Att-3_Permit_R9-2014-0009_Amended.pdf
PDF 2 MB Posted
- Attached to
- O&M Services SBIWTP Federal contract opportunity
- Solicitation number
- 191BWC20R0002
About this file
This solicitation notice seeks proposals for operation and maintenance services for the South Bay International Wastewater Treatment Plant in San Diego County, California. The contractor shall provide full-service O&M including day-to-day management, plant operation, sampling, equipment maintenance, capital improvements, vehicles and supplies. The treatment plant processes an average of 25 million gallons per day of wastewater originating from Tijuana, Mexico under an NPDES permit. The contract will be for a base year starting October 1, 2020 through September 30, 2021 with four one-year option periods. Proposals are due by August 21, 2020 and the contract will be awarded by September 1, 2020. This is an unrestricted procurement conducted by the International Boundary and Water Commission U.S.-Mexico under NAICS code 221320 for sewage treatment facilities.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD
SAN DIEGO REGION
2375 Northside Drive, Suite 100, San Diego, CA 92108 619-516-1990 • Fax 619-516-1994 http://www.waterboards.ca.gov/sandiego/
ORDER NO. R9-2014-0009
AS AMENDED BY ORDER NOS. R9-2014-0094, R9-2017-0024, and R9-2019-0012
NPDES NO. CA0108928
WASTE DISCHARGE REQUIREMENTS
FOR THE UNITED STATES SECTION OF THE
INTERNATIONAL BOUNDARY AND WATER COMMISSION,
SOUTH BAY INTERNATIONAL WASTEWATER TREATMENT PLANT,
DISCHARGE TO THE PACIFIC OCEAN VIA THE SOUTH BAY OCEAN OUTFALL
The following Discharger is subject to waste discharge requirements (WDR's) set forth in this Order:
Table 1. Discharger Information
Discharger United States Section of the International Boundary and Water Commission (USIBWC)
Name of Facility South Bay International Wastewater Treatment Plant
2995 Clearwater Way
Facility Address San Diego, CA 92154
San Diego County
Table 2. Discharge Location
Discharge Effluent Description Discharge Point Discharge Point Receiving
Point No. Latitude (North) Lonaitude (West) Water
001 Secondary treated wastewater 32° 32' 15" N 117° 11 ' 00" w Pacific Ocean
Table 3. Administrative Information
This Order was adopted on: June 26, 2014
This Order shall become effective on: August 1, 2014
This Order shall expire on: July 31, 2019
The Discharger shall file a Report of Waste Discharge as an application for reissuance 180 days prior of WDR's in accordance with title 23, California Code of Regulations, and an application to the Order for reissuance of a National Pollutant Discharge Elimination System (NPDES) permit no expiration date later than:
The U.S. Environmental Protection Agency (USEPA) and the California Regional Water Major Quality Control Board, San Diego Region have classified this discharge as follows:
I, David W. Gibson, Executive Officer, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the California Regional Water Quality Control Board, San Diego Region, on June 26, 2014, and amended on November 12, 2014, December 13, 2017, and February 13, 2019.
tJaesG. Smith, Acting Executive Officer
U.S. Section of the International Boundary and Water Commission Order No. R9-2014-0009 South Bay International Wastewater Treatment Plant As Amended by Order Nos. R9-2014-0094, R9-2017-0024, and R9-2019-0012 NPDES No. CA0108928
ORDER PAGE 2
Contents
I. Facility Information II. Findings III. Discharge Prohibitions IV. Effluent Limitations and Discharge Specifications
A. Effluent Limitations and Performance Goals – Discharge Point No. 001
1. Final Effluent Limitations – Discharge Point No. 001
2. Performance Goals – Discharge Point No. 001
3. Interim Effluent Limitations - Not Applicable
B. Land Discharge Specifications – Not Applicable C. Recycling Specifications – Not Applicable
V. Receiving Water Limitations A. Surface Water Limitation B. Groundwater Limitations – Not Applicable
VI. Provisions A. Standard Provisions B. Monitoring and Reporting Program (MRP) Requirements C. Special Provisions
1. Reopener Provisions
2. Special Studies, Technical Reports and Additional Monitoring Requirements
3. Best Management Practices and Pollution Prevention – Not Applicable
4. Construction, Operation and Maintenance Specifications – Not Applicable
5. Special Provisions for Municipal Facilities (Wastewater Facilities Only)
6. Other Special Provisions - Responsibilities, Liabilities, Legal Action, Penalties – Not
Applicable
7. Compliance Schedules – Not Applicable
VII. Compliance Determination
Tables Table 1. Discharger Information Table 2. Discharge Location Table 3. Administrative Information Table 4. Effluent Limitations at EFF-0011 Table 5. Performance Goals1 Table 6. Sharing Transboundary Wastewater Information with Mexico Table 7. Final Influent Limitations Table 8. Sharing Pretreatment Information with Mexico
Attachments
Attachment A – Abbreviations and Glossary ....................................................................................... A-1 Attachment B – Map ........................................................................................................................... B-1 Attachment C – Flow Schematic .........................................................................................................C-1 Attachment D – Standard Provisions ..................................................................................................D-1 Attachment E – Monitoring and Reporting Program ............................................................................ E-1 Attachment F – Fact Sheet ................................................................................................................. F-1 Attachment G – Ocean Plan and Basin Plan Prohibitions .................................................................. G-1 Attachment H – Dilution Model Information .........................................................................................H-1
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 3
I. FACILITY INFORMATION
General information about the South Bay International Wastewater Treatment Plant (Facility) is summarized in Table 1. More detailed information describing the Facility, five canyon collectors, two pump stations, the South Bay Land Outfall (SBLO), the South Bay Ocean Outfall (SBOO), and other associated infrastructure (collectively referred to as Facilities) is contained in sections I and II of the Fact Sheet (Attachment F). Section I of the Fact Sheet also includes information regarding the Discharger’s permit application.
