Attach 3. Updated Schedule of Items_Veterans Point_ 26FEB2026.xls

XLS spreadsheet 35 KB Posted

Attached to
Veterans Point Trail Rehabilitation Project Federal contract opportunity
Solicitation number
1240LT26Q0015
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items pricing template for the Veterans Point Trail Rehabilitation Project at Black Hills National Forest (Solicitation 1240LT26Q0015, Requisition 710775). The schedule contains line items for both base bid work and optional work, with quantities and unit prices to be completed by bidders.

Base bid items (B-1 through B-10) include: mobilization (1 lump sum); removal of structures and obstructions (1 lump sum); trail reconstruction (328 square yards); route and seal cracks (628 linear feet); asphalt seal coat (1,520 square yards); demolition of retaining wall (295 square feet); installation of segmental retaining wall (889 square feet); gabion wall installation (8.8 cubic yards); handrail removal, reset, repair and refinish (1 lump sum); and erosion control wattle (667 linear feet). Optional bid items (O-1 through O-6) include additional trail reconstruction (91 square yards), crack sealing (283 linear feet), asphalt seal coat (700 square yards), retaining wall demolition (442 square feet), segmental retaining wall installation (620 square feet), and erosion control wattle (217 linear feet) associated with the Lakeshore Loop section. All unit prices are blank, requiring contractor completion. The template includes separate subtotals for base bid and optional items, with a final line for total project cost including all options.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sched Items

SCHEDULE OF ITEMS
BLACK HILLS NATIONAL FOREST
PROJECT TITLE: GAOA VETERANS POINT TRAIL REHABILITATION
WORKPLAN ACQUISITION PLAN/REQUISITION 710775
SCHEDULE OF ITEMS: VETERANS POINT TRAIL REHAB PROJECT
Bid Item No.DescriptionMeth of MeasUnitQty.Unit PriceTotal
B-1MobilizationL.S.Q.L.S.1$ - 0
B-2Removal of Structures and ObstructionsL.S.Q.L.S.1$ - 0
B-3Trail ReconstructionC.Q.S.Y.328$ - 0
B-4Route and seal cracksC.Q.Foot628$ - 0
B-5Asphalt Seal CoatC.Q.SY1520$ - 0
B-6Demo Retaining WallC.Q.SF295$ - 0
B-7Install Segmental Retaining WallC.Q.SF889$ - 0
B-8Gabion WallC.Q.C.Y.8.8$ - 0
B-9Handrail - Remove and Reset, Repair, RefinishC.Q.L.S.1$ - 0
B-10Erosion Control - WattleC.Q.Foot667$ - 0
BASE BID SUBTOTAL$ - 0
O-1Trail ReconstructionC.Q.S.Y.91$ - 0
O-2Route and seal cracksC.Q.Foot283$ - 0
O-3Asphalt Seal CoatC.Q.SY700$ - 0
O-4Demo Retaining WallC.Q.SF442$ - 0
O-5Install Segmental Retaining WallC.Q.SF620$ - 0
O-6Erosion Control - WattleC.Q.Foot217
OPTION BID ITEMS SUBTOTAL$ - 0
PROJECT TOTAL, INCLUDING BASE AND ALL OPTIONS$ - 0