
ES-104
ES-105 ELECTRICAL SYSTEMS NEW WORK PLAN 1ST FLOOR NORTHEAST
ES-106
ELECTRICAL SYSTEMS NEW WORK PLAN 1ST FLOOR NORTHWEST
ELECTRICAL SYSTEMS NEW WORK PLAN 1ST FLOOR SOUTHWEST
ES-107
ES-108
ARCHITECTURAL
HAZARDOUS MATERIALS
E-601 ELECTRICAL EQUIPMENT SCHEDULES
A-000
X
SECTION NUMBER
DWG. NO. WHERE
SECTION IS DRAWN
SECTION MARK
A-000
ELEVATION NUMBER
DWG. NO. WHERE
ELEVATION IS DRAWN
BUILDING ELEVATION MARK
ELEVATION
NUMBER (TYP.)
DWG. NO. WHERE
ELEVATION IS DRAWN
INTERIOR ELEVATION MARK
DWG. NO. WHERE
DETAIL IS DRAWN
CALLOUT HEAD
DETAIL
NUMBER (TYP.)
AREA COVERED BY DETAIL
WINDOW TAG
PARTITION TYPE KEYNOTE
TAG
DOOR TAG
0'-0" A.F.F.X
CEILING TAG
(TYPE & HEIGHT)
CEILING HEIGHT
CEILING TYPE
DETAIL IDENTIFIER (MODULE LETTER AND NUMBER)
NORTH ARROW
PLAN, ELEVATION, SECTION, OR DETAIL VIEW TITLE
PLAN SYMBOLS
SYMBOLS
WALL/PARTITION
TYPE
ARCHITECTURAL ABBREVIATIONS GENERAL NOTES
1. NOTES FOUND ON G-SHEETS, ARE GENERAL NOTES AND APPLY TO THE ENTIRE PROJECT TO INCLUDE THE COMPLETE PLAN SET AND
SPECIFICATIONS, UNLESS NOTED OTHERWISE. SHEET NOTES APPLY TO ALL PLANS, ELEVATIONS, SECTIONS, AND DETAILS FOR THAT SHEET, UNLESS NOTED OTHERWISE. KEYNOTES APPLY TO ELEMENTS ON THE SHEET AS INDICATED, UNLESS NOTED OTHERWISE.
2. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
3. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO
EXCLUDE OTHER ITEMS NECESSARY OR IMPLIED THEREFROM.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION. THE CONTRACTOR SHALL PROVIDE A COMPLETE AND USABLE PRODUCT.
5. THE CONTRACTOR SHALL PROTECT ANY EXISTING, IN-PLACE, AND/OR NEW WORK.
6. ALL WORK NOTED "N.I.C." IS NOT MEANT TO BE PART OF THE CONSTRUCTION SCOPE OF WORK AGREEMENT.
7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
8. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. DIMENSIONS AND PLANS ARE NOT WARRANTED AS ACCURATE. VERIFY
EXISTING CONDITIONS THAT MAY AFFECT THE WORK PRIOR TO BID.
9. DO NOT SCALE DRAWINGS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS.
10. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION OPERATIONS SHALL BE APPLIED.
11. WHEN THE WORD "PROVIDE" IS USED, THE TERM MEANS "FURNISH AND INSTALL", ENCOMPASSING ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR AN ITEM OR ACTION TO BE COMPLETE AND READY FOR ITS INTENDED USE.
12. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
13. DO NOT CUT INTO, REMOVE, OR ALTER ANY STRUCTURAL MEMBER OR FLOOR SYSTEM UNLESS IT IS SPECIFICALLY NOTED OR SHOWN
ON DRAWINGS.
14. THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
15. ALL PRODUCTS LISTED ON DRAWINGS AND NOT INDICATED IN SPECIFICATIONS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.
CONTRACTOR SHALL ADD THESE TO THEIR SUBMITTAL REGISTER.
16. DEMOLITION OR NEW WORK MAY NOT BE SOLELY INDICATED ON THEIR CORRESPONDING SHEETS.
17. CONTRACTOR SHALL REQUEST PARKING, JOB TRAILER, STAGING AND OTHER NECESSARY SPACES.
18. DISPOSE OF DEMOLISHED AND WASTE MATERIALS OFF SITE UNLESS OTHERWISE NOTED.
19. TO PERFORM THE WORK AS AWARDED BY THE BASE BID, OPTION, OR CONTRACT MODIFICATION, THE CONTRACTOR SHALL EITHER PROTECT OR RELOCATE ADJACENT ITEMS, EQUIPMENT, AND STRUCTURES AS NECESSARY TO FACILITATE THE WORK.
20. IN ORDER TO MORE CLEARLY DEPICT WORK BEING IDENTIFIED ON A DRAWING, ITEMS NOTED AS BEING INCLUDED IN THE WORK ARE GENERALLY SHOWN IN HEAVY (BOLD) LINE WEIGHT AND BLACK LINE WORK. GRAY SCALE LINE WORK DENOTES EXISTING CONDITIONS.
NOTE: THERE ARE EXCEPTIONS TO THIS RULE AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW DRAWINGS
AND REQUEST ADDITIONAL INFORMATION PRIOR TO BIDDING.
21. NORMAL INSTALLATION WORKING HOURS WILL BE BETWEEN 0600-1700, MONDAY THROUGH FRIDAY. HOURS OUTSIDE THE NORMAL RANGE REQUIRES COORDINATION AND APPROVAL FROM THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) TWO WEEKS PRIOR.
THE FACILITY WILL BE CLOSED ON GOVERNMENT HOLIDAYS. CONTACT THE C.O.R. FOR A LIST OF GOVERNMENT HOLIDAYS.
22. THE CONTRACTOR SHALL MAKE REQUESTS TO DISCONNECT POWER OR UTILITIES PER SPECIFICATIONS. ALL WORK REQUIRING POWER REMOVAL SHALL BE DONE IN A TIMELY MANNER AND OUTSIDE NORMAL INSTALLATION WORKING HOURS WHEN POSSIBLE. IF SAFE WORKING CONDITIONS EXIST FOR BOTH THE CONTRACTOR AND BUILDING OCCUPANTS, THEN POWER SHALL BE RESTORED FOR BUILDING OCCUPANTS DURING NORMAL WORKING HOURS. THE CONTRACTOR SHALL IMMEDIATELY RESTORE POWER ONCE WORK IS
COMPLETE AND SAFE CONDITIONS EXIST.
23. THE CONTRACTOR SHALL OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM THE INSTALLATION AUTHORITIES HAVING
JURISDICTION.
24. THE CONTRACTOR SHALL COMPLY WITH INSTALLATION POLICIES AND PROCEDURES.
25. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND REGULATORY AGENCIES.
26. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON
INDIVIDUAL SHEETS SHALL BE APPLIED TO RELATED DRAWINGS AND DETAILS.
27. A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL INDICATED.
28. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK. ALL ACCESS PANELS SHALL BE CONCEALED AND LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO
PROCEEDING.
29. ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK THAT PENETRATES FLOORS, WALLS, OR ROOFING SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
30. ALL WORK SHALL BE DONE IN A WORKMAN LIKE MANNER. WORK SHALL CONFORM TO APPLICABLE INDUSTRY OR MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE ATTENTION
OF THE C.O.R. PRIOR TO PROCEEDING WITH THE WORK.
AFF ABOVE FINISHED FLOOR
ACC DR ACCESS DOOR / PANEL
ADAAG AMERICAN WITH DISABILITIES
ACCESSIBILITY GUIDELINES
ACCESS ACCESSORIES
ADJ ADJUST/ ADJUSTABLE
ACOUST. ACOUSTICAL
AB ANCHOR BOLT
ANOD ANODIZED
AC AIR CONDITIONING
AL / ALUM ALUMINUM
& AND
L ANGLE
APP APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
@ AT
ATFP ANTI TERRORISM / FORCE PROTECTION
AVG AVERAGE
AWI ARCHITECTURAL WOODWORK INSTITUTE
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION, INC.
BM BEAM
BLKG BLOCKING
BD BOARD
BTM BOTTOM
BLDG BUILDING
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CH CHANNEL
CPT CARPET
CLG CEILING
CLG HT CEILING HEIGHT
CTR CENTER
℄ CENTER LINE
C TO C CENTER TO CENTER
CT CERAMIC TILE
CLR CLEAR
CO CLEANOUT
CLOS CLOSET
CO COMPANY
COL COLUMN
CONC CONCRETE
CORR CORRIDOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
CY CUBIC YARD
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DR DOOR
DN DOWN
DS DOWNSPOUT
DESC DESCRIPTION
DWG DRAWING
EA EACH
EF EXHAUST FAN
EL ELEVATION
ERD EMERGENCY ROOF DRAIN
EP EPOXY PAINT
ENGR ENGINEER
EQUIP EQUIPMENT
EQ EQUAL
EXIST EXISTING
EXP EXPANSION / EXPOSED
EJ (EXP JT) EXPANSION JOINT
EXP TO EXPOSED TO STRUCTURE
STRUCT
EXT EXTERIOR
ETD ESTIMATED TRAVEL DISTANCE
FAC FACTORY
FDC FIRE DEPARTMENT CONNECTION
FT FEET
FE FIRE EXTINGUISHER
FIN FINISH
FP FLAT PAINT
FF FINISHED FLOOR
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
FV FIELD VERIFY
GA GAGE OR GAUGE
GALV GALVANIZED
GBF GYPSUM BOARD FURRING
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
GP GLOSSY PAINT
GL GLASS
GOVT GOVERNMENT
GYP GYPSUM
GYP BD GYPSUM BOARD
(GWB)
HKS HOOKS
HR HANDRAIL
HDW HARDWARE
HT HEIGHT
H HIGH
HP HIGH POINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HVAC HEATING VENTILATION & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
IRC INTERNATIONAL RESIDENTIAL
CODE
JC JANITOR
JT JOINT
JST JOIST
KP KICK PLATE
LAM LAMINATE
LDG LANDING
LAV LAVATORY
LH LEFT HAND
LHR LEFT HAND REVERSE
LT LIGHT
LTG LIGHTING
LONG LONGITUDINAL
LVR LOUVER
LP LOW POINT
MAS MASONRY
MO MASONRY OPENING
MGR MANAGER
MFR MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MWP METAL WALL PANEL
MIN MINIMUM
MISC MISCELLANEOUS
NIC NOT IN CONTRACT
No. (#) NUMBER
NTS NOT TO SCALE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFGI OWNER FURNISHED
GOVERNMENT INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OW OPEN WEB
OPP OPPOSITE
OD OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND
HEALTH ACT
OVHD OVERHEAD
PDU POWER DISTRIBUTION UNIT
PT PAINT OR PRESSURE TREATED
PR PAIR
PNL PANEL
PART PARTITION
PLAS PLASTER OR PLASTIC
PL PLATE
PLYWD PLYWOOD
LBS OR # POUNDS
PSF POUNDS / SQUARE FOOT
PSI POUNDS / SQUARE INCH
PMJF PRE-MOLDED JOINT FILLER
PRE-FAB PREFABRICATED
QT QUARRY TILE
REF REFERENCE
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISIONS / REVISED
RD ROOF DRAIN
RDO ROOF DRAIN OVERFLOW
RHR RIGHT HAND REVERSE
RM ROOM
RO ROUGH OPENING
RB RUBBER BASE
SC SEALED CONCRETE
SCW SOLID CORE WOOD
SCHED SCHEDULE
SECT SECTION
SGP SEMI-GLOSS PAINT
SHT MET SHEET METAL
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
SPEC(S) SPECIFICATION
SFRM SPRAYED FIRE RESISTIVE MATERIAL
SQ SQUARE
ST STORM
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
TIOL / TLT TOILET
TEL TELEPHONE
THK THICK
T'HOLD THRESHOLD
TG TEMPERED GLASS
T/ TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
T/C TOP OF CURB
TOS TOP OF STEEL
T/W TOP OF WALL
TU TOUCH-UP
TYP TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UL UNDERWRITERS LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
VCB VINYL COVE BASE
VTR VENT THRU ROOF
W WIDTH
W/ WITH
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WNDO WINDOW
W/O WITHOUT
WRGB WATER RESISTANT GYPSUM BOARD
WS WEATHERSTRIPPING
WRO WINDOW ROUGH OPENING
YR YARD
VIEW TITLES
TRUE N
PLAN
NORTH
XXX
X
X# X-###
SCALE
VIEW TITLEA3
X# X-###
GENERAL DEMOLITION / REPAIR NOTES
1. THE CONTRACTOR MAY INSTALL A CHUTE ON THE SIDE OF THE BUILDING TO FACILITATE DEMOLITION. THE CONTRACTOR
ASSUMES ALL RESPONSIBILITY FOR THE STRUCTURAL SUPPORT AND INTEGRITY OF THE CHUTE.
