This document appears to be a drawing or technical specification related to Solicitation Number 36C77624R0063 for the construction of an Inpatient Medicine Bed Addition at the Kansas City VA Medical Center. The key details are:

The Department of Veterans Affairs is seeking proposals to award a single firm-fixed-price construction contract for this minor construction project. The procurement is set-aside using a tiered evaluation process, with priority given to Service-Disabled Veteran-Owned Small Businesses (SDVOSB), Veteran-Owned Small Businesses (VOSB), small businesses, and then other than small (large) business concerns. The project is for the construction of an Inpatient Medicine Bed Addition at the Kansas City VA Medical Center located in Kansas City, MO.

View the file

Other files

File Type Posted
36C77624R0063 Amendment 0004 QandA 2024 04 12.pdf PDF
S04 - Site Visit Agenda - KC VAMC Tiered Evaluation 04 03 2024.pdf PDF
S04 - Site Visit Sign-in Sheet for 589-017 Inpatient Med Bed.pdf PDF
RFP 36C77624R0063 Amendment 0003.pdf PDF
36C77624R0063 Amendment 0002 amended solicitation.pdf PDF
36C77624R0063 Amendment 0002 SF30.pdf PDF
ATT 18 Site Visit Instructions Amendment A0001.pdf PDF
36C77624R0063 0001 03 25 2024.pdf PDF
ATT 11 589-017 06 Drawing FP P.pdf PDF
ATT 17 Small Business Subcontracting Plan Model.docx DOCX document
ATT 4 589-017 B1 Med Beds SPECS 3of3 Final.pdf PDF
ATT 10 589-017 05 Drawing Inter 2of2.pdf PDF
ATT 1 589-017_Const_SOW FINAL.pdf PDF
ATT 8 589-017 04 Drawing Arch.pdf PDF
RFP 36C77624R0063.pdf PDF
ATT 6 589-017 02 Drawing Civil.pdf PDF
ATT 13 589-017 08 Drawing E revised.pdf PDF
ATT 3 589-017 B1 Med Beds SPECS 2of3 Final.pdf PDF
ATT 18 Site Visit Instructions.pdf PDF
ATT 2 589-017 B1 Med Beds SPECS 1of3 Final.pdf PDF
ATT 16 Limitations on Subcontracting - Construction.docx DOCX document
ATT 7 589-017 03 Drawing Struct.pdf PDF
ATT 12 589-017 07 Drawing M.pdf PDF
ATT 14 Division Breakdown Template.xls XLS spreadsheet
ATT 15 DBA Wage Rates WD MO20230082 dated 01 05 2024.pdf PDF
ATT 9 589-017 05 Drawing Inter 1of2.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E. 31ST ST.

S P

R U

C E

A

V E

K E

N S

IN

G

T O

N

E

C Y

P R

E

E

E L M

W O

D

E

LINWOOD BLVD.

L

IS

T E

R

E

E. 35TH ST.

KANSAS CITY VA MEDICAL CENTER

4801 LINWOOD BOULEVARD

KANSAS CITY, MO 64128

E. 33RD ST.

B R

IG

H

T

N

E

S E

M A

N U

E L C

L E

A V

E R

B L V

D

E. 35TH ST.

EAST 35TH STREET

E L M

W O

O D

A V

E N

U E

EAST 33RD STREET

L

IS

T E

R A

V E

N U

E

LINWOOD BOULEVARD

B6

B5

B40

B1

B26

B15

PARKING

GARAGE

B4

B2

ADDITION &

RENOVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/5

-0

.B

M e d

B e d s .M o d

.r v t

/2

/2

:1

:0

P

M

GI000

COVER SHEET

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 M. PERKINS S. POLLARD

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

ISSUED FOR BIDDING

JULY 21, 2022

Solicit No. 36C77623Q0213 589-017 KCVA -Inpatient Medicine Bed Addition - B1

KANSAS CITY VA MEDICAL CENTER

Post Award Contracting Officer:

Sean Kaminski (VHACLE) Email: sean.kaminski@va.gov Office Phone: (216) 447-8300 Ext. 49591

Post Award Contract Specialist:

Rashad Smalls (VHACLE) Email: rashad.smalls@va.gov Office Phone: (216) 447-8300 Ext. 49503

COR: Marcus Stevenson

DEPARTMENT OF VETERANS AFFAIRS

Mechanical Engineer, M.S.

FAC - COR II

Address: VA Medical Center Facilities Service 4801 Linwood Blvd.

Kansas City, MO 64128

Phone: (816) 816-4700 Ext. 57905 Fax: (816) 922-4624 Email: Marcus.Stevenson2@va.gov

USER: KCVA Medical Center 4801 Linwood Blvd.

Kansas City, MO 64128

VICINITY MAP

VISN 15 CO: Andrea Fink Contracting Officer

Department of Veterans Affairs Network Contracting Office Department of Veterans Affairs

Program Contracting Activity Central 6150 Oak Tree Blvd., Suite 300 Independence, OH 44131

CAMPUS PLAN

Construction Scope of Work

589-017, Construct Inpatient Medicine Bed Addition

Kansas City VA Medical Center (KCVA)

CONSTRUCTION SCOPE OF WORK – MOD 2

Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for at the Kansas City VA Medical Center (KCVA) Project 589-017, Construct Inpatient Medicine Bed Addition as required by drawings and specifications. Period of performance is projected to be five-hundred forty (540) calendar days.

The work will require construction of a third floor addition on the North side of the building. The remainder of the 3rd floor west wing shall be renovated.

These areas combine to form a continuous inpatient private bedroom acute medicine unit. A vertical circulation addition with 2 elevators shall also be built with this project serving all floors from Basement thru 8th floor for patient transport.

