Attach 25 Evaluation tables.docx

DOCX document 24 KB Posted

Attached to
Defense Enclave Services (DES) RFP
Solicitation number
HC104720R0014
Issued by

About this file

This document contains evaluation tables and a description of a federal contract opportunity for Defense Enclave Services. The Defense Information Systems Agency intends to award an indefinite delivery, indefinite quantity contract with a ceiling of over $11 billion for a period of 10 years. The contract will provide integrated, standardized and cost-effective information technology services to support 22 Defense Agencies and Field Activities. Services will include managing, operating and supporting the Fourth Estate network architecture to improve security, availability and reliability. A minimum of 25% of the contract value is reserved for small business participation. The solicitation number is HC104720R0014 and proposals are due in the first quarter of fiscal year 2022.

View the file

Other files

File Type Posted
Attach 33 Additional Q A RFP 02052021.xlsx XLSX spreadsheet
Reading Library 8 - DISANet Authorized Hardware List 11092020.xlsx XLSX spreadsheet
Amd 06 final.pdf PDF
Reading Library 12 - DoDNet Equipment Management Consolidated Product List (2020).xlsx XLSX spreadsheet
Attach 21 SOO Appendix F DES TO 0001 DAFA Data Calls 02052021.xlsx XLSX spreadsheet
Amd 05 final.pdf PDF
Attach 15 SOO Appendix F DES IDIQ DAFA Data Calls 01282021.xlsx XLSX spreadsheet
Attach 8 IDIQ Labor Rates 01272021 (v1) (PROTECTED).xlsx XLSX spreadsheet
Attach 15 SOO Appendix F DES IDIQ DAFA Data Calls 01272021.xlsx XLSX spreadsheet
Reading Library 11-DISANet Authorized Software List NIPR-SIPR 01272021.xlsx XLSX spreadsheet
Attach 23 TO 0001 DD254 01272021.pdf PDF
Attach 11 SOO Appendix B DES IDIQ places of performance 01272021.docx DOCX document
Attach 9 TO 0001 SOO 01272021.docx DOCX document
Attach 31 SOO Appendix A-DES TO 001 Services Summary 01272021.docx DOCX document
Attach 21 SOO Appendix F DES TO 0001 DAFA Data Calls 01272021.xlsx XLSX spreadsheet
Attach 32 Q A RFP.xlsx XLSX spreadsheet
Attach 27 Labor Category Descriptions 01272021.docx DOCX document
Attach 14 SOO Appendix E - DES IDIQ PWS Template 01272021.docx DOCX document
Amd 04 final.pdf PDF
Attach 17 SOO Appendix B DES TO 0001 Places of Performance 01272021.docx DOCX document
Reading Library 13 DISA High Performing Sites 01272021.xlsx XLSX spreadsheet
Attach 28 DES TO 001 CLIN Structure 01272021 (DON).xlsx XLSX spreadsheet
Attach 29 SOO Appendix A Services Summary 01272021.docx DOCX document
Attach 22 SOO Appendix G DES TO 0001 Glossary 01272021.docx DOCX document
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted.jpg JPG image
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted17Dec.pdf PDF
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted.pdf PDF
Attach 30 QA DRFP_12032020.xlsx XLSX spreadsheet
Attach 8 IDIQ Labor Rates 12102020 (v1) (PROTECTED).xlsx XLSX spreadsheet
HC104720R0014 amd 01.pdf PDF
Reading Library 3 - DSMC Event Management SOP_4 August 2020_Redacted.pdf PDF
Attach 10 Non disclosure agreements contractors.docx DOCX document
Attach 16 SOO Appendix G -Glossary 09232020.docx DOCX document
Reading Library 5 - Legacy SOP_ DSMC Event Management_Redacted.pdf PDF
Attach 9 TO 0001 SOO 12032020.docx DOCX document
Attach 6 Past Performance Questionnaires.docx DOCX document
Attach 7 Sample Consent Letter.docx DOCX document
Attach 22 SOO Appendix G -DES TO 0001 Glossary.docx DOCX document
Attach 29 SOO Appendix A Services Summary.docx DOCX document
Reading Library 12 - Equipment Management Consolidated Product List (2020).xlsx XLSX spreadsheet
Reading Library 9 - DISA ITSM Flow Chart.pptx PPTX presentation
Reading Library 11 - DISANet Authorized Software List NIPR 2020-11-17.xlsx XLSX spreadsheet
Attach 19 SOO Appendix D - DES TO 0001 QASP 12032020.docx DOCX document
Attach 13 SOO Appendix D- DES IDIQ GSC Workload - 09222020.docx DOCX document
Attach 31 SOO Appendix A-DES TO 001 Services Summary 120220.docx DOCX document
Attach 3 Subcontracting Plan Checklist.docx DOCX document
Attach 28 DES TO 0001 CLIN Structure 12082020.xlsx XLSX spreadsheet
Reading Library 8 - Approved Hardware List 11092020.xlsx XLSX spreadsheet
Reading Library 4 - Legacy Process_After Hours Outage Notification_Redacted.pdf PDF
Reading Library 7 - Legacy SOP_Problem Management_Redacted.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 25: Evaluation Tables

Evaluation Tables

Table 1. Combined Technical/Risk Ratings

Color
Rating
Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Table 2. Definitions Relating to the Technical Evaluation Rating Process

Deficiency is a material failure of a proposal/quotation to meet a Government requirement or a combination of significant weaknesses in a proposal/quotation that increases the risk of unsuccessful contract performance to an unacceptable level.

Risk, as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

Significant Weakness in the proposal/quotation is a flaw that appreciably increases the risk of unsuccessful contract performance.

Strength is an aspect of an offeror's proposal/quotation that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Uncertainty is any aspect of a non-cost/price factor proposal/quotation for which the intent of the offeror is unclear (e.g., there is more than one way to interpret the proposal/quotation or inconsistencies in the proposal/quotation indicating there may have been an error, omission, or mistake).

Weakness means a flaw in the proposal/quotation that increases the risk of unsuccessful contract performance.

Table 3. Past Performance Relevancy Ratings

Rating
Definition
VERY RELEVANT
Present/past performance effort involved essentially the same

scope and magnitude of effort and complexities this solicitation requires.

RELEVANT
Present/past performance effort involved similar scope and

magnitude of effort and complexities this solicitation requires.

SOMEWHAT RELEVANT
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Table 4. Past Performance Quality Ratings

Quality Assessment Rating
Description

EXCEPTIONAL (E)

During the contract period, contractor performance meets or met contractual requirements and exceeds or exceeded many to the Government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

VERY GOOD (VG)

During the contract period, contractor performance meets or met contractual requirements and exceeds or exceeded some to the Government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

SATISFACTORY (S)

During the contract period, contractor performance meets or met contractual requirements. The contractual performance of the element or sub-element being assessed contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

MARGINAL (M)

During the contract period, contractor performance does not or did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

UNSATISFACTORY(U)

During the contract period, contractor performance does not or did not meet most contractual requirements and recovery in a timely manner is not likely. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

NOT APPLICABLE (N)
Unable to provide a rating. Contract did not include performance for this aspect. Do not know.

Table 5 – Performance Confidence Assessments

Rating
Description
SUBSTANTIAL CONFIDENCE
Based on the offeror’s recent/relevant performance record, the

Government has a high expectation that the offeror will successfully perform the required effort.

SATISFACTORY CONFIDENCE
Based on the offeror’s recent/relevant performance record, the

Government has a reasonable expectation that the offeror will successfully perform the required effort.

NEUTRAL CONFIDENCE
No recent/relevant performance record is available or the

offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

LIMITED CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

NO

CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

TABLE 6 . SCRM PLAN RATINGS

Rating
Description
Acceptable
Proposal indicates an adequate approach and understanding of Supply Chain Risk Management with a proposed mitigation plan to accommodate possible risks.
Unacceptable
Proposal does not indicate an adequate approach and understanding of Supply Chain Risk Management or does not include a proposed mitigation plan to accommodate possible risks.

File details come from the government source that posted it. Updated .