2. DUMPSTER CAN BE LOCATED ALONG THE BUILDING DURING WORKING HOURS UPON REQUEST. THE CONTRACTOR SHALL MAKE A REQUEST IN WRITING TO THE C.O.R. AT LEAST TWO WEEKS PRIOR TO THE REQUIREMENT. DUMPSTER MUST COMPLY WITH UFC 4-010-01 DoD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDING. DUMPSTER WILL BE EMPTY EACH TIME THEY ARE PLACED NEAR BUILDINGS AT THE START OF THE WORKING DAY. DUMPSTER WILL BE MOVED AWAY FROM THE BUILDING AT THE END OF EACH WORKING DAY. THE C.O.R. WILL DETERMINE THE DUMPSTER STORAGE LOCATION AT
THE END OF THE WORK DAY.
3. ALL EQUIPMENT, PIPING, WALLS, AND SYSTEMS NOTED FOR DEMOLITION SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR. UNLESS NOTED OTHERWISE ON THESE DRAWINGS, DEMOLITION SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL MATERIALS ASSOCIATED WITH THE EQUIPMENT, WALLS, AND SYSTEMS TO INCLUDE FOUNDATIONS THAT EXTEND ABOVE THE EXISTING GRADE, CONDUIT, WIRING, PIPING, DUCT, HANGERS, EQUIPMENT SUPPORT STRUCTURES, SWITCHES, DISCONNECTS, ETC. EXISTING ELECTRICAL AND MECHANICAL UTILITY SERVICES SHALL BE REMOVED BACK TO THE SOURCE WITHOUT DISCONNECTING SERVICE TO OTHER ACTIVE EQUIPMENT OR SYSTEMS. IT IS THE CONTRACTORS RESPONSIBILITY
TO CONTROL ALL DUST GENERATED FROM THE DEMOLITION WORK.
4. THE CONTRACTOR SHALL COORDINATE CRANE USAGE TWO WEEKS IN ADVANCE WITH THE CONTRACTING OFFICER
REPRESENTATIVE.
5. SCAFFOLDING CAN ONLY BE SECURE TO THE BUILDING UNDER SPECIFIC REQUIREMENTS SINCE BUILDING104 IS AN HISTORICAL LANDMARK LIKE MOST ROCK ISLAND ARSENAL BUILDINGS. THE CONTRACTOR SHALL USE USE ONLY MASONRY OR EPOXY ANCHORS. ATTACHMENTS CAN BE ONLY IN MORTAR JOINTS AND IMPACT OR HAMMER DRILLS ARE NOT PERMITTED. WHERE ATTACHMENTS TO THE STONE ARE REQUIRED FOR NEARING CAPACITY, LOCATION SHALL BE APPROVED BY THE C.O.R. THE CONTRACTOR SHALL IMMEDIATELY PATCH RESULTANT OPENINGS AFTER SCAFFOLDING IS TAKEN DOWN. PATCH SHOULD MATCH EXISTING MORTAR COMPOSITION. COORDINATE WITH THE C.O.R. PRIOR AND CONFORM TO THE REQUIREMENTS OF THE NATIONAL PARK SERVICES (NPS) PRESERVATION BRIEF #2: RE-POINTING MORTAR JOINTS IN HISTORIC MASONRY BUILDINGS, ASTM E2260: GUIDE FOR RE-POINTING HISTORIC MASONRY, ASTM C1707:
POZZOLANIC HYDRAULIC LIMES FOR STRUCTURAL PURPOSES. AND ASTM C144: AGGREGATE FOR MASONRY MORTAR.
6. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND OCCUPATIONAL CODE REQUIREMENTS INCLUDING, ANSIA10.32 PERSONAL FALL PROTECTION, EM 385-1.1 SAFETY AND HEALTH REQUIREMENTS, 29 CFR 1910 OCCUPATIONAL SAFETY AND
HEALTH STANDARDS, AND 29 CFR 1926.500 FALL PROTECTION.
7. GARRISON COMMAND,THEIR CUSTOMERS AND OTHER TENANTS WILL REQUIRE ACCESS TO THE BUILDING 104 ( ALL FLOORS, FIRST FLOOR NORTH, EAST WING AND BASEMENT). THE CONTRACTOR SHALL MOVE MATERIALS AND/OR EQUIPMENT UPON
CUSTOMER REQUEST. THE CONTRACTOR SHALL NOT BLOCK DOORS OR ENTRY POINTS.
8. CONTRACTOR SHALL PROVIDE SAFETY BARRIERS AND OVERHEAD PROTECTION AT DOORS AND OTHER SAFETY EQUIPMENT TO INSURE SAFE INGRESS AND EGRESS TO THE BUILDING FOR GARRISON COMMAND, THEIR CUSTOMERS AND ALL
TENANTS.
9. THE CONTRACTOR CAN MAKE REQUESTS IN ADVANCE TO BLOCK ENTRANCE, BUT THESE MAY NOT BE GRANTED.
10. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE JOB SITE. SEE SPECIFICATIONS FOR MORE DETAILS. THIS INCLUDE INTERIOR AND EXTERIOR AREAS SUBJECT TO FALLING DEBRIS FROM CONSTRUCTION ACTIVITIES.
11. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE CONTRACTING OFFICER IF ANY SUSPECTED HAZARDOUS MATERIAL NOT COVERED IN THE SPECIFICATION, DRAWINGS, OR ENVIRONMENTAL REPORT IS DISCOVERED DURING CONSTRUCTION. HANDLE AND DISPOSE OF HAZARDOUS MATERIAL IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS.
12. BUILDING 104 HAS A KNOWN PRESENCE OF LEAD AND ASBESTOS CONTAINING MATERIAL. SEE HAZARDOUS PLANS.
13. WHEN WORK REQUIRED REMOVAL OF EXISTING FURNITURE TO PERFORM THE WORK THE CONTRACTOR SHALL PROVIDE ADEQUATE SUPERVISION, LABOR MATERIAL, SUPPLIES AND EQUIPMENT NECESSARY TO ACCOMPLISH THE WORK IN TIMELY AND EFFICIENT MANNER. REASSEMBLE PROPERTY AFTER WORK PERFORMED IS DONE. REMOVE ALL PADDING, PACKING
AND CRATING MATERIALS, CLEAN FURNITURE AND PREMISES.
14. WHEN APPLICABLE, DISASSEMBLE FURNITURE FOR SAFE AND EFFICIENT TRANSPORTATION FROM ESTABLISHED ORIGIN LOCATIONS TO THE DESIGNATED STORAGE AREAS WITHIN THE COMPLEX 102-104. THE CONTRACTOR TO PERFORM PACKING, AND / OR CRATING NECESSARY FOR THE PROTECTION OF THE PROPERTY TO BE RELOCATED EITHER
TEMPORARY OR PERMANENT.