II. FINDINGS
The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board), finds:
A. Legal Authorities. This Order serves as WDR’s pursuant to article 4, chapter 4, division 7 of the California Water Code (commencing with section 13260). This Order is also issued pursuant to section 402 of the federal Clean Water Act (CWA) and implementing regulations adopted by the USEPA and chapter 5.5, division 7 of the Water Code (commencing with section 13370). It shall serve as an NPDES permit for point source discharges from this Facility to surface waters.
B. Background and Rationale for Requirements. The San Diego Water Board developed the requirements in this Order based on information submitted as part of the application, through monitoring and reporting programs, and other available information. The Fact Sheet (Attachment F), which contains background information and rationale for the requirements in this Order, is hereby incorporated into and constitutes Findings for this Order. Attachments A through E, G, and H are also incorporated into this Order.
C. Provisions and Requirements Implementing State Law. The provisions/requirements in subsections IV.B, IV.C, V.B, VI.A.2, VI.C.1.b, and VI.C.1.c are included to implement state law only. These provisions/requirements are not required or authorized under the federal CWA; consequently, violations of these provisions/requirements are not subject to the enforcement remedies that are available for NPDES violations.
D. Notification of Interested Parties. The San Diego Water Board has notified the Discharger and interested agencies and persons of its intent to prescribe WDR’s for the discharge and has provided them with an opportunity to submit their written comments and recommendations. Details of the notification are provided in the Fact Sheet (Attachment F).
E. Consideration of Public Comment. The San Diego Water Board, in a public meeting, heard and considered all comments pertaining to the discharge. Details of the Public Hearing are provided in the Fact Sheet (Attachment F).
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 4
THEREFORE, IT IS HEREBY ORDERED, that this Order supersedes Order No. 96-50 except for enforcement purposes, and, in order to meet the provisions contained in division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the CWA and regulations and guidelines adopted thereunder, the Discharger shall comply with the requirements in this Order. If any part of this Order is subject to a temporary stay of enforcement, unless otherwise specified in the order granting stay, the Discharger shall comply with the analogous portions of the previous Order. This action in no way prevents the San Diego Water Board from taking enforcement action for past violations of the previous Order.
III. DISCHARGE PROHIBITIONS
A. The discharge of waste from the Facilities to a location other than Discharge Point No. 001, unless specifically regulated by this Order or separate WDR’s, is prohibited.
B. The Discharger must comply with Discharge Prohibitions contained in the Water Quality Control Plan for Ocean Waters of California, California Ocean Plan (Ocean Plan), incorporated into this Order as if fully set forth herein and summarized in Attachment G, as a condition of this Order.
C. The Discharger must comply with Discharge Prohibitions contained in chapter 4 of the Water Quality Control Plan for the San Diego Basin (Basin Plan), incorporated into this Order as if fully set forth herein and summarized in Attachment G, as a condition of this Order.
IV. EFFLUENT LIMITATIONS AND DISCHARGE SPECIFICATIONS
A. Effluent Limitations and Performance Goals – Discharge Point No. 001
1. Final Effluent Limitations – Discharge Point No. 001
a. The Discharger shall maintain compliance with the following effluent limitations at
Discharge Point No. 001, with compliance measured at Monitoring Location EFF- 001 as described in the Monitoring and Reporting Program (Attachment E):
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 5
Table 4. Effluent Limitations at EFF-0011 Parameter Units1,2 Effluent Limitations1,3
Average Monthly
Average Weekly
Instantaneous Minimum
Instantaneous Maximum
Flow MGD 25 -- --
Carbonaceous Biochemical Oxygen Demand (5-Day at
20°C) (CBOD5)
mg/L 25 40 --lbs/day 5,213 8,340
Total Suspended Solids
(TSS)
mg/L 30 45 --lbs/day 6,255 9,383 --
Oil and Grease mg/L 25 40 75 lbs/day 5,213 8,340 15,012
Settleable Solids mL/L 1.0 1.5 3.0 Turbidity NTU 75 100 225 pH standard units -- -- 6.0 9.0
BASED ON OCEAN PLAN OBJECTIVES FOR PROTECTION OF MARINE AQUATIC LIFE
6-Month Median
Maximum Daily
Instantaneous Minimum
Instantaneous Maximum
Mercury, Total Recoverable µg/L 3.78E+00 1.52E+01 3.82E+01 lbs/day 7.87E-01 3.18E+00 7.96E+00
Zinc, Total Recoverable µg/L 1.16E+03 6.89E+03 -- 1.84E+04 lbs/day 2.41E+02 1.44E+03 -- 3.83E+03
Chronic Toxicity TUc -- 95.6 -- -- Acute Toxicity TUa -- 3.2 -- --
BASED ON OCEAN PLAN OBJECTIVES FOR PROTECTION OF HUMAN HEALTH
30-Day Average
Thallium, Total Recoverable µg/L 1.91E+02 lbs/day 3.99E+01
Tributyltin µg/L 1.34E-01 lbs/day 2.79E-02
Benzidine µg/L 6.60E-03 lbs/day 1.38E-03
Chlordane1 µg/L 2.20E-03 lbs/day 4.58E-04
Chlorodibromomethane (dibromochloromethane) µg/L 8.22E+02 lbs/day 1.71E+02
DDT1 µg/L 1.63E-02 lbs/day 3.39E-03
Heptachlor Epoxide µg/L 1.91E-03 lbs/day 3.99E-04
Hexachlorobenzene µg/L 2.01E-02 lbs/day 4.19E-03
PCBs1 µg/L 1.82E-03 lbs/day 3.79E-04
TCDD Equivalents1 µg/L 3.73E-07 lbs/day 7.77E-08
Toxaphene µg/L 2.01E-02 lbs/day 4.19E-03
1 See Attachment A for definitions of abbreviations and a glossary of common terms used in this Order.
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 6
2 The mass emission rate (MER) limit, in pounds per day, was calculated based on the following equation: MER (lb/day) = 8.34 x Q x C, where Q is the maximum allowable flow rate (in MGD) and C is the concentration (in mg/L).
3 Scientific “E” notation is used to express certain values. In scientific “E” notation, the number following the “E” indicates the position of the decimal point in the value. Negative numbers after the “E” indicate that the value is less than 1, and positive numbers after the “E” indicate that the value is greater than 1. In this notation a value of 6.1E-02 represents 6.1 x 10-2 or 0.061, 6.1E+02 represents 6.1 x 102 or 610, and 6.1E+00 represents 6.1 x 100 or 6.1.
b. Percent Removal. The average monthly percent removal1 of CBOD5 and TSS shall not be less than 85 percent.
2. Performance Goals – Discharge Point No. 001
Parameters that do not have reasonable potential to cause or contribute to an exceedance of water quality objectives, or for which reasonable potential to cause or contribute to an exceedance of water quality objectives cannot be determined, are referred to as performance goal parameters and are assigned the performance goals listed in the following table. Performance goal parameters shall be monitored at Monitoring Location EFF-001 as described in the Monitoring and Reporting Program, Attachment E. The San Diego Water Board will use the results for informational purposes only, not compliance determinations.
Table 5. Performance Goals1
Parameter Unit1,2 Performance Goals1,3
6-Month Median
Maximum Daily
Instantaneous Maximum
30-Day Average
BASED ON OCEAN PLAN OBJECTIVES FOR PROTECTION OF MARINE AQUATIC LIFE
Arsenic, Total Recoverable µg/L 4.81E+02 2.78E+03 7.36E+03 --lbs/day 1.00E+02 5.79E+02 1.54E+03 --
Cadmium, Total Recoverable µg/L 9.56E+01 3.82E+02 9.56E+02 --lbs/day 1.99E+01 7.97E+01 1.99E+02 --
Chromium VI, Total Recoverable4 µg/L 1.91E+02 7.65E+02 1.91E+03 --lbs/day 3.99E+01 1.59E+02 3.99E+02 --
Copper, Total Recoverable µg/L 9.76E+01 9.58E+02 2.68E+03 --lbs/day 2.03E+01 2.00E+02 5.59E+02 --
Lead, Total Recoverable µg/L 1.91E+02 7.65E+02 1.91E+03 --lbs/day 3.99E+01 1.59E+02 3.99E+02 --
Nickel, Total Recoverable µg/L 4.78E+02 1.91E+03 4.78E+03 --lbs/day 9.97E+01 3.99E+02 9.97E+02 --
Selenium, Total Recoverable µg/L 1.43E+03 5.74E+03 1.43E+04 --lbs/day 2.99E+02 1.20E+03 2.99E+03 --
Silver, Total Recoverable µg/L 5.18E+01 2.53E+02 6.54E+02 --lbs/day 1.08E+01 5.27E+01 1.36E+02 --
1 See Attachment A for definitions of abbreviations and a glossary of common terms used in this Order.
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 7
Parameter Unit1,2 Performance Goals1,3
6-Month Median
Maximum Daily
Instantaneous Maximum
30-Day Average
Cyanide, Total Recoverable5 µg/L 9.56E+01 3.82E+02 9.56E+02 --lbs/day 1.99E+01 7.97E+01 1.99E+02 --
Total Chlorine Residual6 µg/L 1.91E+02 7.65E+02 5.74E+03 --lbs/day 3.99E+01 1.59E+02 1.20E+03 --
Ammonia (expressed as nitrogen) µg/L 5.74E+04 2.29E+05 5.74E+05 --lbs/day 1.20E+04 4.78E+04 1.20E+05 --
Phenolic Compounds (non-chlorinated)1 µg/L 2.87E+03 1.15E+04 2.87E+04 --lbs/day 5.98E+02 2.39E+03 5.98E+03 --
Chlorinated Phenolics1 µg/L 9.56E+01 3.82E+02 9.56E+02 --lbs/day 1.99E+01 7.97E+01 1.99E+02 --
Endosulfan1 µg/L 8.60E-01 1.72E+00 2.58E+00 --lbs/day 1.79E-01 3.59E-01 5.38E-01 --
Endrin µg/L 1.91E-01 3.82E-01 5.74E-01 --lbs/day 3.99E-02 7.97E-02 1.20E-01 --
HCH1
µg/L 3.82E-01 7.65E-01 1.15E+00 --lbs/day 7.97E-02 1.59E-01 2.39E-01 --
Radioactivity pCi/l
Not to exceed limits specified in title 17, division 1, chapter 5, subchapter 4, group 3, article 3, section 30253 of the California Code of Regulations, Reference to section 30253 is prospective, including future changes to any incorporated provisions of federal law, as the changes take effect.
BASED ON OCEAN PLAN OBJECTIVES FOR PROTECTION OF HUMAN HEALTH –
NONCARCINOGENS
Acrolein µg/L -- -- -- 2.10E+04 lbs/day -- -- -- 4.39E+03
Antimony, Total Recoverable µg/L -- -- -- 1.15E+05 lbs/day -- -- -- 2.39E+04
Bis(2-chloroethoxy) Methane µg/L -- -- -- 4.21E+02 lbs/day -- -- -- 8.77E+01
Bis(2-chloroisopropyl) Ether µg/L -- -- -- 1.15E+05 lbs/day -- -- -- 2.39E+04
Chlorobenzene µg/L -- -- -- 5.45E+04 lbs/day -- -- -- 1.14E+04 Chromium (III) , Total Recoverable4 µg/L -- -- -- 1.82E+07 lbs/day -- -- -- 3.79E+06
Di-n-butyl Phthalate µg/L -- -- -- 3.35E+05 lbs/day -- -- -- 6.98E+04
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 8
Performance Goals1,3
6-Month Median
Maximum Daily
Instantaneous Maximum
30-Day Average
Dichlorobenzenes1 µg/L -- -- -- 4.88E+05 lbs/day -- -- -- 1.02E+05
Diethyl Phthalate µg/L -- -- -- 3.15E+06 lbs/day -- -- -- 6.58E+05
Dimethyl Phthalate µg/L -- -- -- 7.84E+07 lbs/day -- -- -- 1.63E+07
4,6-dinitro-2-methylphenol µg/L -- -- -- 2.10E+04 lbs/day -- -- -- 4.39E+03
2,4-dinitrophenol µg/L -- -- -- 3.82E+02 lbs/day -- -- -- 7.97E+01
Ethylbenzene µg/L -- -- -- 3.92E+05 lbs/day -- -- -- 8.17E+04
Fluoranthene µg/L -- -- -- 1.43E+03 lbs/day -- -- -- 2.99E+02 Hexachlorocyclopentadien e µg/L -- -- -- 5.54E+03 lbs/day -- -- -- 1.16E+03
Nitrobenzene µg/L -- -- -- 4.68E+02 lbs/day -- -- -- 9.77E+01
Toluene µg/L -- -- -- 8.13E+06 lbs/day -- -- -- 1.69E+06
1,1,1-trichloroethane µg/L -- -- -- 5.16E+07 lbs/day -- -- -- 1.08E+07
BASED ON OCEAN PLAN OBJECTIVES FOR PROTECTION OF HUMAN HEALTH -
CARCINOGENS
Acrylonitrile µg/L -- -- -- 9.56E+00 lbs/day -- -- -- 1.99E+00
Aldrin µg/L -- -- -- 2.10E-03 lbs/day -- -- -- 4.39E-04
Benzene µg/L -- -- -- 5.64E+02 lbs/day -- -- -- 1.18E+02 Beryllium, Total Recoverable µg/L -- -- -- 3.15E+00 lbs/day -- -- -- 6.58E-01
Bis(2-chloroethyl) Ether µg/L -- -- -- 4.30E+00 lbs/day -- -- -- 8.97E-01
Bis(2-ethlyhexyl) Phthalate µg/L -- -- -- 3.35E+02 lbs/day -- -- -- 6.98E+01
Carbon Tetrachloride µg/L -- -- -- 8.60E+01 lbs/day -- -- -- 1.79E+01
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 9
Performance Goals1,3
6-Month Median
Maximum Daily
Instantaneous Maximum
30-Day Average
Chloroform µg/L -- -- -- 1.24E+04 lbs/day -- -- -- 2.59E+03
1,4-dichlorobenzene µg/L -- -- -- 1.72E+03 lbs/day -- -- -- 3.59E+02
3,3'-dichlorobenzidine µg/L -- -- -- 7.74E-01 lbs/day -- -- -- 1.61E-01
1,2-dichloroethane µg/L -- -- -- 2.68E+03 lbs/day -- -- -- 5.58E+02
1,1-dichloroethylene µg/L -- -- -- 8.60E+01 lbs/day -- -- -- 1.79E+01
Dichlorobromomethane µg/L -- -- -- 5.93E+02 lbs/day -- -- -- 1.24E+02 Dichloromethane (Methylene Chloride) µg/L -- -- -- 4.30E+04 lbs/day -- -- -- 8.97E+03
1,3-dichloropropene (1,3-Dichloropropylene) µg/L -- -- -- 8.51E+02 lbs/day -- -- -- 1.77E+02
Dieldrin µg/L -- -- -- 3.82E-03 lbs/day -- -- -- 7.97E-04
2,4-dinitrotoluene µg/L -- -- -- 2.49E+02 lbs/day -- -- -- 5.18E+01
1,2-diphenylhydrazine µg/L -- -- -- 1.53E+01 lbs/day -- -- -- 3.19E+00
Halomethanes1 µg/L -- -- -- 1.24E+04 lbs/day -- -- -- 2.59E+03 heptachlor µg/L -- -- -- 4.78E-03 lbs/day -- -- -- 9.97E-04
Hexachlorobutadiene µg/L -- -- -- 1.34E+03 lbs/day -- -- -- 2.79E+02
Hexachloroethane µg/L -- -- -- 2.39E+02 lbs/day -- -- -- 4.98E+01
Isophorone µg/L -- -- -- 6.98E+04 lbs/day -- -- -- 1.46E+04
N-nitrosodimethylamine µg/L -- -- -- 6.98E+04 lbs/day -- -- -- 1.46E+04
N-nitrosodi-N-propylamine µg/L -- -- -- 3.63E+01 lbs/day -- -- -- 7.57E+00
N-nitrosodiphenylamine µg/L -- -- -- 2.39E+02 lbs/day -- -- -- 4.98E+01
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 10
Performance Goals1,3
6-Month Median
Maximum Daily
Instantaneous Maximum
30-Day Average
PAH1
µg/L -- -- -- 8.41E-01 lbs/day -- -- -- 1.75E-01
1,1,2,2-tetrachloroethane µg/L -- -- -- 2.20E+02 lbs/day -- -- -- 4.58E+01 Tetrachloroethylene (Tetrachloroethene) µg/L -- -- -- 1.91E+02 lbs/day -- -- -- 3.99E+01
Trichloroethylene (Trichloroethene) µg/L -- -- -- 2.58E+03 lbs/day -- -- -- 5.38E+02
1,1,2-trichloroethane µg/L -- -- -- 8.99E+02 lbs/day -- -- -- 1.87E+02
2,4,6-trichlorophenol µg/L -- -- -- 2.77E+01 lbs/day -- -- -- 5.78E+00
Vinyl Chloride µg/L -- -- -- 3.44E+03 lbs/day -- -- -- 7.18E+02 1 See Attachment A for definitions of abbreviations and a glossary of common terms used in this Order.
2 The mass emission rate (MER) limit, in pounds per day, was calculated based on the following equation: MER
(lb/day) = 8.34 x Q x C, where Q is the maximum allowable flow rate (in MGD) and C is the concentration (in mg/L).
3 Scientific “E” notation is used to express certain values. In scientific “E” notation, the number following the “E” indicates that position of the decimal point in the value. Negative numbers after the “E” indicate that the value is less than 1, and positive numbers after the “E” indicate that the value is greater than 1. In this notation a value of 6.1E-02 represents 6.1 x 10-2 or 0.061, 6.1E+02 represents 6.1 x 102 or 610, and 6.1E+00 represents 6.1 x 100 or 6.1.
