Att J-5 - CDRL Reference.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Surface Ship Undersea Warfare (USW) Combat System Production Federal contract opportunity
Solicitation number
N0002423R5202
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a spreadsheet listing 62 Contract Data Requirements Lists (CDRLs) for the federal contract opportunity titled "Surface Ship Undersea Warfare (USW) Combat System Production" being solicited by the Department of the Navy Naval Sea Systems Command.

The CDRLs require the contractor to submit various technical and management reports, plans, specifications, and documentation on frequencies ranging from event-driven to yearly. Deliverables include progress reports, integrated program management data reports, risk management reports, meeting minutes and agendas, data accession lists, quality deficiency reports, system integration plans, verification and validation reports, engineering analyses data and reports, safety hazard analyses, program management plans, test plans and procedures, configuration status accounting information, reliability and maintainability program plans, failed item analyses, item identification marking plans, engineering change proposals, and diminishing manufacturing sources plans. Submission dates and approval requirements vary by CDRL, with approval generally required within 30 days of receipt of government comments until approval is obtained.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Ship Undersea Warfare (USW) Combat System Production, newest first.
File Type Posted
N0002423R5202 Amendment 0002.pdf PDF
Attch JS-2 - Staffing Plan Amendment 0001.xlsx XLSX spreadsheet
N0002423R5202 Amendment 0001.pdf PDF
N00024-23-R-5202 Bidders Question Responses 09072023.pdf PDF
Att J-2 - GFP List Amendment 0001.xlsx XLSX spreadsheet
Attch JS-3 - Cost Element Summary Spreadsheets Amendment 0001.xlsx XLSX spreadsheet
N00024-23-R-5202 Bidders Questions Response 080823.pdf PDF
Exhibit A - Contract Data Requirements List.xlsx XLSX spreadsheet
Exhibit A_Attachment 1 - Data Distribution List.docx DOCX document
Att JS-2 - Staffing Plan.xlsx XLSX spreadsheet
Att JS-4 Contractor Award Information.docx DOCX document
Att J-1 DD254.pdf PDF
Att J-2 - GFP List.xlsx XLSX spreadsheet
Att JS-1 Bidders Question Submittal Form.xlsx XLSX spreadsheet
Att JS-3 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
Att J-3 - GFI List - 23Mar23.pdf PDF
N00024-23-R-5203 Draft RFP Responses.pdf PDF
N00024-23-R-5202 FINAL 08042023.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CDRLTitleDIDSOW Para'sFrequencyDate of first submissionDate of subsequent submissionApproval RequirementFormat SpecificDiscussion
A001Contractor's Progress and Status ReportDI-MGMT-819283.1, 3.1.1, 3.1.4, 3.1.7, 3.1.8, 3.2, 3.2.1, 3.2.1.3, 3.2.4.5Monthly30 days ACA15 Calendar Days After Reporting Period (CDARP)No
A002Contract Work Breakdown StructureDI-MGMT-81334D3.1.3As required15 days ACAAs requiredYesResubmit NLT 30 Calendar Days After Receipt of Comments (CDARC) until approved
A003Integrated Program Management Data and Analysis Report (IPMDAR)DI-MGMT-81861C3.1.6Monthly30 days ACA15 CDARPNoEVM report submitted to EVM-CR website
A004Risk Management Status ReportDI-MGMT-818093.1.7Monthly90 days ACA15 CDARPNo
A005Meeting MinutesDI-ADMN-81250C3.1.5, 3.1.9Event-driven5 working days after a meeting or conferenceN/ANoSystem Engineering Technical Reviews, Program Reviews, programmatic meetings
A006Meeting AgendaDI-ADMN-81249C3.1.5, 3.1.9Event-driven10 working days before a meeting or conferenceN/ANo
A007Data Accession ListDI-MGMT-81453B3.1.12Yearly30 days ACA30 CDARPNo
A008Quality Deficiency ReportDI-QCIC-807363.1.16Monthly30 days ACA15 CDARPNoSubmitted in conjuction with A001
A009Status of GFE ReportDI-MGMT-802693.1.16SEMIA180 days ACA30 CDARPNoBLK 10 - Every 6 months
A010System/Software Integration Plan: Infrastructure as a Service Integration PlanDI-SESS-820443.2.1.9As required60 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A011Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) ReportDI-MSSM-817523.1.4, 3.2.4.5Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A012Request for VarianceDI-MGMT-80640E3.2, 3.5.8, 3.5.10Event-drivenPer Technical InstructionPer Technical InstructionYesPer IWS 5 CM PlanPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A013Management Plan: Materials Screening PlanAs required60 DACPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A014Specification Requirement Verification MatrixDI-MISC-812833.2, 3.2.1.7, 3.3.4Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A015Technical Report – Study/Services: Engineering Analyses DataDI-MISC-80508B3.2, 3.2.1.9Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A016Technical Report – Study/Services: Engineering Analyses ReportsDI-MISC-80508B3.2, 3.2.1.8, 3.2.1.9Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A017System Engineering Management PlanDI-SESS-81785A3.2.1As required30 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A018System Safety Hazard Analysis Report (SSHAR)DI-SAFT-80101C3.2.1.2Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A019Program Management PlanDI-MGMT-817973.1.8As required30 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A020Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) PlanDI-MSSM-817513.2.1.5Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A021Quality Assurance Program PlanDI-QCIC-81794A3.2.1.6As required30 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A022Software Requirements Specification (SRS): Infrastructure as a Service SpecificationsDI-IPSC-81433A3.2.1.9Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A023Technical Report: Work InstructionDI-MISC-80508B3.5.18As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A024Interface