15. FURNISH WHEN NECESSARY, PADDING OR OTHER PROTECTIVE MATERIAL FOR THE INTERIOR OF THE BUILDING, INCLUDING ELEVATORS, FROM AND TO WHICH FURNITURE MAY BE MOVED UNDER THIS CONTRACT AND ENSURE THAT ALL CONTAINERS AND MATERIAL ARE CLEAN AND OF QUALITY SUFFICIENT FOR PROTECTION OF THE FURNITURE.
XX
PICTURE TAG
G-004
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B Y:
J.
FA
VE
LA
D R
AW
N
B Y:
J.
F
AV
EL
A C
H
EC
KE
D
B Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
AB
BR
EV
IA
TI
O
N S, SY
M
BO
LS
A N
D G
EN
ER
AL
SH
EE
T
N O
TE
S
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
5,814
1,022
1,105
LIFE SAFETY PLAN LEGEND
1-HR. FIRE- RATED WALL
BRACKET- MOUNTED FIRE
EXTINGUISHER: 10LB. A:BC
DRY- CHEMICAL TYPE
FIRE EXTINGUISHER CABINET W/
10LB. A:BC DRY- CHEMICAL
FIRE EXTINGUISHER
WALL- MOUNTED EXIT SIGN-
SEE ELECT. DWGS.
TRAVEL DISTANCE
2-HR. FIRE- RATED WALL
XXXX
XXXX
XXXX
ROOM AREA (SF)
OCCUPANCY FACTOR (SF/PN)
NUMBER OF OCCUPANTS (PN)
SCALE:1/8"=1'-0"
LIFE SAFETY PLAN - BASEMENT C1
NORTH
GI001
M
AR
K
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B Y:
J.
F
AV
EL
A D
R
AW
N B
Y:
J.
F
AV
EL
A
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
LI
FE
S
AF
ET
Y
PL
AN
BA
SE
M
EN
T
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
CODE ANALYSIS
PROJECT NAME:
ROCK ISLAND ARSENAL GARRISON CONSOLIDATION,
ROCK ISLAND ARSENAL, ILLINOIS
APPLICABLE CODES AND STANDARDS
UNIFIED FACILITIES CRITERIA (UFC): 1-200-01, CHANGE 4, 2024
UNIFIED FACILITIES CRITERIA (UFC): 3-101-01, CHANGE 4, 2024
UNIFIED FACILITIES CRITERIA (UFC): 3-600-01, CHANGE 6, 2021
UNIFIED FACILITIES CRITERIA (UFC): 4-610-01, CHANGE 1, 2021
INTERNATIONAL BUILDING CODE (IBC), 2024
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101 LIFE SAFETY CODE, 2024
AMERICANS WITH DISABILITIES ACT (ADA) 2010
ARCHITECTURAL BARRIERS ACT (ABA) 2014
BUILDING CHARACTERISTICS
-TOTAL GROSS BUILDING AREA: 161,805 SQ. FT.
-BUILDING NUMBER OF STORIES: THREE STORIES & BASEMENT
-ADJACENT BUILDINGS: BUILDING 103; SHARE EXISTING 2-HOUR FIRE WALL
WITH BUILDING 104
-MIXED OCCUPANCY: BUSINESS (B) ON UPPER FLOORS AND STORAGE (S-1) AT
BASEMENT LEVEL (LSC 6.1.14.3) (IBC 3 & 4)
-NON-SEPARATED OCCUPANCIES (IBC 508.4)
-CONSTRUCTION TYPE (IBC 6 TABLE 601): TYPE III-B
LIMITATIONS FOR TYPE III-B CONSTRUCTION
ALLOWABLE FLOOR AREAS & BUILDING HEIGHT IN STORIES: (IBC 503)
BUSINESS
ALLOWABLE BUILDING HEIGHT: 75 FEET (IBC TABLE 504.3)
ALLOWABLE NUMBER OF STORIES: 4 (IBC TABLE 504.4)
ALLOWABLE AREA EACH STORY: 57,000 SQ FT (IBC TABLE 506.2)
STORAGE-1
ALLOWABLE BUILDING HEIGHT: 75 FEET (IBC TABLE 504.3)
ALLOWABLE NUMBER OF STORIES: 4 (IBC TABLE 504.4)
ALLOWABLE AREA EACH STORY: 52,500 SQ FT (IBC TABLE 506.2)
FIRE PROTECTION SYSTEMS
FIRE PROTECTION SYSTEM
WET PIPE SPRINKLER SYSTEM - EXISTING
FIRE ALARM AND MASS NOTIFICATION SYSTEMS - EXISTING
USE GROUP /OCCUPANCY
BASEMENT: (39,574 SQ. FT. )
BUSINESS GROUP B (IBC 304.1) / BUSINESS EXISTING (LSC 6.1.11.1) \
MODERATE HAZARD (LSC 39.1.5, LSC 6.2.2)
STORAGE-1 (IBC 311.3) / STORAGE (LSC 6.1.13)
NON-SEPARATED OCCUPANCIES (IBC 508.4)
MIXED OCCUPANCY (LSC 6.1.14.3)
FIRST FLOOR: ( 40,322 SQ. FT.)
BUSINESS GROUP B (IBC 304.1) / BUSINESS EXISTING (LSC 6.1.11.1)
MODERATE HAZARD (LSC 39.1.5, LSC 6.2.2)
OCCUPANCY
BUSINESS (EXISTING)
EXIT ACCESS
TRAVEL DISTANCE (FT)
COMMON PATH OF
TRAVEL (FT)
DEAD-END
CORRIDOR (FT)
OCCUPANT LOAD
OCCUPANT LOAD ( LSC TABLE 7.3.1.2)
AREA OCCUPANCY/USE APPROX.
AREA (SF)
OCCUPANT LOAD
FACTOR
(SF/PERSON)
OCCUPANT
LOAD
(PERSONS)
FLOOR
LEVEL
BASEMENT
FLOOR TOTAL 39,574 - 223
ADDITIONAL LIFE SAFETY CRITERIA
ALL MEANS OF EGRESS MUST BE ILLUMINATED I N ACCORDANCE WITH LSC7.8 (LSC 39.2.8)
ARTIFICIAL LIGHTING IS REQUIRED AT LOCATIONS AND TIMES NECESSARY TO MAINTAIN
ADEQUATE ILLUMINATION (LSC 7.8.1.2.1)
EMERGENCY LIGHTING SYSTEMS MUST BE PROVIDED FOR BUSINESS OCCUPANCIES
SUBJECT TO 100 OR MORE OCCUPANTS ABOVE OR BELOW THE LEVEL OF EXIT DISCHARGE.
