AOCACB24Q0082 Amendment 01.pdf
PDF 93 KB Posted
- Solicitation number
- AOCACB24Q0082
- Issued by
-
Architect of the Capitol
About this file
This document is an Amendment to Solicitation Number AOCACB24Q0082 for a Paint Contractor Support Blanket Purchase Agreement (BPA) issued by the Architect of the Capitol (AOC).
The key details are:
- The RFI due date has been extended to August 19, 2024.
- A "Paint Contractor Support Site Walk" document dated August 14, 2024 has been attached and incorporated by reference under Section J.
- The Davis-Bacon Act Wage Determination dated August 9, 2024 has been attached and incorporated by reference under Section J, replacing all prior versions.
- Aside from the changes noted, all other terms and conditions remain unchanged.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: AOCACB24Q0082 Page 1 of 3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
08/15/2024
4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)
9901CODE
Architect of the Capitol Design and Construction Acquisition Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515
6. ISSUED BY 9901CODE
Architect of the Capitol Design and Construction Acquisition Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
AOCACB24Q0082
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
08/02/2024
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1) Extend the RFI due date to August 19, 2024.
2) Attach, "Paint Contractor Support Site Walk", dated August 14, 2024, by reference under Section J.
3) Attach and incorporate the Davis-Bacon Act Wage Determination, dated August 9, 2024, replacing all prior versions, by reference under Section J.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Susan Dunnagan
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV.
11/2016) Prescribed by GSA FAR (48 CFR) 53.243
Document Number: AOCACB24Q0082 Page 2 of 3
Table of Contents
Section Description Page Number
J List of Attachments J.1 List of Attachments
Document Number: AOCACB24Q0082 Page 3 of 3
Section J - List of Attachments
Clause J.1 List of Attachments was added or modified.
J.1 List of Attachments
1 Section C - Statement of Work (SOW), dated 15-Apr-24, pgs. 9 2 Call Order Statement of Work (SOW), dated 15-Apr-24, pgs. 8 3 Exhibit A - Member Suite Square Footage Information 4 Exhibit B - Sample Cannon suite 5 Exhibit C - Sample Longworth suite 6 Exhibit D - Sample Rayburn suite 7 Pricing Document 8 Past Performance Questionnaire, dated 26-Apr-23, pgs. 6 9 Corporate Experience Template, pgs. 3 10 CUI Order 42-4, Security of Controlled Unclassified Information, dated 6-May-16, pgs. 17 11 USCP Request for Criminal History, dated 6-May-16, pg. 1 12 USCP Vehicle Delivery Procedure Guide, dated May-18, pg. 1 13 Employee Rights under the Davis-Bacon, pg. 1 14 Davis-Bacon Act Wage Determination, 9-Aug-24, pgs. 9 15 Davis-Bacon Act Poster, pg. 1 16 Sample Certificate of Insurance, pg. 1 17 Paint Contractor Support Site Walk, 14-Aug-24, pgs. 2
File details come from the government source that posted it. Updated .