4 The Discharger may, at their option, apply this performance goal as a total chromium performance goal.
5 If a Discharger can demonstrate to the satisfaction of the San Diego Water Board (subject to USEPA approval) that an analytical method is available to reliably distinguish between strongly and weakly complexed cyanide, effluent limitations for cyanide may be met by (or performance goals may be evaluated with) the combined measurement of free cyanide, simple alkali metals cyanides, and weakly complexed organometallic cyanide complexes. In order for the analytical method to be acceptable, the recovery of free cyanide from metal complexes must be comparable to that achieved by the approved method in title 40 Code of Federal Regulations (CFR) part 136, as revised May 14, 1999.
6 The water quality objectives for total chlorine residual applicable to intermittent discharges not exceeding two hours, shall be determined through the use of the following equation:
log y = -0.43 (log x) + 1.8, where y = the water quality objective (in µg/l) to apply when chlorine is being discharged;
x = the duration of uninterrupted chlorine discharge in minutes.
Actual effluent limitations for total chlorine, when discharging intermittently, shall then be determined according to Implementation Procedures for Table 1 from the Ocean Plan, using a minimum probable initial dilution factor of 94.6 and a flow rate of 25 MGD.
3. Interim Effluent Limitations - Not Applicable
B. Land Discharge Specifications – Not Applicable C. Recycling Specifications – Not Applicable
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 11
V. RECEIVING WATER LIMITATIONS
A. Surface Water Limitation
The receiving water limitations set forth below for ocean waters are based on water quality objectives contained in the Basin Plan and Ocean Plan and are a required part of this Order.
The discharge of waste shall not cause or contribute to violation of these limitations in the Pacific Ocean. Compliance with these limitations shall be determined from samples collected at stations representative of the area within the waste field where initial dilution is completed.
1. Bacterial Characteristics
a. Within a zone bounded by the shoreline and a distance of three nautical miles from the shoreline, including all kelp beds, the following bacterial objectives shall be maintained throughout the water column. The zone of initial dilution for the ocean outfall is excluded.
i. 30-day Geometric Mean – The following standards are based on the geometric mean of the five most recent samples from each site:
a) Total coliform density shall not exceed 1,000 per 100 mL;
b) Fecal coliform density shall not exceed 200 per 100 mL; and
c) Enterococcus density shall not exceed 35 per 100 mL.
ii. Single Sample Maximum:
a) Total coliform density shall not exceed 10,000 per 100 mL;
b) Fecal coliform density shall not exceed 400 per 100 mL;
c) Enterococcus density shall not exceed 104 per 100 mL; and
d) Total coliform density shall not exceed 1,000 per 100 mL when the fecal coliform/total coliform ratio exceeds 0.1.
b. The Initial Dilution Zone of wastewater outfall shall be excluded from designation as kelp beds for purposes of bacterial standards. Adventitious assemblages of kelp plants on waste discharge structures (e.g., outfall pipes and diffusers) do not constitute kelp beds for purposes of bacterial standards.
c. At all areas where shellfish may be harvested for human consumption, as determined by the San Diego Water Board, the median total coliform density shall not exceed 70 per 100 mL throughout the water column, and not more than 10 percent of the samples shall exceed 230 per 100 mL.
2. Physical Characteristics
a. Floating particulates and grease and oils shall not be visible.
b. The discharge of waste shall not cause aesthetically undesirable discoloration of the ocean surface.
c. Natural light shall not be significantly reduced at any point outside the initial dilution zone as a result of the discharge of waste.
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 12
d. The rate of deposition of inert solids and the characteristics of inert solids in the ocean sediments shall not be changed such that benthic communities are degraded.
3. Chemical Characteristics
a. The dissolved oxygen concentration shall not at any time be depressed more than
10 percent from that which occurs naturally, as the result of the discharge of oxygen demanding waste materials.
b. The pH shall not be changed at any time more than 0.2 units from that which occurs naturally.
c. The dissolved sulfide concentration of waters in and near sediments shall not be significantly increased above that present under natural conditions.
d. The concentration of substances set forth in Chapter II, Table 1 of the Ocean Plan, shall not be increased in marine sediments to levels that would degrade indigenous biota.
e. The concentration of organic materials in marine sediments shall not be increased to levels that would degrade marine life.
f. Nutrient materials shall not cause objectionable aquatic growths or degrade indigenous biota.
g. Numerical water quality objectives established in Chapter II, Table 1 of the Ocean Plan apply to all discharges within the jurisdiction of the Ocean Plan. Unless otherwise specified, all metal concentrations are expressed as total recoverable concentrations.
4. Biological Characteristics
a. Marine communities, including vertebrate, invertebrate, and plant species, shall not be degraded.
b. The natural taste, odor, color of fish, shellfish, or other marine resources used for human consumption shall not be altered.
c. The concentration of organic materials in fish, shellfish, or other marine resources used for human consumption shall not bioaccumulate to levels that are harmful to human health.
5. Radioactivity Discharge of radioactive waste shall not degrade marine life.
B. Groundwater Limitations – Not Applicable
VI. PROVISIONS
A. Standard Provisions
1. The Discharger shall comply with all Standard Provisions included in Attachment D of this Order.
2. The Discharger shall comply with the following provisions. In the event that there is any conflict, duplication, or overlap between provisions specified by this Order, the more stringent provision shall apply.
a. The Facility shall be supervised and operated by persons possessing certificates of appropriate grade pursuant to title 23, division 3, chapter 26 of the California Code
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 13
of Regulations (CCR). The Facility shall be provided with a sufficient number of qualified personnel to operate the Facility effectively so as to achieve the required level of treatment at all times.
b. All proposed new treatment facilities and expansions of existing treatment facilities shall be completely constructed and operable prior to initiation of the discharge from the new or expanded facilities. The Discharger shall submit a certification report for each new canyon collector, treatment facility, expansion of an existing treatment facility, and design capacity re-ratings. The certification report shall be prepared by the design engineer. For design capacity re-ratings, the certification report shall be prepared by the engineer who evaluated the treatment facility design capacity. The signature and engineering license number of the engineer preparing the certification report shall be affixed to the report. If reasonable, the certification report shall be submitted prior to beginning construction.