(LSC 39.2.9)
MEANS OF EGRESS MUST BE PROVIDED WITH SIGNS IN ACCORDANCE WITH LSC 7.10 (LSC
39.2.10)
ARRANGEMENT OF MEANS OF EGRESS
BASE ON LSC TABLE A.7.6
STORAGE (EXISTING)
CAPACITY OF MEANS OF EGRESS
BASE ON LSC TABLE 7.3.3.1
LEVEL COMPONENTS (WIDTH /PERSON) 0.15 IN/PERSON = 33.45 INCHES
STAIRWAYS (WITH/PERSON) 0.20 IN /PERSON = 44.60 INCHES
NUMBER OF MEANS OF EGRESS ( LSC 7.4) 2 REQUIRED
OFFICE
MECH. & COMM ROOMS BUSINESS ACCESSORY
BUSINESS 150
500STORAGE STORAGE ORDINARY H.
2,174 9,117
12,568 25
GROSS AREA REMAINING BUSINESS 15,714 150 105
FLOOR LEVEL
BASEMENT
REQUIRED EGRESS
CAPACITY
AVAILABLE EGRESS
CAPACITY
MEANS OF EGRESS
REQUIRED
MEANS OF EGRESS
PROVIDED
OCCUPANT LOAD
OCCUPANT LOAD ( IBC 304.1 , 3011.3 & TABLE 1004.5)
AREA OCCUPANCY/USE APPROX.
AREA (SF)
OCCUPANT LOAD
FACTOR
(SF/PERSON)
OCCUPANT
LOAD
(PERSONS)
FLOOR
LEVEL
BASEMENT
FLOOR TOTAL 39,574 - 196
OFFICES GROUP B 15019,148 128
STORAGE CAGES GROUP S-1 30020,426 68
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
(ABANDONED)
AutoCAD SHX Text
US
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
US
AutoCAD SHX Text
DF
AutoCAD SHX Text
US
AutoCAD SHX Text
PIT
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text H
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text I
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text H.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 53'
AutoCAD SHX Text 75'
AutoCAD SHX Text 75'
AutoCAD SHX Text 48'
AutoCAD SHX Text 104'
AutoCAD SHX Text 134'
AutoCAD SHX Text 103'
AutoCAD SHX Text 90'
AutoCAD SHX Text 100'
AutoCAD SHX Text 56'
AutoCAD SHX Text 175'
AutoCAD SHX Text 106'
AutoCAD SHX Text 150'
AutoCAD SHX Text
FE
AutoCAD SHX Text
FEC
65'
10,842
4,566
8,225
1,939
3,167
LIFE SAFETY PLAN LEGEND
1-HR. FIRE- RATED WALL
BRACKET- MOUNTED FIRE
EXTINGUISHER: 10LB. A:BC
DRY- CHEMICAL TYPE
FIRE EXTINGUISHER CABINET W/
10LB. A:BC DRY- CHEMICAL
FIRE EXTINGUISHER
WALL- MOUNTED EXIT SIGN-
SEE ELECT. DWGS.
TRAVEL DISTANCE
2-HR. FIRE- RATED WALL
XXXX
XXXX
XXXX
ROOM AREA (SF)
OCCUPANCY FACTOR (SF/PN)
NUMBER OF OCCUPANTS (PN)
SCALE:1/8"=1'-0"
LIFE SAFETY PLAN - 1ST FLOOR C1
NORTH
GI002
M
AR
K
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B Y:
J.
F
AV
EL
A D
R
AW
N B
Y:
J.
F
AV
EL
A
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
LI
FE
S
AF
ET
Y
PL
AN
1S T
FL
O
O R
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
AREA
OFFICE DPW EAST
OCCUPANCY/USE
BUSINESS
FLOOR TOTAL
APPROX.
AREA (SF)
9,225
40,322
OCCUPANT LOAD
FACTOR
(SF/PERSON)
OCCUPANT
LOAD
(PERSONS)
FLOOR
LEVEL
1 ST FLOOR
OCCUPANCY
BUSINESS (EXISTING)
EXIT ACCESS
TRAVEL DISTANCE (FT)
COMMON PATH OF
TRAVEL (FT)
DEAD-END
CORRIDOR (FT)
OCCUPANT LOAD
OCCUPANT LOAD ( LSC TABLE 7.3.1.2)
ARRANGEMENT OF MEANS OF EGRESS
BASE ON LSC TABLE A.7.6
CAPACITY OF MEANS OF EGRESS
BASE ON LSC TABLE 7.3.3.1
LEVEL COMPONENTS (WIDTH /PERSON) 0.15 IN/PERSON = 86"
STAIRWAYS (WITH/PERSON) 0.20 IN PERSON = 115"
NUMBER OF MEANS OF EGRESS ( LSC 7.4) 3 REQUIRED
FLOOR LEVEL
1 ST FLOOR
REQUIRED EGRESS
CAPACITY
AVAILABLE EGRESS
CAPACITY
MEANS OF EGRESS
REQUIRED
MEANS OF EGRESS
PROVIDED
OFFICE GC NORTH
COLLABORATION ROOM
OFFICE FMRW NORTH
BUSINESS
BUSINESS
BUSINESS
150BUSINESS
6,525 44
1,813 12
7,937 53
7,951 15GROSS AREA REMAINING
ASEEMBLY
CONFERENCE 1,891 126
OCCUPANT LOAD
OCCUPANT LOAD ( IBC 304.1 , 3011.3 & TABLE 1004.5)
AREA OCCUPANCY/USE APPROX.
AREA (SF)
OCCUPANT LOAD
FACTOR
(SF/PERSON)
OCCUPANT
LOAD
(PERSONS)
FLOOR
LEVEL
1ST FLOOR
FLOOR TOTAL* 40,332 150 269
OFFICES & ACCESSORY GROUP B 15039,389 263
15943 71CONFERENCE ROOM >50 PN GROUP A-3
*RULES IBC 303.1.1 & 303.1.2 AND IBC 508.2 (10% RULE )
15CONFERENCE 1 ASSEMBLY 378 25
15CONFERENCE + BREAK RM ASSEMBLY 899 60
PLAN ROOM STORAGE 500418 1
STORAGE STORAGE 500300 1
15223 15 15736 49
CONFERENCE 2 ASSEMBLY
CONFERENCE GC ASSEMBLY
STORAGE 500 1
15943ASSEMBLYCONFERENCE ROOM
OFFICE MWR & RM WEST
500390 1STORAGE AREAS STORAGE
STORAGE 500126 1STORAGE
BUSINESS 30180 6
387STORAGE
ASSEMBLY (EXISTING) 250 75 20
115 171 33
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text
(ABANDONED)
AutoCAD SHX Text
TO LANDING
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
TO LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text E.1
AutoCAD SHX Text H.1
AutoCAD SHX Text M
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text 151'
AutoCAD SHX Text
FE
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text 252'
AutoCAD SHX Text 196'
AutoCAD SHX Text 143'
AutoCAD SHX Text 144'
AutoCAD SHX Text 118'
AutoCAD SHX Text 145'
AutoCAD SHX Text 159'
AutoCAD SHX Text 132'
AutoCAD SHX Text
FE
AutoCAD SHX Text
FEC
65'
SCALE:1/8"=1'-0"
B104 PARTIAL BASEMENT WEST WING - HAZARDOUS AREASA6
NORTH
SCALE:1/8"=1'-0"
B104 PARTIAL BASEMENT EAST WING - HAZARDOUS AREASD1
NORTH
H-101
M
AR
K
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
/3
0/
D
ES
IG
N
ED
B Y:
J.
