Attachment 0005 - Installation Support Requirements.pdf
PDF 87 KB Posted
- Solicitation number
- W58RGZ-26-R-0026
About this file
This is an Installation Support Requirements attachment to a Performance Work Statement that outlines contractor support obligations across multiple Fort Rucker organizations and locations.
The contractor shall provide on-demand support as directed by the Contracting Officer Representative (COR) or Contracting Officer (KO) to support Fort Rucker requirements across five primary areas: (1) United States Army Aeromedical Research Laboratory (USAARL) at Lowe Army Heliport – all required field and approved sustainment level maintenance for HH-60M aircraft; (2) Fort Rucker Museum at Museum/Tactical Support Facility – loading/unloading and ground movement of museum aircraft and associated equipment, aircraft and component maintenance support, AMSS fabrication support, and equipment support approved by AVCOE; (3) Fort Rucker Garrison/Tenant Units – equipment support for scheduled installation events or supported community activities, including maintenance, material movement, and fabrication/alteration support; (4) T2COM/AVCOE at Fort Rucker – support for directed requirements; and (5) Fort Rucker Aircraft Maintenance Contractor (FRAM II) at contractor facilities – provision of fire guards for contractor facilities housing aircraft during fire alarm system outages. Support is provided on an as-needed basis when tasked by the COR or KO.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORGANIZATION LOCATION SUPPORT REQUIREMENT
United States Army Aeromedical Research Laboratory (USAARL)
LOWE AHP
All required Field and approved sustainment level maintenance for USAARL HH-60M located at Lowe
AHP.
Fort Rucker Museum Museum/TSF
Loading/unloading and ground movement of museum aircraft and associated equipment; aircraft and component maintenance support;
AMSS Fabrication Support;
Equipment support approved by
AVCOE.
Fort Rucker Garrison/Tenant Units Fort Rucker
Equipment support for scheduled Installation events or supported community activities; maintenance, material movement and fabrication /alteration support.
T2COM/AVCOE Fort Rucker Support for T2COM/AVCOE directed requirements.
Fort Rucker Aircraft Maintenance Contractor (FRAM
II )
Contractor Facilities
Provide Fire Guards for Contractor facilities housing aircraft during Fire Alarm system outages.
ATTACHMENT 0005 INSTALLATION SUPPORT REQUIREMENTS v1.1 7APR26
1. The table below lists the requirements supporting Attachment 0001, PWS Paragraph 2.8.4.
Installation Support Requirements The Contractor shall provide support when as directed by the COR or KO supporting Fort Rucker requirements.
Table 1
File details come from the government source that posted it. Updated .