This solicitation is for operation and maintenance services for the South Bay International Wastewater Treatment Plant in San Diego, California. The contractor shall provide full O&M services for the 25 million gallon per day plant and associated facilities on a firm fixed price basis. Services include day-to-day management, operations, maintenance, repairs, capital improvements, vehicles, housekeeping, grounds maintenance, chemicals and supplies. The base period of performance is one year from October 2020 to September 2021 with four one-year options. The plant provides primary and secondary treatment and discharges treated effluent through the South Bay Ocean Outfall under an NPDES permit. The solicitation was issued by the International Boundary and Water Commission U.S.-Mexico for these services.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32. Please provide repair and replacement history for:
a. Barscreens
• January 2019 - Replaced Support Bracket/Clamp on Barscreen No.3
• April 2019-Replaced Barscreen No. 3 Upper Limit Switch, replaced front south side roller bearing on
Barscreen 1, Troubleshooting by Baker Electric on Barscreen 2
• May 2019 - Replaced Front North side roller bearing
• July 2019 - Replaced bent track section on Barscreen 3 , Replaced rear North Side roller bearing on
Barscreen 1
• September 2019 - Replaced bent track section on Barscreen 1
• November 2019 - Pulled Rake from Barscreen No. 1 sent to Machine Shop for repars, reinstalled.
• December 2019 - Repaired Barscreen No.3 Brake Mechanism, further troubleshooting showed frayed control and power cables.
• January 2020 - Replaced Barscreen No.3 Cable and Rack Assembly, Realigned Jammed Rake on
Barscreen No. 1
b. grit piping system
• February 2019 - Replaced Grit Pump No.4 inlet pipe. Repaired common discharge piping for Grit
Pumps No.4, No.5, No.6
• May 2019 - Replaced Grit Classifier No.1 Lower Housing Assembly, splash skirts, and Ring Retainer
• July 2019 - Overhauled Grit Pump No.6
• August 2019 - Repaired Overhead Grit Piping leaks at Headworks, Installed expanded metal on Grit
Classifier inspection holes
• October 2019 - Bypassed Grit Hoppers, Replaced failed grit piping and associated fittings in Grit
Gallery and Headworks, Replaced end Nozzle on Grit Classifier No.3
• November 2019 - Replaced failed 6-inch 90 on grit line, Replaced pipe reducer, Plug Valve and
Check Valve on Grit Pump No. 5, 6" 45Deg fitting and spool at Headworks
• December 2019 - Replaced Auger on Grit Classifier No.3 o belt press
• BFP2 and BFP1 were overhauled in February 2012
• BFP3 and BFP4 were overhauled in January 2013 o external pump stations
• July 2015 - GCPS Ebara Pump P2
• August 2015 - GCPS Ebara Pump P1
• September 2015 - HPS P1, HPS P2, Completed installation of new motorized valve operators at
Goat Canyon and Hollister lift stations (Replaced old Limitorque Valve Operators)
• January 2019 - GCPS Odor Reduction Pump No.2 o influent pumps
• Influent pump #4 requires repairs.
• Influent pump #5 is making noises.
34. What is the frequency for cleaning of two sludge holding tanks, transfer tanks, and aeration basins?The sludge tanks are cleaned every 5 years. The aeration basins are inspected yearly.
• over project costs for those projects in excess of $100,000.
47. Please provide information on the average gallons per delivery for the Sodium Hypochlorite and the Caustic Soda. In addition, what is the strength of the Caustic Soda (i.e. 25%, 50%?)
Caustic Soda - 50%