F
AV
EL
A D
R
AW
N B
Y:
J.
F
AV
EL
A
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
H
AZ
AR
D
O U
S
AR
EA
S
PL
AN
BA
SE
M
EN
T
LE
VE
L
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
Asbestos Identification
* BUILDING 104 WAS INSPECTED ON MAY 22, 2025 AND A PERIODIC MONITORING/ CONTROL REPORT AND ASBESTOS SURVEY
UPDATE WAS CREATED, SEE APPENDIX E FOR MORE UPDATED INFORMATION.
* IF ADDITIONAL SUSPECT MATERIALS ARE FOUND DURING DEMOLITION/RENOVATION, CONTRACTOR TO ASSUME THEY ARE ASBESTOS CONTAINING MATERIALS UNTIL PROPERLY INSPECTED AND TESTED. CONTRACTOR SHALL REVIEW COMPLETE ASBESTOS
INSPECTION REPORT PRIOR TO WORK.
* GLAZING IN EXISTING/ ORIGINAL WINDOWS SHALL BE ASSUMED TO BE ASBESTOS CONTAINING MATERIAL.
Lead Paint Identification
* ALL PAINTED MASONRY (STONE & BRICK) SHALL BE ASSUMED TO BE LEAD-PAINT
* ALL GLAZING AND PAINT IN ORIGINAL WOODEN WINDOWS SHALL BE ASSUMED TO BE LEAD CONTAINING MATERIAL.
AutoCAD SHX Text
FIGURE 104-FBE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
NOTE
AutoCAD SHX Text BASEMENT BUILDING 104 (linear feet)
AutoCAD SHX Text
ASBESTOS CONTAINING TSI IN
AutoCAD SHX Text Removed TSI (WO# 002113)
AutoCAD SHX Text Removed TSI (WO# 002113)
AutoCAD SHX Text Removed TSI (WO# 002113)
AutoCAD SHX Text Removed 2 linear feet TSI ( WO#22-2812)
AutoCAD SHX Text Tetra Tech EM Inc.
AutoCAD SHX Text 10 psi
AutoCAD SHX Text 30 psi
AutoCAD SHX Text condensate
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Supply 10 psi
AutoCAD SHX Text Condensate
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Supply 30 psi
AutoCAD SHX Text Supply 140 psi
AutoCAD SHX Text East
AutoCAD SHX Text
DCW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text West
AutoCAD SHX Text North
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,200
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 104-BASEMENT-EAST
AutoCAD SHX Text
SAMPLING LOCATIONS AND ASBESTOS
AutoCAD SHX Text
CONTAINING HOMOGENEOUS AREAS
AutoCAD SHX Text
FIGURE LOCATION
AutoCAD SHX Text
BUILDING 104
AutoCAD SHX Text
FLOOR SAMPLE
AutoCAD SHX Text
CEILING SAMPLE
AutoCAD SHX Text
WALL SAMPLE
AutoCAD SHX Text
CONDENSATE
AutoCAD SHX Text
DOMESTIC COLD WATER
AutoCAD SHX Text
DOMESTIC HOT WATER
AutoCAD SHX Text
HIGH PRESSURE STEAM
AutoCAD SHX Text
RISER
AutoCAD SHX Text
UNINSULATED OR
AutoCAD SHX Text
FIBERGLASS PIPING
AutoCAD SHX Text
OTHER TYPE
AutoCAD SHX Text
OF SAMPLE
AutoCAD SHX Text
AS DESCRIBED
AutoCAD SHX Text
PIPE ENDS
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
LOW PRESSURE STEAM
AutoCAD SHX Text
STEAM SERVICE SUPPLY
AutoCAD SHX Text
94RIA104.11.B.1
AutoCAD SHX Text
92RIA104.9.B.1
AutoCAD SHX Text
90RIA104.8.B.1
AutoCAD SHX Text
87RIA104.7.B.2
AutoCAD SHX Text
123RIA104.27.B.3
AutoCAD SHX Text
118RIA81.4.B.1
AutoCAD SHX Text
BOXES INDICATE
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
CONTAINING
AutoCAD SHX Text
ASBESTOS-
AutoCAD SHX Text
ALL SHADED
AutoCAD SHX Text
(NO PERCENTAGE NUMBER INDICATES
AutoCAD SHX Text
AMOUNT OF ASBESTOS FOUND
AutoCAD SHX Text
SAMPLE IDENTIFICATION NUMBER
AutoCAD SHX Text
NUMBER OF HOMOGENEOUS AREA
AutoCAD SHX Text
ASBESTOS NOT DETECTED)
AutoCAD SHX Text
% AND TYPE OF ASBESTOS FOUND
AutoCAD SHX Text
BUILDING NUMBER
AutoCAD SHX Text
FLOOR OF BUILDING
AutoCAD SHX Text
SPECIFIC HOMOGENEOUS AREA
AutoCAD SHX Text
SAMPLE NUMBER WITHIN
AutoCAD SHX Text
3% CH
AutoCAD SHX Text 100 sf
AutoCAD SHX Text
ASBESTOS UNLESS OTHERWISE IDENTIFIED.