i. The certification report shall:
a) Identify the design capacity of the treatment facility, including the daily and 30-day design capacity;
b) Certify the adequacy of each component of the treatment facility; and
c) Contain a requirement-by-requirement analysis, based on acceptable engineering practices, of the process and physical design of the facility to ensure compliance with this Order.
ii. The Discharger shall not initiate a discharge from an existing treatment facility at a daily flow rate in excess of its previously approved design capacity until:
a) The certification report is received by the San Diego Water Board;
b) The San Diego Water Board has received written notification of completion of construction (new treatment facilities and expansions only);
c) An inspection of the facility has been made by the San Diego Water Board or its designated representatives (new treatment facilities and expansions only); and
d) The San Diego Water Board has provided the Discharger with written authorization to discharge at a daily flow rate in excess of its previously approved design capacity.
c. All waste treatment, containment, and disposal facilities shall be protected against 100-year peak stream flows as defined by the San Diego County flood control agency.
d. All waste treatment, containment, and disposal facilities shall be protected against erosion, overland runoff, and other impacts resulting from a 100-year, 24-hour storm event.
e. This Order expires on July 31, 2019, after which, the terms and conditions of this permit are automatically continued pending issuance of a new permit, provided that all requirements of USEPA’s NPDES regulations at 40 CFR section 122.6 and the
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 14
State’s regulations at title 23, division 3, chapter 9, article 3, section 2235.4 of the CCR regarding the continuation of expired permits and waste discharge requirements are met.
f. A copy of this Order shall be posted at a prominent location at or near the treatment and disposal facilities and shall be available to operating personnel at all times.
B. Monitoring and Reporting Program (MRP) Requirements The Discharger shall comply with the MRP, and future revisions thereto, in Attachment E of this Order.
C. Special Provisions
1. Reopener Provisions
a. This Order may be reopened for modification to include an effluent limitation if monitoring establishes that the discharge causes, has the reasonable potential to cause, or contributes to an excursion above a performance goal(s) set forth in section IV.A.2, Table 5, of this Order or as otherwise described in Ocean Plan Table
1. (40 CFR section 122.44(d)(1))
b. This Order may be reopened for modification of the monitoring and reporting requirements and/or special studies requirements, at the discretion of the San Diego Water Board. Such modification(s) may include, but is (are) not limited to, revision(s)
(i) to implement recommendations from Southern California Coastal Water Research Project (SCCWRP), (ii) to develop, refine, implement, and/or coordinate a regional monitoring program, (iii) to develop and implement improved monitoring and assessment programs in keeping with San Diego Water Board Resolution No.
R9-2012-0069, Resolution in Support of a Regional Monitoring Framework, and/or
(iv) to add provisions to require the Discharger to evaluate and provide information on cost and values of the monitoring and reporting program.
c. This Order may be modified, revoked and reissued, or terminated for cause including, but not limited to, the following:
i. Violation of any terms or conditions of this Order. (Water Code section 13381(a))
ii. Obtaining this Order by misrepresentation or failure to disclose fully all relevant facts. (Water Code section 13381(b))
iii. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge. (Water Code section 13381(c))
d. The filing of a request by the Discharger for modifications, revocation and reissuance, or termination of this Order does not stay any condition of this Order.
Notification by the Discharger of planned operational or facility changes or anticipated noncompliance with this Order does not stay any condition of this Order.
(40 CFR section 122.41(f))
e. If any applicable toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is promulgated under section 307(a) of the CWA for a toxic pollutant and that standard or prohibition is more stringent than any limitation on the pollutant in this Order, the San Diego Water Board may institute proceedings under these regulations to modify or revoke
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 15
and reissue the Order to conform to the toxic effluent standard or prohibition. (40 CFR section 122.4(b)(1))
f. This Order may be reopened and modified, in accordance with the provisions set forth in 40 CFR parts 122 and 124.
g. This Order may be reopened and modified to revise effluent limitations as a result of future Basin Plan Amendments, or the adoption of a total maximum daily load (TMDL) for the receiving water. (40 CFR section 122.62(a)(2))
h. This Order may be reopened upon submission by the Discharger of adequate information, as determined by the San Diego Water Board, to provide for dilution credits or a mixing zone, as may be appropriate. (40 CFR section 122.62(a)(2))
i. This Order may also be reopened and modified, revoked and, reissued or terminated in accordance with the provisions of 40 CFR sections 122.44, 122.62 to 122.64, and 125.62. Causes for taking such actions include, but are not limited to, failure to comply with any condition of this Order and permit, and endangerment to human health or the environment resulting from the permitted activity.
2. Special Studies, Technical Reports and Additional Monitoring Requirements
a. Spill and Transboundary Wastewater Flow Event Prevention and Response
Plan.
i. Spill and Transboundary Wastewater Flow Event Types. For purposes of section VI.C.2, spill and transboundary wastewater flow event types are defined and categorized as set forth below. Event types do not include waste discharges to the Pacific Ocean at SBOO Discharge Point No. 001 or discharges of waste from the Facilities specifically regulated by separate waste discharge requirements or an NPDES permit.
a) Spill from the Facilities (Facilities Spill Event). A discharge of treated or untreated wastewater or other material to the environment that occurs from the Discharger’s Facilities, including, but not limited to, the entire wastewater conveyance, storage, treatment, and disposal system (wastewater system) that is owned and operated by the Discharger. The wastewater system includes all devices and system components used such as pipes, pump stations, force mains, Junction Box 1, Junction Box 2, the five canyon collector systems, the treatment works, SBLO, and SBOO.
b) Transboundary Wastewater Flow Past the Canyon Collector System (Flow Event Type A). A dry weather transboundary treated or untreated wastewater or other flow through a conveyance structure owned and operated by the United States Government into Smuggler Gulch, Goat Canyon, Canyon del Sol, Stewart’s Drain, or Silva Drain and not diverted into the canyon collector system for treatment at the Facility.
c) Transboundary Wastewater Flow Event or Other Spill/Wastewater Flow Event in Mexico (Flow Event Type B). A dry weather spill or dry weather transboundary wastewater or other flow (not categorized in other Event Types above) that creates, or threatens to create, pollution or nuisance conditions in waters of the United States and/or State including the Tijuana River (main channel), Yogurt Canyon drainage, other unnamed
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 16
drainages and nearby coastal marine waters. These spills or transboundary flows include, but are not limited to the following:
1) A dry weather transboundary treated or untreated wastewater flow in waters of the Tijuana River (main channel) as described in Commitment No. 16 of IBWC Minute No. 283 (Conceptual Plan for the International Solution to the Border Sanitation Problem in San Diego, California/Tijuana, Baja California, July 2, 1990).
2) A dry weather transboundary treated or untreated wastewater flow through a conveyance structure owned and operated by the United States Government into Yogurt Canyon.
3) Spills or wastewater flows occurring in Mexico that the Discharger has knowledge of.
ii. Development and Submittal. The Discharger shall prepare and submit a Spill and Transboundary Wastewater Flow Prevention and Response Plan (Prevention/Response Plan) to the San Diego Water Board, via the State Water Board’s California Integrated Water Quality System (CIWQS) Program Web site, no later than 180 days after the adoption of this Order. The Prevention/Response Plan shall be developed in consultation with the Comisión Internacional de Limites y Aguas (CILA, the Mexican Section of the IBWC), the San Diego Water Board, the County of San Diego Department of Environmental Health (DEH), and other interested stakeholders. At a minimum, the Prevention/Response Plan shall address the three types of events identified above in section VI.C.2.a.i of this Order and shall include the following elements:
a) Goal. The goal of the Prevention/Response Plan shall be described and consistent with the following criteria:
1) Reduce, eliminate and prevent the recurrence of spills and transboundary wastewater flows;
2) Protect public health and safety; and
3) Prevent adverse impacts to the environment from spills and transboundary wastewater flows, including but not limited to, adverse impacts to waters of the United States and/or State.
b) Desired Outcomes. The Prevention/Response Plan shall be consistent with the following desired outcomes:
1) Prompt notification and reporting of spills and transboundary wastewater flows to appropriate regulatory agencies, municipalities, and other potentially affected entities is ensured;
2) Effective measures are identified, documented and implemented to prevent, reduce, and eliminate spills and transboundary wastewater flows;
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 17
3) Compliance with the requirements of this Order is achieved and maintained;
4) Effective remedial measures are implemented to 1) control or limit the spill and/or transboundary wastewater flow volume, 2) terminate the spill and/or transboundary wastewater flow, and 3) recover as much of the spill and/or transboundary wastewater flow volume as possible for proper disposal, including any wash down water; and
5) A framework for binational actions and cooperation in achieving the goals and desired outcomes of the Prevention/Response Plan is established and followed by the Discharger and CILA and the following agencies to the extent that these agencies are willing and able to participate, Secretaría de Protección al Ambiente (SPA), Comisión Estatal de Servicios Públicos de Tijuana (CESPT), Procuraduría Federal de Protección al Ambiente (PROFEPA), Comisión Nacional del Agua (CONAGUA), and the City of Tijuana’s Secretaría de Desarrollo Urbano y Ecología (SDUE).
c) Roles and Responsibilities. The Prevention/Response Prevention/Response Plan shall:
1) Identify the duly authorized individual(s) or position(s) having overall responsibility for the development and implementation of the Prevention/Response Plan on behalf of the Discharger as described in Attachment D of this Order, Special Provisions, section V.B;
2) Identify the names of all key individuals, associated position titles, e-mail addresses and telephone numbers, including management, administrative, contractor and maintenance positions, responsible for implementing specific measures described in the Prevention/Response Plan, on behalf of the Discharger; and
3) Provide a complete description of the roles and responsibilities, and lines of authority for implementation of the Prevention/Response Plan with respect to the Discharger, including organization chart(s) or similar document(s).
4) Provide a complete description of the roles and responsibilities, and lines of authority for implementation of the Prevention/Response Plan with respect to CILA, SPA, CESPT, PROFEPA, CONAGUA, and SDUE, including organization chart(s) or similar document(s) to the extent that they are available. The Discharger shall request in writing this information to assist the Discharger in implementing the Prevention/Response Plan. The Discharger shall include a copy of the request and CILA’s response to the request in the Prevention/Response Plan. If CILA refuses or does not confirm within one month, the Discharger shall communicate the same to the San Diego Water Board in writing in a timely manner.
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 18
d) Communication and Coordination with Mexico. The Prevention/Response Plan shall document the framework and procedures for coordination between the Discharger, CILA, SPA, CESPT, the San Diego Water Board, and interested parties through regular meetings and written or oral communication to:
1) Develop procedures for reducing, eliminating, and preventing recurrence of transboundary wastewater flows resulting from an emergency or unanticipated outages of wastewater infrastructure on either side of the international border;
2) Develop binational emergency response and notification procedures for loss of wastewater infrastructure capacity on either side of the international border;
3) Review existing plans, specifications and reports of key wastewater infrastructure on both sides of the international border;
4) Assist CILA and local agencies in Mexico, as requested by these entities through IBWC, in preventing, reducing, terminating, and recovering transboundary wastewater flows;
5) Provide a framework for binational actions and cooperation in achieving the goals and desired outcomes of the Prevention/Response Plan; and
6) Optimize use of available wastewater infrastructure capacity on both sides of the international border. This topic shall include, but is not limited to, use of an emergency connection to the City of San Diego sewage collection system, increases in available sewage collection and treatment capacity in Tijuana, and increase in wastewater flow diversion to the IWTP.
e) Inspection and Preventative Maintenance Program. The Prevention/Response Plan shall provide a program for routine inspection and preventative maintenance of the entire wastewater system that is owned and operated by the Discharger including backup power and electrical systems. The inspection and preventative maintenance program shall include the following components:
1) Map, Flow Diagrams, and Design Capacity Documentation. The Prevention/Response Plan shall provide an accurate map and flow diagram, and the design capacity for each key component of the entire Discharger’s wastewater system as well as the main wastewater conveyance and treatment system in Mexico. The information shall address key pipes, force mains, pump stations, treatment plant capacities, and all discharge point(s).
2) Inspection and Preventative Maintenance Program. The Prevention/Response Plan shall provide a description of the routine inspection and preventative maintenance program for the Discharger’s
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 19
wastewater system. The description shall include schedules, protocols, documentation procedures, and associated activities for inspection, preventative maintenance, and cleaning. The documentation procedures shall include the system used to document the inspection and preventive maintenance activities, such as work orders. The Prevention/Response Plan shall include exercising and testing of all key systems and components to verify adequate operation of the system and associated backup alarms.
Each canyon collector shall be inspected daily. The Prevention/Response Plan shall also provide a description of the specific circumstances, mechanisms, and frequency of occurrence whereby the hydraulic capacity of the canyon collector systems is reduced below its design capacity from stoppage, blockage, debris obstructions, vandalism or other causes that impact or limit the flow of wastewater into and through the canyon collector systems. The Prevention/Response Plan shall identify the best practices and procedures employed by the Discharger to reduce, prevent, or eliminate the severity and impact of these mechanisms and to restore the system’s functional capacity to handle transboundary wastewater flows at the design capacity flow rate as quickly as possible. These practices and procedures shall also address the steps taken or planned to ensure adequate clearing and removal of accumulated sand/silt and blockages and correction of all capacity deficiencies in the canyon collector systems within 96 hours following a storm event of
0.1 inches or greater (i.e. 24 hours after wet weather, as defined in Attachment A).
3) Replacement Components. The Prevention/Response Plan shall also describe practices for identifying key replacement components and maintaining an adequate inventory of critical replacement components.
4) Log Maintenance and Retention of Records. The Prevention/Response Plan shall provide for maintaining a log of all pertinent inspection, cleaning, maintenance and repair records for at least five (5) years for use in identifying and prioritizing system deficiencies in order to devise a corrective action strategy to prevent future spills.
f) Rehabilitation and Replacement. The Prevention/Response Plan shall describe a rehabilitation and replacement program to detect, identify, and address any structural deficiencies, or other system devices or components that have caused or are likely to cause spills from the Discharger’s wastewater system. Structural deficiencies include, but are not limited to, major pipe breaks and cracks, inadequate pipe slopes, internal corrosion areas, areas of significant root intrusion, and inadequate hydraulic capacity.
The rehabilitation and replacement program shall provide for identification, ranking and prioritizing of system deficiencies and implementation of short-term and long-term rehabilitation or replacement actions to address each identified deficiency. Rehabilitation and replacement activities should focus on infrastructure that is older and at risk or prone to more frequent blockage
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 20
due to sediment or debris. The Prevention/Response Plan shall also describe a capital improvement program which manages and preserves infrastructure assets, identifies and ranks infrastructure rehabilitation and replacement capital projects, provides a planning and implementation schedule, and identifies options for obtaining the funding needed to implement the program.
g) Training. The Prevention/Response Plan shall describe a program for providing training to ensure that the Discharger’s employees, contractors, and other representatives are adequately trained and possess adequate knowledge, skills and abilities to implement the Prevention/Response Plan.
h) Facilities Spill and Transboundary Wastewater Spill Containment and Cleanup. This section of the Prevention/Response Plan shall apply to Facilities Spill Event and Flow Event Type A.
The Prevention/Response Plan shall describe guidelines and procedures for taking all feasible steps and necessary remedial actions to 1) control or limit the spill and/or transboundary wastewater flow volume, 2) terminate the spill and/or transboundary wastewater flow, and 3) recover as much of the spill and/or transboundary wastewater flow volume as possible for proper disposal, including any wash down water. The Prevention/Response Plan shall incorporate the following components:
1) Investigation and Assessment. The Prevention/Response Plan shall describe procedures for spill and/or transboundary wastewater flow investigation and assessment including volume estimation, adequate monitoring to determine the nature and impact of the event, identification of receiving waters impacted, calls for additional backup support, and notification of appropriate agencies as required under section VI.C.2.d of this Order.
2) Containment. Procedures for containment of the spill and/or transboundary wastewater flow volume including but not limited to the following actions:
i) Use of sand bags or containment barriers;
ii) Containment in downstream storm drains and plugging downstream storm drain outlets to capture the spill and/or transboundary wastewater flow if possible; and
iii) Excavation as necessary to establish containment of spill and/or transboundary wastewater flow.
3) Cleanup. Procedures for cleanup of the spill and/or transboundary wastewater flow including but not limited to the following actions:
i) Collection of solid and liquid material and other debris;
LIMITATIONS AND DISCHARGE REQUIREMENTS PAGE 21
ii) Vacuum truck recovery of wastewater or polluted water and wash down water;
iii) Cleanup of debris within the affected area(s); and
iv) Clean-up of impacted storm drains in accordance with NPDES storm water permit.
i) Notifications and Reporting. This section of the Prevention/Response Plan shall apply to Facilities Spill Event and Flow Event Type A. The Prevention/Response Plan shall describe procedures for prompt notification and reporting of these spills to appropriate parties as described in section VI.C.2.d of this Order. The Prevention/Response Plan shall provide for maintenance of a regularly updated notification and reporting contact list (emails and phone numbers) and adequate public notification to protect the public from exposure to spills and/or transboundary wastewater flows.
Written notifications and reports should be provided to appropriate regulatory agencies, municipalities, and other potentially affected entities to the extent required by this Order, other permits and licenses, state and federal laws, local ordinances or as otherwise described in the Prevention/Response Plan. These organizations shall include, but are not be limited to:
1) California Governor's Office of Emergency Services (Cal OES);
2) DEH;
3) San Diego Water Board;
4) California Department of Fish and Wildlife;
5) U.S. Fish and Wildlife Service;
6) City of Imperial Beach;
7) City of San Diego;
8) USEPA
9) Local water agencies if a water supply has been affected;
10) Interested non-governmental organizations (NGOs); and
11) Other interested parties.
j) Documentation. The Prevention/Response Plan shall include procedures for documentation of each event as required under section VI.C.2.d of this Order including, but not limited to, a description of the spill event and its cause; exact dates…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .