Att J-8_Seed Project Bid Schedule.pdf
PDF 195 KB Posted
- Attached to
- FY25 Multiple Award Construction Contract (MACC) recompete Federal contract opportunity
- Solicitation number
- FA448424R0017
About this file
This document appears to be an Attachment J-8 titled "Seed Project Bid Schedule" related to a federal contract opportunity for a FY25 Multiple Award Construction Contract (MACC) recompete at JB MDL NJ.
The Seed Project Bid Schedule outlines the unit price items required for the contract, including Architect-Engineering (A-E) services to design and deliver a completed project, and demolition and construction services to convert an existing dorm room into a new kitchenette based on the A-E drawings and specifications. The design performance period is 100 days, and the construction performance period is 180 days. The document includes pricing notes such as unit price verification, application of lump sum adjustments, and the requirement to provide bids on all items. The related federal contract opportunity is Solicitation Number FA448424R0017, which seeks contractors to perform a variety of construction and specialty trade tasks at the Air Mobility Command facility.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
ITEM SUPPLIES/SERVICES QUANTITY UNIT PRICE AMOUNT
1 Architect -Engineering (A-E) services to design and deliver completed, drawings, specifications, cost estimates, design analysis and other design package documents, in accordance with SOO and SK-1 dated 2-
1-24. 1 JOB $0.00
2 Provide all labor, equipment, appliances, and materials and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to provide the demolition and construction services for the conversion of the existing dorm room into a new kitchenette based on A-E drawings and specifications.
1 JOB $0.00
SUB-TOTAL: $0.00
ITEM OPTIONAL LINE ITEMS
ITEM SUPPLIES/SERVICES (Estimated Quantity)
ESTIMATED
QUANTITY
UNIT UNIT PRICE
ESTIMATED
AMOUNT
TOTAL Lines 1 and 2
Design Performance Period: 100 days Construction Performance Period: 180 days
NOTE 1: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
NOTE 2: If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro-rata basis to every unit price in the bid schedule.
NOTE 3: Failure to provide a bid on all items will render your bid non-responsive.
PART 1 - THE SCHEDULE
MSBL 24-1023 - CONVERT ROOM 420 ON 4TH FLOOR OF BUILDING 481 INTO A KITCHENETTE
SUPPLIES OR SERVICE AND PRICES/COSTS
File details come from the government source that posted it. Updated .