This document appears to be a drawing or technical specification related to Solicitation Number 36C77624R0063 for the construction of an Inpatient Medicine Bed Addition at the Kansas City VA Medical Center. The key details are:
The Department of Veterans Affairs is seeking proposals to award a single firm-fixed-price construction contract for this minor construction project. The procurement is set-aside using a tiered evaluation process, with priority given to Service-Disabled Veteran-Owned Small Businesses (SDVOSB), Veteran-Owned Small Businesses (VOSB), small businesses, and then other than small (large) business concerns. The project is for the construction of an Inpatient Medicine Bed Addition at the Kansas City VA Medical Center located in Kansas City, MO.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. 31ST ST.
S P
R U
C E
A
V E
K E
N S
IN
G
T O
N
E
C Y
P R
E
E
E L M
W O
D
E
LINWOOD BLVD.
L
IS
T E
R
E
E. 35TH ST.
KANSAS CITY VA MEDICAL CENTER
4801 LINWOOD BOULEVARD
KANSAS CITY, MO 64128
E. 33RD ST.
B R
IG
H
T
N
E
S E
M A
N U
E L C
L E
A V
E R
B L V
D
E. 35TH ST.
EAST 35TH STREET
E L M
W O
O D
A V
E N
U E
EAST 33RD STREET
L
IS
T E
R A
V E
N U
E
LINWOOD BOULEVARD
B6
B5
B40
B1
B26
B15
PARKING
GARAGE
B4
B2
ADDITION &
RENOVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B
M e d
B e d s .M o d
.r v t
/2
/2
:1
:0
P
M
GI000
COVER SHEET
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
ISSUED FOR BIDDING
JULY 21, 2022
Solicit No. 36C77623Q0213 589-017 KCVA -Inpatient Medicine Bed Addition - B1
KANSAS CITY VA MEDICAL CENTER
Post Award Contracting Officer:
Sean Kaminski (VHACLE) Email: sean.kaminski@va.gov Office Phone: (216) 447-8300 Ext. 49591
Post Award Contract Specialist:
Rashad Smalls (VHACLE) Email: rashad.smalls@va.gov Office Phone: (216) 447-8300 Ext. 49503
COR: Marcus Stevenson
DEPARTMENT OF VETERANS AFFAIRS
Mechanical Engineer, M.S.
FAC - COR II
Address: VA Medical Center Facilities Service 4801 Linwood Blvd.
Kansas City, MO 64128
Phone: (816) 816-4700 Ext. 57905 Fax: (816) 922-4624 Email: Marcus.Stevenson2@va.gov
USER: KCVA Medical Center 4801 Linwood Blvd.
Kansas City, MO 64128
VICINITY MAP
VISN 15 CO: Andrea Fink Contracting Officer
Department of Veterans Affairs Network Contracting Office Department of Veterans Affairs
Program Contracting Activity Central 6150 Oak Tree Blvd., Suite 300 Independence, OH 44131
CAMPUS PLAN
Construction Scope of Work
589-017, Construct Inpatient Medicine Bed Addition
Kansas City VA Medical Center (KCVA)
CONSTRUCTION SCOPE OF WORK – MOD 2
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for at the Kansas City VA Medical Center (KCVA) Project 589-017, Construct Inpatient Medicine Bed Addition as required by drawings and specifications. Period of performance is projected to be five-hundred forty (540) calendar days.
The work will require construction of a third floor addition on the North side of the building. The remainder of the 3rd floor west wing shall be renovated.
These areas combine to form a continuous inpatient private bedroom acute medicine unit. A vertical circulation addition with 2 elevators shall also be built with this project serving all floors from Basement thru 8th floor for patient transport.
Additional work is required to accommodate location of 2 portable MRI machines that will serve patients during the construction period. This work is located near the Ambulance-only entry and on the Honors Annex Campus which is a few miles to the east.
Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.
Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please also see the 2010 ACM survey (included in General Requirements 01 00 00, Appendix B) for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM. Abatement methods as stipulated in Specification Sections 02 82 11, 02 82 13.13, 02 82 13.19 and 02 83 33.19, are the only allowable methods of abatement. No alternate abatement methods will be considered.
Civil and Sitework: Work includes all labor, material, equipment, and supervision to perform new civil and site work by the construction drawings and specifications. Civil and Sitework includes all site preparation as well as providing new and relocating existing utilities and equipment, providing new site construction, landscaping, and physical security elements.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment, and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.
All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
In addition to providing new mechanical systems to serve the new addition and renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the Medical Bed space and adjacent corridor. Existing systems shall be rebalanced to preconstruction readings.
Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
The VA shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:
CLIN 01: All work associated with Phase 1 as identified by the drawings and specifications shall be completed in 166 days (with 14 days of activation by the VA prior to the start of Phase 2).
CLIN 02: All work associated with Phase 2 as identified by the drawings and specifications shall be completed in 286 days (with 14 days of activation by the VA prior to the start of Phase 3).
CLIN 04: All work associated with Alternate 1. Alternate 1 removes 30 days from the Period of Performance.