AutoCAD SHX Text
TSI = THERMAL SYSTEM INSULATION
AutoCAD SHX Text
MAG = MAGNESIUM
AutoCAD SHX Text
FG = FIBERGLASS
AutoCAD SHX Text
CH = CHRYSOTILE
AutoCAD SHX Text
AM = AMOSITE
AutoCAD SHX Text
CR = CROCIDOLITE
AutoCAD SHX Text
ALL TSI (PIPE COVERING) CONTAINS
AutoCAD SHX Text TSI on DCW line - black outerpaper
AutoCAD SHX Text
86RIA104.7.B.1-A
AutoCAD SHX Text TSI on DCW line - chalky interior
AutoCAD SHX Text
15% CH
AutoCAD SHX Text 130 lf
AutoCAD SHX Text Mastic
AutoCAD SHX Text
96RIA104.12.B.1-A
AutoCAD SHX Text grey speckled linoleum
AutoCAD SHX Text Brown, tan, and grey speckled linoleum
AutoCAD SHX Text
96RIA104.12.B.1-B
AutoCAD SHX Text white streaks floor tile
AutoCAD SHX Text 12" beige with brown and
AutoCAD SHX Text White with rust and
AutoCAD SHX Text
93RIA104.10.B.1-A
AutoCAD SHX Text
93RIA104.10.B.1-B
AutoCAD SHX Text 4" brown cove base molding
AutoCAD SHX Text 12" grey with brown and
AutoCAD SHX Text white streaks floor tile
AutoCAD SHX Text
86RIA104.7.B.1-B
AutoCAD SHX Text
88RIA104.7.B.3
AutoCAD SHX Text TSI on DCW line
AutoCAD SHX Text
10% CH
AutoCAD SHX Text 130 lf
AutoCAD SHX Text Smooth ceiling plaster
AutoCAD SHX Text TSI on DCW line
AutoCAD SHX Text Mastic
AutoCAD SHX Text
91RIA104.5.B.1-A
AutoCAD SHX Text
91RIA104.5.B.1-B
AutoCAD SHX Text 12" beige with brown and
AutoCAD SHX Text white streaks floor tile
AutoCAD SHX Text Mastic
AutoCAD SHX Text 4" black cove base molding
AutoCAD SHX Text
DF
AutoCAD SHX Text
US
AutoCAD SHX Text
PHASE III - QUADRANT 2
AutoCAD SHX Text S.O.# 16-1442 1/8/16 Removed 18 l.f. of TSI
AutoCAD SHX Text Bulk Samples 104-20-CM(1&2) Carp. Mastic No asb. detected 104-20-TEM-FT3 Floor tile - 2.7% asbestos 104-20-TM(1&2) Tile mastic - 2% asbestos
AutoCAD SHX Text Asbestos Containing Floor tile
AutoCAD SHX Text 104-20-TEM-FT3 Floor tile - 2.7% asbestos 104-20-TM(1&2) Tile mastic - 2% asbestos
AutoCAD SHX Text
FIGURE 104-FBW
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
NOTE
AutoCAD SHX Text BASEMENT BUILDING 104 (linear feet)
AutoCAD SHX Text
ASBESTOS CONTAINING TSI IN
AutoCAD SHX Text Removed TSI (WO# 002113)
AutoCAD SHX Text
BUILDING 104-BASEMENT-WEST
AutoCAD SHX Text
FLOOR SAMPLE
AutoCAD SHX Text
CEILING SAMPLE
AutoCAD SHX Text
WALL SAMPLE
AutoCAD SHX Text
CONDENSATE
AutoCAD SHX Text
DOMESTIC COLD WATER
AutoCAD SHX Text
DOMESTIC HOT WATER
AutoCAD SHX Text
HIGH PRESSURE STEAM
AutoCAD SHX Text
RISER
AutoCAD SHX Text
UNINSULATED OR
AutoCAD SHX Text
FIBERGLASS PIPING
AutoCAD SHX Text
OTHER TYPE
AutoCAD SHX Text
OF SAMPLE
AutoCAD SHX Text
AS DESCRIBED
AutoCAD SHX Text
SAMPLING LOCATIONS AND ASBESTOS
AutoCAD SHX Text
CONTAINING HOMOGENEOUS AREAS
AutoCAD SHX Text
PIPE ENDS
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
LOW PRESSURE STEAM
AutoCAD SHX Text
STEAM SERVICE SUPPLY
AutoCAD SHX Text
FIGURE LOCATION
AutoCAD SHX Text
BUILDING 104
AutoCAD SHX Text
120RIA104.27.B.1
AutoCAD SHX Text
82RIA104.3.B.1
AutoCAD SHX Text
108RIA104.4.B.3
AutoCAD SHX Text
85RIA104.6.B.1
AutoCAD SHX Text
84RIA104.5.B.1
AutoCAD SHX Text
83RIA104.4.B.1
AutoCAD SHX Text
119RIA104.20.B.2
AutoCAD SHX Text abandoned
AutoCAD SHX Text 30 psi
AutoCAD SHX Text 10 psi
AutoCAD SHX Text condensate
AutoCAD SHX Text
118RIA81.4.B.1
AutoCAD SHX Text
BOXES INDICATE
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
CONTAINING
AutoCAD SHX Text
ASBESTOS-
AutoCAD SHX Text
ALL SHADED
AutoCAD SHX Text
(NO PERCENTAGE NUMBER INDICATES
AutoCAD SHX Text
AMOUNT OF ASBESTOS FOUND
AutoCAD SHX Text
SAMPLE IDENTIFICATION NUMBER
AutoCAD SHX Text
NUMBER OF HOMOGENEOUS AREA
AutoCAD SHX Text
ASBESTOS NOT DETECTED)
AutoCAD SHX Text
% AND TYPE OF ASBESTOS FOUND
AutoCAD SHX Text
BUILDING NUMBER
AutoCAD SHX Text
FLOOR OF BUILDING
AutoCAD SHX Text
SPECIFIC HOMOGENEOUS AREA
AutoCAD SHX Text
SAMPLE NUMBER WITHIN
AutoCAD SHX Text
3% CH
AutoCAD SHX Text 100 sf
AutoCAD SHX Text
ASBESTOS UNLESS OTHERWISE IDENTIFIED.
AutoCAD SHX Text
TSI = THERMAL SYSTEM INSULATION
AutoCAD SHX Text
MAG = MAGNESIUM
AutoCAD SHX Text
FG = FIBERGLASS
AutoCAD SHX Text
CH = CHRYSOTILE
AutoCAD SHX Text
AM = AMOSITE
AutoCAD SHX Text
CR = CROCIDOLITE
AutoCAD SHX Text
ALL TSI (PIPE COVERING) CONTAINS
AutoCAD SHX Text green and white streaks floor tile
AutoCAD SHX Text
81RIA104.2.B.1-A
AutoCAD SHX Text Mastic
AutoCAD SHX Text
81RIA104.2.B.1-B
AutoCAD SHX Text 12" olive green with dark
AutoCAD SHX Text and white streaks floor tile
AutoCAD SHX Text 12" grey with green
AutoCAD SHX Text
80RIA104.1.B.1-A
AutoCAD SHX Text Mastic
AutoCAD SHX Text
80RIA104.1.B.1-B
AutoCAD SHX Text 2'x2' spotted/fissured ceiling tile
AutoCAD SHX Text Wallboard
AutoCAD SHX Text Wallboard
AutoCAD SHX Text Mastic
AutoCAD SHX Text specks floor tile
AutoCAD SHX Text
107RIA104.22.B.1-A
AutoCAD SHX Text 12" white with grey
AutoCAD SHX Text
107RIA104.22.B.1-B
AutoCAD SHX Text Insulation on inside of safe
AutoCAD SHX Text 12" beige with brown and
AutoCAD SHX Text white streaks floor tile
AutoCAD SHX Text Smooth ceiling plaster
AutoCAD SHX Text Hard plaster
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Supply 10 psi
AutoCAD SHX Text Condensate
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Supply 30 psi
AutoCAD SHX Text Supply 140 psi
AutoCAD SHX Text East
AutoCAD SHX Text
DCW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text West
AutoCAD SHX Text North
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,200
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ABATED TSI
AutoCAD SHX Text
ABATED ASBESTOS-CONTAINING BUILDING MATERIAL
AutoCAD SHX Text
US
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
PHASE - QUADRANT 2
AutoCAD SHX Text
III
AutoCAD SHX Text Removed 2 l.f. of TSI (WO# 06-4334)
AutoCAD SHX Text Removed 2 l.f. of TSI (WO# 06-5532)
AutoCAD SHX Text Removed 336 sq. ft. of FT (WO# 06-4861)
AutoCAD SHX Text Removed 2 l.f. of TSI (WO# 09-3289)
AutoCAD SHX Text Removed 23 LF of TSI (WO# 10-4727)
AutoCAD SHX Text 8/27/16 16-5696 Removed 72 l.f. of TSI
Tetra Tech EM Inc.
4" blue cove base molding
Drywall
Removed 8 sf of floor tile
(WO# 213-0001)
Army green vibration dampener
Hard plaster
12" white with green streaks floor tile
Mastic
Mastic
12" green with white streaks floor tile Removed 32 sq. ft. of TSI (WO# 07-907ijo)
H-102
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
4-
//3
0/
D
ES
IG
N
ED
B Y:
J.
F
AV
EL
A D
R
AW
N B
Y:
J.
F
AV
EL
A
C H
EC
KE
D B
Y:
C
SB
AP
PR
O
VE
D B
Y:
G
. K O
SK
Y, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
G
AR
R
IS
O
N C
O N
SO
LI
D
AT
IO
N
B1
ST
F
LO
O R
H
AZ
AR
D
O U
S M
AT
ER
IA
LS
AR
EA
S
PL
AN
2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
SCALE:1/16"=1'-0"
B104 1ST FLOOR HAZARDOUS AREAS PLANB1
NORTH
0 10' 20' 40' 1/16" = 1'-0"
Asbestos Identification
Lead Paint Identification
* BUILDING 104 WAS INSPECTED ON MAY 22, 2025 AND A PERIODIC MONITORING/ CONTROL
REPORT AND ASBESTOS SURVEY UPDATE WAS CREATED, SEE APPENDIX E FOR MORE UPDATED
INFORMATION.
* IF ADDITIONAL SUSPECT MATERIALS ARE FOUND DURING DEMOLITION/RENOVATION,
CONTRACTOR TO ASSUME THEY ARE ASBESTOS CONTAINING MATERIALS UNTIL PROPERLY INSPECTED
AND TESTED. CONTRACTOR SHALL REVIEW COMPLETE ASBESTOS INSPECTION REPORT PRIOR TO
WORK.
* GLAZING IN EXISTING/ ORIGINAL WINDOWS SHALL BE ASSUMED TO BE ASBESTOS CONTAINING
MATERIAL.
* ALL PAINTED MASONRY (STONE & BRICK) SHALL BE ASSUMED TO BE LEAD-PAINT
* ALL GLAZING AND PAINT IN ORIGINAL WOODEN WINDOWS SHALL BE ASSUMED TO BE LEAD
CONTAINING MATERIAL.
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text
(ABANDONED)
AutoCAD SHX Text
TO LANDING
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
TO LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text E.1
AutoCAD SHX Text H.1
AutoCAD SHX Text M
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text green with white
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text green with white
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text
100RIA104.16.1.1
AutoCAD SHX Text
97RIA104.13.1.1
AutoCAD SHX Text
99RIA104.15.1.1-A
AutoCAD SHX Text
99RIA104.15.1.1-B
AutoCAD SHX Text Mastic
AutoCAD SHX Text Mastic
AutoCAD SHX Text
98RIA104.14.1.1-B
AutoCAD SHX Text
98RIA104.14.1.1-A
AutoCAD SHX Text 12" white with green streaks floor tile
AutoCAD SHX Text
3% CH
AutoCAD SHX Text 6,000 sf
AutoCAD SHX Text
3% CH
AutoCAD SHX Text 6,000 sf
AutoCAD SHX Text 12" white with green streaks floor tile
AutoCAD SHX Text Black vibration dampener
AutoCAD SHX Text light grey streaks floor tile
AutoCAD SHX Text 12" white with dark grey and
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text green with white
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text
106RIA104.21.1.1
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text green with white
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text green with white
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text Removed 12 sq. ft. of FT (WO# 05-4350)
AutoCAD SHX Text
105RIA104.17.1.2
AutoCAD SHX Text
102RIA104.18.1.1
AutoCAD SHX Text
104RIA104.20.1.1
AutoCAD SHX Text
109RIA104.14.B.2-A
AutoCAD SHX Text
3% CH
AutoCAD SHX Text 36 sf
AutoCAD SHX Text
109RIA104.14.B.2-B
AutoCAD SHX Text
110RIA104.15.1.2-B
AutoCAD SHX Text
110RIA104.15.1.2-A
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text green with white
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text streaks and 12"
AutoCAD SHX Text streaks floor tile
AutoCAD SHX Text green with white
AutoCAD SHX Text Checkered 12"
AutoCAD SHX Text white with green
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
NOTE
AutoCAD SHX Text
FLOOR SAMPLE
AutoCAD SHX Text
WALL SAMPLE
AutoCAD SHX Text
RISER
AutoCAD SHX Text
OTHER TYPE
AutoCAD SHX Text
OF SAMPLE
AutoCAD SHX Text
AS DESCRIBED
AutoCAD SHX Text
118RIA81.4.B.1
AutoCAD SHX Text
BOXES INDICATE
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
CONTAINING
AutoCAD SHX Text
ASBESTOS-
AutoCAD SHX Text
ALL SHADED
AutoCAD SHX Text
(NO PERCENTAGE NUMBER INDICATES
AutoCAD SHX Text
AMOUNT OF ASBESTOS FOUND
AutoCAD SHX Text
NUMBER OF HOMOGENEOUS AREA
AutoCAD SHX Text
ASBESTOS NOT DETECTED)
AutoCAD SHX Text
% AND TYPE OF ASBESTOS FOUND
AutoCAD SHX Text
BUILDING NUMBER
AutoCAD SHX Text
FLOOR OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .