Att. 01 - Landscaping Statement of Work (SOW), dated 7 May 2024, 1 page.pdf
PDF 130 KB Posted
- Attached to
- Landscape Refresh, Bldg. 1 - Hurlburt Field, FL Federal contract opportunity
- Solicitation number
- FA441724Q0301
About this file
This document is a Statement of Work (SOW) for a landscaping upgrade project at the Air Force Headquarters Special Operation Command (HQ AFSOC) facility on Hurlburt Field, FL. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to remove existing white rock, damaged plant bed edgers, and Crape Myrtle trees, while installing new Sabal Palm trees and pine straw. The related federal contract opportunity is a solicitation for commercial services to provide landscaping services for Building 1 on Hurlburt Field, FL. The solicitation is restricted to small businesses, and the evaluation will use a lowest price technically acceptable (LPTA) approach. The response due date is August 22, 2024 at 2:00 PM CT.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
HQ AFSOC LANDSCAPING UPGRADE PROJECT
7 May 2024
DESCRIPTION OF SERVICES:
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide all landscaping upgrades associated with the Air Force Headquarters Special Operation Command (HQ AFSOC) facility on Hurlburt Field, FL. The HQ AFSOC facility current landscape does not appropriately reflex the image of a MAJCOM.
1.1. BASIC SERVICES.
1.1.1 The contractor shall remove all exist white rock from the north and south sides of the HQ AFSOC facility.
1.1.2 The contractor shall remove/replace damaged plant bed edgers, and reinstall all existing edgers that are in good repair.
1.1.3 The contractor shall extend the plant bed on the northside of the building four (4) additional feet from the existing building wall.
1.1.4 The contractor shall remove five (5) Crape Myrtle trees located on the north side of the building. The trees slated for removal will be identified with a red ribbon. All trees need to be removed and treated to prevent future growth.
1.1.5 The contractor shall remove ten (10) Crape Myrtle tree stumps located in the southside flower bed. All stumps need to be removed, stump grinded, and treated to prevent future growth.
1.1.6 The contractor shall install 40 Sabal Palm trees evenly space in the northeast, northwest, and the southeast plant bed areas.
1.1.7 The contractor shall install pine straw to cover the ground in the northeast, northwest, and the southeast plant bed areas.