Design DescriptionDI-IPSC-81436A3.2.3.1Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A025Technical and Management Work PlanDI-MGMT - 81117A3.1.18As required30 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A026Interface Requirement Specification: Hardware Performance and Interface RequirementsDI-IPSC-81434A3.2.2, 3.2.2.1Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A027Production Inspection Equipment Test Systems Engineering Design Data: Engineering Design Data PackageDI-ALSS-815463.2.2.2Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A028Management Plan: System Integration PlanDI-MGMT - 80004A3.2.3Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A029Contractor's Risk Management PlanDI-MGMT-818083.1.9As required60 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A030Technical Report - Studies/Services: Unauthorized Sources Purchase ReportDI-MISC-80508B3.3.6.10As requiredPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A031Supplier's Configuration Management PlanDI-SESS-80858D3.5.1As required60 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A032Test PlanDI-NDTI-80566A3.3.4Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A033Test and Evaluation Program Plan (TEPP)DI-NDTI-812843.3.1As required120 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A034Test ProceduresDI-NDTI-80603A3.2.3Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A035Test/Inspection ReportDI-NDTI-80809B3.2.1.9, 3.3.4, 3.3.5, 3.3.6, 3.3.6.1, 3.3.6.2, 3.3.6.3, 3.3.6.4, 3.3.6.5, 3.3.6.6, 3.3.6.7, 3.3.6.8, 3.2.4.8Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A036System Problem Report - SPRDI-MGMT-81232A3.2.1.3As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A037Baseline Description Document: Engineering and Drawing DocumentationDI-SESS-81121A3.2.1.9, 3.2.4.3Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A038Engineering Documentation Product DrawingsDI-DRPR-81680A3.5.19As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A039Configuration Status Accounting Information: Configuration Item Product Function SpecificationDI-SESS-81253E3.2, 3.2.4.4Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A040Configuration Audit PlanDI-SESS-81646C3.2.4.7As requiredPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A041Configuration Status Accounting InformationDI-SESS-81253E3.2.4.8, 3.3.6As requiredPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule, which will reflect 10 days after test. Resubmit NLT 30 CDARC until approved.
A042Reliability and Maintainability (R&M) Program PlanDI-SESS-81613A3.3.6.11, 3.3.6.13As required60 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A043Technical Report - Studies/Services: Failed Item Analysis ReportDI-MISC-80508B3.3.2Monthly90 days ACA10 CDARPYes
A044Technical Report - Study/Services – Performance Based Logistics Business Case AnalysisDI-MISC-80508B3.4.1As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A045Bill of Materials (BOM) for Logistics and Supply Chain Risk ManagementDI-MGMT-81656B3.4.7.1As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A046Item Unique Identification (IUID) Marking PlanDI-MGMT-81803A3.4.8As required120 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A047Baseline Description Document: Technical Content UpdateDI-SESS-81121A3.4.11, 3.4.12As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A048Baseline Description Document: Configuration Item UpdateDI-SESS-81121A3.4.11As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A049Logistics Management Information (LMI): Provisioning Technical DataDI -SESS-822943.4.11As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A050Counterfeit Prevention PlanDI-MISC-818323.3.6.10As required60 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A051Baseline Description Document: Product Baseline Technical Data PackageDI-SESS-81121A3.2.2.2, 3.4.12, 3.5.19As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A052Technical Report - Studies/Services: Corrective Action Summary ReportDI-MISC-80508B3.3.2As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A053Engineering Change ProposalDI-SESS-80639E3.5.5, 3.5.10As requiredPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A054Specification Change NoticeDI-SESS-80643E3.5.12, 3.5.14As requiredPer Technical InstructionPer Technical InstructionYesCM PlanPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A055Notice of RevisionDI-SESS-80642E3.5.13As requiredPer Technical InstructionPer Technical InstructionYesCM PlanPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A056OPSEC PlanDI-MGMT-80934C3.1.17As required30 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A057As-Built Configuration List -Common

tc={F222273B-E9FC-4E0E-A656-E7E4A5EF7FBC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

5218 Block 4 description is way off from intended usage. Use A41 for all?DI-SESS-818303.5.3.1, 3.5.17Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A058Training Materials: Source ContentDI-ILSS-808723.6.1As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A059Training Conduct Support Document: Training Conduct ReportDI-PSSS-81523D3.6.2As requiredPer Technical InstructionPer Technical InstructionYesResubmit NLT 30 CDARC until approved
A060Installation Control DrawingsDI-DRPR-812423.2.2.2Event-drivenPer Technical InstructionPer Technical InstructionYesPer agreed upon development schedule. Resubmit NLT 30 CDARC until approved
A061Cost Data Summary ReportDI-FNCL-81565C3.1.4As requiredPer Technical InstructionPer Technical InstructionYesPer the OSD guidance?
A062Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management PlanDI-MGMT-819483.2.2.2As required90 days ACAPer Technical InstructionYesResubmit NLT 30 CDARC until approved

File details come from the government source that posted it. Updated .