About this file
This document appears to be a set of construction drawings related to a federal contract opportunity for the Construct Inpatient Medicine Bed Addition at the Kansas City VA Medical Center. The drawings provide detailed information on the fire protection and plumbing systems for the renovation project, including specifications on the sprinkler system design, piping, fixtures, and medical gas components. Key details include:
The project is a set-aside procurement with a tiered evaluation process favoring SDVOSB, VOSB, and small business concerns. The solicitation number is 36C77624R0063 and it is being issued by the Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central. The project involves a minor construction effort to add an inpatient medicine bed addition at the Kansas City VA Medical Center in Kansas City, Missouri. The drawings outline the requirements for modifying the existing fire protection and plumbing systems within the construction area, including relocating and rerouting piping, upgrading fixtures, and integrating new medical gas components. Specific details are provided on sprinkler densities, pipe sizing, fixture rough-ins, and storm drainage calculations.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.J.1
1.J
A5
A6
NN PP RR SS TT
1.G
1.19
ELEVATOR CORRIDOR
C4-09
SPRINKLERS SHALL NOT BE PROVIDED
AT THE TOP OF THE ELEVATOR
HOISTWAY PER NFPA 13.
THIS DEDUCT HAS NO
AFFECT ON FIRE
PROTECTION SCOPE.
DEDUCT ALTERNATE #1
DELETE ELEVATOR CARS
AND HOIST MACHINES
1.J.1
1.J
A5
NN PP RR SS TT
1.G
1.19
ELEVATOR CORRIDOR
C2-09
STORAGE
C2-10
DEDUCT ALTERNATE #1
DELETE ELEVATOR CARS
AND HOIST MACHINES
THIS DEDUCT HAS NO
AFFECT ON FIRE
PROTECTION SCOPE.
1.J.1
1.J
A5
NN PP RR SS TT
1.G
1.19
ELEVATOR LOBBY
CB-09
DEDUCT ALTERNATE #1
DELETE ELEVATOR CARS
AND HOIST MACHINES
THIS DEDUCT HAS NO
AFFECT ON FIRE
PROTECTION SCOPE.
1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS
INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE
TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS
ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED
AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS
OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT
ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL
CONSTRUCTION.
2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR
THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR
IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM
APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE
HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT
NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE
SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.
3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,
14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING
CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.
WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,
THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN
ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S
REPRESENTATIVE.
5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE
IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST
SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,
LATEST EDITION.
6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING
SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND
LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF
THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED
ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO
ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED
WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING
PENETRATIONS THROUGH RATED ASSEMBLIES.
8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE
REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL
WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO
ARE REGULARLY EMPLOYED TO DO SUCH WORK.
9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,
CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE
SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF
THE BUILDING.
10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.
11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS
OTHERWISE NOTED.
12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND
OBSTRUCTION REQUIREMENTS.
13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL
FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,
AND STRUCTURAL COMPONENTS.
14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL
SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE
REQUIREMENTS IN ACCORDANCE WITH NFPA 13.
15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.
PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD
ADJUSTMENT.
16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS
AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL
SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN
ACCORDANCE WITH NFPA.
17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE
SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,
ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL
SPRINKLERS INSTALLED BELOW 7'-0" AFF.
18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND
FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE
10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.
19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES
OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL
PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED
ADJUSTABLE HANGERS.
20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT
WHERE PROHIBITED BY NFPA 13.
21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT
WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS
PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH
NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.
22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE
BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.
FIRE PROTECTION NOTESFIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
UPRIGHT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
ELEVATOR PIT &
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
HAZARD
SYMBOL
AREA NOT IN CONTRACT
FIRE SPRINKLER LEGEND
PENDENT SPRINKLER
UPRIGHT SPRINKLER
EXISTING SPRINKLER
ALTERNATES
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN
CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR
ADJACENT
REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/1
M
E P
-M O
D
-R
.r v t
/2
/2
:1
:2
A
M
FP102A
FLOOR PLANS - FIRE PROTECTION
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 CJF/NPS TMR
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1/8" = 1'-0"
FLOOR PLAN ELEVATOR LOBBY TYPICAL FLOOR FOURTH THRU EIGHTH - FIRE PROTECTION
1/8" = 1'-0"
FLOOR PLAN ELEVATOR LOBBY TYPICAL FLOOR FIRST THRU SECOND - FIRE PROTECTION
1/8" = 1'-0"
FLOOR PLAN ELEVATOR LOBBY BASEMENT - FIRE PROTECTION
Revisions: Date:
07.21.2022
STORAGE
M3-215A
VISITOR TLT
M3-205A
WEIGH STATION
M3-218
ELECT
M3-216
HOUSEKEEPING
M3-217
STAFF TOILET
M3-215B
EXIST MECH CHASE
M3-208
ELECT
M3-210
LINEN CHUTE
M3-240A
CHUTE ROOM/ SOILED
LINEN
M3-240
RECEPTION / MSA
M3-215 NOURISH - FUTURE FAM
PANTRY
M3-209
ELEC ROOM
M3-214
TELEMETRY
M3-255
MULTIPURPOSE BED
STORAGE
M3-257
RESOURCE KIOSK
M3-203B
PATIENT RESTROOM
M3-246A
CLEAN LINENS
M3-241
CORRIDOR
C3-26
CORRIDOR
C3-20
NURSE SUPERVISOR
M3-258A
STAFF WORKSPACE
M3-254
NURSE EDUCATOR
M3-258B
STORAGE
M3-253
PATIENT ROOM 1
M3-248
PATIENT RESTROOM
M3-247A
PATIENT ROOM 2
M3-247
OXYGEN STOR
M3-245
PATIENT ROOM 4
M3-249
PATIENT ROOM 5
M3-250
EQUIP ALCOVE
M3-251
CORRIDOR
C3-19
PATIENT ROOM 3
M3-246
WAITING
M3-203A
CLEAN SUPPLY/ FUTURE
CONSULT
M3-205B
MECH
M3-261
CORRIDOR
C3-22
NETWORK CLOSET
F-155
ELEVATOR CORRIDOR
C3-09
MED ROOM
M3-207B
WORK STATIONS
M3-207A
MATCHLINE
SEE: 1/FP103B
1.J.1
1.J
A5
A6
NN PP RR SS TT
1.G
1.191.181.171.16a1.16
CHARTING
M3-254
CHARTING
M3-252
CORRIDOR
M3-203C
NURSE MANAGER
M3-262
EXISTING SPRINKLERS
IN THIS AREA TO
REMAIN. (TYP.)
DEDUCT ALTERNATE #5 DELETE
RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN
STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE #4
DELETE RENOVATION
OF CORRIDOR C3-20 -
FLOOR AND WALL
FINISHES
STAIRWELL NO. 19
S19
PATIENT RESTROOM
M3-248A
PATIENT RESTROOM
M3-249A
PATIENT RESTROOM
M3-250A
THIS DEDUCT HAS NO
AFFECT ON FIRE
PROTECTION SCOPE.
DEDUCT ALTERNATE #1
DELETE ELEVATOR CARS
AND HOIST MACHINES
THIS DEDUCT HAS NO
AFFECT ON FIRE
PROTECTION SCOPE.
IF THIS DEDUCT IS
TAKEN, EXISTING
SPRINKLER SYSTEM IN
THIS AREA TO REMAIN
UNDISTURBED
(TYP)
1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS
INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE
TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS
ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED
AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS
OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT
ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL
CONSTRUCTION.
2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR
THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR
IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM
APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE
HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT
NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE
SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.
3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,
14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING
CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.
WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,
THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN
ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S
REPRESENTATIVE.
5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE
IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST
SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,
LATEST EDITION.
6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING
SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND
LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF
THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED
ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO
ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED
WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING
PENETRATIONS THROUGH RATED ASSEMBLIES.
8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE
REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL
WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO
ARE REGULARLY EMPLOYED TO DO SUCH WORK.
9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,
CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE
SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF
THE BUILDING.
10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.
11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS
OTHERWISE NOTED.
12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND
OBSTRUCTION REQUIREMENTS.
13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL
FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,
AND STRUCTURAL COMPONENTS.
14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL
SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE
REQUIREMENTS IN ACCORDANCE WITH NFPA 13.
15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.
PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD
ADJUSTMENT.
16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS
AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL
SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN
ACCORDANCE WITH NFPA.
17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE
SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,
ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL
SPRINKLERS INSTALLED BELOW 7'-0" AFF.
18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND
FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE
10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.
19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES
OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL
PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED
ADJUSTABLE HANGERS.
20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT
WHERE PROHIBITED BY NFPA 13.
21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT
WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS
PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH
NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.
22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE
BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.
FIRE PROTECTION NOTESFIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
UPRIGHT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
ELEVATOR PIT &
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
HAZARD
SYMBOL
AREA NOT IN CONTRACT
ALTERNATES
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN
CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR
ADJACENT
REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.
FIRE SPRINKLER LEGEND
PENDENT SPRINKLER
UPRIGHT SPRINKLER
EXISTING SPRINKLER
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
NOTE:
1. PROVIDE HANGER FOR ARMOVERS
GREATER THAN 24" IN LENGTH.
ARMOVER (NOTE 1)
90 EL.
DROP
RISER NIPPLE
BRANCH LINE
1" X 1/2" R.C.
SUSPENDED CEILING FOR HEAD TYPES,
SEE FLOOR PLANS
AND HEAD
DETAILS
KEYNOTES
1. PROVIDE UPRIGHT SPRINKLER WITH GUARD IN MECHANICAL
ROOM.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
matchline
A
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/1
P
-M O
D
-R
.r v t
/2
/2
:1
:3
A
M
FP103A
THIRD FLOOR RENOVATION PLAN - FIRE
PROTECTION - AREA A
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 CJF/NPS TMR
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1/8" = 1'-0"
THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA A
Revisions: Date:
NTS
RETURN BEND ASSEMBLY DETAIL
CHARTING
M3-227
EQUIPMENT ALCOVE
M3-406
STORAGE
M3-215A
VISITOR TLT
M3-205A
STAFF LOCKERS
M3-219A
STAIRWELL NO 3
S3
ELEC CLOSET
M3-220
WEIGH STATION
M3-218
ELECT
M3-216
PATIENT ROOM 7
BARIATRIC
M3-224
PATIENT ROOM 6
BARIATRIC
M3-223
EQUIP STORAGE
M3-225
NURSE LOUNGE
M3-219
HOUSEKEEPING
M3-217
IT CLOSET
M3-221
CLEAN LINEN ALCOVE
M3-414
COPIER PRINTER ALCOVE
M3-222
EQUIPMENT ALCOVE
M3-412
PATIENT ROOM 8
BARIATRIC
M3-226
PATIENT RESTROOM
M3-226A
PATIENT RESTROOM
M3-224A
PATIENT RESTROOM
M3-223A
CORRIDOR
C3-21
STAFF TOILET
M3-215B
RECEPTION / MSA
M3-215 NOURISH - FUTURE FAM
PANTRY
M3-209
ELEC ROOM
M3-214
TELEMETRY
M3-255
RESOURCE KIOSK
M3-203B
WAITING
M3-203A
CLEAN SUPPLY/ FUTURE
CONSULT
M3-205B
MECH
M3-261
NETWORK CLOSET
F-155
STAIRWELL NO. 21
S21
MATCHLINE
SEE: 1/FP103A
A2
1.P
A3
1.N
1.M
1.L
1.K
1.J.1
1.J
AABB CC DD EEFF GG HH JJ KK MM
NN PP RR SS TT1.181.171.16a1.16
CHARTING
M3-418
CHARTING
M3-417
CORRIDOR
M3-203C
F6
F5
(E)6"
STANDPIPE #5
(E)6"
STANDPIPE
#6
EXISTING SPRINKLERS
IN THIS AREA TO
REMAIN. (TYP.)
DEDUCT ALTERNATE #6
DELETE RENOVATION OF 3
PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH
RESTROOMS, STORAGE, AND
CORRIDOR ADJACENT
DEDUCT ALTERNATE #5 DELETE
RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN
STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
CORRIDOR
C3-21
IF THIS DEDUCT IS
TAKEN, EXISTING
SPRINKLER SYSTEM IN
THIS AREA TO REMAIN
UNDISTURBED
IF THIS DEDUCT IS
TAKEN, EXISTING
SPRINKLER SYSTEM IN
THIS AREA TO REMAIN
UNDISTURBED
EXISTING
ZONE
CONTROL
VALVE TO
REMAIN
PROVIDE
NEW
SEPERATE
ZONE VALVE
FOR FUTURE
PHASE
(TYP)
1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS
INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE
TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS
ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED
AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS
OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT
ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL
CONSTRUCTION.
2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR
THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR
IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM
APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE
HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT
NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE
SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.
3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,
14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING
CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.
WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,
THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN
ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S
REPRESENTATIVE.
5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE
IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST
SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,
LATEST EDITION.
6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING
SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND
LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF
THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED
ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO
ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED
WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING
PENETRATIONS THROUGH RATED ASSEMBLIES.
8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE
REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL
WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO
ARE REGULARLY EMPLOYED TO DO SUCH WORK.
9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,
CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE
SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF
THE BUILDING.
10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.
11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS
OTHERWISE NOTED.
12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND
OBSTRUCTION REQUIREMENTS.
13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL
FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,
AND STRUCTURAL COMPONENTS.
14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL
SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE
REQUIREMENTS IN ACCORDANCE WITH NFPA 13.
15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.
PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD
ADJUSTMENT.
16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS
AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL
SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN
ACCORDANCE WITH NFPA.
17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE
SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,
ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL
SPRINKLERS INSTALLED BELOW 7'-0" AFF.
18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND
FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE
10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.
19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES
OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL
PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED
ADJUSTABLE HANGERS.
20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT
WHERE SPECIFICALLY PROHIBITED, IN COMPLIANCE WITH VA GUIDELINES AND
NFPA REQUIREMENTS.
21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT
WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS
PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH
NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.
22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE
BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.
23. SEE SHEET FP103A FOR FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA.
FIRE PROTECTION NOTESALTERNATES
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN
CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR
ADJACENT
REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
UPRIGHT, QUICK
RESPONSE, FM
APPROVED, UL LISTED
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE, FM
APPROVED, UL LISTED
ELEVATOR PIT &
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
HAZARD
SYMBOL
AREA NOT IN CONTRACT
FIRE SPRINKLER LEGEND
PENDENT SPRINKLER
UPRIGHT SPRINKLER
EXISTING SPRINKLER
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
INDICATING TYPE
FLOOR
CONTROL VALVE WITH
SUPERVISORY SWITCH
TO SPRINKLERS
PRESSURE GAUGE
WATER FLOW SWITCH
1" DRAIN LINE
INSPECTORS TEST VALVE
SITE GLASS
AUXILIARY DRAIN
VALVE
SYSTEM RISER
TO DRAIN
UNION WITH CORROSION RESISTANT
ORIFICE GIVING FLOW EQUIVALENT TO
THE SMALLEST SPRINKLER ORIFICE IN
THE SYSTEM
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
matchline
B
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/1
P
-M O
D
-R
.r v t
/2
/2
:1
:3
A
M
FP103B
THIRD FLOOR RENOVATION PLAN - FIRE
PROTECTION - AREA B
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 CJF/NPS TMR
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
1/8" = 1'-0"
THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA B
NTS
FIRE SPRINKLER ZONE VALVE PIPING DETAIL
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND
INSTALLED) UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE
AND VERIFY THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY
NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE
ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• INTERNATIONAL BUILDING CODE (IBC) 2021
• INTERNATIONAL EXISTING BUILDING CODE 2021
• IBC MECHANICAL 2021
• IBC PLUMBING 2021
• IBC ENERGY CONSERVATION 2021
• INTERNATIONAL FIRE CODE 2021
• NFPA 1-2021, THE UNIFORM FIRE CODE
• NFPA 101-2021, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 70-2020, NATIONAL ELECTRICAL CODE
• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT.
DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF
INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL
TIMES DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON
PROJECT.
14. THE COR'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS
OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS PER 01 00 00 AND 01 33 26. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND
ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN A SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP
DRAWINGS SHALL BE TURNED OVER TO THE COR AFTER CONSTRUCTION COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE COR. THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED
WITHOUT WRITTEN CONSENT AND APPROVAL FROM CONTRACTING OFFICER.
PLUMBING NOTES
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES. WHERE CONFLICTS OCCUR BETWEEN CODES, OR BETWEEN CONSTRUCTION DOCUMENTS AND CODES, THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
2. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL
PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS.
3. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER
ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.
4. SUBMIT REQUIRED COORDINATION DRAWINGS PER SPECIFICATION SECTION 22 05 11.
5. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT
SUPPLIES.
6. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED
OTHERWISE.
7. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.
FURNISH CUT-OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL
CONTRACTOR.
8. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT
EVEN THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.
9. VERIFY LOCATION OF WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.
10. CUT AND PATCH CONCRETE AS REQUIRED.
11. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS PART
OF HIS TOTAL WORK.
12. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.
13. CONTRACTOR SHALL SUPPLY TO THE COR THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION. THERE WILL BE NO
INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE COR.
14. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.
15. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DESIGNED AROUND BASIS OF DESIGN PRODUCTS WHICH HAVE ESTABLISHED THE PERFORMANCE CRITERIA FOR THIS PROJECT. PRODUCTS SUBMITTED BY THE CONTRACTOR MAY BE ARRANGED DIFFERENTLY AND PER CONTRACT DOCUMENTS REQUIRE THE PRODUCTION OF CONTRACTOR COORDINATED DRAWINGS TO BE SUBMITTED PRIOR TO THE START OF CONSTRUCTION. THESE DIAGRAMMATIC DRAWINGS DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, AND ACCESSORIES REQUIRED TO COMPLETE THE INSTALLATION OF WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER
EXAMINATION BEEN MADE.
16. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH COR (DOMESTIC WATER, SANITARY
SEWER, ETC.).
17. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.
18. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS
AND/OR MANUFACTURER FOR ROOF SYSTEM USED.
19. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.
20. INSTALL INSULATION PER SPECIFICATIONS ON ALL ROOF LEADERS ABOVE CEILING.
21. THE POTABLE WATER SUPPLY SHALL BE PROTECTED AGAINST BACKFLOW AND SIPHONAGE, BOTH NATURAL AND INDUCED. ALL EQUIPMENT CONNECTED TO THE POTABLE WATER SYSTEM BEING CAPABLE OF POLLUTING OR CONTAMINATING THE POTABLE WATER DISTRIBUTION SYSTEM OR ANY PART THEREOF BY MEANS OF A REVERSAL OF FLOW, PRESSURE DROP, PRESSURE LOSS, INDUCED VACUUM, OR BY INJECTION BECAUSE OF ANY PRIMARY OR AUXILIARY PUMPING SYSTEM CONNECTED, MUST BE ISOLATED AND CONTAINED BY MEANS OF APPROVED BACKFLOW DEVICES, CHECK VALVES, AIR GAPS, OR VACUUM BREAKERS. PLUMBING CONTRACTOR SHALL FURNISH
AND INSTALL THESE DEVICES PER LOCAL CODE REQUIREMENTS.
22. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH REGULATIONS.
23. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS
REQUIRED.
24. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES.
PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT
SUPPLIER FOR EXACT REQUIREMENTS.
25. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.
26. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM
CLEARANCE UNDER CABINETS.
27. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.
28. INSTALL SANITARY PIPING LESS THAN 3" IN DIAMETER AT A SLOPE OF 1/4" PER FOOT, PIPING BETWEEN 3" AND 6" IN DIAMETER AT A SLOPE OF 1/8" PER FOOT, AND PIPING 8" OR GREATER IN DIAMETER AT 1/16" PER FOOT. INSTALL STORM AND CONDENSATE PIPING WITH A MINIMUM SLOPE OF 1/8" PER FOOT. CONTRACTOR IS RESPONSIBLE FOR
PROPER DRAINAGE OF ALL SYSTEMS.
29. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS. TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE ARCHITECTURAL
SHEETS FOR FLOOR SLOPES AND PROPER FINISHED FLOOR ELEVATION.
30. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND
MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.
31. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST
CURRENT ADOPTED VERSION OF THE STATE AND LOCAL CODES.
32. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE
COMPLETION OF PROJECT.
33. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
34. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL ADA REGULATIONS.
35. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT.
THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK
AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF ANY KIND.
36. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHT GRASPING.
37. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT TOWARDS WIDE SIDE OF STALL.
VERIFY IF RIGHT OR LEFT SIDE LOCATION.
(E) EXISTING
AAP AREA ALARM PANEL
CO PIPE CLEAN OUT
CW COLD WATER
DEMO DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
GCO GRADE CLEAN OUT
GPM GALLONS PER MINUTE
HB HOSE BIB
HW HOT WATER
HWR HOT WATER RETURN
IBC INTERNATIONAL BUILDING CODE
MA MEDICAL AIR
MV MEDICAL VACUUM
NC NORMALLY CLOSED
NO NORMALLY OPEN
O OXYGEN
OD OVERFLOW ROOF DRAIN
OSD OVERFLOW (SECONDARY) STORM WATER DRAIN
PSD PRIMARY STORM WATER DRAIN
RD ROOF DRAIN
SAN SANITARY
SP SUMP PUMP
V VENT
VTR VENT THROUGH ROOF
W WASTE
WCO WALL CLEAN OUT
WSFU WATER SUPPLY FIXTURE UNITS
ZVB ZONE VALVE BOX
ABBREVIATIONS
DRAWING KEYNOTE#
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
POINT OF CONNECTION TO CIVIL
CW COLD WATER PIPING
HW HOT WATER PIPING
HWR HOT WATER RETURN PIPING
SAN SANITARY PIPING
(E)CW EXISTING COLD WATER
(E)HWR EXISTING HOT WATER RETURN
(E)HW EXISTING HOT WATER PIPING
EXISTING PIPING TO BE REMOVED
(E)SAN EXISTING SANITARY PIPING
V SANITARY VENT PIPING
PIPE UP
PIPE DOWN
GCO GRADE CLEAN OUT (1-WAY OR 2-WAY)OR
OR VTR VENT THRU ROOF
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)OR
PIPE CAP
WCO
FLOOR DRAIN
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
STRAINER
UNION
PLUMBING LEGEND
FD
HOSE BIB WITH VACUUM BREAKER
CONTROL VALVE
MEDICAL GAS NOTES
1. MEDICAL GAS SYSTEMS SHALL BE FURNISHED, INSTALLED, AND TESTED IN STRICT ACCORDANCE WITH NFPA 99, 2018 EDITION.
2. INSTALLATION AND TERMINATIONS OF ALL LOW VOLTAGE AREA ALARM WIRING AND CONDUIT PER NFPA 99 BY
PLUMBING MEDICAL GAS CONTRACTOR.
3. PLUMBING MEDICAL GAS CONTRACTOR TO SUPPLY THE REQUIRED NUMBER OF VACUUM REGULATORS, OXYGEN
FLOW METERS MEDICAL AIR FLOW METERS AS PART OF MEDICAL GAS EQUIPMENT PACKAGE.
4. PROVIDE MEDICAL GAS PIPE LABELS IN COMPLIANCE WITH NFPA 99, AND AT LOCATIONS INCLUDING BUT NOT LIMITED TO: AT INTERVALS OF NOT MORE THAN 20 FT., AT LEAST ONCE WITHIN EACH SPACE, AND ON BOTH SIDES OF EVERY WALL AND FLOOR SLAB PENETRATION. MEDICAL GAS PIPING SHALL BE IDENTIFIABLE BY APPROPRIATE
LABELING WITH NAME OF GAS CONTAINED.
5. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING OXYGEN, AIR, AND VACUUM PIPING AND ADJUST PIPING
LAYOUT TO ACCOMMODATE CONNECTIONS.
6. MEDICAL GAS CONTRACTOR SHALL INCLUDE THE COST OF THE SYSTEM FUNCTIONAL TEST TO THEIR FEE.
7. EXISTING MEDICAL GAS SYSTEMS MUST BE KEPT IN SERVICE AT ALL TIMES DURING CONSTRUCTION OF THE NEW SYSTEMS. THE FINAL CONNECTIONS OF THE NEW SYSTEMS TO THE EXISTING MEDICAL GAS SYSTEMS SHALL BE COORDINATED WITH THE OWNER'S OPERATIONS AND SHALL BE MADE AFTER HOURS OF THE OWNERS
OPERATIONS SO AS NOT TO PRESENT ANY DISRUPTION TO THE OWNER'S OPERATIONS.
8. ALL TESTING OF THE NEW SYSTEMS AND PIPING SHALL BE DONE PRIOR TO THE FINAL MEDICAL GAS PIPE CONNECTIONS TO THE EXISTING PIPING AND SHALL BE RETESTED AFTER THE FINAL CONNECTION AS WARRANTED.
9. AN AREA ALARM PANEL SHALL BE PROVIDED IN THE NURSING WING AS INDICATED, WITH GAS SPECIFIC SYSTEM
PRESSURE READINGS.
10. MEDICAL GASES SHALL BE DISTRIBUTED THROUGH PIPING TO ZONE VALVE BOXES. ALL VALVES SHALL BE THREE
PIECE BALL TYPE WITH BLOW-OUT PROOF STEMS, LOCKING HANDLES AND FULL PORT DESIGN.
11. FROM ZONE VALVE BOXES, MEDICAL GASES SHALL BE DISTRIBUTED TO MEET THE SPACE REQUIREMENTS.
12. ALL MEDICAL GAS PIPING SHALL BE PRECLEANED, TYPE K, ASTM B 819, HARD DRAWN, SEAMLESS COPPER TUBING WITH BRAZED WROUGHT COPPER FITTINGS, ASTM B16.22 OR MSS SP-73; FACTORY CLEANED, PURGED, AND SEALED FOR MEDICAL GAS SERVICE. STORE PRECLEANED AND SEALED MEDICAL GAS PIPE, FITTINGS, VALVES, AND
SPECIALTIES WITH SEALING PLUGS AND SEALING PACKAGING INTACT.
13. LABEL MEDICAL GAS PIPE, FITTINGS, VALVES, AND SPECIALTIES THAT HAVE NOT BEEN PRECLEANED, OR THAT HAVE BEEN PRECLEANED BUT HAVE SEAL OR PACKAGING THAT IS NOT INTACT, WITH TEMPORARY LABELS INDICATING
THAT CLEANING IS REQUIRED BEFORE INSTALLATION.
ALTERNATES
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED
DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES
DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN
CAMPUS AND HONORS CAMPUS
DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA
DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR
AND WALL FINISHES
DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,
NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET
M3-205A, AND NETWORK CLOSET F-155.
DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,
M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR
ADJACENT
REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/1
P
-M O
D
-R
.r v t
/2
/2
:4
:3
P
M
P001
NOTES AND LEGEND - PLUMBING
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 CJF/NPS TMR/ANK
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
DRAWING INDEX - PLUMBING
P001 NOTES AND LEGEND - PLUMBING
PD100A BASEMENT FLOOR DEMOLITION PLAN - PLUMBING - AREA A
PD103A THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA A
PD103B THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA B
PL100A BASEMENT FLOOR RENOVATION PLAN - PLUMBING - AREA A
PL103A THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A
PL103B THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA B
PL104A FOURTH FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A
PL113A THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA A
PL113B THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA B
P501 DETAILS - PLUMBING
P901 ISOMETRICS - PLUMBING DRAINAGE
P902 ISOMETRICS - PLUMBING SUPPLY
P903 ISOMETRICS - PLUMBING SUPPLY
P904 ISOMETRICS - MEDICAL GAS
PLUMBING FIXTURE SCHEDULE
FIXTURE
MARK
FIXTURE DESCRIPTION
ROUGH-IN PIPE SIZES FIXTURE UNITS
COLD
WATER
SUPPLY
HOT
WATER
SUPPLY
FIXTURE
TRAP
FIXTURE
DRAIN
COLD
WATER
HOT
WATER
DRAINAGE
P-103
WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL
MOUNTED, ELONGATED RIM, 1-1/2" TOP SPUD, VITREOUS
CHINA, SIPHON JET FLUSHING ACTION; 1.28 GPF MANUAL
FLUSH VALVE, VACUUM BREAKER; OPEN FRONT SEAT
LESS COVER, STAINLESS STEEL CHECK HINGE. RIM: 17".
SEE SPECIFICATION 22 40 00.
1 1/2" N/A 4" 4" 10 0 4
P-104
WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL
MOUNTED, ELONGATED RIM, WITH BEDPAN WASHER, 1-1/2"
TOP SPUD, VITREOUS CHINA, SIPHON JET FLUSHING
ACTION; 1.28 GPF MANUAL FLUSH VALVE, VACUUM
BREAKER; OPEN FRONT SEAT LESS COVER, STAINLESS
STEEL CHECK HINGE. RIM: 17". SEE SPECIFICATION 22 40
00.
1 1/2" N/A 4" 4" 10 0 4
P-114
BARIATRIC WATER CLOSET, BARRIER FREE – ADA HEGHT,
FLOOR MOUNTED ELONGATED RIM, WITH BEDPAN
WASHER, 1-1/2” TOP SPUD VITROUS CHINA, SIPHON JET
FLUSHING ACTION; 1.28 GPF MANUAL FLUSH VALVE,
VACUUM BREAKER; OPEN FRONT SEAT LESS COVER,
STIANLESS STEEL CHECK HINGE, RIM:17”. SEE
SPECIFICATION 22 40 00.
1 1/2" N/A 4" 4" 10 0 4
P-404
LAVATORY, BARRIER FREE - INTEGRAL WITH
COUNTERTOP, ADA COMPLIANT, FAUCET HOLES AS
REQUIRED. PROVIDE SENSOR CONTROL AUTOMATIC
FAUCET, AC POWERED, WITH ASSE 1070 COMPLIANT
THERMOSTATIC MIXING VALVE, 1/2 GPM, POLISHED
CHROME, LEAD FREE. PROVIDE GRID DRAIN ASSEMBLY,
P-TRAP, STOPS, SUPPLIES, ETC., FOR A COMPLETE
INSTALLATION. COORDINATE REQUIREMENTS WITH
COUNTERTOP FURNITURE SUPPLIER.
1/2" 1/2" 1 1/2" 2" 0.5 0.5 1
P-417
OVAL LAVATORY, BARRIER FREE - COUNTERTOP MOUNT,
ADA COMPLIANT, SELF RIMMING, FRONT OVERFLOW,
VITREOUS CHINA, FAUCET HOLES AS REQUIRED. TOP OF
FRONT RIM MOUNTED 34" FROM FINISHED FLOOR AND MIN.
2-1/2" FROM FRONT EDGE OF COUNTERTOP. PROVIDE
WRIST BLADE, GOOSENECK FAUCET. PROVIDE WITH ASSE
1070 COMPLIANT THERMOSTATIC MIXING VALVE, 1/2 GPM,
POLISHED CHROME, LEAD FREE, DECK MOUNTED.
PROVIDE COVER PLATES, GRID DRAIN ASSEMBLY, P-TRAP,
STOPS, SUPPLIES, ETC., FOR A COMPLETE INSTALLATION.
SEE SPECIFICATION 22 40 00.
1/2" 1/2" 1 1/2" 2" 0.5 0.5 1
P-418
LAVATORY - BARRIER FREE, WALL HUNG, 20"x18", VITREOUS CHINA, FAUCET HOLES AS REQUIRED, SELF-DRAINING DECK. PROVIDE CONCEALED ARM
SUPPORT CARRIER. PROVIDE WRIST BLADE, GOOSENECK
FAUCET, ADA COMPLIANT, DECK MOUNTED FAUCET, WITH
ASSE 1070 COMPLIANT THERMOSTATIC MIXING VALVE.
TOP OF RIM 34" FROM FINISHED FLOOR. PROVIDE COVER
PLATES, PERFORATED…