About this file

This document is a Government Furnished Information (GFI) list for solicitation N00024-23-R-5202 to provide an AN/SQQ-89 Undersea Warfare Combat System.

The GFI list identifies required documentation for an AN/SQQ-89A(V)15 HT0 Engineering Design Data Package, including the document title, number, date, and due date at the contractor's plant. The solicitation is for the Surface Ship Undersea Warfare Combat System Production and is issued by the Department of the Navy Naval Sea Systems Command. The GFI list does not contain any pricing terms or response dates for the solicitation. It solely identifies technical data packages that will be furnished by the government to support proposal preparation and contract performance for providing the AN/SQQ-89 combat system.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Ship Undersea Warfare (USW) Combat System Production, newest first.
File Type Posted
N0002423R5202 Amendment 0002.pdf PDF
Attch JS-3 - Cost Element Summary Spreadsheets Amendment 0001.xlsx XLSX spreadsheet
N0002423R5202 Amendment 0001.pdf PDF
Attch JS-2 - Staffing Plan Amendment 0001.xlsx XLSX spreadsheet
N00024-23-R-5202 Bidders Question Responses 09072023.pdf PDF
Att J-2 - GFP List Amendment 0001.xlsx XLSX spreadsheet
N00024-23-R-5202 Bidders Questions Response 080823.pdf PDF
N00024-23-R-5202 FINAL 08042023.pdf PDF
Att JS-1 Bidders Question Submittal Form.xlsx XLSX spreadsheet
Att JS-3 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
Exhibit A - Contract Data Requirements List.xlsx XLSX spreadsheet
Exhibit A_Attachment 1 - Data Distribution List.docx DOCX document
Att JS-2 - Staffing Plan.xlsx XLSX spreadsheet
Att JS-4 Contractor Award Information.docx DOCX document
Att J-1 DD254.pdf PDF
Att J-2 - GFP List.xlsx XLSX spreadsheet
Att J-5 - CDRL Reference.xlsx XLSX spreadsheet
N00024-23-R-5203 Draft RFP Responses.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Aug. 2021) Page 1 of 6

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Aug. 2021) Page 2 of 6

GOVERNMENT FURNISHED INFORMATION (CON'T)

NAVSEA 4340/2 (Rev. Aug. 2021) Page 3 of 6

NAVSEA 4340/2 (Rev. Aug. 2021) Page 4 of 6

NAVSEA 4340/2 (Rev. Aug. 2021) Page 5 of 6

NAVSEA 4340/2 (Rev. Jul 2020) Page 6 of 6

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Aug. 2021) Page of NAVSEA 4340/2 (Rev. Jul 2020) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1: J-3
TextField2:
TextField7: AN/SQQ-89 Undersea Warfare Combat System
TextField8: N00024-23-R-5202
DateField1: 23 March, 2023
TextField3:
DateField3:
DateField2: Various
DateField2: Various
DateField2: Various
DateField2: 2023-01-12
DateField2: Various
DateField2: 2023-03-14
DateField2: 2023-01-12
DateField2: 2023-01-12
TextField6: Various
TextField6: Various
TextField6: Various
TextField6: N/A
TextField6: Various
TextField6: N/A
TextField6: 22-SQQ-89A-041303
TextField6: 21-SQQ-89A-037211
TextField5: HYPERVISOR TECHNOLOGY 0 (HT0) CONFIGURATION ITEM PRODUCT FUNCTION SPECIFICATION (CIPFS) Package
TextField5: Technical Data Package (TDP) for DDG Initial Package
TextField5: Technical Data Package (TDP) for Build in Place Package
TextField5: CG, DDG & FFG Level 0, 1 & 2 drawings
TextField5: Installation Control Drawings (ICD) Package
TextField5: AN/SQQ-89(V) ENVIRONMENTAL AND PRODUCT

QUALITY SPECIFICATION (EPQS) Revision 8.1 - DRAFT

TextField5: AN/SQQ--89(V)16 HT0 Engineering Design Data 89(V)16 HT0 Engineering Design Data Package (EDDP)Package (EDDP)
TextField5: AN/SQQ--89A(V)15 HT0 Engineering Design Data 89A(V)15 HT0 Engineering Design Data Package (EDDP)Package (EDDP)
TextField4: 1
TextField4: 8
TextField4: 7
TextField4: 6
TextField4: 5
TextField4: 4
TextField4: 3
TextField4: 2

File details come from the government source that posted it. Updated .