Att. 02_Project Requirement Price Schedule.docx
DOCX document 19 KB Posted
- Attached to
- AJJY 25-1073M Repair Rota Dorm B25017
- Solicitation number
- FA524025R0003
About this file
The document is a Project Requirement Price Schedule for a Design-Build construction project at Andersen Air Force Base in Guam. The project involves comprehensive renovation of the Rota Dormitory (B25017), with a total project magnitude between $25-$100 million. Key renovation scope includes complete interior and exterior repairs, full HVAC and plumbing system replacements, electrical distribution system updates, fire protection improvements, and site grading.
The solicitation is a Historically Underutilized Business Zone (HUBZone) Small Business set-aside with a Firm Fixed Price (FFP) contract type, using NAICS code 236220 with a small business size standard of $45 million. The project has a 864-calendar day performance period, with a site visit scheduled for 26 June 2025 and Request for Information deadline of 07 July 2025. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE), and the contract is being executed by the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CUI | FA524025R0003 | |
| Attachment 02 |
PROJECT REQUIREMENT PRICE SCHEDULE
Project #: AJJY 25-1073M
Project Name: Repair Rota Dorm B25017 Andersen Air Force Base, GU
Project Description: The Contractor is tasked with a Design-Build requirement to design and fully repair Rota Dorm (B25017) which includes renovation of interiors including floors, walls, ceiling, finishes, full restroom renovation, updating code for Energy and Life Safety, exterior renovations resulting from recent storm damage. Walkway slabs and spandrel beams will be repaired. Repairs will also include a complete update to the HVAC and Plumbing systems in the Rota dorm. Rota is conditioned by a chilled water and a central chiller plant- both will be replaced. A complete replacement of air handlers, ductwork, grilles, variable air volume boxes, and chilled water piping will be replaced. The chilled water pump will be replaced. All existing plumbing utilities will be replaced and updated. The existing heat pump water heaters will be replaced with standard electric water heaters with large storage tanks. Electrical updates include an update to the entire electrical distribution system. The system updates will include a complete replacement of electrical distribution from the pad mount transformer secondary conductors to the entire downstream building distribution system. Fire protection updates include sprinkler protection throughout, installation of a mass notification system, and a wet-pipe sprinkler system throughout the dorm. The Rota dorm must be re-graded to maintain positive drainage away from the building. Existing storm sewer inlets are buried with debris, dirt, and grass- these are to be cleared. Work shall be performed in accordance with the Statement of Work and all associated attachments.
| ITEM |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL EVALUATED PRICE (TEP) |
| 0001 |
| AJJY 25-1073M Repair Rota Dorm B25017 Andersen Air Force Base, GU |
| 1 |
| LOT |
| CONTRACTOR/OFFEROR NAME |
| ADDRESS |
Proposal Valid Through (Date): ____________
SIGNATURE DATE SIGNED
CUI
File details come from the government source that posted it. Updated .