ATT 8 589-017 04 Drawing Arch.pdf
PDF 18 MB Posted
- Attached to
- TIERED EVALUATION - Construct Inpatient Medicine Bed Addition at the Kansas City VA Medical Center
- Solicitation number
- 36C77624R0063
About this file
This document appears to be an architectural drawing (ATT 8 589-017 04 Drawing Arch.pdf) related to a federal contract opportunity for the Construct Inpatient Medicine Bed Addition project at the Kansas City VA Medical Center.
The associated federal contract opportunity, Solicitation Number 36C77624R0063, is a solicitation from the Department of Veterans Affairs (VA) to award a single firm-fixed-price construction contract for this minor construction project. The procurement is set-aside with a tiered evaluation process, prioritizing Service-Disabled Veteran-Owned Small Businesses (SDVOSB), Veteran-Owned Small Businesses (VOSB), small businesses, and other than small (large) business concerns. The project is located in Kansas City, Missouri.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S S
ARCHITECTURAL SYMBOLS
SHEET NUMBER
A-100 Sheet Number
Discipline Code
A-1 1/8" = 1'-0"
View Name
VIEW TITLE
Drawing Scale
Drawing Number
1/8" = 1'-0"
View NameA-1 A101R101
VIEW TITLE WITH REFERENCES
Drawing Scale
Sheet Number
Drawing Number
Reference Sheet Number
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
A-200
A1 Position on Sheet
Sheet Number
Position on Sheet
Sheet Number
A1
A2B2
B1
A-350
MATCH LINES
MATCHLINE
SEE: A1/A-101B
Sheet Number
Position on Sheet
AREA REFERENCE
A
SEE: (X/X-XXX)
Reference to Area
View Reference for Additional Information
BUILDING SECTION
Position on Sheet
Sheet Number
SIM
X
X-XXX
SIM
X
X-XXX
WALL SECTION
Position on Sheet
Sheet Number
X
X-XXX
SIM
DETAIL - SECTION
SIM
X
X-XXX
Position on Sheet
Sheet Number
DETAIL - PLAN/RCP
SIM
X
X-XXX
Position on Sheet
Sheet Number
DRAWING REVISIONS
Revision Number
NORTH ARROW
True North
PLAN
NORTH Plan North
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
GRAPHIC SCALE
COLUMN GRID LINES
Column Grid Line (New)
Column Grid Line (Existing)
1 2
A
B
LEVEL DATUM
LEVEL XX
0' - 0"
Level Name
Level Elevation
SPOT ELEVATION
0'-0"
Spot Elevation
ROOM TAG
ROOM
NAME
ABC123
150 SF
Room Name
Room Number
CEILING TAG
Type Mark
1' - 0" AFF
Ceiling Type
Ceiling Height
DOOR NUMBER TAG
New Door Door Number Tag
1A
Existing Door Door Number Tag
1A101
WINDOW TAG
Interior Window Tag
XX
XX
Exterior Window Tag
CURTAIN WALL TAG
XX
Interior Curtain Wall Tag
Exterior Curtain Wall Tag
XX
AD100
Room Code Room Area Or Volume
1T
CURTAIN PANEL TAG
Interior Curtain Wall Tag
WALL TYPE TAG
≠ A# B
C
V V Item - VA Supplied & Installed
V C ITEM -
VA Supplied & Contractor Installed
C C Item - Contractor Supplied & Installed
FFE Tag (By JSN)A1000
TM FFE Tag Furnished By VA Equipment Vendor
? KEYNOTE
1"
R 1/2"
90°
DIMENSION TO FACE OF
FINISH, FACE OF CONCRETE,
COLUMN CENTERLINE, OR AS
NOTED.
DIMENSIONS
1"
Symbol Indicates No Sound
Attenuation
Partition Type
CMU/Stud Width
Partition Modifier Partition Modifier II
KEYNOTE TAG
SEE A-720 STANDARD PARTITION TYPES
Contract Limit line Style
Not In Contract Area
CONTRACT LIMIT GRAPHIC
LINE STYLES
Centerline
Demolished
Temporary
Hidden
Overhead
Beyond
FURNITURE, FIXTURE, & EQUIPMENT
8'-6"1
Name
Room Name Room Number
Existing Finish Key
Ceiling Height
TM Toilet Accessory Tag. See A-730
Deduct Alt
MATERIALS LEGEND
CONCRETE (SECTION)
GRANULAR FILL
CONCRETE MASONRY UNITS
BRICK
RIGID INSULATION (SECTION)
ACOUSTIC/THERMAL INSULATION (SECTION)
STEEL (SECTION)
ALUMINUM (SECTION)
WOOD FINISH (SECTION)
LUMBER FINISH (SECTION)
EARTHWORK (SECTION)
STUD WALL (PLAN & SECTION)
EXISTING WALL TO REMAIN (PLAN & SECTION)
DEMOLISHED WALL (PLAN &
SECTION)
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION
DOOR NUMBER
SYMBOL AND MINIMUM
CLEARANCES
18" MIN.
12" MIN.
6" MIN.
1A
WALL LEGEND
RECESSED LUMINAIRE (24x24)
SMOKE DETECTOR
SPEAKER
HVAC RETURN DIFFUSER
EXIT LIGHT
HEAT DETECTOR
HVAC EXHAUST DIFFUSER
LINEAR UPLIGHT LUMINAIRE, WALL
MOUNTED
RECESSED ROUND DOWNLIGHT
LUMINAIRE
RECESSED LUMINAIRE (24x48)
ACOUSTICAL TILE CEILING (24x24)
ACOUSTICAL TILE CEILING (24x48)
GYPSUM BOARD CEILING
ACCESS PANEL
HVAC SUPPLY DIFFUSER
SPRINKLER
UNDERCABINET TASK LIGHT
EXISTING DEMO NEW
CEILING ACCENT SEE IN601
REFLECTED CEILING SYMBOL LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:0
:4
P
M
A-001
ARCHITECTURAL - SYMBOLS, & GENERAL NOTES
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
ABBREVIATIONS
° DEGREE
± PLUS/MINUS
⌀ DIAMETER
≈ ALMOST EQUAL
∠ ANGLE
℄ CENTER LINE
Δ DELTA, DEFLECTION
ϕ ELECTRICAL PHASE
≠ NOT EQUAL
Ω OHM, OMEGA
BOUNDARY LINE
FLOW LINE
≡ IDENTITY
INITIAL LENGTH
MOMENT LINE
PROPERTY LINE, PLATE
½ ONE HALF FRACTION
¼ ONE QUARTER FRACTION
¾ THREE QUARTERS FRACTION
> GREATER THAN
≥ GREATER THAN OR EQUAL TO
< LESS THAN
≤ LESS THAN OR EQUAL TO
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT, AUGER BORING
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
ABS AIR BREAK SWITCH
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACB AIR CIRCUIT BREAKER
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CONDUCTOR STEEL
REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ACM ACCOUSTICAL CEILING MATERIAL
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
ADO AUTOMATIC DOOR OPERATOR
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AL ALUMINUM
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AM ACOUSTIC MATERIAL
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ANT ANTENNA
AP ACCESS PANEL, APPROX.,
APPROXIMATE
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARR ARRESTOR
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B BASELINE, BOTTOM
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEJ BRICK EXPANSION JOINT
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BO BOARD
BOT BOTTOM
BR BEDROOM, BOTTOM REGISTER
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS, CHANNEL
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN, CORNER BEAD, CIRCUIT
BREAKER
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER, CONTRACTOR
SUPPLIED & INSTALLED
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS,
CONTRACT DOCUMENTS, CEILING
DIFFUSER
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY, CORNER GUARD
C&G CURB AND GUTTER
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH CHILLER
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL
JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM² SQUARE CENTIMETER
CM³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNDS CONDENSATE
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
CODP CLEANOUT W/ DECK PLUG
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT, CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR, CONTRACTION
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CP NON-REINFORCED CONCRETE PIPE
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CR CHAIR, CRASH RAIL
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CS CONCRETE SEALER/SURFACE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE, CURRENT
TRANSFORMER, COOLING TOWER
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER, CONTOUR, COOLING TOWER
RETURN
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CUH CABINET UNIT HEATER
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CW COLD WATER
CWB CAPILLARY WATER BARRIER
CWR COLD WATER RETURN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL, DRY BUILT, DIRECT BURIAL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DD DIVERSION DIKE
DEG, ° DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DI DUCTILE IRON
DIA, DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DISTRIBUTION
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR
DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT, STORM DRAINAGE
STRUCTURE
DSGN DESIGN
DW DISHWASHER, DOMESTIC WATER
DWD DRINKING WATER DISPENSER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EAM EXCEPT AS NOTED
EAT ENTERING AIR TEMPERATURE
EF EACH FACE, EXHAUST FAN
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EG EXHAUST GRILLE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
E/P EDGE OF PAVEMEMNT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ER EXHAUST REGISTER
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EVAP EVAPORATIVE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXP JT EXPANSION JOINT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT, FEMALE, FIRE, FUSE,
FILTER
FA FIRE ALARM
FAB FABRIC
FABX FIRE ALARM BOX
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN, FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E, FFE FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD, FLAT HEAD SCREWS, FIRE
HYDRANT
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FJ FELT JOINT
FL FLOORLINE, FLOOR, FLASHING, FLOW
LINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
4 WAY FOUR WAY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPH FROST PROOF HYDRANT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR
FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION, FULL SIZE
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FV FIELD VERIFY
FW FIRE WATER
FWC FABRIC WALLCOVERING
G GROUND, GAS LINE, GRAM
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALVANIZED
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR, GLAZED
COATING
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFI GROUND FAULT INTERRUPT
GFMU GROUND FACE MASONRY UNIT
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLZ-C GLAZED BLOCK-CMU
GLZ-T GLAZED BLOCK-CLAY TILE
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR GRADE
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GW GROUND WATER
GWB GYPUSM WALL BOARD
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH, HEIGHT, HUMIDIFIER
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAC HOUSEKEEPING AIDS CLOSET
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE, HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HD HARD DRAWN
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HGSW HORN GAP SWITCH
HID HIGH INTENSITY DISCHARGE
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE, HIGH POINT,
HORSEPOWER
HPS HIGH PRESSURE SODIUM
HQ HEADQUARTERS
HR HOUR
HS HEAT-STRENGTHENED (GLASS) OR
HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER, HEAD WALL
HYD HYDRANT
HYDR HYDRAULIC
HZ HERTZ
I INTERSTATE (HIGHWAY) OR MOMENT
OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR
INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
IE INVERT ELEVATION
ILLUM ILLUMINATION
IMC INTERMEDIATE METAL CONDUIT
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
INV INVERT
IP INLET PROTECTION
IRBF INDUSTRIAL RESIN BASE FLOORING
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX, JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
JST JOIST
K KILO
KCP KEENE'S CEMENT PLASTER
KD KILN DRIED OR KNOCKED DOWN
KG KILOGRAM
KN KILONEWTON
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
L ANGLE, LOUVER, LENGTH, LENGTH OF
CURVE
LA LIGHTING ARRESTOR
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LC LEAD COVERED
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE, LATENT HEAT
RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED, LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
L/S LITERS PER SECOND
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVC LENGTH OF VERTICAL CURVE
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
M METER, MEGA
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD METAL DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL, MEDIUM
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLO MAIN LUG ONLY
MLWK MILLWORK
mm MILLIMETER
MMP MEMBRANE WATERPROOFING
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MP MEDIUM PRESSURE
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
M/S METERS PER SECOND
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA, NON-CORROSIVE
NCOMBL NONCOMBUSTIBLE
NDC NOSE DOWN CURB
NE NORTHEAST
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
ASSOCIATION
NRP NON-REMOVABLE
NS NARROW STILE
NTS NOT TO SCALE
NUM NUMERAL
NW NORTHWEST
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG, OVERHEAD
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM, OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSD OPEN SITE DRAIN
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OVHD OVERHEAD
OUT OUTLET
OZ OUNCE
P PIPE, POLE
Pa PASCALES
PA PUBLIC ADDRESS
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON, PULL BOX
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE, PORTLAND
CEMENT, PRECAST
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PJF PREFORMED JOINT FILLER
PKG PACKAGE
PL PROPERTY LINE, PLATE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLAS CMU PLASTER COVERED CMU
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PNT PAINT
PO POST OFFICE, PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRIM PRIMARY
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PRV PRESSURE RELIEF VALVE
PS PULL SWITCH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, PRESSURE
TREATED, POINT OF TANGENT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC), POINT
OF VERTICAL CURVE
PVG PAVING
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT
PVMT PAVEMENT
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS, RISER, RUBBER, RETURN
RA RETURN AIR
RAD RADIATOR, RADIUS
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN,
REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
RED REDUCING
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY, REFRIGERATION
REG REGISTER, REGULATOR
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RESIL T RESILIENT TILE
RET RETURN
REV REVISION
RF RADIO FREQUENCY, ROOF, RETURN
FAN
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RGS RIGID GALVANIZED STEEL
RH RIGHT HAND
RHC REHEAT COIL
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RI RUBBER INSULATED
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RVT RESILIENT VINYL TILE
RWD REDWOOD
RWL RAIN WATER LEADER
S SECOND, SOUTH, SANITARY, SEWER,
STRUCTURE
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY SEWER
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL, SCHEDULE
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR,
OR SOAP DISPENSER;
SDG SIDING
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SG SUPPLY GRILLE
SGD SLIDING GLASS DOOR
1PH SINGLE PHASE
SGL SINGLE
SH SHEET
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FL SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKCP SUSPENDED KEENE'S CEMENT
PLASTER
SKLT SKYLIGHT
SL SLOPE
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMH SANITARY MODULE
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SP STATIC PRESSURE, SINGLE POLE
SPC SUSPENDED PLASTER CEILING
SPDT SINGLE POLE DOUBLE THROW
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPST SINGLE POLE SINGLE THROW
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SR SUPPLY REGISTER
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS, STREET, SINGLE THROW
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUP SUPPORT
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SV B SHEET VINYL BASE
SW SWITCH, SIDE WALK
SWBD SWITCHBOARD
SWDR SWING DOOR
SWGR SWITCH GEAR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD, TILE, TOP, TANGENT
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TC TOP OF CURB
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL
TEMPERATURE CONTROL PANEL;
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
TERM TERMINAL
TH TOTAL HEAD (PUMPS)
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRSLD THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK, TOP REGISTER
TRANS TRANSOM, TRANSITION
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH, TUBE STEEL, TOP
OF STEEL, TOP OF STONE, TOP OF
SLAB
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UCF UNDER COUNTER FREEZER
UCR UNDER COUNTER REFRIGERATOR
UGE UNDERGROUND ELECTRIC
UGND UNDERGROUND
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UNO UNLESS NOTED OTHER WISE
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT, VENT, VALVE
VA VOLT AMPRE
VAC VACUUM
VAR VARIES
VB VINYL BASE
VC VARNISH CAMBRIC, VITRIFIED CLAY, VA
SUPPLIED & CONTRACTOR INSTALLED
VCT VINYL COMPOSITION TILE, VITRIFIED
CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VPI VERTICAL POINT OF INTERSECTION
VPOC VERTICAL POINT OF CURVE
VPOT VERTICAL POINT OF TANGENT
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
VV VA SUPPLIED & INSTALLED
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE, WEST, WIDTH, WASTE, WATER,
WATT, WIRE
W/ WITH
W/O WITHOUT
WA WATT
WARR WARRANTY
WB WET BULB
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD, WINDOW DIMENSION
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WL WATER LEVEL
WLD WELDED
WM WIRE MESH
WOM WALK OFF MATT
WP WATERPROOFING, WEATHERPROOF
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP, WASTE STACK, WATER
SURFACE, WATERSTOP
WSCT WAINSCOT
WT WEIGHT
WTB WALL TILE BASE
WTL WALL TILE
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XFMR TRANSFORMER
XPS EXTRUDED POLYSTYRENE BOARD
(INSULATION)
X-STR EXISTING STRUCTURE
YD YARD
YR YEAR
1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN
OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.
ENSURE ADEQUATE EGRESS CLEARANCES ARE
MAINTAINED AND NOT IMPEDED DURING PHASED
CONSTRUCTION.
2. GENERAL NOTES APPLY TO ALL DRAWING SETS.
3. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT
INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN
OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL
NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED
BUILDING DOCUMENTS.
4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.
IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS
ARE DISCOVERED FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI)
BEFORE AND/OR DURING CONSTRUCTION.
5. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT
NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT
LIMIT APPLICATION OF ANY DRAWING OR DETAIL. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED, FOLLOW PROCEDURES LISTED
IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI)
PRIOR TO PROCEEDING WITH WORK.
6. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN
ON DRAWINGS. INFORMATION COMMON TO SEVERAL
DRAWINGS MAY BE NOTED ON ONLY ONCE.
CONTRACTORS ARE RESPONSIBLE FOR ENTIRE SET OF
DOCUMENTS.
7. PATCH ALL HOLES IN EXISTING SURFACES AND WHERE
EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS
OCCURRED AND PREPARE WALL SURFACES (PATCH, SKIM
COAT, PAINT AND FINISH TO MATCH ADJACENT SURFACES)
AS REQUIRED IN PREPARATION FOR NEW FINISHES
SCHEDULED. PATCH TO MATCH ADJACENT SURFACES IF
NOT SCHEDULED.
8. DIMENSIONS ARE TO STRUCTURAL GRIDLINE OR FACE OF
FINISHED WALL UNLESS NOTED OTHERWISE.
9. PROVIDE METAL BACKING AND/OR METAL BLOCKING IN
WALLS AS REQUIRED AT ALL WALL-MOUNTED ITEMS.
VERIFY HEIGHT AND LENGTH WITH ACTUAL EQUIPMENT.
REFER TO METAL BACKING AND BLOCKING DETAILS ON
SHEET A-722. AT EXISTING WALLS, REMOVE WALL
MATERIAL TO INSTALL METAL BACKING/BLOCKING FOR
NEW WALL-MOUNTED ITEMS.
10. ALL EXISTING FLOOR AND WALL OPENINGS AND
DEPRESSIONS NOT USED IN THE NEW WORK SHALL BE
FILLED OR CLOSED WITH MATERIALS TO MEET REQUIRED
FIRE RATING AND MATCH ADJACENT FINISHES.
11. DRAWINGS ARE NOT TO BE SCALED. CONTRACTOR TO
VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO
COMMENCING THE WORK.
12. COORDINATE WITH INTERIORS SHEETS FOR CORNER
GUARD AND WALL PROTECTION LOCATIONS AND DETAILS.
13. RADIUS EXPOSED COUNTERTOP CORNERS 2" RADIUS,
TYPICALLY. (2" WHERE 3MM EDGE BANDING, 1" RADIUS AT
PLAM EDGES.) SEE CASEWORK DETAILS.
14. CAULK ALL COUNTERTOPS, BACKSPLASHES AND CABINETS
AT LOCATIONS WHERE THEY MEET WALLS. SEAL ALL CUT-
OUTS IN COUNTERTOPS.
15. ALL CUTTING AND PATCHING REQUIRED FOR NEW
MECHANICAL AND ELECTRICAL WORK IN ALL EXISTING
SPACES SHALL BE BY THE RESPECTIVE CONTRACTORS.
16. MATCH ALL FINISHED WALL THICKNESS WHERE NEW
WALLS OCCUR IN LINE WITH EXISTING WALLS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST &
NOISE CONTAINMENT BARRIERS BETWEEN THE WORK
AREA & THE ADJACENT OCCUPIED SPACES.
18. ALL PIPING, CONDUITS, AND RELATED MECHANICAL AND
ELECTRICAL ITEMS SHALL BE CONCEALED WITHIN
DRYWALL AND/OR PLASTER FURRING AS REQUIRED IN
FINISHED AREAS WHETHER SHOWN ON DRAWINGS OR NOT
UNLESS OTHERWISE NOTED.
19. SEAL AROUND ALL MECHANICAL AND ELECTRICAL
EQUIPMENT PENETRATIONS AT RATED WALLS, ABOVE AND
BELOW CEILINGS, WITH A UL APPROVED FIRE-STOPPING
MATERIAL.
20. ALL INTERIOR WALLS WILL BE TYPE 'S' CONSTRUCTION
UNLESS OTHERWISE INDICATED. ALL FRAMING AROUND
COLUMNS WILL BE TYPE 'L2' CONSTRUCTION UNLESS
OTHERWISE INDICATED. REFER TO REGULATORY PLAN
SHEETS GI001 FOR WALL RATINGS.
21. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING
INTERSECT, THE HIGHEST RATED PARTITION TAKES
PRECEDENT.
22. ALL EXISTING TO REMAIN CEILING AND WALL GRILLES,
DIFFUSERS AND LIGHTS, SPRINKLER HEADS, OCCUPANCY
AND FIRE ALARM DETECTORS TO BE CLEANED IN AREAS
OF CONSTRUCTION.
23. VERIFY THAT THE EXISTING WALLS REQUIRING FIRE
RATING ARE MAINTAINED, REPAIRED AND EXTENDED TO
STRUCTURE.
24. REFER TO LIFE SAFETY PLANS AND FLOOR PLANS FOR
LOCATION OF REQUIRED WALL RATINGS.
25. ALL THERMOSTAT LOCATIONS TO BE COORDINATED WITH
COR PRIOR TO INSTALLATION.
GENERAL SHEET NOTES:
Revisions: Date:
/21
/20
T
A S P H A
LT
W
C O N C R E T E
C U R B
G U T T E R
EAST 35TH STREET
E L M
W O
O D
A V
E N
U E
EAST 33RD STREET
L
IS
T E
R A
V E
N U
E
LINWOOD BOULEVARD
B6
B5
B40
B1
B26
B15
PARKING
GARAGE
B4
B2
MAINTAIN SAFE PROTECTED
PEDESTRIAN PATHWAY FROM
EXITS
EXITS TEMPORARILY CLOSED
FOR CONSTRUCTION
CONSTRUCTION FENCING AT
LIMITS OF CONSTRUCTION
CONSTRUCTION ACCESS
AREA
VEHICLE TRAFFIC PATH
(PHASE 1 & 2)
TEMPORARY FENCING
DEDUCTIVE ALTERNATE
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A
B
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:1
:5
P
M
AS100
ARCHITECTURAL SITE DIAGRAMS
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS K.HUTCH
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1" = 160'-0" F1
SITE PLAN
1" = 40'-0" B6
SITE LIMIT OF CONSTRUCTION PHASE 1
LEGEND - SITE CONSTRUCTION PHASING
SHEET NOTES
Revisions: Date:
DEDUCT
ALTERNATE 2:
DELETE SITE PREP
FOR TEMPORARY
MRI'S AT MAIN
CAMPUS AND
HONORS CAMPUS
1 LIMITS OF CONSTRUCTION LINE
2 CONSTRUCTION ACCESS AREA
3 AREA OF RENOVATION
4 EXITS TEMPORARILY CLOSED DURING CONSTRUCTION
5 EXITS TEMPORARILY CLOSED FOR CONSTRUCTION
6 EXISTING SIDEWALK TO REMAIN - PROTECT CONCRETE AND REPLACE ANY
DAMAGED AREAS
7 CONSTRUCTION LIMITS - PHASE 1. REFER TO PLAN FOR MORE
INFORMATION.
8 CONSTRUCTION LIMITS - PHASE 2. REFER TO PLAN FOR MORE
INFORMATION.
9 PHASE 1 CONSTRUCTION VEHICLE TRAVEL PATH.
10 COORDINATE WITH COR (CONTRACTING OFFICER REPRESENTATIVE) FOR
ANY ACTIVITIES REQUIRING ACCESS DURING PEAK HOSPITAL HOURS. PLAN
TO BLOCK OFF PARKING AT THESE LOCATIONS & HAVE CONSTRUCTION
PERSONNEL TO DIRECT TRAFFIC & PROTECT PEDESTRIANS DURING ANY
CONSTRUCTION TRAFFIC EVENTS.S
DURING PEAK HOSPITAL HOURS. PLAN TO BLOCK OFF PARKING AT
THESE LOCATIONS & HAVE CONSTRUCTION PERSONNEL TO
DIRECT TRAFFIC & PROTECT PEDESTRIANS DURING ANY
CONSTRUCTION TRAFFIC EVENTS.
11 GATE & SIGN; CONSTRUCTION PERSONNEL ONLY.
12 NEW TEMPORARY FENCE TO SECURE CONSTRUCTION MATERIALS.
13 COORDINATE ALL ACCESS WITH COR (CONTRACTING OFFICER
REPRESENTATIVE). CONTRACTOR TO LIMIT MOVEMENT OF EQUIPMENT &
SUPPLIES BETWEEN STORAGE LOT & CONSTRUCTION AREA TO OFF-PEAK
HOURS (7PM-7AM)
14 ALL CONTRACTOR PARKING, STORAGE, LAY DOWN SPACE & TRAILER TO BE
LIMITED TO THIS LOT.
15 EXISTING FENCE.
16 CONTRACTOR TO ENSURE ACCESSIBLE (ADA) PATHWAY IS KEPT CLEAN
AND PROTECTED FROM PARKING GARAGE TO MAIN ENTRY. COORDINATE
WITH COR FOR FINAL EXTENTS OF CONSTRUCTION AREA AND LIMITED
TIMES FOR DAILY CONTRACTOR ACCESS. CONTRACTOR TO PROVIDE
FLAGGER AND PERSONNEL TO COORDINATE PEDESTRIAN ACCESS AND
CONSTRUCTION VEHICLES DURING LIMITED TIMES WHEN CROSS TRAFFIC
CANNOT BE AVOIDED.
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT
MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT
/21
CONCRETESIDEWALK
SIGN
SS
S S
S S
SS
SS
SS
S S
S S
S S
SS
SS S
S
SS
SS
S S
SS
S S
S S
S S
SS
S
S
S
S
S
S
" G
G
G
G
G
G
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
XX
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1 9
3 9
6 93
930 930
940 940
935 935
943 943
DN
E
C
C
AA
A
A
T
AC AC
T
LS
CONCRETESIDEWALK
SIGN
PORTABLE MRI UNIT
LOCATION -
DIMENSIONS
SHOWN FOR
COORDINATION
ONLY
MRI RENTAL IS NOT
IN CONTRACT
4'-0" 23'-11"
REFER TO E-
SHEETS FOR
ELECTRICAL
AND DATA
CONNECTIONS
EXCLUSION
ZONE - NO
ACCESS
8' -0
TEMPORARY FENCE 5'
AROUND UNIT /
MAINTENANCE ACCESS ONLY
- VEHICLE TRAFFIC TO BE
KEPT 8' AWAY FROM UNIT
STRIPE AREA
FOR PATIENT /
STAFF ACCESS
CANOPY
ABOVE
8'-6" 3'-6"
'-1
'-0
'-0
5'-0" 5'-0"
5'-0"
6' -0
DEDUCT ALTERNATE #2:
DELETE SITE PREP FOR
TEMPORARY MRI'S
TEMPORARY
MRI
LOCATION
1" = 20'-0" F1
MRI LOCATION - EMERGENCY ROOM ACCESS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:1
:1
P
M
AS101
TEMPORARY MRI LOCATION - MAIN CAMPUS
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
SCALE: NOT TO SCALE
C9
ELECTRICAL SERVICE
SCALE: NOT TO SCALE
B8
BAY FROM NORTH
SCALE: NOT TO SCALE
B9
BAY FROM EAST
SCALE: NOT TO SCALE
C8
DRIVE EXITING AMBULANCE BAY
LOOKING EAST
Revisions: Date:
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT
MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT
/21
AD
AD
H C 1-
E
H C 1-
E
24/30
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
BRO
O
KLYN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
B
RO
O
KL
YN
U
TI
LIT
Y
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
B
AR
/3
/LL
8/ 0/
LL
36/30
C -2 X
0L -2 R D-
0L -2 R D-
0L -2 R D-
0L -2 R D-
0L-2
RD
-2
0L-2
RD
-2
0L-2
RD
-2
0L-2
RD
-2
0L-2
RD
-2
0L-2
RD
-2
STA
IR
GROUP
B
IO
FE
ED
UP
UP
T M
PB
PB
R P4
T M
PB
PB
T M
PB
PB
360°
360°
360°
360°
360°
360°
13'-1"
24/30
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
BR
O O K
LY
N
/L L
/L L
36/ 30
T M
PB
PB
MM
13'-1"
TRASH
B3
RJ-900
RELOCATE LIGHT POLE -
REFER TO ELECT
CONCRETE PAD LEVEL
WITH PATIO TO THE
NORTH
REFER TO E-SHEETS FOR
ELECTRICAL AND DATA
CONNECTIONS
TEMPORARY FENCE 5'
AROUND UNIT /
MAINTENANCE ACCESS ONLY
- VEHICLE TRAFFIC TO BE
KEPT 8' AWAY FROM UNIT
6'-9"
5'-0" 8'-6" 5'-0" 6'-6"
6'-0"
CONCRETE RAMP 1:20
SLOPE - FIELD VERIFY HT
5' -0
'-5
4' -8
'-0
5' -6
MAINTAIN 6'-0" CLEAR
MINIMUM PATHWAY FOR
EXITING
DEDUCT ALTERNATE #2:
DELETE SITE PREP FOR
TEMPORARY MRI'S
PORTABLE MRI UNIT
LOCATION -
DIMENSIONS
SHOWN FOR
COORDINATION
ONLY
MRI RENTAL IS NOT
IN CONTRACT
HONORS ANNEX
TEMPORARY MRI LOCATION
KCVA HONORS ANNEX
4251 NORTHERN AVENUE
KANSAS CITY, MO 64133
N O
R T H
E R
N A
V E
N U
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:1
:1
P
M
AS102
TEMPORARY MRI LOCATION - HONORS CAMPUS
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1" = 20'-0" E1
MRI LOCATION - HONORS CAMPUS
SCALE: NOT TO SCALE
F6
BACK DRIVE FROM SOUTH
PLAN
NORTH
SCALE: NOT TO SCALE
F9
TRASH ENCLOSURE
SCALE: NOT TO SCALE
D6
GAS, SWITCHGEAR, AND COMPRESSOR
SCALE: NOT TO SCALE
F9
SERVICE, DOORS TO TRANSFORMER
SCALE: NOT TO SCALE
C6
NORTHWEST PATIO
SCALE: NOT TO SCALE
C9
NORTHWEST PATIO
Revisions: Date:
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT
MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT
/21
DN
BIOMED
NETWORK
ROOM
1117 SF
CAFETERIA
2063 SF
NO WORK
D4
RJ-901
B3
RJ-901
B8
RJ-901
B9
RJ-901
D6
RJ-901
MATCHLINE
SEE: F2/XAD102
4' -0
2'
-0
DEDUCT ALTERNATE 3:
DELETE STIAR IN MRI AREA
CORRIDOR
MB-210MB-210
ARCHITECTURAL SYMBOL LEGEND - DEMO
INTERIOR STUD FRAMED WALL. SEE WALL TYPES
PROPOSED EXTERIOR WALL. SEE WALL SECTIONS
1 HR FIRE AND SMOKE BARRIER
2 HR FIRE AND SMOKE BARRIER
SMOKE RATED PARTITION / SMOKE BARRIER /
COMPARTMENT
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING
GENERAL DEMOLITION NOTES
VA/VA ITEM - VA SUPPLIED & INSTALLED
VA/CC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED
CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT INDICATORA1000
KEY PLAN
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED
ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED
PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK
INCLUDE B126.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING DEVICES SHOWN DO NOT REPRESENT ALL DEVICES OR EXACT
LOCATIONS. CONTRACTOR TO VERIFY ALL ITEMS ONSITE PRIOR TO BIDDING.
E. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
F. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
G. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
I. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
J. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
K. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED AS
NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
L. CONTRACTOR TO DEMO ALL ELECTRICAL DATA, THERMOSTATS, MEDICAL GAS
EQUIPMENT. CAP SYSTEMS APPROPRIATELY FOR FUTURE CONNECTIONS,
COORDINATE WITH MEP.
M. SPRINKLER PROTECTION WITHIN THE CONSTRUCTION AREA IS TO BE
MAINTAINED TO ALLOW THE USE OF A NON-RATED CONSTRUCTION BARRIER.
IN ROOMS/AREAS WHERE THE CEILING IS REMOVED FOR MORE THAN A
SINGLE WORK SHIFT AT A TIME, THIS WILL REQUIRE THE REMOVAL OF THE
EXISTING PENDENT SPRINKLERS AND INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA 13 REQUIREMENTS. NO
ADJUSTMENTS TO EXISTING SPRINKLER SPACING ARE REQUIRED. AFTER
NEW CEILING GRIDS ARE INSTALLED, THE NEW PENDENT SPRINKLERS SHALL
BE INSTALLED IN CONJUNTION WITH THE NEW CEILING TILES SO THAT AT THE
END OF EACH WORK SHIFT ALL AREAS WITH NEW CEILING TILES SHALL HAVE
THE NEW SPRINKLERS INSTALLED AS WELL. (THE SPRINKLERS SHALL BE
PRESSURIZED AT THE END OF THE WORK SHIFT.)
SHEET NOTES
NO WORK
XX
X-XXX
EXISTING PHOTO LOCATION
EXISTING GRID
EXISTING DOOR TO REMAIN
DEMOLISHED DOOR
MATCHLINE
DEMO AREA IN CEILING
DEDUCTIVE ALTERNATE
1.J.1
1.J
1.19a 1.20 1.20a 1.21
1.G
STAIRWELL
NO. 20
S20S20
B3
RJ-905
1.J
1.20a 1.21
1.H
1.G
1.19
8 STAIRWELL
NO. 20
S20S20
CORRIDOR
C4-20C4-20
B9
RJ-905
PHOTO VIEWS BY FLOOR:
4TH - B9/RJ-905
5TH - D1/RJ-905
6TH - D3/RJ-905
7TH - D5/RJ-905
8TH - D7/RJ-905
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:1
:2
P
M
AD100A
ARCHITECTURAL - DEMOLITION PLAN -
BASEMENT - AREA A
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1/8" = 1'-0" F1
ARCHITECTURAL - DEMOLITION PLAN - BASEMENT - AREA A
1 DEMOLISH PORTION OF EXISTING WALL
2 DEMOLISH DOOR
3 DEMOLISH CASEWORK AND PLUMBING FIXTURES
4 BRACE EXISTING RETAINING WALL TO REMAIN - RE: STRUCTURAL
5 MOVE EXISTING MECHANICAL EQUIPMENT TO TEMPORARY LOCATION.
RELOCATE AFTER ADDITION IS COMPLETE
6 PROTECT EXITING FROM EXISTING DOOR
7 DEMO EXISTING LIGHT POLE
8 DEMOLISH EXISTING WINDOW
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT
MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT
Revisions: Date:
1/8" = 1'-0" B4
DEMO PLAN - ELEVATOR CORRIDOR SECOND FLOOR
1/8" = 1'-0"
B7
DEMO PLAN ELEVATOR CORRIDOR TYPICAL FLOOR FOURTH THRU EIGHTH
SEE:
F1/AD100A FOR ELEVATOR BASEMENT DEMO PLAN
AD101A FOR FIRST FLOOR ELEVATOR PLAN
AD103A FOR THIRD FLOOR ELEVATOR PLAN
EXISTING FINISH SCHEDULE - BASEMENT
Existing Finish Key
Existing Base
Existing Floor
Existing Wall Material
Existing Ceiling Material
1 VB VCT GYP ACM
EXISTING FINISH ABBERVIATIONS
VB- VINYL BASE
VCT- VINYL COMPOSIT TILE
GYP- GYPSUM
ACM- ACCOUSTIC CEILING MATERIAL
CPT- CARPET
CT- CERAMIC TILE
/21
LINE OF EXISTING
INTERIOR FLOOR SLAB
LINE OF BASEMENT
BELOW
LINE OF LOBBY
WALLS ABOVE
C1-33
CORRIDOR
M1-308
RECEPTION
M1-304
WAITING
M1-300
VESTIBULE
M1-302
WAITING
C1-31
CORRIDOR
M1-307
PACT CHECK-IN
M1-312A
SHAR. MED STOR.
MED. APPT.
M1-305
LOBBY
M1-325
SHARED DOCUMENTSM1-327
CLEAN
M1-326
MED EQPT
M1-322
FLEX OFFICE
M1-318
TOILET
M1-315
CONSULT
M1-311
EXAM
M1-319
CONSULT
M1-320A
TOILET
M1-320
PROCEDURE
M1-328
SOILED
M1-317
EXAM
M1-309
TELE-HEALTH M1-313
EXAM
M1-323
EXTENDED TEAM
1.16a 1.17 1.18
1.K
1.J.1
1.19a 1.20 1.21
1.G
1.191.16
D1
RJ-901
B1
RJ-901
D9
RJ-905
D8
RJ-901
B3
RJ-901
B4
RJ-901
B6
RJ-901
1F
'-2
STAIRWELL NO.3
S3
LOBBY
C1-10B
VESTIBULE
C1-10A
STAIR #3A
S-3A
IF ALTERNATE 3 ACCEPTED -
• DO NOT DEMO EXISTING WINDOW AND
PORTION OF WALL
ARCHITECTURAL SYMBOL LEGEND - DEMO
INTERIOR STUD FRAMED WALL. SEE WALL TYPES
PROPOSED EXTERIOR WALL. SEE WALL SECTIONS
1 HR FIRE AND SMOKE BARRIER
2 HR FIRE AND SMOKE BARRIER
SMOKE RATED PARTITION / SMOKE BARRIER /
COMPARTMENT
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING
GENERAL DEMOLITION NOTES
VA/VA ITEM - VA SUPPLIED & INSTALLED
VA/CC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED
CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT INDICATORA1000
KEY PLAN
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED
ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED
PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK
INCLUDE B126.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING DEVICES SHOWN DO NOT REPRESENT ALL DEVICES OR EXACT
LOCATIONS. CONTRACTOR TO VERIFY ALL ITEMS ONSITE PRIOR TO BIDDING.
E. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
F. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
G. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
I. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
J. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
K. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED AS
NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
L. CONTRACTOR TO DEMO ALL ELECTRICAL DATA, THERMOSTATS, MEDICAL GAS
EQUIPMENT. CAP SYSTEMS APPROPRIATELY FOR FUTURE CONNECTIONS,
COORDINATE WITH MEP.
M. SPRINKLER PROTECTION WITHIN THE CONSTRUCTION AREA IS TO BE
MAINTAINED TO ALLOW THE USE OF A NON-RATED CONSTRUCTION BARRIER.
IN ROOMS/AREAS WHERE THE CEILING IS REMOVED FOR MORE THAN A
SINGLE WORK SHIFT AT A TIME, THIS WILL REQUIRE THE REMOVAL OF THE
EXISTING PENDENT SPRINKLERS AND INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA 13 REQUIREMENTS. NO
ADJUSTMENTS TO EXISTING SPRINKLER SPACING ARE REQUIRED. AFTER
NEW CEILING GRIDS ARE INSTALLED, THE NEW PENDENT SPRINKLERS SHALL
BE INSTALLED IN CONJUNTION WITH THE NEW CEILING TILES SO THAT AT THE
END OF EACH WORK SHIFT ALL AREAS WITH NEW CEILING TILES SHALL HAVE
THE NEW SPRINKLERS INSTALLED AS WELL. (THE SPRINKLERS SHALL BE
PRESSURIZED AT THE END OF THE WORK SHIFT.)
SHEET NOTES
NO WORK
XX
X-XXX
EXISTING PHOTO LOCATION
EXISTING GRID
EXISTING DOOR TO REMAIN
DEMOLISHED DOOR
MATCHLINE
DEMO AREA IN CEILING
DEDUCTIVE ALTERNATE
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 matchline
A
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/1
/2
:4
:4
A
M
AD101A
ARCHITECTURAL - DEMOLITION PLAN - FIRST
FLOOR - AREA A
TRIPLE C THE A& E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1/8" = 1'-0"
F1
ARCHITECTURAL - DEMOLITION PLAN - FIRST FLOOR - AREA A
1 DEMO EXISTING STOREFRONT SYSTEM WITH SLIDING DOORS
2 DEMO FLOOR SLAB
3 DEMO LARGE TREE
4 DEMO VESTIBULE ROOF
5 EXISTING SIDEWALK TO REMAIN
6 DEMO EXISTING WINDOW
7 DEMOLISH PORTION OF EXISTING WALL
8 DEMO METAL PANEL LEAN-TO ENCLOSURE AND CONCRETE SLAB
9 DEMO EXISTING DOOR AND FRAME - TYPICAL FLOORS 1-8
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT
MAIN CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT
Revisions: Date:
EXISTING FINISH SCHEDULE - FIRST FLOOR
Existing Finish Key
Existing Base
Existing Floor
Existing Wall Material
Existing Ceiling Material
2 VB CPT GYP ACM / GYP
EXISTING FINISH ABBERVIATIONS
VB- VINYL BASE
VCT- VINYL COMPOSIT TILE
GYP- GYPSUM
ACM- ACCOUSTIC CEILING MATERIAL
CPT- CARPET
CT- CERAMIC TILE
/21
1.16a 1.17 1.18 1.18a
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .