Amend 0003_SUMMARY OF CHANGES.pdf
PDF 107 KB Posted
- Attached to
- Veterans Point Trail Rehabilitation Project Federal contract opportunity
- Solicitation number
- 1240LT26Q0015
- Issued by
- Department of Agriculture Forest Service
About this file
This is an Amendment to a federal solicitation for the Veterans Point Trail Rehabilitation Project located in the Black Hills National Forest, Pennington County, South Dakota. Amendment Three (0003/A0003) to Solicitation Number 1240LT26Q0015 provides three key modifications: an additional site visit scheduled for February 25, 2026, at 1:00 p.m. Mountain Time at coordinates 44°04'56.2"N 103°29'36.9"W (1.6 miles south on US385 from the junction of US385 and SD44 to Custer Gulch Road); an extended deadline for questions to March 3, 2026, at 10:00 a.m. Mountain Time; and an extended deadline for quote submissions to March 24, 2026, at 10:00 a.m. Mountain Time. Prospective contractors must schedule pre-bid site visits by contacting the Contracting Officer Representative (COR), Richard Zacher, at Richard.zacher@usda.gov or (605)440-3471 no later than noon Mountain Time on February 24, 2026. Questions and quotes must be submitted via email to Janice King, Contract Specialist (janice.king@usda.gov) and Lucas Dahlman, Contracting Officer (lucas.dahlman@usda.gov), with the email subject line reading "Veterans Point Trail Rehabilitation Question/Quote – 1240LT26Q0015." All other terms and conditions of the original solicitation remain unchanged.
The amendment also includes a Questions and Answers section addressing five key contractor inquiries regarding detailed quantity takeoffs for segmental retaining walls and asphalt rehabilitation, approved equipment access routes, public trail access during construction, designated staging and material storage areas, and working hours or seasonal restrictions. Answers reference specific sections of the Final Drawings (sheet 2 of 7 and sheet 5 of 7) and Final Specifications (Attachment 4), indicating that equipment access is limited to the existing trail and the path to the parking lot, equipment cannot cross the existing pedestrian wooden bridge, and contractors should reference the General Requirements sections for staging area, public protection, and schedule information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0004_SUMMARY OF CHANGES.pdf | ||
| Attach 3. Updated Schedule of Items_Veterans Point_ 26FEB2026.xls | XLS spreadsheet | |
| Attach 4. Updated Specifications_Veterans Point_26Feb2026.pdf | ||
| Amend 0002_SUMMARY OF CHANGES.pdf | ||
| Attach 6. Updated Wage Determination_SD20260001_01.30.2026.pdf | ||
| Amend 0001_SUMMARY OF CHANGES.pdf | ||
| Attach 1. Solicitation_Terms and Agreement_Veterans Point Trail.pdf | ||
| Attach 3. Schedule of Items_Veterans Point_ 9Dec2025.xls | XLS spreadsheet | |
| Attach 4. Final Specs_Veterans Point_10Dec2025.pdf | ||
| Attach 2. Statement of Work_Veterans Point_9Dec2025.pdf | ||
| Attach 5. Final Drawings_ 01.27.2026.pdf | ||
| Attach 6. Wage Determination_SD20260032_01.02.26.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF CHANGES
PROJECT: VETERANS POINT TRAIL REHABILIATION PROJECT
Black Hills National Forest, Pennington County, South Dakota
Solicitation Number: 1240LT26Q0015 – A0003
The purpose of Amendment Three (Amendment 0003/A0003) is as follows:
Please read this Amendment in its entirety.
1) To provide an additional Site Visit.
2) To extend the due date for questions and for quote submissions as below indicated.
3.) All other terms and conditions remain the same.
The additional site visit will be held on February 25th, 2026, at 1:00 p.m. Mountain Time
Location for the Veterans Point Trail Rehabilitation Project site visit:
Coordinates: 44°04'56.2"N 103°29'36.9"W
1.6 miles south on US385 from the Jct. of US385 and SD44 to Custer Gulch Road.
Note: US385 is closed to through traffic from Taylor Ranch Road to Pactola Lake Dam.
To schedule a pre-bid site visit for the projects, contact the COR, Richard Zacher, via email at Richard.zacher@usda.gov or by phone at (605)440-3471 no later than noon, 12:00 p.m., Mountain Time, on February 24, 2026.
The due date for questions is extended to March 3rd, 2026, at 10:00 a.m. Mountain Time
The due date for quotes/responses is extended to March 24th, 2026, at 10:00 a.m. Mountain Time.
Email addresses for submission of questions and quotes by the respective due dates to following:
Janice King, Contract Specialist, at janice.king@usda.gov and Lucas Dahlman, Contracting Officer, at lucas.dahlman@usda.gov.
In the submission of your questions and/or quotes, include in the email’s subject line:
Veterans Point Trail Rehabilitation Question/Quote (which ever applies) – 1240LT26Q0015.
mailto:Richard.zacher@usda.gov mailto:janice.king@usda.gov mailto:lucas.dahlman@usda.gov
QUESTIONS and ANSWERS:
1. Are detailed quantity takeoffs available for the segmental retaining walls, asphalt rehabilitation areas, and gabion work, or should contractors rely solely on measurements from the drawings? See tables in the Final Drawings sheet 5 of 7.
2. What equipment access routes are approved for construction activities, and are there any restrictions on staging or material delivery paths? Equipment access is on the existing trail and the Path to Parking Lot shown in the Final Drawings sheet 2 of 7 and in Part 1.5.B: SITE ACCESS of the General Requirements in the Final Specs, Attach 4. Equipment is not to cross the existing pedestrian wooden bridge.
3. Will the trail remain open to the public during construction, and if so, what level of traffic control is expected from the contractor? See Part 1.7.C: STAGING AREA of the General Requirements in the Final Specs, Attach 4. See Part 1.11.A: PROTECTION OF PUBLIC of the General Requirements in the Final Specs, Attach 4.
4. Are there designated staging and material storage areas available on site, and are there limits on temporary laydown zones? See Part 1.7.C: STAGING AREA of the General Requirements in the Final Specs, Attach 4.
5. Are there restrictions on working hours or seasonal limitations beyond those noted in the solicitation? See Part 1.10.A and Part 1.10.B: SCHEDULE of the General Requirements in the Final Specs, Attach 4.