About this file
This is a Schedule of Items document for the Veterans Point Trail Rehabilitation Project on Black Hills National Forest, outlining the bid items and quantities for a trail reconstruction and restoration effort. The project is a solicitation (1240LT26Q0015) issued by the Department of Agriculture Forest Service, with questions due by February 10, 2026, and quotes due by February 24, 2026. The period of performance for all work is March 1, 2026, through May 20, 2027.
The base bid comprises ten line items totaling approximately 328 square yards of trail reconstruction, 628 linear feet of crack routing and sealing, 1,520 square yards of asphalt seal coat, removal and installation of retaining walls (295 square feet demolition, 889 square feet segmental installation), 8.8 cubic yards of gabion wall construction, handrail repair work, and 667 linear feet of erosion control wattle. Optional bid items include an additional 91 square yards of trail reconstruction, 283 linear feet of crack sealing, 700 square yards of asphalt seal coat, 442 square feet of retaining wall demolition, 620 square feet of segmental retaining wall installation, and 217 linear feet of erosion control wattle, primarily associated with the Lakeshore Loop. All line items show zero dollar values on the form, indicating this is a template for contractors to populate with their pricing. The contractor must provide unit prices for each item, with measurements in square yards, linear feet, cubic yards, square feet, and lump sum amounts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 3. Updated Schedule of Items_Veterans Point_ 26FEB2026.xls | XLS spreadsheet | |
| Amend 0004_SUMMARY OF CHANGES.pdf | ||
| Attach 4. Updated Specifications_Veterans Point_26Feb2026.pdf | ||
| Amend 0003_SUMMARY OF CHANGES.pdf | ||
| Amend 0002_SUMMARY OF CHANGES.pdf | ||
| Attach 6. Updated Wage Determination_SD20260001_01.30.2026.pdf | ||
| Amend 0001_SUMMARY OF CHANGES.pdf | ||
| Attach 1. Solicitation_Terms and Agreement_Veterans Point Trail.pdf | ||
| Attach 4. Final Specs_Veterans Point_10Dec2025.pdf | ||
| Attach 2. Statement of Work_Veterans Point_9Dec2025.pdf | ||
| Attach 5. Final Drawings_ 01.27.2026.pdf | ||
| Attach 6. Wage Determination_SD20260032_01.02.26.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sched Items
| SCHEDULE OF ITEMS | ||||||
| BLACK HILLS NATIONAL FOREST | ||||||
| PROJECT TITLE: GAOA VETERANS POINT TRAIL REHABILITATION | ||||||
| WORKPLAN ACQUISITION PLAN/REQUISITION 710775 | ||||||
| SCHEDULE OF ITEMS: VETERANS POINT TRAIL REHAB PROJECT | ||||||
| Period of Performance: Base Bid Items: 3/01/2026 - 5/20/2027 | ||||||
| Bid Item No. | Description | Meth of Meas | Unit | Qty. | Unit Price | Total |
| B-1 | Mobilization | L.S.Q. | L.S. | 1 | $ - 0 | |
| B-2 | Removal of Structures and Obstructions | L.S.Q. | L.S. | 1 | $ - 0 | |
| B-3 | Trail Reconstruction | C.Q. | S.Y. | 328 | $ - 0 | |
| B-4 | Route and seal cracks | C.Q. | Foot | 628 | $ - 0 | |
| B-5 | Asphalt Seal Coat | C.Q. | SY | 1520 | $ - 0 | |
| B-6 | Demo Retaining Wall | C.Q. | SF | 295 | $ - 0 | |
| B-7 | Install Segmental Retaining Wall | C.Q. | SF | 889 | $ - 0 | |
| B-8 | Gabion Wall | C.Q. | C.Y. | 8.8 | $ - 0 | |
| B-9 | Handrail - Remove and Reset, Repair, Refinish | C.Q. | L.S. | 1 | $ - 0 | |
| B-10 | Erosion Control - Wattle | C.Q. | Foot | 667 | $ - 0 | |
| BASE BID SUBTOTAL | $ - 0 | |||||
| Period of Performance: Option Bid Items: 3/01/2026 - 5/20/2027 | ||||||
| O-1 | Trail Reconstruction | C.Q. | S.Y. | 91 | $ - 0 | |
| O-2 | Route and seal cracks | C.Q. | Foot | 283 | $ - 0 | |
| O-3 | Asphalt Seal Coat | C.Q. | SY | 700 | $ - 0 | |
| O-4 | Demo Retaining Wall | C.Q. | SF | 442 | $ - 0 | |
| O-5 | Install Segmental Retaining Wall | C.Q. | SF | 620 | $ - 0 | |
| O-6 | Erosion Control - Wattle | C.Q. | Foot | 217 | ||
| OPTION BID ITEMS SUBTOTAL | $ - 0 | |||||
| PROJECT TOTAL, INCLUDING BASE AND ALL OPTIONS | $ - 0 | |||||