Additional work is required to accommodate location of 2 portable MRI machines that will serve patients during the construction period. This work is located near the Ambulance-only entry and on the Honors Annex Campus which is a few miles to the east.

Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.

Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please also see the 2010 ACM survey (included in General Requirements 01 00 00, Appendix B) for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM. Abatement methods as stipulated in Specification Sections 02 82 11, 02 82 13.13, 02 82 13.19 and 02 83 33.19, are the only allowable methods of abatement. No alternate abatement methods will be considered.

Civil and Sitework: Work includes all labor, material, equipment, and supervision to perform new civil and site work by the construction drawings and specifications. Civil and Sitework includes all site preparation as well as providing new and relocating existing utilities and equipment, providing new site construction, landscaping, and physical security elements.

Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment, and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.

Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.

All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.

In addition to providing new mechanical systems to serve the new addition and renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the Medical Bed space and adjacent corridor. Existing systems shall be rebalanced to preconstruction readings.

Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.

Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.

All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.

Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.

The VA shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.

Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:

CLIN 01: All work associated with Phase 1 as identified by the drawings and specifications shall be completed in 166 days (with 14 days of activation by the VA prior to the start of Phase 2).

CLIN 02: All work associated with Phase 2 as identified by the drawings and specifications shall be completed in 286 days (with 14 days of activation by the VA prior to the start of Phase 3).

CLIN 04: All work associated with Alternate 1. Alternate 1 removes 30 days from the Period of Performance.

CLIN 05: All work associated with Alternate 2. Alternate 2 removes 14 days from the Period of Performance.

CLIN 06: All work associated with Alternate 3. Alternate 3 removes 30 days from the Period of Performance.

CLIN 07: All work associated with Alternate 4. Alternate 4 removes 7 days from the Period of Performance.

CLIN 08: All work associated with Alternate 5. Alternate 5 removes 30 days from the Period of Performance.

CLIN 09: All work associated with Alternate 6. Alternate 6 removes 60 days from the Period of Performance.

Alternates Deductive alternates are cascading and must be exercised in the order presented Deduct Alternate 1: Delete elevator cars and hoist machines Deduct Alternate 2: Delete site prep for temporary MRI's at Main Campus and Honors Campus Deduct Alternate 3: Delete stair in MRI Area Deduct Alternate 4: Delete renovation of Corridor C3-20 - floor and wall finishes Deduct Alternate 5: Delete renovation of Waiting Room M3-203A, Nourishment M3-209, Soiled Linen Storage M3-205b, Visitor Toilet M3-205a, and Network Closet F-155.

Deduct Alternate 6: Delete renovation of 3 Patient Rooms (M3-223, M3-224 & M3-226) along with restrooms storage and corridor adjacent

Each project shall utilize the Bid Form included with this specification section, 00 01 15 General Requirements.

The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:

01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS and 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.

Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.

HIPAA: The design shall accommodate compliance with current HIPAA requirements.

Complete and Functional: The Additions and Renovation shall be in 3 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Maintain free and unobstructed egress shall be maintained during all phases.

PLAN

NORTH

DEDUCTIVE ALTERNATES :

DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED

DEDUCT ALTERNATE 1: DELETE ELEVATOR CARS AND HOIST MACHINES REFER TO A102.

DEDUCT ALTERNATE 2: DELETE SITE PREP FOR TEMPORARY MRI'S AT MAIN CAMPUS AND HONORS CAMPUS - REFER TO AS101 AND AS102

DEDUCT ALTERNATE 3: DELETE STAIR IN MRI AREA - REFER TO GC200

DEDUCT ALTERNATE 4: DELETE RENOVATION OF CORRIDOR C3-20 - FLOOR AND WALL FINISHES - REFER TO GC200.

DEDUCT ALTERNATE 5: DELETE RENOVATION OF WAITING ROOM M3-203A, NOURISHMENT M3-209, SOILED LINEN STORAGE M3-205B, VISITOR TOILET M3-205A, AND NETWORK

CLOSET F-155. - REFER TO GC200

DEDUCT ALTERNATE 6: DELETE RENOVATION OF 3 PATIENT ROOMS (M3-223, M3-224 & M3-226) ALONG WITH RESTROOMS STORAGE AND CORRIDOR ADJACENT. - REFER TO GC200.

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

_____________________________________________________________SIGNATURE __________________________DATE

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.

ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK.

CREDENTIALS SHALL BE SUPPLIED TO THE COR AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT

REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER

PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.

July 21, 2022

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/5

-0

I n p a ti e n t M e d ic a l B e d

A d d it io n

/5

-0

.B M e d

B e d s .M o d

.r v t

/2

/2

:2

:3

A

M

GI001

PROJECT SHEET INDEX

TRIPLE C THE A&E GROUP

2625 LINDELL BLVD. 2ND FLOOR, 2064

ST. LOUIS, MO 63108

MAT PERKINS

520-481-8548

589-017

B1

JULY 21, 2022 M. PERKINS S. POLLARD

ISSUED FOR BIDDING KCVA -Inpatient Medicine Bed Addition

4801 LINWOOD BLVD KANSAS CITY, MO 64128

- DRAWING INDEX -

Sheet Number SHEET NAME IN C

LU

D

E D

IN

5% S

D

IN

C

LU

D

E D

IN

0% D

D

IN

C

LU

D

E D

IN

5% D

D

IN

C

LU

D

E D

IN

5% C

D

IN

C

LU

D

E D

IN

C D

IN

C

LU

D

E D

IN

IF

B

MH103BB THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA B No No No Yes Yes Yes

MP103A THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA A No No Yes Yes Yes Yes

