This is a technical specifications document issued by the County of Sacramento, Department of Waste Management and Recycling, detailing the minimum requirements for one new landfill compactor to be procured through a full-service operating lease for use at the Kiefer Landfill. The compactor must be purpose-built for municipal solid waste landfill operations, manufactured within twelve months of the bid date, and not a modified wheel loader. The equipment specifications encompass comprehensive requirements across multiple categories including a minimum operating weight of 123,000 pounds, a six-cylinder diesel engine with minimum 550 net flywheel horsepower and Tier 4 Final emissions compliance, a powershift transmission with minimum four forward and four reverse speeds, articulated frame steering, four steel landfill compaction wheels with approximately 48-inch minimum width and 67-inch minimum diameter incorporating a minimum of 190 compactor tips, and a semi-U blade assembly with minimum 22 cubic yard capacity. The compactor must feature a ROPS/FOPS certified pressurized cab with air conditioning, rearview camera system, and integrated monitoring systems, along with a factory-installed automatic fire suppression system containing two 50-pound dry chemical cylinders and dual-zone detection.
The specifications mandate additional critical components including a heavy-duty cooling system designed for ambient temperatures exceeding 110 degrees Fahrenheit, a load-sensing hydraulic system with 10-micron or better filtration, a factory telematics system with GPS tracking and machine diagnostics with minimum four-year subscription included, and a comprehensive landfill guarding package with full engine compartment, belly, axle, and frame protection installed at the factory. The vendor must deliver the equipment complete, serviced, fueled, and ready for operation to Kiefer Landfill located at 12701 Kiefer Boulevard, Sloughhouse, California 95683, and provide two operator training sessions of minimum four hours each, one maintenance training session of minimum two hours, and a follow-up field visit within seven working days after delivery. The compactor must include a minimum 24-month/5,000-hour comprehensive machine warranty and a minimum 60-month/10,000-hour structural frame warranty, with parts availability guaranteed within 24 hours. The County anticipates operating the equipment up to seven days per week for 52 weeks per year.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPACTOR TECHNICAL SPECIFICATIONS
County of Sacramento
Department of Waste Management and Recycling
LANDFILL COMPACTOR
TECHNICAL SPECIFICATIONS
These specifications describe the minimum requirements for one (1) new, unused landfill compactor designed specifically for municipal solid waste landfill operations and manufactured within twelve (12) months of the bid date.
The machine shall be purpose-built for landfill service and shall not be a modified wheel loader.
A. OPERATING WEIGHT
Compliance Specification
___ ___ 1. Minimum operating weight shall be 123,000 lbs.
___ ___ 2. Weight shall include all guarding, wheels, tips, fluids, fuel, fire suppression system, and landfill package.
___ ___ 3. No ballast or add-on weights permitted to achieve minimum operating weight.
___ ___ 4. Machine shall be specifically designed and manufactured for landfill compaction operations.
B. ENGINE
Attachment 2a
Compliance Specification
___ ___ 1. Six-cylinder diesel engine.
___ ___ 2. Minimum net flywheel horsepower: 550 HP.
___ ___ 3. Tier 4 Final emissions compliant.
___ ___ 4. Turbocharged and aftercooled.
___ ___ 5. Electronic engine controls.
___ ___ 6. Heavy-duty landfill air intake pre-cleaning system.
___ ___ 7. Reversible cooling fan.
___ ___ 8. Quick-change engine oil evacuation system.
C. ELECTRICAL SYSTEM
Compliance Specification
___ ___ 1. 24-volt electrical system.
___ ___ 2. Minimum 150-amp alternator.
___ ___ 3. Maintenance-free batteries.
___ ___ 4. LED lighting package.
___ ___ 5. Electronic backup alarm.
___ ___ 6. Integrated monitoring system with visual and audible alarms.
D. TRANSMISSION
Compliance Specification
___ ___ 1. Powershift transmission.
___ ___ 2. Minimum four forward and four reverse speeds.
___ ___ 3. Automatic shift capability.
___ ___ 4. Lock-up torque converter.
___ ___ 5. On-the-go shifting and directional changes.
E. COOLING SYSTEM
Compliance Specification
___ ___ 1. Heavy-duty cooling package designed for landfill service.
___ ___ 2. Modular radiator core construction.
___ ___ 3. Automatic reversing fan.
___ ___ 4. Designed for operation in ambient temperatures exceeding
110°F.
___ ___ 5. Radiator guard shall allow easy cleaning access.
F. STEERING
Compliance Specification
___ ___ 1. Articulated frame steering.
___ ___ 2. Hydraulic steering system.
___ ___ 3. Emergency steering system meeting SAE standards.
___ ___ 4. Steering shall be fully functional at all operating speeds.
G. AXLES AND FINAL DRIVES
___ ___ 1. Heavy-duty landfill axle arrangement.
___ ___ 2. Planetary final drives.
___ ___ 3. Oscillating rear axle.
___ ___ 4. Axle guards and seal protection.
___ ___ 5. Full undercarriage guarding.
H. WHEELS AND TIPS
Compliance Specification
___ ___ 1. Four steel landfill compaction wheels.
___ ___ 2. Wheel width approximately 48 inches minimum.
___ ___ 3. Minimum wheel diameter 67 inches.
___ ___ 4. Wheels shall incorporate paddle and cleat design for maximum compaction.
___ ___ 5. Minimum tip count: 190 total.
___ ___ 6. Replaceable compactor tips and wear bars.
___ ___ 7. Tip retainers shall be protected from refuse wrapping.
___ ___ 8. Self-cleaning wheel design.
I. BLADE ASSEMBLY
Compliance Specification
___ ___ 1. Landfill push blade.
___ ___ 2. Semi-U configuration.
___ ___ 3. Minimum blade capacity 22 cubic yards.
___ ___ 4. Full hydraulic lift and tilt.
___ ___ 5. Heavy-duty wear-resistant construction.
___ ___ 6. Trash rack integrated into blade structure.
___ ___ 7. Blade hoses protected from refuse damage.
J. CAB ASSEMBLY
Compliance Specification
___ ___ 1. ROPS/FOPS certified cab.
___ ___ 2. Fully enclosed and pressurized.
___ ___ 3. Air conditioning and heater.
___ ___ 4. Tinted safety glass.
___ ___ 5. Air suspension seat.
___ ___ 6. Rearview camera system.
___ ___ 7. Front and rear windshield wipers and washers.
___ ___ 8. AM/FM radio with Bluetooth.
___ ___ 9. Noise levels shall meet OSHA requirements.
K. HYDRAULIC SYSTEM
Compliance Specification
___ ___ 1. Load-sensing hydraulic system.
___ ___ 2. Separate steering and implement circuits.
___ ___ 3. Filtration rating 10 microns or better.
___ ___ 4. Quick-change hydraulic oil service system.
___ ___ 5. Double-acting cylinders.
L. LANDFILL GUARDING PACKAGE
Compliance Specification
___ ___ 1. Full engine compartment guarding.
___ ___ 2. Belly guards.
___ ___ 3. Axle seal guards.
___ ___ 4. Ladder and handrail protection.
___ ___ 5. Transmission guarding.
___ ___ 6. Hydraulic hose protection.
___ ___ 7. Front frame impact guards.
___ ___ 8. Rear frame protection package.
___ ___ 9. Debris-resistant radiator protection system.
___ ___ 10. Landfill package shall be factory installed.
M. FIRE SUPPRESSION SYSTEM
Compliance Specification
___ ___ 1. Factory-installed automatic fire suppression system.
___ ___ 2. Two (2) 50-pound dry chemical cylinders minimum.
___ ___ 3. Minimum sixteen (16) discharge nozzles.
___ ___ 4. Dual-zone detection system.
___ ___ 5. Manual activation inside and outside cab.
___ ___ 6. Audible and visual warning system.
___ ___ 7. One 20-pound Purple K extinguisher mounted externally.
N. TELEMATICS
Compliance Specification
___ ___ 1. Factory telematics system.
___ ___ 2. GPS location tracking.
___ ___ 3. Machine diagnostics.
___ ___ 4. Idle time reporting.
___ ___ 5. Fuel consumption monitoring.
___ ___ 6. Minimum 4-year subscription included.
O. SERVICEABILITY
Compliance Specification
___ ___ 1. Fast-fill diesel system.
___ ___ 2. Fast-fill DEF system.
___ ___ 3. Ground-level service points.
___ ___ 4. Quick-change fluid evacuation system for engine, hydraulic, transmission, and axle compartments.
___ ___ 5. Swing-out cooling package access.
P. DELIVERY
Machine shall be delivered complete, serviced, fueled, inspected, and ready for operation to:
Kiefer Landfill
12701 Kiefer Boulevard
Sloughhouse, California 95683
Q. TRAINING
Vendor shall provide:
Two (2) operator training sessions (minimum four hours each)
One (1) maintenance training session (minimum two hours)
Follow-up field visit within seven working days after delivery
R. WARRANTY
Minimum 24-month / 5,000-hour comprehensive machine warranty.
Minimum 60-month / 10,000-hour structural frame warranty.
Parts availability within 24 hours.