Attach (17) - MECSP Worksheet.docx

DOCX document 22 KB Posted

Attached to
Submarine Rescue Vessel Extended Time Charter
Solicitation number
N3220526R6077
Issued by

About this file

This is a Mission Essential Contractor Services Plan (MECSP) Worksheet template required as part of a submarine rescue vessel time charter solicitation issued by the Department of the Navy Military Sealift Command. The worksheet is not a substantive solicitation document but rather a compliance template that offerors must complete and submit in accordance with DFARS 252.237-7024 and RFP Section L-4.11.

The worksheet requires offerors to provide narrative descriptions addressing six mandatory elements of a MECSP: (1) provisions for acquiring essential personnel and resources to maintain operations for up to 30 days or until normal operations resume; (2) strategies for addressing challenges during extended crises such as pandemics occurring in repeated waves; (3) mitigation of time lapses between acquisition initiation and on-site availability of personnel and resources; (4) components and processes for identifying, training, and preparing personnel capable of remote work or relocation to alternate facilities; (5) established alert and notification procedures for mobilizing essential contractor service personnel; and (6) approaches for communicating crisis roles and responsibilities to contractor employees. Offerors must reference specific sections and page numbers of their proposed MECSP documents where each requirement is addressed, with worksheet responses serving as addenda if required information is not included in the primary MECSP submission.

View the file

Other files

File Type Posted
N3220526R6077 Amendment 0005.pdf PDF
N3220526R6077 Amendment 0004.pdf PDF
Attach (01) - PROFORMA - SPECIALTIME 2026 (A0003).pdf PDF
Attach (04) - Wage Determination 2019-0288 Rev. 27 (A0003).pdf PDF
N3220526R6077 Amendment 0003.pdf PDF
N3220526R6077 - Q and A (A0003).pdf PDF
Attach (05) - Government Furnished Property (A0002).xlsx XLSX spreadsheet
N3220526R6077 Amendment 0002.pdf PDF
Attach (01) - PROFORMA - SPECIALTIME 2026 (A0002).pdf PDF
N3220526R6077 Amendment 0001.pdf PDF
Attach (01) - PROFORMA - SPECIALTIME 2026 (A0001).pdf PDF
Attach (02) - Performance Work Statement.pdf PDF
Attach (07) - Crew Complement.docx DOCX document
Attach (10) - CBRN Requirements.pdf PDF
Attach (15) - CDRL 0001.pdf PDF
Solicitation - N3220526R6077.pdf PDF
Attach (01) - PROFORMA - SPECIALTIME 2026.pdf PDF
Attach (16) - MSC SOM.pdf PDF
Attach (19) - Clarification and Question Form.docx DOCX document
Attach (04) - Wage Determination 2019-0288 Rev. 26.pdf PDF
Attach (06) - Basic Pricing Data.xlsx XLSX spreadsheet
Attach (18) - SFLLL.pdf PDF
Attach (22) - Shipyard Data Info Template.xlsx XLSX spreadsheet
Attach (03) - Guidelines for Off-Hire.pdf PDF
Attach (05) - Government Furnished Property.xlsx XLSX spreadsheet
Attach (09) - ATFP.pdf PDF
Attach (11-1) - Specs Decon Station (CRBD).pdf PDF
Attach (11-2) - CBRN Decon Stat DWG.pdf PDF
Attach (20) - Technical Offer Worksheet.xlsx XLSX spreadsheet
Attach (24) - MOSHIP_Criteria_Manual_for_USN_SubRescue_Rev_E.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN (MECSP) WORKSHEET

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Section L-4.11 of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b) (2) (i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b) (2) (ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b) (2) (iii)).

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b) (2) (iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b) (2) (v)).

File details come from the government source that posted it. Updated .