Att-9_2019_Flows.pdf

PDF 1 MB Posted

Attached to
O&M Services SBIWTP Federal contract opportunity
Solicitation number
191BWC20R0002
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

This document provides details for a federal contract solicitation for operation and maintenance services of the South Bay International Wastewater Treatment Plant. The International Boundary and Water Commission is seeking a firm-fixed price contract for non-personal services to provide full-service O&M of the 25 million gallon per day plant and associated facilities located in San Diego County, California. Services include day-to-day management, plant operations, maintenance, repair, sampling, testing, reporting, supplies, vehicle fleet management, and grounds maintenance. The base period of performance is from October 1, 2020 to September 30, 2021 with four one-year option periods. Responses are due by September 1, 2020, with a 30-day transition period before the base period start date. The NAICS code is 221320 for Sewage Treatment Facilities with a size standard of $20.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to O&M Services SBIWTP, newest first.
File Type Posted
191BWC20R0002 006.pdf PDF
Att 32 SBIWTP OM Revised Equipment List 06.02.2020.pdf PDF
Att 31 QandA correction and clarification.pdf PDF
191BWC20R0002 0055.pdf PDF
Att 30 Attachment 19 Updated .pdf PDF
Att 29 Answers to Pending Responces.pdf PDF
191BWC20R0002 004.pdf PDF
Att 24c 2019 Monthly SBIWTP OandM Report.pdf PDF
Att 24b 2018 Monthly SBIWTP OandM Report.pdf PDF
Att 16 REV SBIWTP Capital Plan Report 2020 2024.pdf PDF
Att 23 SWIWTP Condition Assessment V4 2020 1 28.pdf PDF
Att 11 REV2 Chemicals Usage Summary.pdf PDF
Att 27 SBIWTP SCADA NW Diagram.pdf PDF
Att 28Questions an Answers.pdf PDF
Att 25 CanyonCollectors.pdf PDF
191BWC20R0002 0003.pdf PDF
Att 1 SBIWTP OM Contract PWS 2020 Revised 05.15.2020.pdf PDF
Att 22 Q and A.pdf PDF
191BWC20R0002 0002.pdf PDF
Att 21 Sign-In PreProposal Conf.pdf PDF
Att 20 WD 2015-5636 Rev 12 .pdf PDF
Att 2 SBIWTP OandM QASP 2020V2.pdf PDF
191BWC20R0002 0001.pdf PDF
Att-6a_FY19 Preventive Maintenance.pdf PDF
Att-17_SBIWTP_SSP_042020.pdf PDF
Att-3_Permit_R9-2014-0009_Amended.pdf PDF
Att 1 SBIWTP OM Contract PWS final 04.27.2020.pdf PDF
Att-16_SBIWTP-Capital Plan Report 2020-2024.pdf PDF
Att-7_2019_Maintenance-Tasks.pdf PDF
Att-12_Form99_Canyon-Inspections.pdf PDF
Att-15_List-of-Permits.pdf PDF
Att-5-SBIWTP Site Latest Layout.pdf PDF
Att-8_2019_Maintenance-Expenses.pdf PDF
Att-4_Stormwater-Permit_wqo2014_0057_dwq_rev_mar2015.pdf PDF
Att-13_Equipment-Inventory.pdf PDF
Att-11-REV_Chemicals-Usage-Summary.pdf PDF
Att-14_Section 508-Compliance-Template.pdf PDF
Att-18-SBIWTP_SOO_V2_06192018.pdf PDF
191BWC20R0002 South Bay.pdf PDF
Att-19_PLC_Replacements_Table.pdf PDF
Att-10-REV_2019_Chemicals-Dosage.pdf PDF
Att-6b_FY19 Unplanned Corrective Repairs.pdf PDF
Att 2 Reqd Perf Metrics.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Bay International Wastewater Treatment Plant 2019 Monthly Flows

The influent meter at the plant has been bypassed since April 2017 when a leak from the influent meter vault was discovered. Therefore, the following tables do not show values for the influent flow.

January 2019

February 2019

March 2019

April 2019

May 2019

June 2019

July 2019

August 2019

September 2019

October 2019

November 2019

December 2019

File details come from the government source that posted it. Updated .