MP103B THIRD FLOOR RENOVATION PLAN - MECHANICAL PIPING - AREA B No No Yes Yes Yes Yes

MP108 ELEVATOR FLOOR PLANS - MECHANICAL PIPING - AREA A No Yes Yes Yes Yes Yes

M-501 DETAILS - MECHANICAL No No No Yes Yes Yes

M-502 DETAILS - MECHANICAL No No No Yes Yes Yes

M-503 DETAILS - MECHANICAL No No No Yes Yes Yes

M-504 DETAILS - MECHANICAL No No No Yes Yes Yes

M-601 CONTROLS - MECHANICAL No No No Yes Yes Yes

M-602 CONTROLS - MECHANICAL No No No Yes Yes Yes

M-603 CONTROLS - MECHANICAL No No No Yes Yes Yes

ELECTRICAL

E001 NOTES AND LEGEND - ELECTRICAL Yes Yes Yes Yes Yes Yes

ELD100A BASEMENT DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes

ELD101A FIRST FLOOR DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes

ELD103A THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes

ELD103B THIRD FLOOR DEMOLITION PLAN - LIGHTING - AREA B Yes Yes Yes Yes Yes Yes

EPD100A BASEMENT FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes

EPD101 FIRST FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes

EPD103A THIRD FLOOR DEMOLITION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes

EPD103B THIRD FLOOR DEMOLITION PLAN - POWER - AREA B Yes Yes Yes Yes Yes Yes

EL100 BASEMENT RENOVATION PLAN - LIGHTING No No Yes Yes Yes Yes

EL101 FIRST FLOOR RENOVATION PLAN - LIGHTING Yes Yes Yes Yes Yes Yes

EL102 ELEVATOR PLAN - LIGHTING Yes Yes Yes Yes Yes Yes

EL103A THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA A Yes Yes Yes Yes Yes Yes

EL103B THIRD FLOOR RENOVATION PLAN - LIGHTING - AREA B Yes Yes Yes Yes Yes Yes

EP100A BASEMENT FLOOR RENOVATION PLAN - POWER - SOUTH No No Yes Yes Yes Yes

EP101A FIRST FLOOR RENOVATION PLAN - POWER No No Yes Yes Yes Yes

EP101B FIRST FLOOR RENOVATION PLAN - POWER - TEMP MRI No No Yes Yes Yes Yes

EP101C FIRST FLOOR RENOVATION PLAN - HONORS ANNEX No No No No No Yes

EP102 ELEVATOR PLAN - POWER & SPECIAL SYSTEMS Yes Yes Yes Yes Yes Yes

EP103A THIRD FLOOR RENOVATION PLAN - POWER - AREA A Yes Yes Yes Yes Yes Yes

EP103B THIRD FLOOR RENOVATION PLAN - POWER - AREA B Yes Yes Yes Yes Yes Yes

EF103A THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA A Yes Yes Yes Yes Yes Yes

EF103B THIRD FLOOR RENOVATION PLAN - FIRE ALARM - AREA B Yes Yes Yes Yes Yes Yes

EY101A FIRST FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A Yes Yes Yes Yes Yes Yes

EY103A THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA A Yes Yes Yes Yes Yes Yes

EY103B THIRD FLOOR RENOVATION PLAN - SPECIAL SYSTEMS - AREA B Yes Yes Yes Yes Yes Yes

ET103 THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - OVERALL No No No Yes Yes Yes

ET103A THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA A No No No Yes Yes Yes

