This document is a Pricing Document related to a federal contract opportunity for Paint Contractor Support services. The Architect of the Capitol (AOC) is issuing a Solicitation for a Blanket Purchase Agreement (BPA) to provide a variety of painting services across several House Office Buildings. The Pricing Document outlines the specific tasks and pricing for services such as general painting, suite painting for the Cannon House Office Building (CHOB), Longworth House Office Building (LHOB), and Rayburn House Office Building (RHOB), as well as additional services like ceiling painting, trim work, wall patching, and caulking. The contract includes a base year and four option years. A site visit is scheduled for August 12, 2024, and responses are due by noon on August 9, 2024.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Architect of the Capitol |
| House Office Buildings |
| General Painting & Transition Pricing Document |
| Price | ||||||||
| Item | Task | Description | Quantity Per | Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 |
| 1 | General Painting | ||
| 1a | General daily rate: crew of (2) indivduals (half day) | Paint walls, ceilings, and/ or hallways; protect remaining furniture in suite; misc protection | EA |
1b General daily rate: crew of (4) indivduals (half day) Paint walls, ceilings, and/ or hallways; protect remaining furniture in suite; misc protection EA
1c General daily rate: crew of (2) indivduals (full day) Paint walls, ceilings, and/ or hallways; protect remaining furniture in suite; misc protection EA
1d General daily rate: crew of (4) individuals (full day) Paint walls, ceilings, and/ or hallways; protect remaining furniture in suite; misc protection EA
| 2 | CHOB Suite Painting | Average suite SF is 1130 | |
| 2a | CHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | EA |
| 2b | CHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | EA |
| 1c | CHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | EA |
| 3 | LHOB Suite Painting | Average suite SF is 1020 | |
| 3a | LHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | EA |
| 3b | LHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | EA |
| 2c | LHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | EA |
| 4 | RHOB Suite Painting | Average suite SF is 1200 | |
| 4a | RHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | EA |
| 4b | RHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | EA |
| 3c | RHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | EA |
5 Ceiling Painting Provide add to paint ceilings in RHOB and CHOB SF
6 Non-white trim in suite Provide add for one additional coat of paint on trim to cover non-standard white trim color LF
7 Member Office non-standard custom paint Provide add for one additonal coat of wall paint for walls were custom paint will not be covered by standard one coats SF
8 Wall patching and prime Provide add to patch, sand, prime walls from minor cracks, nail and screw holes - sizes 12"x12" or smaller EA
9 Caulking Provide add for caulking in suite LF
10 Spider Cracking painting Provide add to apply two coats of 'Peel Bond' (or equivalent) on ceiling prior to finish coats of paint SF
11 RHOB cabinet front delete Provide credit to not apply one coat of paint to RHOB built-in cabinet fronts/faces SF
12 Miscellenous Moldings (chair rail, crown, base board) Provide add alternate to paint any custom moldings in spaces are not standard to the suite LF
13 CHOB COS (Chief of Staff) partition painting Provide add to apply one coat of paint to COS partition woodwork and doors SF
*Note: House Paint Transition Support (Items 2 - 13) will not occur doing Option Year 1 & Option Year 3.
Suite Checklist
| Architect of the Capitol | |
| 118th Transition | Date: |
| Suite Pricing Checklist |
Building/Suite:
AOC Rep:
Contractor Rep:
| Suite Pricing Items | ||||||
| Item | Task | Description | Units | Quantity | Price/Unit | Total |
| 1 | CHOB Suite Painting | |||||
| 1a | CHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | ||||
| 1b | CHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | ||||
| 1c | CHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint walls - 2 coats; Paint grade Trim, moldings, doors, - 1 coat, exclude COS partition; protect remaining furniture in suite; misc protection | ||||
| 2 | LHOB Suite Painting | |||||
| 2a | LHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 2b | LHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 2c | LHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint Walls - 2 coats, Ceilings - 1 coat, partition paint grade trim, doors - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 3 | RHOB Suite Painting | |||||
| 3a | RHOB: Paint suite Day Shift (6:30am to 3:30pm) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 3b | RHOB: Paint suite Evening Shift (4:00pm to 1:00am) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 3c | RHOB: Paint suite Night Shift (9:30pm to 6:30am) | Paint walls - 2 coats, Trim, moldings, doors, cabinets - 1 coat; protect remaining furniture in suite; misc protection | ||||
| 4 | Ceiling Painting | Provide add to paint ceilings in RHOB and CHOB | SF | |||
| 5 | Non-white trim in suite | Provide add for one additional coat of paint on trim to cover non-standard white trim color | LF | |||
| 6 | Member Office non-standard custom paint | Provide add for one additonal coat of wall paint for walls were custom paint will not be covered by standard one coats | SF | |||
| 7 | Wall patching and prime | Provide add to patch, sand, prime walls from minor cracks, nail and screw holes - sizes 12"x12" or smaller | EA | |||
| 8 | Caulking | Provide add for caulking in suite | LF | |||
| 9 | Spider Cracking painting | Provide add to apply two coats of 'Peel Bond' (or equivalent) on ceiling prior to finish coats of paint | SF | |||
| 10 | RHOB cabinet front delete | Provide create to not apply one coat of paint to RHOB built-in cabinet fronts/faces | SF | |||
| 11 | Miscellenous Moldings (chair rail, crown, base board) | Provide add alternate to paint any custom moldings in spaces are not standard to the suite | LF | |||
| 12 | CHOB COS (Chief of Staff) partition painting | Provide add to apply one coat of paint to COS partition woodwork and doors | SF | |||
| Suite Total: |
File details come from the government source that posted it. Updated .