CLIN 05: All work associated with Alternate 2. Alternate 2 removes 14 days from the Period of Performance.
CLIN 06: All work associated with Alternate 3. Alternate 3 removes 30 days from the Period of Performance.
CLIN 07: All work associated with Alternate 4. Alternate 4 removes 7 days from the Period of Performance.
CLIN 08: All work associated with Alternate 5. Alternate 5 removes 30 days from the Period of Performance.
CLIN 09: All work associated with Alternate 6. Alternate 6 removes 60 days from the Period of Performance.
Alternates Deductive alternates are cascading and must be exercised in the order presented Deduct Alternate 1: Delete elevator cars and hoist machines Deduct Alternate 2: Delete site prep for temporary MRI's at Main Campus and Honors Campus Deduct Alternate 3: Delete stair in MRI Area Deduct Alternate 4: Delete renovation of Corridor C3-20 - floor and wall finishes Deduct Alternate 5: Delete renovation of Waiting Room M3-203A, Nourishment M3-209, Soiled Linen Storage M3-205b, Visitor Toilet M3-205a, and Network Closet F-155.
Deduct Alternate 6: Delete renovation of 3 Patient Rooms (M3-223, M3-224 & M3-226) along with restrooms storage and corridor adjacent
Each project shall utilize the Bid Form included with this specification section, 00 01 15 General Requirements.
The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:
01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS and 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
Complete and Functional: The Additions and Renovation shall be in 3 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Maintain free and unobstructed egress shall be maintained during all phases.
PLAN
NORTH
DEDUCTIVE ALTERNATES :
DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED
DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES REFER TO A102.
DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN CAMPUS AND HONORS CAMPUS - REFER TO AS101 AND AS102
DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA - REFER TO GC200
DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR AND WALL FINISHES - REFER TO GC200.
DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A, NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET M3-205A, AND NETWORK
CLOSET F-155. - REFER TO GC200
DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223, M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT. - REFER TO GC200.
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________________________________________SIGNATURE __________________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.
ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK.
CREDENTIALS SHALL BE SUPPLIED TO THE COR AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT
REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.
AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER
PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.
July 21, 2022
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/5
-0
I n p a ti e n t M e d ic a l B e d
A d d it io n
/5
-0
.B M e d
B e d s .M o d
.r v t
/2
/2
:2
:3
A
M
GI001
PROJECT SHEET INDEX
TRIPLE C THE A&E GROUP
2625 LINDELL BLVD. 2ND FLOOR, 2064
ST. LOUIS, MO 63108
MAT PERKINS
520-481-8548
589-017
B1
JULY 21, 2022 M. PERKINS S. POLLARD
ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition
4801 LINWOOD BLVD KANSAS CITY, MO 64128
- DRAWING INDEX -
Sheet Number SHEET NAME IN C
LU
D
E D
IN
5% S
D
IN
C
LU
D
E D
IN
0% D
D
IN
C
LU
D
E D
IN
5% D
D
IN
C
LU
D
E D
IN
5% C
D
IN
C
LU
D
E D
IN
C D
IN
C
LU
D
E D
IN
IF
B
MH103BB THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA B No No No Yes Yes Yes
MP103A THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA A No No Yes Yes Yes Yes
MP103B THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA B No No Yes Yes Yes Yes
MP108 ELEVATOR FLOOR PLANS - MECHANICAL PIPING - AREA A No Yes Yes Yes Yes Yes
M-501 DETAILS - MECHANICAL No No No Yes Yes Yes
M-502 DETAILS - MECHANICAL No No No Yes Yes Yes
M-503 DETAILS - MECHANICAL No No No Yes Yes Yes
M-504 DETAILS - MECHANICAL No No No Yes Yes Yes
M-601 CONTROLS - MECHANICAL No No No Yes Yes Yes
M-602 CONTROLS - MECHANICAL No No No Yes Yes Yes
M-603 CONTROLS - MECHANICAL No No No Yes Yes Yes
ELECTRICAL
E001 NOTES AND LEGEND - ELECTRICAL Yes Yes Yes Yes Yes Yes
ELD100A BASEMENT DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes
ELD101A FIRST FLOOR DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes
ELD103A THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes
ELD103B THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA B Yes Yes Yes Yes Yes Yes
EPD100A BASEMENT FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes
EPD101 FIRST FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes
EPD103A THIRD FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes
EPD103B THIRD FLOOR DEMOLITION PLAN - POWER - AREA B Yes Yes Yes Yes Yes Yes
EL100 BASEMENT RENOVATION PLAN - LIGHTING No No Yes Yes Yes Yes
EL101 FIRST FLOOR RENOVATION PLAN - LIGHTING Yes Yes Yes Yes Yes Yes
EL102 ELEVATOR PLAN - LIGHTING Yes Yes Yes Yes Yes Yes
EL103A THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes
EL103B THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA B Yes Yes Yes Yes Yes Yes
EP100A BASEMENT FLOOR RENOVATION PLAN - POWER - SOUTH No No Yes Yes Yes Yes
EP101A FIRST FLOOR RENOVATION PLAN - POWER No No Yes Yes Yes Yes
EP101B FIRST FLOOR RENOVATION PLAN - POWER - TEMP MRI No No Yes Yes Yes Yes
EP101C FIRST FLOOR RENOVATION PLAN - HONORS ANNEX No No No No No Yes
EP102 ELEVATOR PLAN - POWER & SPECIAL SYSTEMS Yes Yes Yes Yes Yes Yes
EP103A THIRD FLOOR RENOVATION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes
EP103B THIRD FLOOR RENOVATION PLAN - POWER - AREA B Yes Yes Yes Yes Yes Yes
EF103A THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA A Yes Yes Yes Yes Yes Yes
EF103B THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA B Yes Yes Yes Yes Yes Yes
EY101A FIRST FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A Yes Yes Yes Yes Yes Yes
EY103A THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A Yes Yes Yes Yes Yes Yes
EY103B THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA B Yes Yes Yes Yes Yes Yes
ET103 THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - OVERALL No No No Yes Yes Yes
ET103A THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA A No No No Yes Yes Yes
ET103B THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA B No No No Yes Yes Yes
E401 ENLARGED VIEWS - ELECTRICAL Yes Yes Yes Yes Yes Yes
E501 ELECTRICAL ONE-LINE DIAGRAM Yes Yes Yes Yes Yes Yes
E502 ELECTRICAL ONE-LINE DIAGRAM No No No Yes Yes Yes
E503 ELECTRICAL ONE-LINE DIAGRAM No No No No No Yes
E601 ELECTRICAL SCHEDULES No No Yes Yes Yes Yes
E602 ELECTRICAL SCHEDULES No No Yes Yes Yes Yes
E701 ELECTRICAL DETAILS No No Yes Yes Yes Yes
E702 ELECTRICAL DETAILS No No No Yes Yes Yes
TELECOM / SECURITY
TY-100A TELECOM / SECURITY - BASEMENT AREA A No Yes Yes Yes Yes Yes
TY-101 TELECOM / SECURITY - FIRST FLOOR AREA A No Yes Yes Yes Yes Yes
TY-102 TELECOM / SECURITY - 2ND, 4TH THRU 8TH FLOOR No Yes Yes Yes Yes Yes
TY-103 TELECOM / SECURITY - THIRD FLOOR PLAN No Yes Yes Yes Yes Yes
- DRAWING INDEX -
Sheet Number SHEET NAME IN C
LU
D
E D
IN
5% S
D
IN
C
LU
D
E D
IN
0% D
D
IN
C
LU
D
E D
IN
5% D
D
IN
C
LU
D
E D
IN
5% C
D
IN
C
LU
D
E D
IN
C D
IN
C
LU
D
E D
IN
IF
B
A-302 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes
A-303 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes
A-351 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes
A-352 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes
A-353 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes
A-354 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes
A-360 ARCHITECTURAL - SECTIONS - INTERIOR WALL No Yes Yes Yes Yes Yes
A-361 ARCHITECTURAL - SECTIONS - INTERIOR WALL Yes Yes Yes Yes
A-401 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes
A-402 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes
A-403 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes
A-420 ARCHITECTURAL - ENLARGED STAIR VIEWS No Yes Yes Yes Yes Yes
A-501 ARCHITECTURAL - DETAILS - EXTERIOR No Yes Yes Yes Yes Yes
A-502 ARCHITECTURAL - DETAILS - EXTERIOR No Yes Yes Yes Yes Yes
A-510 ARCHITECTURAL ROOF DETAILS Yes Yes Yes Yes
A-551 ARCHITECTURAL - DETAILS - CASEWORK No Yes Yes Yes Yes Yes
A-552 ARCHITECTURAL - DETAILS - CEILING No No Yes Yes Yes Yes
A-553 ARCHITECTURAL - DETAILS - FLOOR AND INTERIOR WALL No No Yes Yes Yes Yes
A-601 ARCHITECTURAL DOOR & WINDOW SCHEDULE No Yes Yes Yes Yes Yes
A-602 ARCHITECTURAL WINDOW, DOOR, & FRAME TYPES Yes Yes Yes Yes Yes Yes
A-603 FRAME DETAILS Yes Yes Yes Yes Yes Yes
A-604 DOOR & FRAME DETAILS Yes Yes Yes
A-720 ARCHITECTURAL - STANDARD PARTITION TYPES Yes Yes Yes Yes Yes Yes
A-721 ARCHITECTURAL - PARTITION HEAD DETAILS No Yes Yes Yes Yes Yes
A-722 ARCHITECTURAL - PARTITION FRAMING DETAILS No Yes Yes Yes Yes Yes
A-730 ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS No Yes Yes Yes Yes Yes
SIGNAGE
AW100 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND
SCHEDULE
No Yes Yes Yes Yes Yes
AW103A ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA A No Yes Yes Yes Yes Yes
AW103B ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA B No Yes Yes Yes Yes Yes
INTERIORS
IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A No Yes Yes Yes Yes Yes
IN102 INTERIOR FINISH PLAN - ELEVATOR No Yes Yes Yes Yes Yes
IN103 INTERIOR FINISH PLAN - THIRD FLOOR - OVERALL Yes Yes Yes Yes Yes Yes
IN103A INTERIOR FINISH PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes
IN103B INTERIOR FINISH PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes
IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND SCHEDULES Yes Yes Yes Yes Yes Yes
IN901 INTERIOR FINISH BOARDS - THIRD FLOOR Yes Yes Yes Yes Yes Yes
IN902 INTERIOR RENDERINGS Yes Yes Yes Yes Yes Yes
REFERENCE
RJ-901 PHOTO REFERENCES - EXTERIOR Yes Yes Yes Yes Yes Yes
RJ-902 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes
RJ-903 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes
RJ-904 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes
RJ-905 PHOTO REFERENCES - ELEVATOR CONNECTIONS Yes Yes Yes Yes Yes Yes
RJ-920 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-921 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-922 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-923 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-924 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-930 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-931 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
RJ-932 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes
FURNITURE
IF103 INTERIOR FURNITURE PLAN - THIRD FLOOR - OVERALL Yes Yes Yes Yes Yes Yes
IF103A INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes
IF103B INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes
IF901A INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY No No No Yes Yes Yes
IF901B INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY No No No Yes Yes Yes
EQUIPTMENT
Q-601 EQUIPMENT PLAN - OVERALL No Yes Yes Yes Yes Yes
Q-601A EQUIPMENT PLAN - AREA A No Yes Yes Yes Yes Yes
Q-601B EQUIPMENT PLAN - AREA B No Yes Yes Yes Yes Yes
Q-602 EQUIPMENT SCHEDULE No Yes Yes Yes Yes Yes
FIRE PROTECTION
FP102A FLOOR PLANS - FIRE PROTECTION No Yes Yes Yes Yes Yes
FP103A THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA A Yes Yes Yes Yes Yes Yes
FP103B THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA B Yes Yes Yes Yes Yes Yes
PLUMBING
P001 NOTES AND LEGEND - PLUMBING Yes Yes Yes Yes Yes Yes
PD100A BASEMENT FLOOR DEMOLITION PLAN - PLUMBING - AREA A No Yes Yes Yes Yes Yes
PD103A THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA A Yes Yes Yes Yes Yes Yes
PD103B THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA B Yes Yes Yes Yes Yes Yes
PL100A BASEMENT FLOOR RENOVATION PLAN - PLUMBING - AREA A No Yes Yes Yes Yes Yes
PL103A THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A Yes Yes Yes Yes Yes Yes
PL103B THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA B Yes Yes Yes Yes Yes Yes
PL104A FOURTH FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A No No Yes Yes Yes Yes
PL113A THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA A No Yes Yes Yes Yes Yes
PL113B THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA B No Yes Yes Yes Yes Yes
P501 DETAILS - PLUMBING No No No Yes Yes Yes
P901 ISOMETRICS - PLUMBING DRAINAGE No No No Yes Yes Yes
P902 ISOMETRICS - PLUMBING SUPPLY No No No Yes Yes Yes
P903 ISOMETRICS - PLUMBING SUPPLY No No No No Yes Yes
P904 ISOMETRICS - MEDICAL GAS No No No No No Yes
MECHANICAL
M-001 NOTES AND LEGEND - MECHANICAL Yes Yes Yes Yes Yes Yes
M-002 SCHEDULES - MECHANICAL No Yes Yes Yes Yes Yes
M-003 SCHEDULES - MECHANICAL No No No Yes Yes Yes
MD103A THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA A Yes Yes Yes Yes Yes Yes
MD103B THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA B Yes Yes Yes Yes Yes Yes
MH101C FIRST FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA C No Yes Yes Yes Yes Yes
MH102 ELEVATOR FLOOR PLANS - MECHANICAL HVAC No No Yes Yes Yes Yes
MH103A THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA A Yes Yes Yes Yes Yes Yes
MH103AA THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA A No No No Yes Yes Yes
MH103B THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA B Yes Yes Yes Yes Yes Yes
- DRAWING INDEX -
Sheet Number SHEET NAME IN C
LU
D
E D
IN
5% S
D
IN
C
LU
D
E D
IN
0% D
D
IN
C
LU
D
E D
IN
5% D
D
IN
C
LU
D
E D
IN
5% C
D
IN
C
LU
D
E D
IN
C D
IN
C
LU
D
E D
IN
IF
B
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes Yes Yes
GI001 PROJECT SHEET INDEX No Yes Yes Yes Yes Yes
GI021 GENERAL LEED CERTIFICATION No Yes Yes Yes Yes Yes
GI022 GENERAL LEED CERTIFICATION No Yes Yes Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes Yes Yes Yes
GI100 LIFE SAFETY - BASEMENT PLAN Yes Yes Yes Yes Yes Yes
GI101 LIFE SAFETY - FIRST FLOOR PLAN Yes Yes Yes Yes Yes Yes
GI102 LIFE SAFETY - SECOND, FOURTH, FIFTH FLOOR PLANS Yes Yes Yes Yes Yes Yes
GI103 LIFE SAFETY - THIRD FLOOR PLAN Yes Yes Yes Yes Yes Yes
GI104 LIFE SAFETY - SIXTH, SEVENTH, EIGHTH FLOOR PLANS Yes Yes Yes Yes Yes Yes
GI105 PLUMBING - PROJECT CALCULATIONS No Yes Yes Yes Yes Yes
GI201 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes
GI202 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes
GI203 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes
GI204 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes
GI205 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes
GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY Yes Yes Yes Yes Yes Yes
GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY Yes Yes Yes Yes Yes Yes
GI303 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY No No Yes Yes Yes Yes
GC100 CURRENT AND FUTURE PROJECT DIAGRAM - FOR REFERENCE ONLY No No No No No Yes
GC101 PHASING PLAN Yes Yes Yes Yes Yes Yes
GC102 PHASING PLAN Yes Yes Yes Yes Yes Yes
GC200 ALTERNATE DIAGRAMS No No Yes Yes Yes Yes
SURVEY
VF101 CIVIL - SURVEY PLAN - NORTH Yes Yes Yes Yes Yes Yes
CIVIL
CD101 CIVIL - DEMOLITION PLAN - NORTH Yes Yes Yes Yes Yes Yes
CS101 CIVIL - SITE PLAN - NORTH Yes Yes Yes Yes Yes Yes
CS101A CIVIL - SITE PLAN TEMPORARY MRI LOCATION - MAIN CAMPUS Yes
CS101B CIVIL - SITE PLAN TEMPORARY MRI LOCATION - HONORS CAMPUS Yes
CS501A CIVIL - DETAILS Yes
CG101 CIVIL - GRADING PLAN - NORTH Yes Yes Yes Yes Yes Yes
CG102 CIVIL - STORMWATER PROTECTION PLAN NORTH Yes Yes Yes Yes
CG501 CIVIL - GRADING DETAILS Yes Yes Yes Yes Yes Yes
CU101 CIVIL - UTILITY PLAN - NORTH Yes Yes Yes Yes Yes Yes
STRUCTURAL
S001 GENERAL NOTES No Yes Yes Yes Yes Yes
S002 3D VIEW No Yes Yes Yes Yes Yes
S003 3D VIEW No Yes Yes Yes Yes Yes
S004 3D VIEW - FUTURE No Yes Yes Yes Yes Yes
S005 3D VIEW - FUTURE No Yes Yes Yes Yes Yes
S100 FOUNDATION PLAN - AREA A No Yes Yes Yes Yes Yes
S101 LEVEL 1 - AREA A No Yes Yes Yes Yes Yes
S102 LEVEL 2 - AREA A No Yes Yes Yes Yes Yes
S103 LEVEL 3 - AREA A No Yes Yes Yes Yes Yes
S104 LEVEL 4 - AREA A No Yes Yes Yes Yes Yes
S105 LEVEL 5, LEVEL 6, & LEVEL 7 - AREA A No Yes Yes Yes Yes Yes
S106 LEVEL 8, LEVEL 9, & LEVEL 10 - AREA A No Yes Yes Yes Yes Yes
S200 FOUNDATION SECTIONS No Yes Yes Yes Yes Yes
S201 FOUNDATION SECTIONS No No No Yes Yes Yes
S202 FOUNDATION SECTIONS No No No Yes Yes Yes
S203 FOUNDATION SECTIONS No No No Yes Yes Yes
S204 FOUNDATION SECTIONS No No No Yes Yes Yes
S205 FOUNDATION SECTIONS No No No Yes Yes Yes
S206 FOUNDATION SECTIONS No No No No No Yes
S300 FRAMING SECTIONS No Yes Yes Yes Yes Yes
S301 FRAMING SECTIONS No No No Yes Yes Yes
S302 FRAMING SECTIONS No No No Yes Yes Yes
S303 FRAMING SECTIONS No No No Yes Yes Yes
S304 FRAMING SECTIONS No No No Yes Yes Yes
S305 FRAMING SECTIONS No No No Yes Yes Yes
S306 FRAMING SECTIONS No No No Yes Yes Yes
S307 FRAMING SECTIONS No No No Yes Yes Yes
S308 FRAMING SECTIONS No No No Yes Yes Yes
S309 FRAMING SECTIONS No No No Yes Yes Yes
S310 FRAMING SECTIONS No No No Yes Yes Yes
S311 FRAMING SECTIONS No No No Yes Yes Yes
S312 FRAMING SECTIONS No No No Yes Yes Yes
S400 FRAMING ELEVATIONS No No No Yes Yes Yes
ARCHITECTURAL
A-001 ARCHITECTURAL - SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes Yes Yes
AS100 ARCHITECTURAL SITE DIAGRAMS Yes Yes Yes Yes Yes Yes
AS101 TEMPORARY MRI LOCATION - MAIN CAMPUS No Yes Yes Yes Yes Yes
AS102 TEMPORARY MRI LOCATION - HONORS CAMPUS No No No No No Yes
AD100A ARCHITECTURAL - DEMOLITION PLAN - BASEMENT - AREA A Yes Yes Yes Yes Yes Yes
AD101A ARCHITECTURAL - DEMOLITION PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes Yes Yes
AD103A ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes
AD103B ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes
A-100A ARCHITECTURAL PLAN - BASEMENT - AREA A Yes Yes Yes Yes Yes Yes
A-100B ARCHITECTURAL PLAN - BASEMENT - AREA B Yes Yes Yes Yes Yes Yes
A-101A ARCHITECTURAL PLAN - FIRST FLOOR - AREA A & PARTIAL B Yes Yes Yes Yes Yes Yes
A-102 ARCHITECTURAL PLAN - ELEVATOR Yes Yes Yes Yes Yes Yes
A-103A ARCHITECTURAL PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes
A-103B ARCHITECTURAL PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes
A-113A ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA A No Yes Yes Yes Yes Yes
A-113B ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA B No Yes Yes Yes Yes Yes
A-114 ARCHITECTURAL - ENLARGED DIMENSIONED VIEWS No Yes Yes Yes Yes Yes
A-115 ARCHITECTURAL PLAN - ROOF Yes Yes Yes Yes Yes Yes
AC101 ARCHITECTURAL - REFLECTED CEILING PLAN - FIRST FLOOR Yes Yes Yes Yes Yes Yes
AC102A ARCHITECTURAL - REFLECTED CEILING PLAN - SECOND FLOOR - AREA A Yes Yes Yes Yes Yes Yes
AC103A ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes
AC103B ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes
A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes
A-202 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes
A-203 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes
A-204 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes
A-301 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes
Revisions: Date:
/21
/20
/21
/20
SS-1 PREREQUISITE: CONSTRUCTION ACTIVITY POLLUTION
PREVENTION
Required To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.
Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the erosion and sedimentation requirements of the 2017 U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) or local equivalent, whichever is more stringent. Projects must apply the CGP regardless of size. The plan must describe the measures implemented.
INTEGRATIVE PROCESS (IP)
LEED v4 BD+C: HEALTHCARE
SS-4 CREDIT: HEAT ISLAND REDUCTION
To minimize effects on microclimates and human and wildlife habitats by reducing heat islands.
Choose one of the following options:
Option 1. Nonroof and Roof (2 points except Healthcare, 1 point Healthcare)
Meet the following criterion:
Area of Area of High- Area of Vegetated Nonroof Reflectance Roof Roof Measures ————— + —————— + —————— ≥ Total Site Paving Area + Total Roof Area
0.5 0.75 0.75
Alternatively, an SRI and SR weighted average approach may be used to calculate compliance.
High-reflectance roof Use roofing materials that have an aged SRI equal to or greater than the values in Table 1. If aged SRI is not available, the roofing material shall have an initial SRI equal to or greater than the values in Table 1.
Option 2. Parking under Cover (1 point) Place a minimum of 75% of parking spaces under cover. Any roof used to shade or cover parking must (1) have a three-year aged SRI of at least 32 (if three-year aged value information is not available, use materials with an initial SRI of at least 39 at installation), (2) be a vegetated roof, or (3) be covered by energy generation systems, such as solar thermal collectors, photovoltaics, and wind turbines.
The credit calculations must include all existing and new off-street parking spaces that are leased or owned by the project, including parking that is outside the project boundary but is used by the project. On-street parking in public rights-of-way is excluded from these calculations.
1 point of 2 possible
SS-5 CREDIT: LIGHT POLLUTION REDUCTION
To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.
Requirements
Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (Option 1) or the calculation method (Option 2). Projects may use different options for uplight and light trespass.Meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:
• the photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design;
and
• the lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.
Additionally, meet the internally illuminated signage requirement. Do not exceed a luminance of 200 cd/m2 (nits) during nighttime hours and 2000 cd/m2 (nits) during daytime hours.
1 point of 1 possible
WE-1 PREREQUISITE: INDOOR WATER USE REDUCTION
Required To reduce indoor water consumption.
For the fixtures and fittings listed in Table 1, as applicable to the project scope, reduce aggregate water consumption by 20% from the baseline. Base calculations on the volumes and flow rates shown in Table 1.
All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled (or a local equivalent for projects outside the U.S.).
Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow fixtures and fittings at the local standard supply pressure; the supply pressure must be consistent in the baseline and proposed case.
Install appliances, equipment, and processes within the project scope that meet the requirements listed in the tables below.
Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2.
In addition, water-consuming appliances, equipment, and processes must meet the requirements listed in Tables 4 and 5.
WATER EFFICIENCY (WE)
WE-2 PREREQUISITE: BUILDING-LEVEL WATER METERING
Required To support water management and identify opportunities for additional water savings by tracking water consumption.
Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.
Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.
WE-4 CREDIT: INDOOR WATER USE REDUCTION
To reduce indoor water consumption.
Requirements Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.
Percentage Reduction Points (BD+C) Points (CS) Points (Schools, Retail, Hospitality, Healthcare) 25% 1 1 1 30% 2 2 2 35% 3 3 3 40% 4 4 4 45% 5 -- 5 50% 6 -- -- Schools, Retail, Hospitality, and Healthcare only Meet the percentage reduction requirements above. AND Appliance and Process Water.
Install equipment within the project scope that meets the minimum requirements in Table 2, 3, 4, or 5. One point is awarded for meeting all applicable requirements in any one table. All applicable equipment listed in each table must meet the standard. Schools, Retail, and Healthcare projects can earn a second point for meeting the requirements of two tables.
1 point of 7 possible
ENERGY AND ATMOSPHERE
EA-1 PREREQUISITE: FUNDAMENTAL COMMISSIONING
AND VERIFICATION Required To support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability.
Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability.
• Develop the OPR.
• Develop a BOD.
The commissioning authority (CxA) must do the following:
• Review the OPR, BOD, and project design.
• Develop and implement a Cx plan.
• Confirm incorporation of Cx requirements into the construction documents.
• Develop construction checklists.
• Develop a system test procedure.
• Verify system test execution.
• Maintain an issues and benefits log throughout the Cx process.
• Prepare a final Cx process report.
• Document all findings and recommendations and report directly to the owner throughout the process.
Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:
• a sequence of operations for the building;
• the building occupancy schedule;
• equipment run-time schedules;
• setpoints for all HVAC equipment;
• set lighting levels throughout the building;
• minimum outside air requirements;
• any changes in schedules or setpoints for different seasons, days of the week, and times of day;
• a systems narrative describing the mechanical and electrical systems and equipment;
• a preventive maintenance plan for building equipment described in the systems narrative; and
• a commissioning program that includes periodic commissioning requirements, ongoing commissioning tasks, and continuous tasks for critical facilities.
EA-2 PREREQUISITE: MINIMUM ENERGY PERFORMANCE
Required To reduce the environmental and economic harms of excessive energy use by achieving a minimum level of energy efficiency for the building and its systems.
Comply with ANSI/ASHRAE/IESNA Standard 90.1–2016, with errata or a USGBC-approved equivalent standard. ASHRAE 90.1-2016 Compliance pathways in Section 4.2.1.1 include compliance with all mandatory provisions, and compliance with one of the following:
Prescriptive provisions of Sections 5 through 10 Section 11 Energy Cost Budget Method Normative Appendix G Performance Rating Method. When using Appendix G, the Performance Cost Index (PCI) shall be less than or equal to the Performance Cost Index Target (PCIt) in accordance with the methodology provided in Section 4.2.1.1. Document the PCI, PCIt, and percentage improvement using metrics of cost or greenhouse gas (GHG) emissions.
EA-3 PREREQUISITE: BUILDING-LEVEL ENERGY METERING
Required To support energy management and identify opportunities for additional energy savings by tracking building-level energy use.
Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.
Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification. At a minimum, energy consumption must be tracked at one-month intervals. This commitment must carry forward for five years or until the building changes ownership or lessee.
EA-4 PREREQUISITE: FUNDAMENTAL REFRIGERANT
MANAGEMENT Required To reduce stratospheric ozone depletion.
Do not use chlorofluorocarbon (CFC)-based refrigerants in new heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems. When reusing existing HVAC&R equipment, complete a comprehensive CFC phase-out conversion before project completion. Phase-out plans extending beyond the project completion date will be considered on their merits.
Existing small HVAC&R units (defined as containing less than 0.5 pound [225 grams] of refrigerant) and other equipment, such as standard refrigerators, small water coolers, and any other equipment that contains less than 0.5 pound (225 grams) of refrigerant, are exempt.
PREREQUISITE: INTEGRATIVE PROJECT PLANNING AND DESIGN
Maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies. Utilize innovative approaches and techniques for green design and construction.
SUSTAINABLE SITES
CREDIT: INTEGRATIVE PROCESS
Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff.
As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum:
Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum);
Selects the LEED credits to meet the targeted certification level; and Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met
SS-2 PREREQUISITE: ENVIRONMENTAL SITE ASSESSMENT
Required To protect the health of vulnerable populations by ensuring that the site is assessed for environmental contamination and that any environmental contamination has been remediated.
Requirements Conduct a Phase I Environmental Site Assessment as described in ASTM E1527-13 (or a local equivalent) to determine whether environmental contamination exists at the site. If contamination is suspected, conduct a Phase II Environmental Site Assessment as described in ASTM E1903–11 (or a local equivalent). If a site is contaminated, remediate the site to meet local, state, or national environmental protection agency region residential (unrestricted) standards, whichever are most stringent.
WE-1 PREREQUISITE: OUTDOOR WATER USE REDUCTION
Required To reduce outdoor water consumption.
Reduce outdoor water use through one of the following options. Nonvegetated surfaces, such as permeable or impermeable pavement, should be excluded from the landscape area calculations. Athletic fields and playgrounds (if vegetated) and food gardens may be included or excluded at the project team’s discretion.
Option 1. No Irrigation Required Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.
OR
Option 2. Reduced Irrigation Reduce the project’s landscape water requirement by at least 30% from the calculated baseline for the site’s peak watering month.
Reductions must be achieved through plant species selection and irrigation system efficiency, as calculated by the Environmental Protection Agency (EPA) WaterSense Water Budget Tool.
LT CREDIT: ACCESS TO QUALITY TRANSIT
Locate any functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or informal transit stops, or within a ½-mile (800-meter) walking distance of existing or planned bus rapid transit stops, passenger rail stations or commuter ferry terminals. The transit service at those stops and stations in aggregate must meet the minimums listed in Table 1. Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date. Both weekday and weekend trip minimums must be met.
For each qualifying transit route, only trips in one direction are counted towards the threshold.
If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold.
Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry).
Weekday trips Weekend trips Points 72 30 1 144 108 2
Projects served by two or more transit routes such that no one route provides more than 60% of the prescribed levels may earn one additional point, up to the maximum number of points. If existing transit service is temporarily rerouted outside the required distances for less than two years, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level.
LOCATION AND TRANSPORATION (LT)
2 point of 2 possible
LT CREDIT: BICYCLE FACILITIES
ESTABLISHMENT
To promote bicycling and transportation efficiency and reduce vehicle distance traveled. To improve public health by encouraging utilitarian and recreational physical activity. REF SITE PLAN
PERFORMANCE
Bicycle Network Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter)walking distance or bicycling distance from a bicycle network that connects to at least one of the following:
• at least 10 diverse uses (see Appendix 1);
• a school or employment center, if the project total floor area is 50% or more residential; or
• a bus rapid transit stop, passenger rail station, or ferry terminal.
All destinations must be within a 3-mile (4800-meter) bicycling distance of the project boundary.
Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within one year of that date.
Bicycle Storage and Shower Rooms Case 1. Commercial or Institutional Projects Provide short-term bicycle storage for at least 2.5% of all peak visitors, but no fewer than four storage spaces per building.
Provide long-term bicycle storage for at least 5% of all regular building occupants, but no fewer than four storage spaces per building in addition to the short-term bicycle storage spaces.
Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants thereafter.
Bicycle Network Meet Bicycle Network requirements for all projects.
1 point of 1 possible
LT CREDIT: ELECTRIC VEHICLES
ESTABLISHMENT
To reduce pollution by promoting alternatives to conventionally fueled automobiles. REF SITE PLAN
PERFORMANCE
Provide charging infrastructure for electric vehicles for on-site parking.
Option 1. Electric Vehicle Charging (1 point) Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project or at least two spaces, whichever is greater. Clearly identify and reserve these spaces for the sole use by plug-in electric vehicles.
The EVSE must:
• Provide a Level 2 charging capacity (208 – 240 volts) or greater.
• Comply with the relevant regional or local standard for electrical connectors, such as SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or IEC 62196 of the International Electrotechnical Commission for projects outside the U.S.
• Be vehicle-to-grid (V2G) connected and comply with ISO 15118 and be capable of responding to time-of-use market signals (e.g.
price). Projects pursuing EA credit Grid Harmonization should incorporate EVSE into any demand response program or load flexibility and management strategies.
OR
Option 2. Electric Vehicle Charging Infrastructure (1 point) Make 6% of parking spaces or at least 6 spaces EV Ready.
To be EV Ready, meet all of the following:
• Install listed raceway capable of accommodating a 208/240-volt dedicated branch circuit.
• The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter).
• The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or enclosure in close proximity to the proposed location of the EV spac
0 point of 1 possible
SS CREDIT: RAINWATER MANAGEMENT
To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region.
Requirements Treat run-off from pollutant-generating impervious surfaces (i.e. vehicle pavement, service courts, trash enclosures) using low-impact development (LID) practice.
In a manner best replicating natural site hydrology processes, retain (i.e. infiltrate, evapotranspirate, or collect and reuse) on site the runoff from the developed site for, at minimum, the 80th percentile of regional or local rainfall events using low-impact development (LID) and greeninfrastructure (GI) practices. GI and LID strategies can be either structural or non-structural. Points are awarded according to Table 1.
For all projects, the use of coal tar sealants shall be prohibited in any application exposed to stormwater, wash waters, condensates, irrigation water, snowmelt, or icemelt.
Examples of acceptable techniques include the following:
• planting rain gardens with native or adapted plant material (e.g. trees shrubs);
• installing a vegetated roof;
• using permeable paving, consisting of porous above-ground materials (e.g., open pavers, engineered products), a base layer designed to drain water away from the building, and (often) a 6-inch-deep (150 millimeters) subbase; and installing permanent infiltration or collection features (e.g., vegetated swale, rain garden, rainwater cistern) that can…