ET103B THIRD FLOOR ELECTRICAL TELECOMMUNICATIONS PLAN - AREA B No No No Yes Yes Yes

E401 ENLARGED VIEWS - ELECTRICAL Yes Yes Yes Yes Yes Yes

E501 ELECTRICAL ONE-LINE DIAGRAM Yes Yes Yes Yes Yes Yes

E502 ELECTRICAL ONE-LINE DIAGRAM No No No Yes Yes Yes

E503 ELECTRICAL ONE-LINE DIAGRAM No No No No No Yes

E601 ELECTRICAL SCHEDULES No No Yes Yes Yes Yes

E602 ELECTRICAL SCHEDULES No No Yes Yes Yes Yes

E701 ELECTRICAL DETAILS No No Yes Yes Yes Yes

E702 ELECTRICAL DETAILS No No No Yes Yes Yes

TELECOM / SECURITY

TY-100A TELECOM / SECURITY - BASEMENT AREA A No Yes Yes Yes Yes Yes

TY-101 TELECOM / SECURITY - FIRST FLOOR AREA A No Yes Yes Yes Yes Yes

TY-102 TELECOM / SECURITY - 2ND, 4TH THRU 8TH FLOOR No Yes Yes Yes Yes Yes

TY-103 TELECOM / SECURITY - THIRD FLOOR PLAN No Yes Yes Yes Yes Yes

- DRAWING INDEX -

Sheet Number SHEET NAME IN C

LU

D

E D

IN

5% S

D

IN

C

LU

D

E D

IN

0% D

D

IN

C

LU

D

E D

IN

5% D

D

IN

C

LU

D

E D

IN

5% C

D

IN

C

LU

D

E D

IN

C D

IN

C

LU

D

E D

IN

IF

B

A-302 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes

A-303 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes

A-351 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes

A-352 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes

A-353 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes

A-354 ARCHITECTURAL - SECTIONS - EXTERIOR WALL No Yes Yes Yes Yes Yes

A-360 ARCHITECTURAL - SECTIONS - INTERIOR WALL No Yes Yes Yes Yes Yes

A-361 ARCHITECTURAL - SECTIONS - INTERIOR WALL Yes Yes Yes Yes

A-401 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes

A-402 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes

A-403 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes Yes Yes

A-420 ARCHITECTURAL - ENLARGED STAIR VIEWS No Yes Yes Yes Yes Yes

A-501 ARCHITECTURAL - DETAILS - EXTERIOR No Yes Yes Yes Yes Yes

A-502 ARCHITECTURAL - DETAILS - EXTERIOR No Yes Yes Yes Yes Yes

A-510 ARCHITECTURAL ROOF DETAILS Yes Yes Yes Yes

A-551 ARCHITECTURAL - DETAILS - CASEWORK No Yes Yes Yes Yes Yes

A-552 ARCHITECTURAL - DETAILS - CEILING No No Yes Yes Yes Yes

A-553 ARCHITECTURAL - DETAILS - FLOOR AND INTERIOR WALL No No Yes Yes Yes Yes

A-601 ARCHITECTURAL DOOR & WINDOW SCHEDULE No Yes Yes Yes Yes Yes

A-602 ARCHITECTURAL WINDOW, DOOR, & FRAME TYPES Yes Yes Yes Yes Yes Yes

A-603 FRAME DETAILS Yes Yes Yes Yes Yes Yes

A-604 DOOR & FRAME DETAILS Yes Yes Yes

A-720 ARCHITECTURAL - STANDARD PARTITION TYPES Yes Yes Yes Yes Yes Yes

A-721 ARCHITECTURAL - PARTITION HEAD DETAILS No Yes Yes Yes Yes Yes

A-722 ARCHITECTURAL - PARTITION FRAMING DETAILS No Yes Yes Yes Yes Yes

A-730 ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS No Yes Yes Yes Yes Yes

SIGNAGE

AW100 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND

SCHEDULE

No Yes Yes Yes Yes Yes

AW103A ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA A No Yes Yes Yes Yes Yes

AW103B ARCHITECTURAL SIGNAGE PLAN - THIRD FLOOR - AREA B No Yes Yes Yes Yes Yes

INTERIORS

IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A No Yes Yes Yes Yes Yes

IN102 INTERIOR FINISH PLAN - ELEVATOR No Yes Yes Yes Yes Yes

IN103 INTERIOR FINISH PLAN - THIRD FLOOR - OVERALL Yes Yes Yes Yes Yes Yes

IN103A INTERIOR FINISH PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes

IN103B INTERIOR FINISH PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes

IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND AND SCHEDULES Yes Yes Yes Yes Yes Yes

IN901 INTERIOR FINISH BOARDS - THIRD FLOOR Yes Yes Yes Yes Yes Yes

IN902 INTERIOR RENDERINGS Yes Yes Yes Yes Yes Yes

REFERENCE

RJ-901 PHOTO REFERENCES - EXTERIOR Yes Yes Yes Yes Yes Yes

RJ-902 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes

RJ-903 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes

RJ-904 PHOTO REFERENCES - THIRD FLOOR Yes Yes Yes Yes Yes Yes

RJ-905 PHOTO REFERENCES - ELEVATOR CONNECTIONS Yes Yes Yes Yes Yes Yes

RJ-920 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-921 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-922 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-923 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-924 ARCHITECTURE - EQUIPMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-930 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-931 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

RJ-932 INTERIOR - EQUIPTMENT CUTSHEETS - BASIS OF DESIGN No No Yes Yes Yes Yes

FURNITURE

IF103 INTERIOR FURNITURE PLAN - THIRD FLOOR - OVERALL Yes Yes Yes Yes Yes Yes

IF103A INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes

IF103B INTERIOR FURNITURE PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes

IF901A INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY No No No Yes Yes Yes

IF901B INTERIOR FURNITURE PLAN - THIRD FLOOR - FOR REFERENCE ONLY No No No Yes Yes Yes

EQUIPTMENT

Q-601 EQUIPMENT PLAN - OVERALL No Yes Yes Yes Yes Yes

Q-601A EQUIPMENT PLAN - AREA A No Yes Yes Yes Yes Yes

Q-601B EQUIPMENT PLAN - AREA B No Yes Yes Yes Yes Yes

Q-602 EQUIPMENT SCHEDULE No Yes Yes Yes Yes Yes

FIRE PROTECTION

FP102A FLOOR PLANS - FIRE PROTECTION No Yes Yes Yes Yes Yes

FP103A THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA A Yes Yes Yes Yes Yes Yes

FP103B THIRD FLOOR RENOVATION PLAN - FIRE PROTECTION - AREA B Yes Yes Yes Yes Yes Yes

PLUMBING

P001 NOTES AND LEGEND - PLUMBING Yes Yes Yes Yes Yes Yes

PD100A BASEMENT FLOOR DEMOLITION PLAN - PLUMBING - AREA A No Yes Yes Yes Yes Yes

PD103A THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA A Yes Yes Yes Yes Yes Yes

PD103B THIRD FLOOR DEMOLITION PLAN - PLUMBING - AREA B Yes Yes Yes Yes Yes Yes

PL100A BASEMENT FLOOR RENOVATION PLAN - PLUMBING - AREA A No Yes Yes Yes Yes Yes

PL103A THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A Yes Yes Yes Yes Yes Yes

PL103B THIRD FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA B Yes Yes Yes Yes Yes Yes

PL104A FOURTH FLOOR RENOVATION PLAN - PLUMBING DRAINAGE - AREA A No No Yes Yes Yes Yes

PL113A THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA A No Yes Yes Yes Yes Yes

PL113B THIRD FLOOR RENOVATION PLAN - PLUMBING SUPPLY - AREA B No Yes Yes Yes Yes Yes

P501 DETAILS - PLUMBING No No No Yes Yes Yes

P901 ISOMETRICS - PLUMBING DRAINAGE No No No Yes Yes Yes

P902 ISOMETRICS - PLUMBING SUPPLY No No No Yes Yes Yes

P903 ISOMETRICS - PLUMBING SUPPLY No No No No Yes Yes

P904 ISOMETRICS - MEDICAL GAS No No No No No Yes

MECHANICAL

M-001 NOTES AND LEGEND - MECHANICAL Yes Yes Yes Yes Yes Yes

M-002 SCHEDULES - MECHANICAL No Yes Yes Yes Yes Yes

M-003 SCHEDULES - MECHANICAL No No No Yes Yes Yes

MD103A THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA A Yes Yes Yes Yes Yes Yes

MD103B THIRD FLOOR DEMOLITION PLAN - MECHANICAL HVAC - AREA B Yes Yes Yes Yes Yes Yes

MH101C FIRST FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA C No Yes Yes Yes Yes Yes

MH102 ELEVATOR FLOOR PLANS - MECHANICAL HVAC No No Yes Yes Yes Yes

MH103A THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA A Yes Yes Yes Yes Yes Yes

MH103AA THIRD FLOOR RENOVATION AIR DISTRIBUTION PLAN - MECHANICAL HVAC - AREA A No No No Yes Yes Yes

MH103B THIRD FLOOR RENOVATION PLAN - MECHANICAL HVAC - AREA B Yes Yes Yes Yes Yes Yes

- DRAWING INDEX -

Sheet Number SHEET NAME IN C

LU

D

E D

IN

5% S

D

IN

C

LU

D

E D

IN

0% D

D

IN

C

LU

D

E D

IN

5% D

D

IN

C

LU

D

E D

IN

5% C

D

IN

C

LU

D

E D

IN

C D

IN

C

LU

D

E D

IN

IF

B

GENERAL

GI000 COVER SHEET Yes Yes Yes Yes Yes Yes

GI001 PROJECT SHEET INDEX No Yes Yes Yes Yes Yes

GI021 GENERAL LEED CERTIFICATION No Yes Yes Yes Yes Yes

GI022 GENERAL LEED CERTIFICATION No Yes Yes Yes Yes Yes

GI050 GENERAL NOTES Yes Yes Yes Yes Yes Yes

GI100 LIFE SAFETY - BASEMENT PLAN Yes Yes Yes Yes Yes Yes

GI101 LIFE SAFETY - FIRST FLOOR PLAN Yes Yes Yes Yes Yes Yes

GI102 LIFE SAFETY - SECOND, FOURTH, FIFTH FLOOR PLANS Yes Yes Yes Yes Yes Yes

GI103 LIFE SAFETY - THIRD FLOOR PLAN Yes Yes Yes Yes Yes Yes

GI104 LIFE SAFETY - SIXTH, SEVENTH, EIGHTH FLOOR PLANS Yes Yes Yes Yes Yes Yes

GI105 PLUMBING - PROJECT CALCULATIONS No Yes Yes Yes Yes Yes

GI201 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes

GI202 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes

GI203 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes

GI204 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes

GI205 SMOKE COMPARTMENT DIAGRAMS No No Yes Yes Yes Yes

GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY Yes Yes Yes Yes Yes Yes

GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY Yes Yes Yes Yes Yes Yes

GI303 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY No No Yes Yes Yes Yes

GC100 CURRENT AND FUTURE PROJECT DIAGRAM - FOR REFERENCE ONLY No No No No No Yes

GC101 PHASING PLAN Yes Yes Yes Yes Yes Yes

GC102 PHASING PLAN Yes Yes Yes Yes Yes Yes

GC200 ALTERNATE DIAGRAMS No No Yes Yes Yes Yes

SURVEY

VF101 CIVIL - SURVEY PLAN - NORTH Yes Yes Yes Yes Yes Yes

CIVIL

CD101 CIVIL - DEMOLITION PLAN - NORTH Yes Yes Yes Yes Yes Yes

CS101 CIVIL - SITE PLAN - NORTH Yes Yes Yes Yes Yes Yes

CS101A CIVIL - SITE PLAN TEMPORARY MRI LOCATION - MAIN CAMPUS Yes

CS101B CIVIL - SITE PLAN TEMPORARY MRI LOCATION - HONORS CAMPUS Yes

CS501A CIVIL - DETAILS Yes

CG101 CIVIL - GRADING PLAN - NORTH Yes Yes Yes Yes Yes Yes

CG102 CIVIL - STORMWATER PROTECTION PLAN NORTH Yes Yes Yes Yes

CG501 CIVIL - GRADING DETAILS Yes Yes Yes Yes Yes Yes

CU101 CIVIL - UTILITY PLAN - NORTH Yes Yes Yes Yes Yes Yes

STRUCTURAL

S001 GENERAL NOTES No Yes Yes Yes Yes Yes

S002 3D VIEW No Yes Yes Yes Yes Yes

S003 3D VIEW No Yes Yes Yes Yes Yes

S004 3D VIEW - FUTURE No Yes Yes Yes Yes Yes

S005 3D VIEW - FUTURE No Yes Yes Yes Yes Yes

S100 FOUNDATION PLAN - AREA A No Yes Yes Yes Yes Yes

S101 LEVEL 1 - AREA A No Yes Yes Yes Yes Yes

S102 LEVEL 2 - AREA A No Yes Yes Yes Yes Yes

S103 LEVEL 3 - AREA A No Yes Yes Yes Yes Yes

S104 LEVEL 4 - AREA A No Yes Yes Yes Yes Yes

S105 LEVEL 5, LEVEL 6, & LEVEL 7 - AREA A No Yes Yes Yes Yes Yes

S106 LEVEL 8, LEVEL 9, & LEVEL 10 - AREA A No Yes Yes Yes Yes Yes

S200 FOUNDATION SECTIONS No Yes Yes Yes Yes Yes

S201 FOUNDATION SECTIONS No No No Yes Yes Yes

S202 FOUNDATION SECTIONS No No No Yes Yes Yes

S203 FOUNDATION SECTIONS No No No Yes Yes Yes

S204 FOUNDATION SECTIONS No No No Yes Yes Yes

S205 FOUNDATION SECTIONS No No No Yes Yes Yes

S206 FOUNDATION SECTIONS No No No No No Yes

S300 FRAMING SECTIONS No Yes Yes Yes Yes Yes

S301 FRAMING SECTIONS No No No Yes Yes Yes

S302 FRAMING SECTIONS No No No Yes Yes Yes

S303 FRAMING SECTIONS No No No Yes Yes Yes

S304 FRAMING SECTIONS No No No Yes Yes Yes

S305 FRAMING SECTIONS No No No Yes Yes Yes

S306 FRAMING SECTIONS No No No Yes Yes Yes

S307 FRAMING SECTIONS No No No Yes Yes Yes

S308 FRAMING SECTIONS No No No Yes Yes Yes

S309 FRAMING SECTIONS No No No Yes Yes Yes

S310 FRAMING SECTIONS No No No Yes Yes Yes

S311 FRAMING SECTIONS No No No Yes Yes Yes

S312 FRAMING SECTIONS No No No Yes Yes Yes

S400 FRAMING ELEVATIONS No No No Yes Yes Yes

ARCHITECTURAL

A-001 ARCHITECTURAL - SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes Yes Yes

AS100 ARCHITECTURAL SITE DIAGRAMS Yes Yes Yes Yes Yes Yes

AS101 TEMPORARY MRI LOCATION - MAIN CAMPUS No Yes Yes Yes Yes Yes

AS102 TEMPORARY MRI LOCATION - HONORS CAMPUS No No No No No Yes

AD100A ARCHITECTURAL - DEMOLITION PLAN - BASEMENT - AREA A Yes Yes Yes Yes Yes Yes

AD101A ARCHITECTURAL - DEMOLITION PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes Yes Yes

AD103A ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes

AD103B ARCHITECTURAL - DEMOLITION PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes

A-100A ARCHITECTURAL PLAN - BASEMENT - AREA A Yes Yes Yes Yes Yes Yes

A-100B ARCHITECTURAL PLAN - BASEMENT - AREA B Yes Yes Yes Yes Yes Yes

A-101A ARCHITECTURAL PLAN - FIRST FLOOR - AREA A & PARTIAL B Yes Yes Yes Yes Yes Yes

A-102 ARCHITECTURAL PLAN - ELEVATOR Yes Yes Yes Yes Yes Yes

A-103A ARCHITECTURAL PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes

A-103B ARCHITECTURAL PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes

A-113A ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA A No Yes Yes Yes Yes Yes

A-113B ARCHITECTURAL DIMENSION PLAN - THIRD FLOOR - AREA B No Yes Yes Yes Yes Yes

A-114 ARCHITECTURAL - ENLARGED DIMENSIONED VIEWS No Yes Yes Yes Yes Yes

A-115 ARCHITECTURAL PLAN - ROOF Yes Yes Yes Yes Yes Yes

AC101 ARCHITECTURAL - REFLECTED CEILING PLAN - FIRST FLOOR Yes Yes Yes Yes Yes Yes

AC102A ARCHITECTURAL - REFLECTED CEILING PLAN - SECOND FLOOR - AREA A Yes Yes Yes Yes Yes Yes

AC103A ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA A Yes Yes Yes Yes Yes Yes

AC103B ARCHITECTURAL - REFLECTED CEILING PLAN - THIRD FLOOR - AREA B Yes Yes Yes Yes Yes Yes

A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes

A-202 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes

A-203 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes

A-204 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes Yes Yes

A-301 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes Yes Yes

Revisions: Date:

/21

/20

/21

/20

SS-1 PREREQUISITE: CONSTRUCTION ACTIVITY POLLUTION

PREVENTION

Required To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the erosion and sedimentation requirements of the 2017 U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) or local equivalent, whichever is more stringent. Projects must apply the CGP regardless of size. The plan must describe the measures implemented.

INTEGRATIVE PROCESS (IP)

LEED v4 BD+C: HEALTHCARE

SS-4 CREDIT: HEAT ISLAND REDUCTION

To minimize effects on microclimates and human and wildlife habitats by reducing heat islands.

Choose one of the following options:

Option 1. Nonroof and Roof (2 points except Healthcare, 1 point Healthcare)

Meet the following criterion:

Area of Area of High- Area of Vegetated Nonroof Reflectance Roof Roof Measures ————— + —————— + —————— ≥ Total Site Paving Area + Total Roof Area

0.5 0.75 0.75

Alternatively, an SRI and SR weighted average approach may be used to calculate compliance.

High-reflectance roof Use roofing materials that have an aged SRI equal to or greater than the values in Table 1. If aged SRI is not available, the roofing material shall have an initial SRI equal to or greater than the values in Table 1.

Option 2. Parking under Cover (1 point) Place a minimum of 75% of parking spaces under cover. Any roof used to shade or cover parking must (1) have a three-year aged SRI of at least 32 (if three-year aged value information is not available, use materials with an initial SRI of at least 39 at installation), (2) be a vegetated roof, or (3) be covered by energy generation systems, such as solar thermal collectors, photovoltaics, and wind turbines.

The credit calculations must include all existing and new off-street parking spaces that are leased or owned by the project, including parking that is outside the project boundary but is used by the project. On-street parking in public rights-of-way is excluded from these calculations.

1 point of 2 possible

SS-5 CREDIT: LIGHT POLLUTION REDUCTION

To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.

Requirements

Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (Option 1) or the calculation method (Option 2). Projects may use different options for uplight and light trespass.Meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:

• the photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design;

and

• the lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.

Additionally, meet the internally illuminated signage requirement. Do not exceed a luminance of 200 cd/m2 (nits) during nighttime hours and 2000 cd/m2 (nits) during daytime hours.

1 point of 1 possible

WE-1 PREREQUISITE: INDOOR WATER USE REDUCTION

Required To reduce indoor water consumption.

For the fixtures and fittings listed in Table 1, as applicable to the project scope, reduce aggregate water consumption by 20% from the baseline. Base calculations on the volumes and flow rates shown in Table 1.

All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled (or a local equivalent for projects outside the U.S.).

Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow fixtures and fittings at the local standard supply pressure; the supply pressure must be consistent in the baseline and proposed case.

Install appliances, equipment, and processes within the project scope that meet the requirements listed in the tables below.

Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2.

In addition, water-consuming appliances, equipment, and processes must meet the requirements listed in Tables 4 and 5.

WATER EFFICIENCY (WE)

WE-2 PREREQUISITE: BUILDING-LEVEL WATER METERING

Required To support water management and identify opportunities for additional water savings by tracking water consumption.

Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.

Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.

WE-4 CREDIT: INDOOR WATER USE REDUCTION

To reduce indoor water consumption.

Requirements Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.

Percentage Reduction Points (BD+C) Points (CS) Points (Schools, Retail, Hospitality, Healthcare) 25% 1 1 1 30% 2 2 2 35% 3 3 3 40% 4 4 4 45% 5 -- 5 50% 6 -- -- Schools, Retail, Hospitality, and Healthcare only Meet the percentage reduction requirements above. AND Appliance and Process Water.

Install equipment within the project scope that meets the minimum requirements in Table 2, 3, 4, or 5. One point is awarded for meeting all applicable requirements in any one table. All applicable equipment listed in each table must meet the standard. Schools, Retail, and Healthcare projects can earn a second point for meeting the requirements of two tables.

1 point of 7 possible

ENERGY AND ATMOSPHERE

EA-1 PREREQUISITE: FUNDAMENTAL COMMISSIONING

AND VERIFICATION Required To support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability.

Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability.

• Develop the OPR.

• Develop a BOD.

The commissioning authority (CxA) must do the following:

• Review the OPR, BOD, and project design.

• Develop and implement a Cx plan.

• Confirm incorporation of Cx requirements into the construction documents.

• Develop construction checklists.

• Develop a system test procedure.

• Verify system test execution.

• Maintain an issues and benefits log throughout the Cx process.

• Prepare a final Cx process report.

• Document all findings and recommendations and report directly to the owner throughout the process.

Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:

• a sequence of operations for the building;

• the building occupancy schedule;

• equipment run-time schedules;

• setpoints for all HVAC equipment;

• set lighting levels throughout the building;

• minimum outside air requirements;

• any changes in schedules or setpoints for different seasons, days of the week, and times of day;

• a systems narrative describing the mechanical and electrical systems and equipment;

• a preventive maintenance plan for building equipment described in the systems narrative; and

• a commissioning program that includes periodic commissioning requirements, ongoing commissioning tasks, and continuous tasks for critical facilities.

EA-2 PREREQUISITE: MINIMUM ENERGY PERFORMANCE

Required To reduce the environmental and economic harms of excessive energy use by achieving a minimum level of energy efficiency for the building and its systems.

Comply with ANSI/ASHRAE/IESNA Standard 90.1–2016, with errata or a USGBC-approved equivalent standard. ASHRAE 90.1-2016 Compliance pathways in Section 4.2.1.1 include compliance with all mandatory provisions, and compliance with one of the following:

Prescriptive provisions of Sections 5 through 10 Section 11 Energy Cost Budget Method Normative Appendix G Performance Rating Method. When using Appendix G, the Performance Cost Index (PCI) shall be less than or equal to the Performance Cost Index Target (PCIt) in accordance with the methodology provided in Section 4.2.1.1. Document the PCI, PCIt, and percentage improvement using metrics of cost or greenhouse gas (GHG) emissions.

EA-3 PREREQUISITE: BUILDING-LEVEL ENERGY METERING

Required To support energy management and identify opportunities for additional energy savings by tracking building-level energy use.

Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.

Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification. At a minimum, energy consumption must be tracked at one-month intervals. This commitment must carry forward for five years or until the building changes ownership or lessee.

EA-4 PREREQUISITE: FUNDAMENTAL REFRIGERANT

MANAGEMENT Required To reduce stratospheric ozone depletion.

Do not use chlorofluorocarbon (CFC)-based refrigerants in new heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems. When reusing existing HVAC&R equipment, complete a comprehensive CFC phase-out conversion before project completion. Phase-out plans extending beyond the project completion date will be considered on their merits.

Existing small HVAC&R units (defined as containing less than 0.5 pound [225 grams] of refrigerant) and other equipment, such as standard refrigerators, small water coolers, and any other equipment that contains less than 0.5 pound (225 grams) of refrigerant, are exempt.

PREREQUISITE: INTEGRATIVE PROJECT PLANNING AND DESIGN

Maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies. Utilize innovative approaches and techniques for green design and construction.

SUSTAINABLE SITES

CREDIT: INTEGRATIVE PROCESS

Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff.

As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum:

Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum);

Selects the LEED credits to meet the targeted certification level; and Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met

SS-2 PREREQUISITE: ENVIRONMENTAL SITE ASSESSMENT

Required To protect the health of vulnerable populations by ensuring that the site is assessed for environmental contamination and that any environmental contamination has been remediated.

Requirements Conduct a Phase I Environmental Site Assessment as described in ASTM E1527-13 (or a local equivalent) to determine whether environmental contamination exists at the site. If contamination is suspected, conduct a Phase II Environmental Site Assessment as described in ASTM E1903–11 (or a local equivalent). If a site is contaminated, remediate the site to meet local, state, or national environmental protection agency region residential (unrestricted) standards, whichever are most stringent.

WE-1 PREREQUISITE: OUTDOOR WATER USE REDUCTION

Required To reduce outdoor water consumption.

Reduce outdoor water use through one of the following options. Nonvegetated surfaces, such as permeable or impermeable pavement, should be excluded from the landscape area calculations. Athletic fields and playgrounds (if vegetated) and food gardens may be included or excluded at the project team’s discretion.

Option 1. No Irrigation Required Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.

OR

Option 2. Reduced Irrigation Reduce the project’s landscape water requirement by at least 30% from the calculated baseline for the site’s peak watering month.

Reductions must be achieved through plant species selection and irrigation system efficiency, as calculated by the Environmental Protection Agency (EPA) WaterSense Water Budget Tool.

LT CREDIT: ACCESS TO QUALITY TRANSIT

Locate any functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or informal transit stops, or within a ½-mile (800-meter) walking distance of existing or planned bus rapid transit stops, passenger rail stations or commuter ferry terminals. The transit service at those stops and stations in aggregate must meet the minimums listed in Table 1. Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date. Both weekday and weekend trip minimums must be met.

For each qualifying transit route, only trips in one direction are counted towards the threshold.

If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold.

Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry).

Weekday trips Weekend trips Points 72 30 1 144 108 2

Projects served by two or more transit routes such that no one route provides more than 60% of the prescribed levels may earn one additional point, up to the maximum number of points. If existing transit service is temporarily rerouted outside the required distances for less than two years, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level.

LOCATION AND TRANSPORATION (LT)

2 point of 2 possible

LT CREDIT: BICYCLE FACILITIES

ESTABLISHMENT

To promote bicycling and transportation efficiency and reduce vehicle distance traveled. To improve public health by encouraging utilitarian and recreational physical activity. REF SITE PLAN

PERFORMANCE

Bicycle Network Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter)walking distance or bicycling distance from a bicycle network that connects to at least one of the following:

• at least 10 diverse uses (see Appendix 1);

• a school or employment center, if the project total floor area is 50% or more residential; or

• a bus rapid transit stop, passenger rail station, or ferry terminal.

All destinations must be within a 3-mile (4800-meter) bicycling distance of the project boundary.

Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within one year of that date.

Bicycle Storage and Shower Rooms Case 1. Commercial or Institutional Projects Provide short-term bicycle storage for at least 2.5% of all peak visitors, but no fewer than four storage spaces per building.

Provide long-term bicycle storage for at least 5% of all regular building occupants, but no fewer than four storage spaces per building in addition to the short-term bicycle storage spaces.

Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants thereafter.

Bicycle Network Meet Bicycle Network requirements for all projects.

1 point of 1 possible

LT CREDIT: ELECTRIC VEHICLES

ESTABLISHMENT

To reduce pollution by promoting alternatives to conventionally fueled automobiles. REF SITE PLAN

PERFORMANCE

Provide charging infrastructure for electric vehicles for on-site parking.

Option 1. Electric Vehicle Charging (1 point) Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project or at least two spaces, whichever is greater. Clearly identify and reserve these spaces for the sole use by plug-in electric vehicles.

The EVSE must:

• Provide a Level 2 charging capacity (208 – 240 volts) or greater.

• Comply with the relevant regional or local standard for electrical connectors, such as SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or IEC 62196 of the International Electrotechnical Commission for projects outside the U.S.

• Be vehicle-to-grid (V2G) connected and comply with ISO 15118 and be capable of responding to time-of-use market signals (e.g.

price). Projects pursuing EA credit Grid Harmonization should incorporate EVSE into any demand response program or load flexibility and management strategies.

OR

Option 2. Electric Vehicle Charging Infrastructure (1 point) Make 6% of parking spaces or at least 6 spaces EV Ready.

To be EV Ready, meet all of the following:

• Install listed raceway capable of accommodating a 208/240-volt dedicated branch circuit.

• The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter).

• The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or enclosure in close proximity to the proposed location of the EV spac

0 point of 1 possible

SS CREDIT: RAINWATER MANAGEMENT

To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region.

Requirements Treat run-off from pollutant-generating impervious surfaces (i.e. vehicle pavement, service courts, trash enclosures) using low-impact development (LID) practice.

In a manner best replicating natural site hydrology processes, retain (i.e. infiltrate, evapotranspirate, or collect and reuse) on site the runoff from the developed site for, at minimum, the 80th percentile of regional or local rainfall events using low-impact development (LID) and greeninfrastructure (GI) practices. GI and LID strategies can be either structural or non-structural. Points are awarded according to Table 1.

For all projects, the use of coal tar sealants shall be prohibited in any application exposed to stormwater, wash waters, condensates, irrigation water, snowmelt, or icemelt.

Examples of acceptable techniques include the following:

• planting rain gardens with native or adapted plant material (e.g. trees shrubs);

• installing a vegetated roof;

• using permeable paving, consisting of porous above-ground materials (e.g., open pavers, engineered products), a base layer designed to drain water away from the building, and (often) a 6-inch-deep (150 millimeters) subbase; and installing permanent infiltration or collection features (e.g., vegetated swale, rain garden, rainwater cistern) that can…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .