This document appears to be a set of construction drawings related to a federal contract opportunity for the Construct Inpatient Medicine Bed Addition at the Kansas City VA Medical Center. The drawings provide detailed information on the fire protection and plumbing systems for the renovation project, including specifications on the sprinkler system design, piping, fixtures, and medical gas components. Key details include:

The project is a set-aside procurement with a tiered evaluation process favoring SDVOSB, VOSB, and small business concerns. The solicitation number is 36C77624R0063 and it is being issued by the Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central. The project involves a minor construction effort to add an inpatient medicine bed addition at the Kansas City VA Medical Center in Kansas City, Missouri. The drawings outline the requirements for modifying the existing fire protection and plumbing systems within the construction area, including relocating and rerouting piping, upgrading fixtures, and integrating new medical gas components. Specific details are provided on sprinkler densities, pipe sizing, fixture rough-ins, and storm drainage calculations.

View the file

Other files

File Type Posted
36C77624R0063 Amendment 0004 QandA 2024 04 12.pdf PDF
S04 - Site Visit Agenda - KC VAMC Tiered Evaluation 04 03 2024.pdf PDF
S04 - Site Visit Sign-in Sheet for 589-017 Inpatient Med Bed.pdf PDF
RFP 36C77624R0063 Amendment 0003.pdf PDF
36C77624R0063 Amendment 0002 amended solicitation.pdf PDF
36C77624R0063 Amendment 0002 SF30.pdf PDF
ATT 18 Site Visit Instructions Amendment A0001.pdf PDF
36C77624R0063 0001 03 25 2024.pdf PDF
ATT 17 Small Business Subcontracting Plan Model.docx DOCX document
ATT 4 589-017 B1 Med Beds SPECS 3of3 Final.pdf PDF
ATT 5 589-017 01 Drawing Gen revised.pdf PDF
ATT 10 589-017 05 Drawing Inter 2of2.pdf PDF
ATT 1 589-017_Const_SOW FINAL.pdf PDF
ATT 8 589-017 04 Drawing Arch.pdf PDF
RFP 36C77624R0063.pdf PDF
ATT 6 589-017 02 Drawing Civil.pdf PDF
ATT 13 589-017 08 Drawing E revised.pdf PDF
ATT 3 589-017 B1 Med Beds SPECS 2of3 Final.pdf PDF
ATT 18 Site Visit Instructions.pdf PDF
ATT 2 589-017 B1 Med Beds SPECS 1of3 Final.pdf PDF
ATT 16 Limitations on Subcontracting - Construction.docx DOCX document
ATT 7 589-017 03 Drawing Struct.pdf PDF
ATT 12 589-017 07 Drawing M.pdf PDF
ATT 14 Division Breakdown Template.xls XLS spreadsheet
ATT 15 DBA Wage Rates WD MO20230082 dated 01 05 2024.pdf PDF
ATT 9 589-017 05 Drawing Inter 1of2.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.J.1

1.J

A5

A6

NN PP RR SS TT

1.G

1.19

ELEVATOR CORRIDOR

C4-09

SPRINKLERS SHALL NOT BE PROVIDED

AT THE TOP OF THE ELEVATOR

HOISTWAY PER NFPA 13.

THIS DEDUCT HAS NO

AFFECT ON FIRE

PROTECTION SCOPE.

DEDUCT ALTERNATE #1

DELETE ELEVATOR CARS

AND HOIST MACHINES

1.J.1

1.J

A5

NN PP RR SS TT

1.G

1.19

ELEVATOR CORRIDOR

C2-09

STORAGE

C2-10

DEDUCT ALTERNATE #1

DELETE ELEVATOR CARS

AND HOIST MACHINES

THIS DEDUCT HAS NO

AFFECT ON FIRE

PROTECTION SCOPE.

1.J.1

1.J

A5

NN PP RR SS TT

1.G

1.19

ELEVATOR LOBBY

CB-09

DEDUCT ALTERNATE #1

DELETE ELEVATOR CARS

AND HOIST MACHINES

THIS DEDUCT HAS NO

AFFECT ON FIRE

PROTECTION SCOPE.

1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS

INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE

TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS

ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED

AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS

OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT

ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL

CONSTRUCTION.

2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR

THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR

IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM

APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE

HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT

NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE

SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.

3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,

14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING

CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.

WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,

THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.

4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN

ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S

REPRESENTATIVE.

5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE

IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST

SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,

LATEST EDITION.

6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE

CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING

SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND

LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF

THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.

7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,

CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED

ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO

ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED

WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING

PENETRATIONS THROUGH RATED ASSEMBLIES.

8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE

REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL

WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO

ARE REGULARLY EMPLOYED TO DO SUCH WORK.

9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,

CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE

SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF

THE BUILDING.

10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.

11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS

OTHERWISE NOTED.

12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND

OBSTRUCTION REQUIREMENTS.

13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL

FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,

AND STRUCTURAL COMPONENTS.

14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL

SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE

REQUIREMENTS IN ACCORDANCE WITH NFPA 13.

15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.

PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD

ADJUSTMENT.

16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS

AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL

SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN

ACCORDANCE WITH NFPA.

17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE

SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,

ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL

SPRINKLERS INSTALLED BELOW 7'-0" AFF.

18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND

FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE

10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.

19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES

OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL

PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED

ADJUSTABLE HANGERS.

20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT

WHERE PROHIBITED BY NFPA 13.

21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT

WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS

PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH

NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.

22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE

BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.

FIRE PROTECTION NOTESFIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

UPRIGHT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

ELEVATOR PIT &

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

HAZARD

SYMBOL

AREA NOT IN CONTRACT

FIRE SPRINKLER LEGEND

PENDENT SPRINKLER

UPRIGHT SPRINKLER

EXISTING SPRINKLER

ALTERNATES

DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED

DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES

DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN

CAMPUS AND HONORS CAMPUS

DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA

DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR

AND WALL FINISHES

DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,

M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR

ADJACENT

REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

B

IM

/5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/1

M

E P

-M O

D

-R

.r v t

/2

/2

:1

:2

A

M

FP102A

FLOOR PLANS - FIRE PROTECTION

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 CJF/NPS TMR

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

1/8" = 1'-0"

FLOOR PLAN ELEVATOR LOBBY TYPICAL FLOOR FOURTH THRU EIGHTH - FIRE PROTECTION

1/8" = 1'-0"

FLOOR PLAN ELEVATOR LOBBY TYPICAL FLOOR FIRST THRU SECOND - FIRE PROTECTION

1/8" = 1'-0"

FLOOR PLAN ELEVATOR LOBBY BASEMENT - FIRE PROTECTION

Revisions: Date:

07.21.2022

STORAGE

M3-215A

VISITOR TLT

M3-205A

WEIGH STATION

M3-218

ELECT

M3-216

HOUSEKEEPING

M3-217

STAFF TOILET

M3-215B

EXIST MECH CHASE

M3-208

ELECT

M3-210

LINEN CHUTE

M3-240A

CHUTE ROOM/ SOILED

LINEN

M3-240

RECEPTION / MSA

M3-215 NOURISH - FUTURE FAM

PANTRY

M3-209

ELEC ROOM

M3-214

TELEMETRY

M3-255

MULTIPURPOSE BED

STORAGE

M3-257

RESOURCE KIOSK

M3-203B

PATIENT RESTROOM

M3-246A

CLEAN LINENS

M3-241

CORRIDOR

C3-26

CORRIDOR

C3-20

NURSE SUPERVISOR

M3-258A

STAFF WORKSPACE

M3-254

NURSE EDUCATOR

M3-258B

STORAGE

M3-253

PATIENT ROOM 1

M3-248

PATIENT RESTROOM

M3-247A

PATIENT ROOM 2

M3-247

OXYGEN STOR

M3-245

PATIENT ROOM 4

M3-249

PATIENT ROOM 5

M3-250

EQUIP ALCOVE

M3-251

CORRIDOR

C3-19

PATIENT ROOM 3

M3-246

WAITING

M3-203A

CLEAN SUPPLY/ FUTURE

CONSULT

M3-205B

MECH

M3-261

CORRIDOR

C3-22

NETWORK CLOSET

F-155

ELEVATOR CORRIDOR

C3-09

MED ROOM

M3-207B

WORK STATIONS

M3-207A

MATCHLINE

SEE: 1/FP103B

1.J.1

1.J

A5

A6

NN PP RR SS TT

1.G

1.191.181.171.16a1.16

CHARTING

M3-254

CHARTING

M3-252

CORRIDOR

M3-203C

NURSE MANAGER

M3-262

EXISTING SPRINKLERS

IN THIS AREA TO

REMAIN. (TYP.)

DEDUCT ALTERNATE #5 DELETE

RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN

STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

DEDUCT ALTERNATE #4

DELETE RENOVATION

OF CORRIDOR C3-20 -

FLOOR AND WALL

FINISHES

STAIRWELL NO. 19

S19

PATIENT RESTROOM

M3-248A

PATIENT RESTROOM

M3-249A

PATIENT RESTROOM

M3-250A

THIS DEDUCT HAS NO

AFFECT ON FIRE

PROTECTION SCOPE.

DEDUCT ALTERNATE #1

DELETE ELEVATOR CARS

AND HOIST MACHINES

THIS DEDUCT HAS NO

AFFECT ON FIRE

PROTECTION SCOPE.

IF THIS DEDUCT IS

TAKEN, EXISTING

SPRINKLER SYSTEM IN

THIS AREA TO REMAIN

UNDISTURBED

(TYP)

1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS

INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE

TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS

ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED

AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS

OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT

ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL

CONSTRUCTION.

2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR

THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR

IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM

APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE

HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT

NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE

SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.

3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,

14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING

CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.

WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,

THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.

4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN

ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S

REPRESENTATIVE.

5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE

IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST

SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,

LATEST EDITION.

6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE

CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING

SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND

LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF

THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.

7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,

CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED

ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO

ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED

WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING

PENETRATIONS THROUGH RATED ASSEMBLIES.

8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE

REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL

WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO

ARE REGULARLY EMPLOYED TO DO SUCH WORK.

9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,

CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE

SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF

THE BUILDING.

10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.

11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS

OTHERWISE NOTED.

12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND

OBSTRUCTION REQUIREMENTS.

13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL

FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,

AND STRUCTURAL COMPONENTS.

14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL

SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE

REQUIREMENTS IN ACCORDANCE WITH NFPA 13.

15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.

PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD

ADJUSTMENT.

16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS

AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL

SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN

ACCORDANCE WITH NFPA.

17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE

SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,

ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL

SPRINKLERS INSTALLED BELOW 7'-0" AFF.

18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND

FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE

10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.

19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES

OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL

PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED

ADJUSTABLE HANGERS.

20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT

WHERE PROHIBITED BY NFPA 13.

21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT

WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS

PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH

NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.

22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE

BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.

FIRE PROTECTION NOTESFIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

UPRIGHT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

ELEVATOR PIT &

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

HAZARD

SYMBOL

AREA NOT IN CONTRACT

ALTERNATES

DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED

DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES

DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN

CAMPUS AND HONORS CAMPUS

DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA

DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR

AND WALL FINISHES

DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,

M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR

ADJACENT

REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.

FIRE SPRINKLER LEGEND

PENDENT SPRINKLER

UPRIGHT SPRINKLER

EXISTING SPRINKLER

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

NOTE:

1. PROVIDE HANGER FOR ARMOVERS

GREATER THAN 24" IN LENGTH.

ARMOVER (NOTE 1)

90 EL.

DROP

RISER NIPPLE

BRANCH LINE

1" X 1/2" R.C.

SUSPENDED CEILING FOR HEAD TYPES,

SEE FLOOR PLANS

AND HEAD

DETAILS

KEYNOTES

1. PROVIDE UPRIGHT SPRINKLER WITH GUARD IN MECHANICAL

ROOM.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

matchline

A

B

IM

/5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/1

P

-M O

D

-R

.r v t

/2

/2

:1

:3

A

M

FP103A

THIRD FLOOR RENOVATION PLAN - FIRE

PROTECTION - AREA A

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 CJF/NPS TMR

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

1/8" = 1'-0"

THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA A

Revisions: Date:

NTS

RETURN BEND ASSEMBLY DETAIL

CHARTING

M3-227

EQUIPMENT ALCOVE

M3-406

STORAGE

M3-215A

VISITOR TLT

M3-205A

STAFF LOCKERS

M3-219A

STAIRWELL NO 3

S3

ELEC CLOSET

M3-220

WEIGH STATION

M3-218

ELECT

M3-216

PATIENT ROOM 7

BARIATRIC

M3-224

PATIENT ROOM 6

BARIATRIC

M3-223

EQUIP STORAGE

M3-225

NURSE LOUNGE

M3-219

HOUSEKEEPING

M3-217

IT CLOSET

M3-221

CLEAN LINEN ALCOVE

M3-414

COPIER PRINTER ALCOVE

M3-222

EQUIPMENT ALCOVE

M3-412

PATIENT ROOM 8

BARIATRIC

M3-226

PATIENT RESTROOM

M3-226A

PATIENT RESTROOM

M3-224A

PATIENT RESTROOM

M3-223A

CORRIDOR

C3-21

STAFF TOILET

M3-215B

RECEPTION / MSA

M3-215 NOURISH - FUTURE FAM

PANTRY

M3-209

ELEC ROOM

M3-214

TELEMETRY

M3-255

RESOURCE KIOSK

M3-203B

WAITING

M3-203A

CLEAN SUPPLY/ FUTURE

CONSULT

M3-205B

MECH

M3-261

NETWORK CLOSET

F-155

STAIRWELL NO. 21

S21

MATCHLINE

SEE: 1/FP103A

A2

1.P

A3

1.N

1.M

1.L

1.K

1.J.1

1.J

AABB CC DD EEFF GG HH JJ KK MM

NN PP RR SS TT1.181.171.16a1.16

CHARTING

M3-418

CHARTING

M3-417

CORRIDOR

M3-203C

F6

F5

(E)6"

STANDPIPE #5

(E)6"

STANDPIPE

#6

EXISTING SPRINKLERS

IN THIS AREA TO

REMAIN. (TYP.)

DEDUCT ALTERNATE #6

DELETE RENOVATION OF 3

PATIENT ROOMS (M3-223,

M3-224 & M3-226) ALONG WITH

RESTROOMS, STORAGE, AND

CORRIDOR ADJACENT

DEDUCT ALTERNATE #5 DELETE

RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN

STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

CORRIDOR

C3-21

IF THIS DEDUCT IS

TAKEN, EXISTING

SPRINKLER SYSTEM IN

THIS AREA TO REMAIN

UNDISTURBED

IF THIS DEDUCT IS

TAKEN, EXISTING

SPRINKLER SYSTEM IN

THIS AREA TO REMAIN

UNDISTURBED

EXISTING

ZONE

CONTROL

VALVE TO

REMAIN

PROVIDE

NEW

SEPERATE

ZONE VALVE

FOR FUTURE

PHASE

(TYP)

1. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS

INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE

TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS

ARE REMOVED FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED

AND NEW DROPS TO NEW PENDENT SPRINKLER ARE INSTALLED. UNLESS

OTHERWISE INDICATED EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT

ARE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR PHASING AND WALL

CONSTRUCTION.

2. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR

THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR

IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM

APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE

HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT

NECESSARY TO COMPLETE THE INSTALLATION AND COMPLY WITH THE

SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.

3. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13,

14, AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING

CODE 2018, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES.

WHERE CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR,

THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.

4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN

ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNER'S

REPRESENTATIVE.

5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL BE DONE

IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND TEST

SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,

LATEST EDITION.

6. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE

CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING

SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND

LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF

THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.

7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,

CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED

ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING. REFER TO

ARCHITECTURAL DOCUMENTS FOR LOCATIONS OF SMOKE AND/OR FIRE RATED

WALLS; REFER TO PENETRATION DETAILS FOR FIRE PROTECTION PIPING

PENETRATIONS THROUGH RATED ASSEMBLIES.

8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE

REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL

WHO HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO

ARE REGULARLY EMPLOYED TO DO SUCH WORK.

9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,

CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE

SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF

THE BUILDING.

10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA 13.

11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS

OTHERWISE NOTED.

12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND

OBSTRUCTION REQUIREMENTS.

13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL

FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,

AND STRUCTURAL COMPONENTS.

14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL

SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE

REQUIREMENTS IN ACCORDANCE WITH NFPA 13.

15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE.

PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD

ADJUSTMENT.

16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS

AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL

SPRINKLERS, IF NECESSARY, TO PROVIDE ADEQUATE COVERAGE IN

ACCORDANCE WITH NFPA.

17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE

SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,

ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL

SPRINKLERS INSTALLED BELOW 7'-0" AFF.

18. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND

FITTINGS CONFORMING TO ASTM A53. MINIMUM SIZE IS ONE (1") INCH. SCHEDULE

10 MAY BE USED FOR 2 1/2" AND LARGER. DO NOT THREAD THIN-WALL PIPE.

19. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES

OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL

PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED

ADJUSTABLE HANGERS.

20. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT

WHERE SPECIFICALLY PROHIBITED, IN COMPLIANCE WITH VA GUIDELINES AND

NFPA REQUIREMENTS.

21. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT

WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS

PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH

NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.

22. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE

BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.

23. SEE SHEET FP103A FOR FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA.

FIRE PROTECTION NOTESALTERNATES

DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED

DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES

DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN

CAMPUS AND HONORS CAMPUS

DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA

DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR

AND WALL FINISHES

DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,

M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR

ADJACENT

REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.

FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

UPRIGHT, QUICK

RESPONSE, FM

APPROVED, UL LISTED

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE, FM

APPROVED, UL LISTED

ELEVATOR PIT &

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE PER NFPA 13 1

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

HAZARD

SYMBOL

AREA NOT IN CONTRACT

FIRE SPRINKLER LEGEND

PENDENT SPRINKLER

UPRIGHT SPRINKLER

EXISTING SPRINKLER

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

INDICATING TYPE

FLOOR

CONTROL VALVE WITH

SUPERVISORY SWITCH

TO SPRINKLERS

PRESSURE GAUGE

WATER FLOW SWITCH

1" DRAIN LINE

INSPECTORS TEST VALVE

SITE GLASS

AUXILIARY DRAIN

VALVE

SYSTEM RISER

TO DRAIN

UNION WITH CORROSION RESISTANT

ORIFICE GIVING FLOW EQUIVALENT TO

THE SMALLEST SPRINKLER ORIFICE IN

THE SYSTEM

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

matchline

B

B

IM

/5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/1

P

-M O

D

-R

.r v t

/2

/2

:1

:3

A

M

FP103B

THIRD FLOOR RENOVATION PLAN - FIRE

PROTECTION - AREA B

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 CJF/NPS TMR

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

1/8" = 1'-0"

THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA B

NTS

FIRE SPRINKLER ZONE VALVE PIPING DETAIL

GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND

INSTALLED) UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE

AND VERIFY THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY

NECESSARY MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE

ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:

• INTERNATIONAL BUILDING CODE (IBC) 2021

• INTERNATIONAL EXISTING BUILDING CODE 2021

• IBC MECHANICAL 2021

• IBC PLUMBING 2021

• IBC ENERGY CONSERVATION 2021

• INTERNATIONAL FIRE CODE 2021

• NFPA 1-2021, THE UNIFORM FIRE CODE

• NFPA 101-2021, THE LIFE SAFETY CODE

• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK

• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

• NFPA 70-2020, NATIONAL ELECTRICAL CODE

• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.

• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES

• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT.

DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF

INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.

10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.

11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL

TIMES DURING CONSTRUCTION.

12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON

PROJECT.

14. THE COR'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS

OR HER SUBMITTAL DATA.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS PER 01 00 00 AND 01 33 26. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND

ASSOCIATED DIVIDERS.

16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN A SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP

DRAWINGS SHALL BE TURNED OVER TO THE COR AFTER CONSTRUCTION COMPLETION.

17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE COR. THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED

WITHOUT WRITTEN CONSENT AND APPROVAL FROM CONTRACTING OFFICER.

PLUMBING NOTES

1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES. WHERE CONFLICTS OCCUR BETWEEN CODES, OR BETWEEN CONSTRUCTION DOCUMENTS AND CODES, THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.

2. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL

PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS.

3. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER

ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.

4. SUBMIT REQUIRED COORDINATION DRAWINGS PER SPECIFICATION SECTION 22 05 11.

5. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT

SUPPLIES.

6. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED

OTHERWISE.

7. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.

FURNISH CUT-OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL

CONTRACTOR.

8. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT

EVEN THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.

9. VERIFY LOCATION OF WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.

10. CUT AND PATCH CONCRETE AS REQUIRED.

11. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS PART

OF HIS TOTAL WORK.

12. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.

13. CONTRACTOR SHALL SUPPLY TO THE COR THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION. THERE WILL BE NO

INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE COR.

14. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.

15. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DESIGNED AROUND BASIS OF DESIGN PRODUCTS WHICH HAVE ESTABLISHED THE PERFORMANCE CRITERIA FOR THIS PROJECT. PRODUCTS SUBMITTED BY THE CONTRACTOR MAY BE ARRANGED DIFFERENTLY AND PER CONTRACT DOCUMENTS REQUIRE THE PRODUCTION OF CONTRACTOR COORDINATED DRAWINGS TO BE SUBMITTED PRIOR TO THE START OF CONSTRUCTION. THESE DIAGRAMMATIC DRAWINGS DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, AND ACCESSORIES REQUIRED TO COMPLETE THE INSTALLATION OF WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER

EXAMINATION BEEN MADE.

16. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH COR (DOMESTIC WATER, SANITARY

SEWER, ETC.).

17. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.

18. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS

AND/OR MANUFACTURER FOR ROOF SYSTEM USED.

19. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.

20. INSTALL INSULATION PER SPECIFICATIONS ON ALL ROOF LEADERS ABOVE CEILING.

21. THE POTABLE WATER SUPPLY SHALL BE PROTECTED AGAINST BACKFLOW AND SIPHONAGE, BOTH NATURAL AND INDUCED. ALL EQUIPMENT CONNECTED TO THE POTABLE WATER SYSTEM BEING CAPABLE OF POLLUTING OR CONTAMINATING THE POTABLE WATER DISTRIBUTION SYSTEM OR ANY PART THEREOF BY MEANS OF A REVERSAL OF FLOW, PRESSURE DROP, PRESSURE LOSS, INDUCED VACUUM, OR BY INJECTION BECAUSE OF ANY PRIMARY OR AUXILIARY PUMPING SYSTEM CONNECTED, MUST BE ISOLATED AND CONTAINED BY MEANS OF APPROVED BACKFLOW DEVICES, CHECK VALVES, AIR GAPS, OR VACUUM BREAKERS. PLUMBING CONTRACTOR SHALL FURNISH

AND INSTALL THESE DEVICES PER LOCAL CODE REQUIREMENTS.

22. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH REGULATIONS.

23. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS

REQUIRED.

24. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES.

PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT

SUPPLIER FOR EXACT REQUIREMENTS.

25. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.

26. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM

CLEARANCE UNDER CABINETS.

27. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.

28. INSTALL SANITARY PIPING LESS THAN 3" IN DIAMETER AT A SLOPE OF 1/4" PER FOOT, PIPING BETWEEN 3" AND 6" IN DIAMETER AT A SLOPE OF 1/8" PER FOOT, AND PIPING 8" OR GREATER IN DIAMETER AT 1/16" PER FOOT. INSTALL STORM AND CONDENSATE PIPING WITH A MINIMUM SLOPE OF 1/8" PER FOOT. CONTRACTOR IS RESPONSIBLE FOR

PROPER DRAINAGE OF ALL SYSTEMS.

29. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS. TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE ARCHITECTURAL

SHEETS FOR FLOOR SLOPES AND PROPER FINISHED FLOOR ELEVATION.

30. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND

MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.

31. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST

CURRENT ADOPTED VERSION OF THE STATE AND LOCAL CODES.

32. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE

COMPLETION OF PROJECT.

33. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

34. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL ADA REGULATIONS.

35. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT.

THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK

AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF ANY KIND.

36. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHT GRASPING.

37. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT TOWARDS WIDE SIDE OF STALL.

VERIFY IF RIGHT OR LEFT SIDE LOCATION.

(E) EXISTING

AAP AREA ALARM PANEL

CO PIPE CLEAN OUT

CW COLD WATER

DEMO DEMOLISH OR DEMOLITION

DFU DRAINAGE FIXTURE UNITS

EWC ELECTRIC WATER COOLER

EXIST EXISTING

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

GCO GRADE CLEAN OUT

GPM GALLONS PER MINUTE

HB HOSE BIB

HW HOT WATER

HWR HOT WATER RETURN

IBC INTERNATIONAL BUILDING CODE

MA MEDICAL AIR

MV MEDICAL VACUUM

NC NORMALLY CLOSED

NO NORMALLY OPEN

O OXYGEN

OD OVERFLOW ROOF DRAIN

OSD OVERFLOW (SECONDARY) STORM WATER DRAIN

PSD PRIMARY STORM WATER DRAIN

RD ROOF DRAIN

SAN SANITARY

SP SUMP PUMP

V VENT

VTR VENT THROUGH ROOF

W WASTE

WCO WALL CLEAN OUT

WSFU WATER SUPPLY FIXTURE UNITS

ZVB ZONE VALVE BOX

ABBREVIATIONS

DRAWING KEYNOTE#

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

POINT OF CONNECTION TO CIVIL

CW COLD WATER PIPING

HW HOT WATER PIPING

HWR HOT WATER RETURN PIPING

SAN SANITARY PIPING

(E)CW EXISTING COLD WATER

(E)HWR EXISTING HOT WATER RETURN

(E)HW EXISTING HOT WATER PIPING

EXISTING PIPING TO BE REMOVED

(E)SAN EXISTING SANITARY PIPING

V SANITARY VENT PIPING

PIPE UP

PIPE DOWN

GCO GRADE CLEAN OUT (1-WAY OR 2-WAY)OR

OR VTR VENT THRU ROOF

WCO WALL CLEAN OUT

FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)OR

PIPE CAP

WCO

FLOOR DRAIN

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

STRAINER

UNION

PLUMBING LEGEND

FD

HOSE BIB WITH VACUUM BREAKER

CONTROL VALVE

MEDICAL GAS NOTES

1. MEDICAL GAS SYSTEMS SHALL BE FURNISHED, INSTALLED, AND TESTED IN STRICT ACCORDANCE WITH NFPA 99, 2018 EDITION.

2. INSTALLATION AND TERMINATIONS OF ALL LOW VOLTAGE AREA ALARM WIRING AND CONDUIT PER NFPA 99 BY

PLUMBING MEDICAL GAS CONTRACTOR.

3. PLUMBING MEDICAL GAS CONTRACTOR TO SUPPLY THE REQUIRED NUMBER OF VACUUM REGULATORS, OXYGEN

FLOW METERS MEDICAL AIR FLOW METERS AS PART OF MEDICAL GAS EQUIPMENT PACKAGE.

4. PROVIDE MEDICAL GAS PIPE LABELS IN COMPLIANCE WITH NFPA 99, AND AT LOCATIONS INCLUDING BUT NOT LIMITED TO: AT INTERVALS OF NOT MORE THAN 20 FT., AT LEAST ONCE WITHIN EACH SPACE, AND ON BOTH SIDES OF EVERY WALL AND FLOOR SLAB PENETRATION. MEDICAL GAS PIPING SHALL BE IDENTIFIABLE BY APPROPRIATE

LABELING WITH NAME OF GAS CONTAINED.

5. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING OXYGEN, AIR, AND VACUUM PIPING AND ADJUST PIPING

LAYOUT TO ACCOMMODATE CONNECTIONS.

6. MEDICAL GAS CONTRACTOR SHALL INCLUDE THE COST OF THE SYSTEM FUNCTIONAL TEST TO THEIR FEE.

7. EXISTING MEDICAL GAS SYSTEMS MUST BE KEPT IN SERVICE AT ALL TIMES DURING CONSTRUCTION OF THE NEW SYSTEMS. THE FINAL CONNECTIONS OF THE NEW SYSTEMS TO THE EXISTING MEDICAL GAS SYSTEMS SHALL BE COORDINATED WITH THE OWNER'S OPERATIONS AND SHALL BE MADE AFTER HOURS OF THE OWNERS

OPERATIONS SO AS NOT TO PRESENT ANY DISRUPTION TO THE OWNER'S OPERATIONS.

8. ALL TESTING OF THE NEW SYSTEMS AND PIPING SHALL BE DONE PRIOR TO THE FINAL MEDICAL GAS PIPE CONNECTIONS TO THE EXISTING PIPING AND SHALL BE RETESTED AFTER THE FINAL CONNECTION AS WARRANTED.

9. AN AREA ALARM PANEL SHALL BE PROVIDED IN THE NURSING WING AS INDICATED, WITH GAS SPECIFIC SYSTEM

PRESSURE READINGS.

10. MEDICAL GASES SHALL BE DISTRIBUTED THROUGH PIPING TO ZONE VALVE BOXES. ALL VALVES SHALL BE THREE

PIECE BALL TYPE WITH BLOW-OUT PROOF STEMS, LOCKING HANDLES AND FULL PORT DESIGN.

11. FROM ZONE VALVE BOXES, MEDICAL GASES SHALL BE DISTRIBUTED TO MEET THE SPACE REQUIREMENTS.

12. ALL MEDICAL GAS PIPING SHALL BE PRECLEANED, TYPE K, ASTM B 819, HARD DRAWN, SEAMLESS COPPER TUBING WITH BRAZED WROUGHT COPPER FITTINGS, ASTM B16.22 OR MSS SP-73; FACTORY CLEANED, PURGED, AND SEALED FOR MEDICAL GAS SERVICE. STORE PRECLEANED AND SEALED MEDICAL GAS PIPE, FITTINGS, VALVES, AND

SPECIALTIES WITH SEALING PLUGS AND SEALING PACKAGING INTACT.

13. LABEL MEDICAL GAS PIPE, FITTINGS, VALVES, AND SPECIALTIES THAT HAVE NOT BEEN PRECLEANED, OR THAT HAVE BEEN PRECLEANED BUT HAVE SEAL OR PACKAGING THAT IS NOT INTACT, WITH TEMPORARY LABELS INDICATING

THAT CLEANING IS REQUIRED BEFORE INSTALLATION.

ALTERNATES

DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED

DEDUCT ALTERNATE #1 DELETE ELEVATOR CARS AND HOIST MACHINES

DEDUCT ALTERNATE #2 DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN

CAMPUS AND HONORS CAMPUS

DEDUCT ALTERNATE #3 DELETE STAIR IN MRI AREA

DEDUCT ALTERNATE #4 DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR

AND WALL FINISHES

DEDUCT ALTERNATE #5 DELETE RENOVATION OF WAITING ROOM M3-203A,

NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET

M3-205A, AND NETWORK CLOSET F-155.

DEDUCT ALTERNATE #6 DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223,

M3-224 & M3-226) ALONG WITH RESTROOMS, STORAGE, AND CORRIDOR

ADJACENT

REFER TO FLOOR PLANS FOR ADDITIONAL DEDUCT DETAILS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

B

IM

/5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/1

P

-M O

D

-R

.r v t

/2

/2

:4

:3

P

M

P001

NOTES AND LEGEND - PLUMBING

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 CJF/NPS TMR/ANK

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

DRAWING INDEX - PLUMBING

P001 NOTES AND LEGEND - PLUMBING

PD100A BASEMENT FLOOR DEMOLITION PLAN - PLUMBING - AREA A

PD103A THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA A

PD103B THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA B

PL100A BASEMENT FLOOR RENOVATION PLAN - PLUMBING - AREA A

PL103A THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A

PL103B THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA B

PL104A FOURTH FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A

PL113A THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA A

PL113B THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA B

P501 DETAILS - PLUMBING

P901 ISOMETRICS - PLUMBING DRAINAGE

P902 ISOMETRICS - PLUMBING SUPPLY

P903 ISOMETRICS - PLUMBING SUPPLY

P904 ISOMETRICS - MEDICAL GAS

PLUMBING FIXTURE SCHEDULE

FIXTURE

MARK

FIXTURE DESCRIPTION

ROUGH-IN PIPE SIZES FIXTURE UNITS

COLD

WATER

SUPPLY

HOT

WATER

SUPPLY

FIXTURE

TRAP

FIXTURE

DRAIN

COLD

WATER

HOT

WATER

DRAINAGE

P-103

WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL

MOUNTED, ELONGATED RIM, 1-1/2" TOP SPUD, VITREOUS

CHINA, SIPHON JET FLUSHING ACTION; 1.28 GPF MANUAL

FLUSH VALVE, VACUUM BREAKER; OPEN FRONT SEAT

LESS COVER, STAINLESS STEEL CHECK HINGE. RIM: 17".

SEE SPECIFICATION 22 40 00.

1 1/2" N/A 4" 4" 10 0 4

P-104

WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL

MOUNTED, ELONGATED RIM, WITH BEDPAN WASHER, 1-1/2"

TOP SPUD, VITREOUS CHINA, SIPHON JET FLUSHING

ACTION; 1.28 GPF MANUAL FLUSH VALVE, VACUUM

BREAKER; OPEN FRONT SEAT LESS COVER, STAINLESS

STEEL CHECK HINGE. RIM: 17". SEE SPECIFICATION 22 40

00.

1 1/2" N/A 4" 4" 10 0 4

P-114

BARIATRIC WATER CLOSET, BARRIER FREE – ADA HEGHT,

FLOOR MOUNTED ELONGATED RIM, WITH BEDPAN

WASHER, 1-1/2” TOP SPUD VITROUS CHINA, SIPHON JET

FLUSHING ACTION; 1.28 GPF MANUAL FLUSH VALVE,

VACUUM BREAKER; OPEN FRONT SEAT LESS COVER,

STIANLESS STEEL CHECK HINGE, RIM:17”. SEE

SPECIFICATION 22 40 00.

1 1/2" N/A 4" 4" 10 0 4

P-404

LAVATORY, BARRIER FREE - INTEGRAL WITH

COUNTERTOP, ADA COMPLIANT, FAUCET HOLES AS

REQUIRED. PROVIDE SENSOR CONTROL AUTOMATIC

FAUCET, AC POWERED, WITH ASSE 1070 COMPLIANT

THERMOSTATIC MIXING VALVE, 1/2 GPM, POLISHED

CHROME, LEAD FREE. PROVIDE GRID DRAIN ASSEMBLY,

P-TRAP, STOPS, SUPPLIES, ETC., FOR A COMPLETE

INSTALLATION. COORDINATE REQUIREMENTS WITH

COUNTERTOP FURNITURE SUPPLIER.

1/2" 1/2" 1 1/2" 2" 0.5 0.5 1

P-417

OVAL LAVATORY, BARRIER FREE - COUNTERTOP MOUNT,

ADA COMPLIANT, SELF RIMMING, FRONT OVERFLOW,

VITREOUS CHINA, FAUCET HOLES AS REQUIRED. TOP OF

FRONT RIM MOUNTED 34" FROM FINISHED FLOOR AND MIN.

2-1/2" FROM FRONT EDGE OF COUNTERTOP. PROVIDE

WRIST BLADE, GOOSENECK FAUCET. PROVIDE WITH ASSE

1070 COMPLIANT THERMOSTATIC MIXING VALVE, 1/2 GPM,

POLISHED CHROME, LEAD FREE, DECK MOUNTED.

PROVIDE COVER PLATES, GRID DRAIN ASSEMBLY, P-TRAP,

STOPS, SUPPLIES, ETC., FOR A COMPLETE INSTALLATION.

SEE SPECIFICATION 22 40 00.

1/2" 1/2" 1 1/2" 2" 0.5 0.5 1

P-418

LAVATORY - BARRIER FREE, WALL HUNG, 20"x18", VITREOUS CHINA, FAUCET HOLES AS REQUIRED, SELF-DRAINING DECK. PROVIDE CONCEALED ARM

SUPPORT CARRIER. PROVIDE WRIST BLADE, GOOSENECK

FAUCET, ADA COMPLIANT, DECK MOUNTED FAUCET, WITH

ASSE 1070 COMPLIANT THERMOSTATIC MIXING VALVE.

TOP OF RIM 34" FROM FINISHED FLOOR. PROVIDE COVER

PLATES, PERFORATED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .