ATT 7 - Vol 3-Drawings-EHRM-Big Spring.pdf
PDF 17 MB Posted
- Attached to
- Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)
- Solicitation number
- 36C77624B0004_1
About this file
This document appears to be a set of drawings associated with the federal contract opportunity for "Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)". The solicitation number is 36C77624B0004_1 and the agency is the Department of Veterans Affairs Technology Acquisition Center Austin. The contract is for infrastructure upgrades to the main building at the VA facility in Big Spring, Texas. The document contains technical drawings and schematics related to the construction and upgrade work required under this contract opportunity.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLICABLE CODES AND STANDARDS
CODE CRITERIA AND DESIGN CONDITIONS
APPLICABLE CODES
INTERNATIONAL BUILDING CODE
PG-18-1, MASTER CONSTRUCTION SPECIFICATION INDEX
PG-18-3, DESIGN AND CONSTRUCTION PROCEDURES
PG-18-4, STANDARD DETAILS AND CAD STANDARDS
PG-18-5, EQUIPMENT GUIDE LIST
PG-18-9, SPACE AND FACILITY PLANNING CRITERIA
PG-18-10, DESIGN MANUALS:
FIRE PROTECTION
PG-18-15, VA A/E DESIGN SUBMISSION REQUIREMENTS
PG-18-17, ENVIRONMENTAL COMPLIANCE PROGRAM
H-18-8, SEISMIC DESIGN HANDBOOK
SPECIAL DESIGN REQUIREMENTS
A/E QUALITY ALERTS
A/E DESIGN ALERTS
VA 0055, ENERGY AND WATER MANAGEMENT PROGRAM
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
NFPA 70, NATIONAL ELECTRICAL CODE
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT
NFPA 101, LIFE SAFETY CODE
NFPA, NATIONAL FIRE CODES – ALL REFERENCED BY NFPA 101 AND UBC
NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS
PL 100-678 PUBLIC BUILDINGS AMENDMENT ACT
UL FIRE PROTECTION EQUIPMENT DIRECTORY
UL FIRE RESISTANCE DIRECTORY
UL BUILDING MATERIALS DIRECTORY
NOTE DESCRIPTION
FIRE SUPPRESSION GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
NOTE DESCRIPTION
A.
FIRE SPRINKLER PERFORMANCE REQUIREMENTS
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING
OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDINGS 1, 2, 18 AND 25 WILL BE MODIFIED BY
RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO
SPACE FUNCTION, NEW DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE
WITHIN EACH RENOVATED SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I
OCCUPANCIES BASED ON NFPA 13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE SYSTEM SHUT-DOWN AND DRAINAGE IN EACH BUILDING AND ON
EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A MONITORED SPRINKLER SYSTEM WILL
REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE ENTIRE BUILDING OR
FLOOR LEVEL DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.
EXPOSED SPRINKLER PIPE ROUTED IN FINISHED OFFICE AREAS WITH EXPOSED STRUCTURE SHALL BE PAINTED AS DIRECTED BY THE ARCHITECT. PROVIDE COLOR SAMPLES FOR THE ARCHITECT TO
REVIEW AND SELECT. PIPE ROUTING SHALL BE BASED UPON THE SPACE EXPOSED STRUCTURE,
CENTERLINES AND AXES TO ESTABLISH A PATTERN COMPLIMENTARY TO EACH SPACE STRUCTURE.
CONTRACTOR SHALL ARRANGE SPRINKLER HEADS COMPLIMENTARY TO EACH CEILING TYPE.
SPRINKLER HEADS LOCATED IN LAY-IN CEILINGS SHALL BE CENTERED IN RESPECTIVE CEILING TILES (CENTERED IN THE SHORT AXES FOR 2x4 CEILING TILES).
ALL SPRINKLER HEAD LOCATIONS BE COORDINATED WITH THE STRUCTURE, LIGHT FIXTURES, HVAC
ELEMENTS, PLUMBING ELEMENTS, ARCHITECTURAL CEILING TREATMENTS. LAYOUT SHALL BE
COORDINATED WITH AND REVIEWED BY THE ARCHITECT.
THE FIRE PROTECTION AREA DESCRIPTIONS SHOWN ON THE PLAN(S) ARE FOR REFERENCE ONLY.
THE CONTRACTOR SHALL VERIFY WITH THE OWNER AND THE AUTHORITY HAVING JURISDICTION ALL SPACE CLASSIFICATIONS, COMMODITY TYPES AND LOCATIONS OF OBSTACLES PRIOR TO PROVIDING
DESIGN CALCULATIONS OR SPRINKLER SHOP DRAWINGS.
LOCATIONS OF SYSTEM TEST AND DRAIN VALVES SHALL BE COORDINATED WITH THE OWNER BY
SPECIFICALLY CALLING TO THE OWNERS ATTENTION THE LOCATIONS OF THESE SUB-SYSTEMS.
PROVIDE STORAGE CABINET PAINTED RED SIZED TO ACCOMMODATE SIX SPRINKLER HEADS OF EACH
TYPE PROVIDED ON THE PROJECT. PROVIDE PROPERLY SIZED WRENCH(ES) TO FIT SPRINKLER
HEADS (TO BE LOCATED IN THE CABINET). FASTEN CABINET TO WALL ADJACENT TO FIRE SPRINKLER
VALVING AT 5'-0" AFF TO CENTERLINE OF CABINET.
MAKE ALL NECESSARY OFFSETS FOR EXISTING ARCHITECTURAL, STRUCTURAL AND MECHANICAL
FEATURES OF THE BUILDING WHERE NECESSARY TO ACCOMPLISH THE WORK AS INDICATED.
CONTRACTOR SHALL PROVIDE "AS-BUILT" DRAWINGS IN PDF AND "AUTOCAD OR EQUIVALENT" FILES
ON DISK AT END OF INSTALLATION.
ELECTRICAL ROOMS SHALL BE PROVIDED WITH INSTITUTIONAL TYPE AUTOMATIC SPRINKLER HEADS
IN ACCORDANCE WITH AUTHORITY HAVING JURISDICTION.
WHEN PENETRATING FIRE-RATED ENCLOSURE, PROVIDE FIRE-RATED SEALS AROUND
PENETRATIONS EQUAL TO THE FIRE RATING OF THAT ENCLOSURE. REFER ARCHITECTURAL FOR FIRE
RATED ENCLOSURES. ALL FLOORS ABOVE GRADE SHALL BE FIRE-RATED.
EXPOSED PIPING AND HANGERS SHALL BE CLEANED BEFORE BEING PAINTED.
SPRINKLER PIPING SHALL BE ROUTED TO AVOID INTERFERENCE WITH SANITARY WASTE AND VENT PIPING, CHILLED WATER PIPING, DUCT WORK AND DIFFUSERS, ELECTRICAL LIGHT FIXTURES AND
CONDUIT AS SHOWN ON THE CONTRACTOR'S SHOP DRAWINGS.
SPRINKLER HEADS 7'-0" OR LESS ABOVE FINISHED FLOOR SHALL BE PROVIDED WITH SPRINKLER
HEAD GUARDS.
EXPOSED PIPING SHALL BE PAINTED RED AND PROVIDED WITH PIPING LABELS.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
FIRE SPRINKLER GENERAL NOTES
AND DESIGN DATA
F-001
-2
-9
F -0
/2
/1
.p d f
114A
114B
18B
3A
87I
87K
20A
113B
107A
107B
96C
96B
151 150 116
127 128
72F
138A
18A
147C
65B
91G
91J
119A
119B
125D
120D
122A 122B
122D 122C
124A 124B
124C 124D
125A
125C 125B
136137138
147B
147A
ATS
ENG.
145A
120C
120B 120A119C
119C
113A
112H
106B
106A
104A
105A
100A
98 97
164A162 161160
85A
158A82
91C
95A
95B
96A
96D96E
91B
91D 91E
91H
91A 91I
91F87E
87D
9090A
87C 87B
87O
87P
87N 87M
87A
87F87G
87L
152A
153B
153A
1B
1D1E
4B
4A
66A78910
65A
72G
55A
53B5353A
28A
31E
31A
31E
31B
31C
91K
91M91N
91L
112A
HEALTH
BENEFIT
ADMIN.
4C
4E 4F
64B
64A
67A
112B
112C
112D
112E
112F
112G
HEALTH
BENEFIT
ADMIN.
EYEWASH
RO WATER
ICE MACHICE
EYEWASH
EYEWASH
Hose Bibb
3 washers
WH
washer
CLOSET
MENS
BATH RM
MALE
REST RM
CHEMICAL STORAGE
CART WASH
ELECTRICAL CLOSET
HOUSE
KEEPING
SUPPLY
MALE
REST RM
DRESSING RM
DRESSING RM
MALE
REST RM
EMS
SOILED
LINEN RM
REST RM
MALE
REST RM
ELECTRICAL RM ELECTRICAL RM CLOSET
HOUSE KEEPING
TELECOM
CLOSET
SCALE
SOILED UTILITY
REST RM
REST
RM STAFF
TOILET
DATA IRM
TELECOM CLOSET
REST RM
ELECTRICAL RM
HOUSE
KEEPING
FEMALE
REST RM
CLOSET
HOUSE
KEEPING
STORAGE CLOSET
FP
FP
NURSE OFFICE ER
MED DISPENSING
PHARMACY VAULT
SMOKING SHELTERSMOKING SHELTER
FP
CLINIC
WAITING
AREA PRIMARY CARE
SOCIAL
WORKER
NURSE
Office
Primary Care Nurse
ELECTRICAL RM
MED
DISPENSARY
STAIR
EXAM
RM
(PURPLE)
CLINIC
(ORANGE)
COPY RM NURSE CLINIC (GOLD)PHYSICAIN (GOLD)
VACANT
CLINIC
ROOM
(GOLD)
EXAM ROOM (GOLD)
NURSE TRIAGE (SILVER)
PHYSICAIN
(SILVER)
EXAM
RM
(SILVER)
EXAM
ROOM
(SILVER)
NURSE
TRIAGE
(PURPLE)
EXAM
RM
(PURPLE)
PHYSICIAN
(PURPLE)
TELE- HEALTHWOMANS
HEALTH
WHEEL
CHAIR
AREA
RECEPTION CONTROL
FP
STAIR
- C
TEXAS
VETERANS
COMMISSION
CLOSET
D.A.V
CLINIC EXAM (GOLD)
physicain (ORANGE)
NURSE
CLINIC
(ORANGE)
Pahamacist health behavior Coor, AUDIOLOGIST
TRIAGE
UC BED
BREAK RM
MED
RM
CORRIDOR
PATIENT
AFFECT
RM / EMS
PATIENT CLOTHING
LINEN REPAIR
OUTDOOR EQUIP
BREAK RM
LAUNDRY FOREMAN
CLEAN
LINEN
STORAGE
SOILED LINEN
RM / EMS
LINEN
RM EMS
FEMALE
REST
RM EMS
RELEASE OF
INFORMATION
CHIEF
HIMS
STORAGE
EQUINOX RM IRM FILE RM
CLINICAL
PHARMACY
MY
HEALTHY
VET
TELE-
HEALTHPHARMACY WAITING AREA
PHARMACY PATIENT COUNSELING
LINEN CHUTE
BREAK RM
FIRE
ALARM
PHARMACY CHIEF
SECY
AUDIOLOGY
BOOTH
SUPPLY
RM IRM
OFFICEOFFICE
NARC VAULT
STORAGE
CONSULTING RM
INPATIENT PHARMACY
IV
RM
BREAK RM
MEDICATION DISPENSINGINGREDIENT CONTROL
DIET
OFFICE
TRAVEL AGENTAGENT CASHIER
NUTRITION AND FOOD
CHIEF
NUTRITION
FOOD AND SVC
DISHWASHER AREA
FP
POTS
AND
PANS
WASH RM
WALK-IN
REFRIGERATION
FREEZER
FREEZER
WALK-IN REFRIED
WALK-IN
REFRIGERATION
DESSERT / NOURISHMENT AREA
VEGETABLE PREP
WALK-IN
REFRIGERATION
STORAGE
C&P
VACANT
STAFF
OPHTHALMOLOGY
NURSE
OFFICE
PROVIDERS OFFICEEXAM RM
LOCKER RM
TRAINING RM
CHIEF POLICE
PATIENT
REPRESENTATIVE
DIRECTOR
FP
FEE
BASIS
DIRECTORS
STAIR
- B
COMMUNCATION
SPECIALIST
STORAGE
VOLUNTARY
STORAGE
VCS
STORAGE
A/O
CANTEEN OFFICE
FP
FEMALE
REST RM
CHAPEL
FP
CHAPLAIN
STAIR - A
CONFERENCE RM
A/O
INTEGRATED
CARE
A/O
TO THE
DIRECTOR
HEALTH
SYSTEM
BENEFITS
A/O TO
CHIEF OF
STAFF
COPIER
ADMIN OFFICER
ASSOCIATE DIRECTOR
ASST
COS
ADMIN
DIRECTOR
CHIEF STAFF
TELEPHONE
SWITCH
BOARD /
IRM
CORRIDOR
ELEVATOR
CORRIDOR
CORRIDOR
TOILET
CHEMICAL STORAGE
MALE REST RM
FP
TOILET
ELEVATOR
FP
STAIR
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PHARMACY PATIENT COUNSELING
C&P
VACANT
C&P
VACANT
C&P
FILEROOM
C&P
EXAM
C&P
EXAMC&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
CORRIDOR
OFFICE RM
ARMORY RM
HOLDING
RM
POLICE CHECK IN
PATIENT
REPRESENTATIVE
DIRECTOR
PRIVACY
OFFICER
PATIENT
REPRESENTATIVE
DIRECTOR
CHIEF
VOLUNTARY
VOLUNTARY
SERVICE
NURSE
MANAGER
ASST TO
CHIEF
NURSING
NURSE
CHIEF
HEALTH
SYSTEM
BENEFITS
A/O
INTEGRATED
CARE
HK
AOD
EQUIPMENT
STORAGE
UC BED
UC BED
UC BED
ISOLATION
ROOM
AUDIOLOGISTAUDIOLOGY TECH
TELE- HEALTH
WAITING
AREA
VACANT
W A T E R
S U P P L Y
DISH
ROLLING SHUTTER
ROLL UP DOOR 10'2"
UP
WOMEN'S
INFORMATION
RAMP
RAMP
RAMP
VCS
STORAGE
FP
N
FS
TS
D
D S
C
CHR
CHS
(N) O.A. DUCTWORK
CONNECTION POINT.
8x6
3/4" 1"
220A
- 221 222
227 227A
216B
216A
212C 212D
212A
206 205 204 203 202
201K 201I 201H 201G 201F 201E
200A
200201B 201C 200C
201D 200B
265A
237A
236A
237 238
239A
240 241 242
243C
243B
243A 243 243D 244
246A
233A 234 234A
234B 234C
234D
233B
232A
232B
231A
231 AND 232
232E232D232231B
04 01 02
235A
258A 259A
255 255A
252 252B
252A
264B
264A
264A
- 262 261
209 208 207
212B
201K
294 283
231C
212E
212F
213A
HOUSE KEEPING
MENS TOILET
ELECTRICAL
PREP RM
STORAGE
TOILET
TOILET
EMPLOYEE TOILET
FLUORO
SCREEN
DATA RM
SHOWER
HOUSE KEEPING
STORAGE
PATIENT REST RM
DRESSING RM
ELECTRICAL
RM
STORAGE
UNISEX TOILET
CLEAN
AND
STERILE
SUPPLY
SOIL
DISPOSAL
SCRUB
DRESSING
RM
SCHEDULING
CARDIO PULM
SECTION
ELECTRICAL
SOILED HOLDING
AND DISPOSAL
CRASH CART
ELECTRICAL
RM
TELEPHONE
CLOSET
GURNEY
NURSE STATION
PATIENT
HOLDING /
RECOVERY
CLEAN CORE
CAT SCAN
STAIR
ELEVATOR
MALE
STAFF
LOCKER
STAFF
LOCKER
SURGY
CLERK
STAFF LOUNGE
FEMALE
TOILET
FP
STAIR -
A
FP
SUPPLY
NUCLEAR MEDICINE
FP
ULTRA SOUND
RADIOLOGY
OFFICE
CONFERENCE
RM
X-RAY
CHECK-IN
WORK RM
R/F AND SPECIAL
PROCEDURE
GENERAL
RADIOLOGY
RADIATION
TOILET
STORAGE
MECH
GU RM
TOILET
SCOPES
CLEAN UP
STER AND
STORAGE
TOILET
EGD / COLONOSCOPY
GENERAL OR
EQUIP
STORAGE
SCRUB
GENERAL OR
CONTROL
RM
EQUIP RM
PREP RM
DEXA
ULTRA
SOUND
RADIOLOGIST
OFFICE RM
X-RAY WAITING AREA
EKG / STRESS TEST
/ TREADMILLPFT RMECO CARDIOGRAM
OFFICE
CARDIO PULM
SUPERVISION
OFFICEBREAK RM
LAB
DENTAL LAB
DENTAL
CLINIC
OFFICE
SECY PM
AND RSOFFICEPROSTHETICS STORAGE
SPD STORAGE
SPD
PREP ROOM
SPD
DECONTAMINATION
MENS
STORAGE
PROSTHETIC OFFICE
FP
PROSTHETICS
LINEN
CHUTE
PM AND
RS PGM
MGR
OFFICE
PHYSICAL THERAPYOCCUPATIONAL THERAPY
WOMENS
KITCHEN
CONFERENCE
RM
VESTIBULE
CONFERENCE RM
TOILET
STAIR
STAIR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
MECH ROOM
LOCKER RM EMPLOYEE
REST RM
WORK AREA
BLOOD DRAWTOILET
STORAGESTORAGE
DARK RM
STORAGE
EEG AND HOLTER
MONITOR OXYGEN
STORAGE
CLOSET
TOILET
STAIR -
C
DENTAL
STORAGE
FP
FP
LAB
LOUNGE
OFFICE
OFFICE
OFFICE
LAB
STORAGE
LABSTORAGEAUTOMATED CHEMISTRYLAB SVCOFFICE
LABDENTAL LAB DENTAL
OFFICE
DENTAL
SURGY
OPERATORY
DENTAL
DENTAL
OPERATORY
DENTAL
OPERATORYDENTAL HYGIENEX-RAY
DENTAL
WAITING
RMSECY
ESCORT
SVC
LINEN
CHUTE
TOILET
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
LAB PHLEBOTOMY
CORRIDOR
CORRIDOR
T
T
T
T
T
T
TO ROOF OF
1ST FLOOR
TO ROOF 1ST FLOOR
LOCKER
RECEPTION WINDOW
356A
373308
300C
318A318A
364A
320A
341A
350A
369A
368A
365A
374A374A376A377A 300E
300G300A
300E
333A
314A
325 326
328 329
331 332
338 338A 340 341
345 346 346A
351A
351 352 352A 353A
353 354
360A
366366A
367368
374375
378300F
300D 301A
302303 303A
305A
310A
311A
312A 312313
313A
315A
315B
316317318
320322
HC BATH
ELECTRICAL
ELECTRICAL
RM
STORAGE
PATIENT
TOILET
SHOWER
STORAGE
STAFF
TOILET
ANTE RM
STAIR - DSTAIR
- B
PATIENT
TOILET
SHOWER
PATIENT
TOILET
SHOWER
TOILET
PATIENT
TOILET
SHOWER
HOUSE
KEEPING
FP
SECRETARY
NURSING
SOILED UTILITY RM
EQUIP
STORAGE
STORAGE
INFO
RESOURCE
MGMT
HOUSE
KEEPING
FP
STORAGE
BATH
TELE
CLOSET
TOILET
TOILET
TOILET
BATH /
SHOWER
BATH /
SHOWER
BATH /
SHOWER
FEMALE
TOILET
CLOSET
MALE
TOILET
TOILET
EMP HEALTH
STORAGE(O2)
CLOSET
ANTE RM
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDORCORRIDOR
2 BED PATIENT
RM
PATIENT
TOILET
SHOWER
OFFICE TUB
RM
CLEAN LINEN
CLEAN
UTILITY
AND ICE
MACH RM
MED
PREP
NURSE
STATION
CC
IV STORAGE /
COMP RM
2 PATIENT RM
BATH /
SHOWER
HEAD NURSE
OFFICE
BIO-HAZARD
RM
STAIR -
C
DUMB
WAITER
PHYSICIAN
OFFICE
STORAGE
STAFF OFFICE
AFGE
OFFICE
AFGE
OFFICE
OFFICE
TELECOM
CLOSET
OFFICE
BATH
OFFICE OFFICE
BATH BATH
LOGISTICS STORAGE LOGISTICS
LOGISTICS
Existing
1700 Sq. Ft.
MECH RM
STAIR - E
FP
SPD
ELEVATOR
BREAK
ROOM
VACANT
HC
TOILET
RESIDENCE
RESIDENCE
RESIDENCE
RESIDENCE
STAFF
OFFICE
STAFF
OFFICE
OFFICE
BREAK RM
FP
RESIDENCE
LACTUTATION
ROOM
LOGISTICS
3 PPLE
RESIDENCE
WAITING RMOFFICE
SECY
AMB.
ADMINISTRATOR
OFFICE
CHIEF NURSING
OFFICE
CHAP
OFFICE
CHAP.
OPTIONAL
CONTRACTOR
ENG.
EXAM ROOM
EYE CLINIC
PATIENT
RM
PATIENT
RM
BATH
TB RMTB RM
BATH
PATIENT
RM
PATIENT
RM ANTE
RM
TOILET
SPD
STORAGE
2 BED PATIENT
RM
1 BED PATIENT
RM
STAIR -
A
1 BED PATIENT
RM
2 BED PATIENT
RM
2 BED PATIENT
RM
TOILET
TOILET
TOILET
TOILET
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
TOILET
STAIR
DOWN
18 19 20 22 24 25 27 28
F-401
F-401
F-401
4442 50
F-401
(E) FIRE STANDPIPE (E) FLOOR
ZONE VALVE(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE (E) FLOOR
ZONE VALVE
F-401
F-401
KEY PLAN NTS
18 19 20 22 24 25 28
F-402
F-402
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE (E) FLOOR
ZONE VALVE
F-402
F-402
18 19 20 22 24 25 27 28
F-402
F-402
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
F-402
F-402
FIRE SPRINKLER NOTES
DESCRIPTIONNOTE
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 1 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW
DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED
SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA
13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE
SYSTEM SHUT-DOWN AND DRAINAGE ON EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A
MONITORED SPRINKLER SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A
FIRE WATCH OF THE ENTIRE BUILDING OR FLOOR LEVEL DURING THE ENTIRE PERIOD THE
SPRINKLER SYSTEM IS SHUT-OFF.
BUILDING 1’S FIRE SUPPRESSION SYSTEM INCLUDES A FIRE PUMP, THREE STAIRWELL WET
STANDPIPES AND FLOOR CONTROL VALVES WITH FLOW SWITCH AND DRAIN ON EACH FLOOR IN
EACH OF THE THREE STAIRWELLS. THE BUILDING IS SEPARATED INTO THREE SMOKE
COMPARTMENTS. EACH SMOKE COMPARTMENT HAS A SEPARATE FLOOR CONTROL VALVE ON
EACH FLOOR. SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS
AND BRANCH PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
BUILDING 1 - OVERALL FIRE PLAN -
LEVEL 01, 02, 03
F-101
-2
-9
F -1
/1
/1
.p d f
1" = 30'-0"
BUILDING 1 - LEVEL 01 - OVERALL FLOOR PLAN
15' 30' 60'0'
1" = 30'SCALE
1" = 30'-0"
BUILDING 1 - LEVEL 02 - OVERALL FLOOR PLAN
1" = 30'-0"
BUILDING 1 - LEVEL 03 - OVERALL FLOOR PLAN
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
N.T.S.
N
40054012
40684066
4019 4014
4030 4027
40504052
4079 4080
4158 4157 4156
4122 4129 4136
4128 4135
4127 4134
41014095
4143 4144
4018 4008 4098 4106
409 476
STAFF
PUBLIC
PUBLIC
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTHMENTAL
HEALTH
MENTAL
HEALTH
GRIEF
OEF/OIF
MANAGER
OEF/OIF
PROGRAM
OEF/OIF
CASE MANAGER
OEF/OIF
CASE MANAGER
OEF/OIF
PATIENT
SAFETY
PATIENT
SAFETY
SUICIDE
PREVENTION
MEDICAL STAFF STAFF
CONFERENCE
CHAPLAIN'S
CHAPLAIN'S
SOCIAL
WORK
SOCIAL
WORK
SOCIAL
WORK
SOCIAL
WORK
GROUP
HUD
VASH
NIEC
SOCIAL WORK
CHIEF'S
MECHANICAL
VOLUNTEER
COMPUTER
MENTAL
HEALTH
MENTAL HEALTH
CHIEF'S MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
PSYCHOLOGY
PSYCHOLOGY
PSYCHOLOGY
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
CONTROL
RELAXATION
CWT
TRAINING
GROUP
GROUP
GROUP
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
EXAM
STAFF
MECHANICAL
RECREATION
THERAPY
MULTI-PURPOSE
PUBLIC
PLAY
TELE-MEDICINE
NURSE'SNURSE'S
SOCIAL
WORK
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
COPY/
PUBLIC
WORK/
TELE-MEDICINE
PATIENT
PATIENT
WOMEN'S
STAFF
EXISTING EXISTING
TOILET
TOILET
TOILET
OFFICEOFFICE
OFFICE
OFFICE
OFFICEOFFICE
COUNSELING
OFFICE
SUPPORT
OFFICE OFFICE
CLERICAL
SECRETARY
OFFICE
OFFICE
LOUNGE/LIBRARY BREAKROOM
ROOM
OFFICE
OFFICE
OFFICE
SECRETARY
OFFICEOFFICE
ROOM
OFFICE
OFFICE
OFFICE
ROOM
TOILET
AREA
ROOM
ADMIN
OFFICE CLERICAL
OFFICE
OFFICE
OFFICE
EXAM ROOM
EXAM ROOM
EXAM ROOM
OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE
ROOM
ROOM
LAB
ROOM
ROOM
ROOM OFFICE OFFICE
OFFICE OFFICE
OFFICE STORAGE
ROOM
LIBRARY
BREAKROOM
ROOM
ROOM
ROOM
TOILET
ELECTRICAL
STORAGE
AREA
ROOM
OFFICEOFFICE
OFFICE
TOILET
OFFICE
OFFICE OFFICE
COMPUTER
ELECTRICAL
LOBBY
RECEPTION
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR CORRIDOR CORRIDOR
CORRIDOR
TOILET
COPY
STAIR #1
STAIR #2
STAIR #3
STAIR #4
STAIR #5
TOILET
ROOM
TOILET
LOUNGE
VENDING
DATA
HAC STORAGE
HAC
MECH.
HAC
TOILET
DATA
DATA DATA
DATA
511513
532A
564A
524A
516A
522A
571A
569 567 561
566515
521A 520 518
517 516
510A
509A
509 508
508A
507A
570A
563A
557556555
554A
566A
554553
553A
552A
552551
551A
550A
550549
549A
548A
541540
530529
528A
529A
527A
526A
526525
523522
515A
521D
STAIRWELL
E
FP
COMMUNICATION
HOUSE
KEEPING
TOILET
MECHTOILET /
SHOWER
TOILET /
SHOWER
TOILET /
SHOWER
FP
FP
CORRIDOR
TOILET /
SHOWER
FIRE STAND PIPE IRM FP
HOUSE
KEEPING
LINEN
STORAGE
LINEN CHUTE
VENDING ALCOVE
CORRIDOR
LOBBY
CORRIDORCORRIDOR
SEMI-PRIVATE DINING OFFICE
STAIR - A
SENSORIUM PATIENT RM PATIENT RM CORRIDOR
ELECTRICAL
STAIR - B
PATIENT RM
TOILET
SHOWER
TOILET
PATIENT RM PATIENT RM
TOILET /
SHOWER
TOILET
PATIENT RM
HEAD
NURSE
(ECTU)
MED RM
BREAK RM
WAITING
NURSE WORK
NURSE STATION
FAMILY RM
LAUNDRY
CLEAN UTILITY
PATIENT RM
TOILET
PATIENT RM
STAIR - D
ELECTRICAL
PATIENT RM
SOCIAL WORKER
STORAGE
DUMB
WAITER
TOILET
PATIENT RM TUB AND
SHOWER RM
MULTI PURPOSE
STAIR - E
SUPPLY
RECREATION THERAPIST
RECREATION OFFICERECREATION OFFICEKITCHEN
TOILET
TOILET
PATIENT RMPATIENT RM
TOILET
TOILET
PATIENT RMPATIENT RM
TOILET
TOILET
PATIENT RMPATIENT RM
TOILET
TOILET
PATIENT RM
CLEAN LINEN
TOILET
DAY RMDIETITIAN
SPD STORAGE
STAIR -
C
LINEN CHUTE
SOILED UTILITYPATIENT RM
TOILET
SHOWERPATIENT RM
PATIENT RM
TOILET /
SHOWER
TOILET
SHOWER
PATIENT RMPATIENT RM
PATIENT RM
PATIENT RMPATIENT RM
TOILET
STORAGE
DINING RM
TOILET /
SHOWER
TOILET
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
FOURTH FLOOR ROOF
FOURTH FLOOR ROOF
LOCKER
618G
618F618E 618D
NFS
STORAGE
RENOVATE
CALL
CENTER
619C
616B
602A
613 619A
627B
619B
604A
600A
606A
607B
607A
626A
612A
616A
618A
618B
618C 619
619E
619D 620 621 622
623 623A
625B
627A
627C
629A
630A
600B
603604
606B
607C
612611
610609 609A608
607D
HOUSE KEEPING
DUMP
WAITER
WOMENS TOILET
CLOSET STORAGE
STORAGE
LINEN CHUTE
STORAGE
TOILET
TOILET STAFF
STORAGE
EMS
ENGG
ENGG
TOILET
STORAGE
STORAGE
ENG.
ENGG
CLOSETFP
STAIR
- C
OFFICE
A.D
EEO
A.D.
OFFICE
HAS
STORAGE
IRM
CLOSET
MALE TOILET
STORAGE
UTILITY STORAGE
Wash Room
EMS
MECH RM /
STORAGE
CONFERENCE RMVERA/
MCA/CODING
HASA
STAIR - D
ELECTRICAL CLOSET
FP
TOILET
BREAKROOM
STORAGE
TELEHEALTH
COS
MOBILITY
HAS
WOMENS TOILET
OPERATOR
HAS
CALL CENTER
HB&A
TRANSPORTATION
HAS
CHIEF
HAS
OFFICE
STAFF
INFORMATICS
A.D.
INFORMATICS
A.D.
OFFICE, CHIEF
POSTHETICS
STORAGE
LOGISTICS
FP
ELECTRICAL CLOSET
STAIR
- B
OFFICE, CHIEF
HAS
TOILET
TOILET MALE
STORAGE ENG.
TELEHEALTH
STORAGETELEHEALTH
COS
OFFICE
HAS
OFFICE
HAS
CONFERENCE ROOM
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
HAS
BREAKROOM OFFICE
LOGISTICS
OFFICE
LOGISTICS
OFFICE
LOGISTICS
VACANT
OFFICE
LOGISTICS
VOLUNTEER
SVC.
STORAGE KEY PLAN NTS
F-403
18 19 20 22 24 25 27 28
F-403
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE (E) FLOOR
ZONE VALVE
F-403
F-403
F-403
F-403
18 19 20 22 24 25 27 28
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
F-403
F-403
F-403
18 19 20 22 24 25 27 28
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
(E) FIRE STANDPIPE
(E) FLOOR
ZONE VALVE
F-403
FIRE SPRINKLER NOTES
DESCRIPTIONNOTE
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 1 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW
DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED
SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA
13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE
SYSTEM SHUT-DOWN AND DRAINAGE ON EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A
MONITORED SPRINKLER SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A
FIRE WATCH OF THE ENTIRE BUILDING OR FLOOR LEVEL DURING THE ENTIRE PERIOD THE
SPRINKLER SYSTEM IS SHUT-OFF.
BUILDING 1’S FIRE SUPPRESSION SYSTEM INCLUDES A FIRE PUMP, THREE STAIRWELL WET
STANDPIPES AND FLOOR CONTROL VALVES WITH FLOW SWITCH AND DRAIN ON EACH FLOOR IN
EACH OF THE THREE STAIRWELLS. THE BUILDING IS SEPARATED INTO THREE SMOKE
COMPARTMENTS. EACH SMOKE COMPARTMENT HAS A SEPARATE FLOOR CONTROL VALVE ON
EACH FLOOR. SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS
AND BRANCH PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
BUILDING 1 - OVERALL FIRE
SPRINKLER PLAN - LEVEL 04, 05, 06
F-102
-2
-9
F -1
/2
/2
.p d f
1" = 30'-0"
BUILDING 1 - LEVEL 04 - OVERALL FLOOR PLAN
15' 30' 60'0'
1" = 30'SCALE
1" = 30'-0"
BUILDING 1 - LEVEL 05 - OVERALL FLOOR PLAN
1" = 30'-0"
BUILDING 1 - LEVEL 06 - OVERALL FLOOR PLAN
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
BIZHUB 283
SMALL BW
BOILER 3 BOILER 2 BOILER 1
MECH-BOARD
NO.2 COMPRESSOR
FILTER
SOFTNED
CHILLER NO. 1 HEAT CHILLER NO. 2
PUMP PUMP PUMP PUMP
PUMP
PUMP
METER BOARD
PUMP
CHILLER
PLANT 2
PUMP
CONDENSATE
4400-0309
EXCHANGER
UPDN
37B
TOILET STAFF
30A 37C
37D
33C
33D 33
33B
28A
HK
CLOSET
30B
30C
WATER
TEST RM
TOILET /
SHOWERLOCKER STAFF
PUMP RMCHILLER PLANT
WATER
TREATMENT
OFFICE
STORAGE
A/C
SHOP
AUXILIARY
GENERATOR
OPER
OFFICE
OPER
FOREMAN
STORAGE
RECIEVING
AREA
SF 989
BREAKROOM
WAREHOUSE
UP
STAIR
TOWER
BOILER PLANT
Recieving Area
W or k Ta bl e
Mail Clerks
MAIL AND UPS
Office
SENSITIVE DISCU
P S/
A R R
IV
A L S Y
ST
EM
S RECIEVING FILES
EYE
WASH
SPILL
KIT
C B O C S
TO
R A G E/
P
IC
K
U P
CARTS &
EQUIPMENT
AREA
REPRODUCTION AREA
S H
ELF FO
R D
IS
C R
EP
A N C Y O
R N
O N D
ELIV
ER
A B
LE FR
EIG
H T
EI
L S
TO
R A G E
R
EC
Y C
LIN
G
LIFE PACK
STATION
INVENTORY
MANAGER
N
F-404
TR
28B
EXISTING 6"
WATER SERVICE
WITH WET PIPE
FIRE SPRINKLER
VALVE
KEY PLAN
NTS
FIRE SPRINKLER NOTES
DESCRIPTIONNOTE
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 2 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW
DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED
SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA
13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE
SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 2. SHUT DOWN OF A MONITORED SPRINKLER
SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE
ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.
BUILDING 2’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM CHECK
VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING. SPRINKLER
MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS
NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
BUILDING 2 - OVERALL FIRE
SPRINKLER PLAN
F-103
-2
-9
F -1
/1
/2
.p d f
1/16" = 1'-0"
BUILDING 2 - OVERALL FLOOR PLAN
8' 16' 32'0'
1/16" =1'-0"SCALE
TRUE
NORTH
PLAN
F.
O .M
BOILER ROOM
124A
GENERAL STORAGE
CORRIDOR
101C
PUBLIC MALE
TOILET
101D
PUBLIC FEMALE
TOILET
101B
LOBBY
167A
RECEPTION
152C
2 BED RM
152B
2 BED RM
152A
TOILET
52 SF
154A
TOILET
52 SF
154B
2 BED RM
PUBLIC
MALE
TOILET
BREAK ROOM
CORRIDOR
156C
2 BED RM
154C
2 BED RM
PATIENT
LAUNDRY ROOM156B
2 BED RM
PATIENT EMS
162B
HAC
162F
LINEN COLLECTION
ROOM
162E
CLEAN
LINEN
ROOM
162D
TRASH
COLLECTION RM
162C
TELECOM
PATIENT EDUCATION
/ CONFERENCE /
GROUP ROOM
PATIENT EDUCATION
/ CONFERENCE /
GROUP ROOM
EXAM/TREATMENT
ROOM
TREATMENT
ROOM
CORRIDOR
167D
DOMICILIARY
CHIEF
OFFICE
167C
CLINICAL
COORDINATOR
167B
PROVIDER
OFFICE
165A
RESIDENT'S
ENTRY
165B
WAITING
PUBLIC
FEMALE
TOILET
161C
2 BED RM
161A
TOILET
161B
2 BED RM
159A
TOILET
159B
2 BED RM
159C
2 BED RM
157C
2 BED RM
155A
TOILET
157A
TOILET
157B
2 BED RM
155B
2 BED RM
155C
2 BED RM
153C
2 BED RM
153A
TOILET
153B
2 BED RM
151B
KITCHENETTE
151A
TOILET
151C
1 BED
RM SUITE
QUIET ROOM
147A
TOILET
147B
KITCHENETTE
113 SF
147C
1 BED
RM SUITE
FITNESS
143A
TOILET
143B
1 BED RM
141A
TOILET
141B
BARIATRIC ROOM
139A
TOILET
139B
1 BED RM
137A
TOILET
137B
2 BED RM
137C
2 BED RM
135A
TOILET
133C
2 BED RM
135B
1 BED RM
131A
TOILET
133A
TOILET
133B
2 BED RM
131B
2 BED RM
131C
2 BED RM
129C
2 BED RM
129B
2 BED RM
129A
TOILET
127A
TOILET
127B
2 BED RM
127C
2 BED RM
PUBLIC
FEMALE
TOILET
CORRIDOR
134C
2 BED RM
134A
TOILET
132A
TOILET
134B
2 BED RM
132B
2 BED RM
132C
2 BED RM
130C
2BED RM
130A
TOILET
130B
2 BED ROOM
128C
2 BED RM
128A
TOILET
52 SF
128B
2 BED RM
DOMICILIARY
HEALTH
TECHNICIAN 122
CLEAN LINEN
STORAGE
VESTIBULE
124B
PATIENT
LUGGAGE
STORAGE
124C
RECYCLING
PATIENT TV LOUNGE
PATIENT TV LOUNGE
103A
RESIDENT DINING
105B
NON-FOOD STORAGE
132 SF
105C
DISH WASH AND
STORAGE
105A
SERVING UNIT
105D
DIETICIAN'S
WORK
ROOM107
RESIDENT'S KITCHEN
CORRIDOR
ENV. MGMT
STORAGE
HAC
VENDING
PUBLIC
WAITING
MULTI-PURPOSE
ELECTRICAL
ROOM
MECHANICAL
KEY PLAN
8 17
NTS
F-404
F-404
EXISTING 6" WATER
SERVICE WITH WET PIPE
FIRE SPRINKLER VALVE
FIRE
ALARM
PANEL
FIRE ALARM
ANNUCIATOR
PANEL
FIRE SPRINKLER NOTES
DESCRIPTIONNOTE
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 18 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW
DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED
SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA
13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE
SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 18. SHUT DOWN OF A MONITORED SPRINKLER
SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE
ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.
BUILDING 18’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM
CHECK VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING.
SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH
PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
BUILDING 18 - OVERALL FIRE
SPRINKLER PLAN
F-104
-2
-9
F -1
/2
/2
.p d f
1/16" = 1'-0"
BUILDING 18 - OVERALL FLOOR PLAN
8' 16' 32'0'
1/16" =1'-0"SCALE
TRUE
NORTH
PLAN
OC
FOYER
STAFF OFFICE
TYPCIAL RES.
ROOM
TOIL.
1A
TYPICAL RES.
ROOM
TOIL.
2A
TYPICAL RES.
ROOM
TOIL.
3A
TYPICAL RES.
ROOM
TOIL.
5A
LAUNDRY/
SAFE ROOM
TOIL.
10A
TYPICAL RES.
ROOM
TYPICAL RES.
ROOM
TYPICAL RES.
ROOM
TYPICAL RES.
ROOM
TOIL.
8A
ELEC.
PANTRY
TYPICAL RES.
ROOM
TOIL.
6A
SOILED UTIL.
H.A.C.
LAUNDRY
CLEAN
SOILED
TYPICAL RES.
ROOM
TOIL.
7A
GUEST TOIL.
TOIL.
4A
TOIL.
9A
CLEAN
28 SOILED
DINING ROOM
KITCHEN
CORR.
MECHANICAL
CORR.
MEDS
SPA/BATH/SAFE
ROOM
LIVING ROOM
RECEIVING/STORAGE
CORR.
CORR.
C1-25
CORR.
C2-25
DATA
SUPPLIES/EQUIP.
STORAGE
STORAGE
KEY PLAN NTS
(E) FIRE
SPRINKLER
WATER
SERVICE AND
ALARM
VALVING
(E)FIRE ALARM
PANEL
WALL MOUNTED A/C
FIRE SPRINKLER NOTES
DESCRIPTIONNOTE
FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 25 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW
DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED
SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA
13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE
SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 25. SHUT DOWN OF A MONITORED SPRINKLER
SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE
ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.
BUILDING 25’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM
CHECK VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING.
SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH
PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.
NOTES BY SYMBOL
DESCRIPTIONNOTE
CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER
DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO
PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF
ROOMS AFFECTED BY CONSTRUCTION.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
BUILDING 25 - OVERALL FIRE
SPRINKLER PLAN
F-105
-2
-9
F -1
/2
/2
.p d f
1/8" = 1'-0"
BUILDING 25 - OVERALL FLOOR PLAN
4' 8' 16'0'
1/8" =1'-0"SCALE
TRUE
NORTH
PLAN
TR
WALL MOUNTED A/C
WALL MOUNTED
A/C
CABLETRAY
LIGHTING
IT RACK
SPRINKLER
TR
TR
TR
WALL
MOUNTED
A/C
WALL
MOUNTED
A/C
CABLETRAY
IT RACK
LIGHTING
SPRINKLER
TELEPHONE
SWITCH BOARD
EQUINOX
ROOM
CEILINGS BEING
REMOVED PENDANT
HEAD REPLACED WITH
UPRIGHT HEADS
OPEN STRUCTURE,
REWORK PIPING FROM
REMOVED DUCTWORK
AND REMOVED
OVERHEAD
MECHANICAL
EQUIPMENT
1IT RACK
(E)CRAC(E)CRAC
CABLE TRAY
CABLE
TRAY
CABLE
TRAY
DUCTWORK
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
NOTES BY SYMBOL
DESCRIPTIONNOTE
CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER
DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO
PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF
ROOMS AFFECTED BY CONSTRUCTION.
OCCUPANCY TYPE LEGEND
ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)
WET PIPE UPRIGHT SPRINKLER
QUICK RESPONSE, STANDARD COVERAGE
DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY
0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER
OPERATION AREA. PROTECTION AREA PER HEAD
SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F
TEMPERATURE HEAD, BRASS FINISH HEAD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
FIRE SPRINKLER ENLARGED PLAN
F-401
-2
-9
F -4
/1
/1
.p d f
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - ROOM 57 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - ROOM 57 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - ROOM 82 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - ROOM 82 NEW WORK
2' 4' 8'0'
1/4" =1'-0"SCALE
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - IRM ROOM 96 & 98 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 01 - IRM ROOM 96 & 98 NEW WORK
OCOC
350A
351A
SOILED UTILITY RM
BATH
OFFICE
BATH
TR
WALL MOUNTED A/C
WALL MOUNTED
A/C
CABLETRAY
IT RACK
LIGHTING
SPRINKLER
SPRINKLER
TR
WALL MOUNTED A/C
WALL MOUNTED A/C
CABLETRAY
IT RACK
SPRINKLER
TR
WALL
MOUNTED A/C
CABLETRAY
IT RACK
SPRINKLER
SPRINKLER
TR
350A
WALL MOUNTED
A/C
WALL MOUNTED
A/C
CABLETRAY
IT
RACK
LIGHTING
SPRINKLER
27 28
19 20
TR
TR
TR
NOTES BY SYMBOL
DESCRIPTIONNOTE
CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER
DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO
PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF
ROOMS AFFECTED BY CONSTRUCTION.
OCCUPANCY TYPE LEGEND
ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)
WET PIPE UPRIGHT SPRINKLER
QUICK RESPONSE, STANDARD COVERAGE
DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY
0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER
OPERATION AREA. PROTECTION AREA PER HEAD
SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F
TEMPERATURE HEAD, BRASS FINISH HEAD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
FIRE SPRINKLER ENLARGED PLAN
F-402
-2
-9
F -4
/1
/2
.p d f
1/4" = 1'-0"
BUILDING 1 - LEVEL 02 - ROOM 229 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 02 - ROOM 236 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 03 - ROOM 340 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 03 - ROOM 350A NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 03 - ROOM 350 DEMO
8 1/4" = 1'-0"
BUILDING 1 - LEVEL 03 - ROOM 340 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 02 - ROOM 229 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 02 - ROOM 236 DEMO
2' 4' 8'0'
1/4" =1'-0"SCALE
TR
WALL
MOUNTED
A/C
CABLE
TRAY
IT RACK
LIGHTING
SPRINKLER
TR
WALL
MOUNTED A/C
WALL
MOUNTED
A/C
CABLETRAY
IT RACK
LIGHTING
SPRINKLER
SPRINKLER
TR
WALL MOUNTED
A/C
CABLETRAY
IT
RACK
SPRINKLER
TR
WALL MOUNTED A/C
WALL MOUNTED A/C
CABLETRAY
IT RACK
SPRINKLER
TR
WALL MOUNTED A/C
WALL MOUNTED A/C
CABLE
TRAY
IT RACK
SPRINKLER
TR
TR
TR
TR
TR
NOTES BY SYMBOL
DESCRIPTIONNOTE
CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER
DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO
PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF
ROOMS AFFECTED BY CONSTRUCTION.
OCCUPANCY TYPE LEGEND
ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)
WET PIPE UPRIGHT SPRINKLER
QUICK RESPONSE, STANDARD COVERAGE
DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY
0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER
OPERATION AREA. PROTECTION AREA PER HEAD
SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F
TEMPERATURE HEAD, BRASS FINISH HEAD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
FIRE SPRINKLER ENLARGED PLAN
F-403
-2
-9
F -4
/2
/2
.p d f
1/4" = 1'-0"
BUILDING 1 - LEVEL 04 - ROOM 4074 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 04 - ROOM 4160 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 05 - ROOM 530 NEW WORK
31/4" = 1'-0"
BUILDING 1 - LEVEL 05 - ROOM 544 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 06 - ROOM 618 NEW WORK
1/4" = 1'-0"
BUILDING 1 - LEVEL 04 - ROOM 4074 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 04 - ROOM 4160 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 05 - ROOM 530 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 05 - ROOM 544 DEMO
1/4" = 1'-0"
BUILDING 1 - LEVEL 06 - ROOM 618 DEMO
2' 4' 8'0'
1/4" =1'-0"SCALE
O C
OC
OC
o s
TR
112A
CABLETRAY
IT RACK
SPRINKLER
TR
28B
CABLETRAY
IT RACK
LIGHTING
LIGHTING
SPRINKLER
SPRINKLER
TR
162C
WALL MOUNTED A/C
WALL MOUNTED A/C
CABLETRAY
SPRINKLER
NOTES BY SYMBOL
DESCRIPTIONNOTE
CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER
DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO
PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF
ROOMS AFFECTED BY CONSTRUCTION.
OCCUPANCY TYPE LEGEND
ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)
WET PIPE UPRIGHT SPRINKLER
QUICK RESPONSE, STANDARD COVERAGE
DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY
0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER
OPERATION AREA. PROTECTION AREA PER HEAD
SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F
TEMPERATURE HEAD, BRASS FINISH HEAD
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
DGMJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
FIRE SPRINKLER ENLARGED PLAN
F-404
-2
-9
F -4
/2
/2
.p d f
1/2" = 1'-0"
BUILDING 8 - ROOM 112S NEW WORK
1/2" = 1'-0"
BUILDING 2 - ROOM 28B NEW WORK
1' 2' 4'0'
1/2" =1'-0"SCALE
1/2" = 1'-0"
BUILDING 18 - ROOM 162C NEW WORK
1/2" = 1'-0"
BUILDING 18 - ROOM 162C DEMO
NOTE DESCRIPTION
AIRSIDE NOTES
CONSTRUCT DUCTS OF COMMERCIAL G90 GALVANIZED STEEL UNLESS OTHERWISE SPECIFIED.
FABRICATION OF DUCTWORK SYSTEMS MUST CONFORM TO RECOMMENDATIONS AND
STANDARDS OF ASHRAE AND SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" 2005 EDITION
FOR THE PARTICULAR SYSTEM DESIGNED. DUCT PRESSURE CLASS AND SEAL CLASS IS
INDICATED ON THE HVAC DUCT SCHEDULE IN THIS DRAWING SET.
THE MINIMUM ALLOWABLE THICKNESS FOR ALL HVAC DUCTS IS 26 GAGE GALVANIZED STEEL,
EXCEPT FOR DUCT SYSTEMS COMPLETELY CONTAINED WITHIN A SINGLE FIRE AREA. DUCTS THAT
PENETRATE FIRE-RATED CONSTRUCTION ASSEMBLIES MUST BE MINIMUM 24 GAGE GALVANIZED
STEEL.
ALL DUCT DIMENSIONS INDICATED ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS IN INCHES. IF DUCT LINER IS SPECIFIED, THE EXTERNAL SHEET METAL DIMENSIONS MUST BE INCREASED TO
MAINTAIN THE INSIDE DUCT DIMENSIONS SHOWN ON THE PLANS.
PROVIDE TURNING VANES IN ALL 90 DEGREE MITERED ELBOWS AND ALL BULLHEAD TEES EVEN IF
TURNING VANES ARE NOT GRAPHICALLY SHOWN ON PLAN DRAWINGS.
A.
B.
C.
D.
NOTE DESCRIPTION
GENERAL NOTES
SHOULD DISCREPANCIES OCCUR WITHIN THE CONTRACT DOCUMENTS (DRAWINGS AND
SPECIFICATIONS), THE MORE STRINGENT AND MORE COSTLY APPROACH MUST APPLY FOR
BIDDING PURPOSES. THE CONTRACTOR IS TO NOTIFY THE OWNER'S REPRESENTATIVE OF
DISCREPANCIES FOR CLARIFICATION. CLARIFICATIONS ISSUED AFTER THE CONTRACT IS
AWARDED ARE TO BE INCORPORATED BY THE CONTRACTOR AT NO ADDITIONAL COSTS AND ARE
TO BE REVIEWED BY THE OWNER'S REPRESENTATIVE TO DETERMINE IF A REDUCTION IN COST IS
JUSTIFIED.
THE CONTRACTOR MUST OBTAIN ALL PERMITS AND PAY ALL FEES AND CHARGES TO ALL LOCAL
AND OTHER RELATED AGENCIES AS REQUIRED.
PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR A COMPLETE AND
OPERABLE INSTALLATION AS SPECIFIED AND SHOWN ON THE DRAWINGS AND SPECIFICATIONS,
FULLY TESTED, ADJUSTED AND READY FOR USE.
THE DRAWINGS SHOW THE EXTENT OF THE WORK AND THE GENERAL ARRANGEMENT. THE
DRAWINGS, HOWEVER, ARE DIAGRAMMATIC AND EXACT COORDINATED LAYOUT OF THE VARIOUS
SYSTEMS IS THE RESPONSIBILITY OF THE CONTRACTOR.
VERIFY ANY AND ALL INDICATED CONFIGURATIONS, DIMENSIONS AND ELEVATIONS BY FIELD
MEASUREMENTS AND COORDINATED WITH ARCHITECTURAL DRAWINGS AND STRUCTURAL
CONDITIONS.
COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE THE
INSTALLATION OF THE VARIOUS SYSTEM EQUIPMENT AND MATERIALS. NO STRUCTURAL
MEMBERS SHALL BE CUT WITHOUT PRIOR APPROVAL OF STRUCTURAL ENGINEER.
COORDINATE THE INSTALLATION OF THE VARIOUS SYSTEM MATERIALS AND EQUIPMENT ABOVE
CEILINGS WITH SUSPENSION SYSTEM, LIGHT FIXTURES, AND OTHER INSTALLATIONS.
ALL MATERIALS, EQUIPMENT AND APPARATUS INSTALLED ON THE PROJECT MUST BE NEW AND
INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. THE
MANUFACTURER, OR HIS AUTHORIZED REPRESENTATIVE, MUST CERTIFY IN WRITING TO THE
OWNER AND THE OWNER'S REPRESENTATIVE, THAT THE INSTALLATION HAS BEEN MADE IN
ACCORDANCE WITH SUCH PRINTED REQUIREMENTS.
MANUFACTURER'S NAME AND MODEL NUMBERS INDICATED ON THE DRAWINGS ARE ONLY FOR
REFERENCE CONVENIENCE. ENGINEER-APPROVED SUBSTITUTIONS ARE PERMITTED. THE
CONTRACTOR, THROUGH THE MANUFACTURER, IS RESPONSIBLE TO CONFIRM THE
CORRECTNESS OF ALL MODEL NUMBERS SO AS TO MEET THE SPECIFIC PROJECT REQUIREMENTS
AND MINIMUM INDICATED PERFORMANCE.
INSTALL EQUIPMENT, MATERIALS AND PIPING SYSTEMS TO PROVIDE REQUIRED ACCESS FOR
SERVICING, MAINTENANCE, AND GENERAL INSPECTION PER MANUFACTURER'S INSTRUCTIONS
AND LOCAL CODE REQUIREMENTS. COORDINATE THE FINAL LOCATION OF CONCEALED
EQUIPMENT AND DEVICES REQUIRING ACCESS WITH FINAL LOCATION OF REQUIRED ACCESS
PANELS AND DOORS. ALLOW AMPLE SPACE FOR REMOVAL OF ALL PARTS THAT REQUIRE
REPLACEMENT OR SERVICING. PIPING SYSTEMS SHALL NOT BLOCK SERVICE ACCESS OF ANY
NATURE, SUCH AS FILTER REMOVAL, EQUIPMENT ACCESS PANELS, CLEANING OF TUBES, AND
SIMILAR ITEMS.
COORDINATE THE EXACT LOCATION OF THIS WORK WITH THE WORK OF THE OTHER TRADES
PRIOR TO FABRICATION OR INSTALLATION OF SAME. VERIFY ALL DIMENSIONS AND ELEVATIONS.
PROVIDE ADDITIONAL OFFSETS AND SECTIONS OF MATERIAL AS MAY BE REQUIRED TO MEET THE
APPLICABLE JOB CONDITION REQUIREMENTS.
IT WILL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO COORDINATE BETWEEN HIS
EQUIPMENT SUPPLIERS AND ANY SUBCONTRACTOR AS TO WHICH DEVICES ARE SUPPLIED WITH
EQUIPMENT, REQUIRED WIRING AND VOLTAGES AND OTHER COORDINATION ITEMS AS RELATED
TO A PROPER AND OPERABLE INSTALLATION. ALL POWER WIRING AND CONTROL WIRING MUST
COMPLY WITH DIVISION 26 REQUIREMENTS.
DIMENSIONAL LOCATIONS INCLUDING ELEVATIONS INDICATED ON THE DRAWINGS ARE
APPROXIMATE AND FOR REFERENCE ONLY. THE CONTRACTOR MUST COORDINATE WITH OTHER
TRADES AND SERVICES TO AVOID INTERFERENCES ROUTING DUCTWORK AND PIPING.
ALL MATERIALS IN ALL SUPPLY AND RETURN AIR PLENUMS MUST BE PLENUM RATED IN
ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE. MATERIALS WITHIN PLENUM MUST
NOT EXCEED A FLAME SPREAD INDEX OF 25 AND A SMOKE-DEVELOPED INDEX OF 50.
COORDINATE WITH OTHER TRADES TO PROVIDE PLENUM RATED MATERIALS.
INSTALL ALL SPACE TEMPERATURE SENSORS AND THERMOSTATS 48 INCHES AFF UNLESS
OTHERWISE NOTED.
PIPE PENETRATIONS AT ALL FIRE RATED FLOORS, NON-FIRE RATED FLOORS, FIRE-RATED SHAFTS, WALLS, BARRIERS, PARTITIONS MUST BE SEALED WITH A UL LISTED FIRESTOP ASSEMBLY EQUAL
TO OR GREATER THAN THE ASSEMBLY FIRE RESISTANCE RATING. REFER TO ARCHITECTURAL
PARTITION A-300 DRAWINGS FOR FIRE-RATED ASSEMBLY LOCATIONS.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
NOTE DESCRIPTION
WATER SIDE NOTES
REFER TO "HVAC PIPING SCHEDULE" IN THIS DRAWING SET FOR A SCHEDULE OF PIPING
MATERIALS, JOINING METHODS, INSULATION, HANGER SPACING, AND PRESSURE TESTING
REQUIREMENTS. REFER TO SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS.
ALL JOINTS WHERE DISSIMILAR METALS OCCUR MUST BE PROVIDED WITH A DIELECTRIC BREAK.
RUNOUT PIPING TO ALL VAV TERMINAL UNITS, FAN COIL UNITS, AND OTHER HYDRONIC TERMINAL
DEVICES MUST BE 3/4" UNLESS NOTED OTHERWISE ON PLANS.
INSTALL MANUAL AIR VENTS AT THE HIGH POINT OF PIPING SYSTEM ON EACH LEVEL FOR
HYDRONIC SYSTEMS.
PROVIDE PETE'S PLUGS AT ALL DDC CONTROL DEVICES IN HYDRONIC PIPING.
ALL MANUAL ISOLATION VALVES MUST BE ORDERED WITH EXTENDED STEM LENGTH BEYOND THE
INSULATION THICKNESS.
ALL MANUAL ISOLATION BALL VALVES MUST BE TWO-PIECE, FULL PORT, BRONZE BODY WITH
STAINLESS STEEL TRIM (MINIMUM 150 PSIG RATED).
CONDENSATE DRAIN PIPING MUST BE SLOPED DOWN AT LEAST 1% IN DIRECTION OF FLOW.
A.
B.
C.
D.
E.
F.
G.
H.
INDOOR DESIGN CONDITIONS
AREA
RELATIVE HUMIDITY
TELECOMMUNICATION ROOMS CLASS B * 41-95
DESIGN
TEMPERATURE
DB (°F) MAX (%) MIN (%)
80 8
CODE CRITERIA AND DESIGN CONDITIONS
APPLICABLE
CODES
STANDARDS
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
1.2 W/FT2
AMBIENT
DESIGN
CONDITIONS
COOLING DRY BULB DESIGN TEMPERATURE
(0.4%)
LOAD
CRITERIA
EXISTING WALL U-VALUE
ROOF U-VALUE (ASSEMBLY DESCRIPTION BELOW)
2021 INTERNATIONAL PLUMBING CODE
ELEVATION
CLIMATE ZONE (IECC - 2021)
WINDOW UNIT U-VALUE
PLUG LOADS
WINDOW UNIT SOLAR HEAT GAIN COEFFICIENT
100°F
68°F
18°F
105°F
2,441 FEET
NFPA 90A (2020) - STANDARD FOR THE INSTALLATION OF
AIR-CONDITIONING AND VENTILATING SYSTEMS
MEAN COINCIDENT COOLING WET BULB DESIGN TEMPERATURE
(0.4%)
HEATING DESIGN TEMPERATURE
(99.6%)
AMBIENT AIR-COOLED HEAT REJECTION TEMPERATURE
3B
0.326
BTU/(H-FT²-°F)
0.125
BTU/(H-FT²-°F)
0.60
BTU/(H-FT²-°F)
0.80
2.0 W/FT²
LIGHTING LOAD
5 KW1-RACK LOAD
2-RACK LOAD 7.5 KW
3-RACK LOAD 8.5 KW
4-RACK LOAD 10 KW
TELECOMMUNICATIONS ROOM LOADS
DATA CENTER CLASS A1 * 72-81 60 30
NFPA 75 (2020) - STANDARD FOR THE FIRE PROTECTION OF
INFORMATION TECHNOLOGY EQUIPMNET
OIT - INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACES
TELECOMMUNICATION ENCLOSURE ROOMS 60-85 80 8
* TEMPERATURE AND HUMIDITY CONDITIONS AS MEASURED
AT RACK INLET
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Spring, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12/23/2022
519-21-900
EALJW
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONSTRUCTION DOCUMENTS
HVAC GENERAL NOTES AND DESIGN
DATA
M-001
-2
-9
M -0
/2
/1
.p
T
CO2
M
H
Ƨ
P
CO
NO2
LH
Q
AIRSIDE SYMBOLS
14 / 8
14ø
14 / 8ø
PIPING SYMBOLS
CONTROLS SYMBOLS
GENERAL SYMBOLS
G
CHS
CHR
W
HWS
HWR
CD
CWS
CWR
1%
L/G
M
M
M
M
M-###
FCU-1-2
EQUIPMENT NUMBER IN BUILDING
BUILDING NUMBER
TRUE
NORTH
PLAN
NORTH
HVAC SYMBOLS
NOTE:
NOT ALL OF THE SYMBOLS ON THIS SHEET ARE NECESSARILY USED IN THIS PROJECT.
T
(U)
(E-U)
NEW OR RELOCATED
MECHANICAL EQUIPMENT
EXISTING MECHANICAL EQUIPMENT
TO REMAIN
EXISTING MECHANICAL EQUIPMENT
TO BE REMOVED
POINT OF NEW CONNECTION
NOTE BY SYMBOL (DEMOLITION)
NOTE BY SYMBOL (NEW WORK)
3/4" UNDERCUT DOOR
ISOMETRIC VIEW
EQUIPMENT TAGS
NORTH ARROW
TEMPERATURE SENSOR (DDC)
(FIGURE NOTES UNIT SERVED)
THERMOSTAT
(FIGURE NOTES UNIT SERVED)
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
EXHAUST AIR DUCT RISER
NEW OR RELOCATED CEILING-
MOUNTED SUPPLY AIR DIFFUSER
NEW OR RELOCATED CEILING-
MOUNTED RETURN AIR GRILLE
NEW OR RELOCATED CEILING-
MOUNTED EXHAUST AIR GRILLE
EXISTING CEILING-MOUNTED
SUPPLY AIR DIFFUSER TO REMAIN
EXISTING CEILING-MOUNTED SUPPLY
AIR DIFFUSER TO BE REMOVED
EXISTING CEILING-MOUNTED
RETURN AIR GRILLE TO REMAIN
EXISTING CEILING-MOUNTED
RETURN AIR GRILLE TO BE REMOVED
EXISTING CEILING-MOUNTED
EXHAUST AIR GRILLE TO REMAIN
EXISTING CEILING-MOUNTED
EXHAUST AIR GRILLE TO BE REMOVED
NEW OR RELOCATED DUCTWORK
EXISTING DUCTWORK TO REMAIN
EXISTING DUCTWORK TO BE REMOVED
RECTANGULAR DUCT - FIRST
FIGURE IS SIDE SHOWN IN INCHES
ROUND DUCT (FIGURE=SIZE IN INCHES)
OVAL DUCT (FIGURE=SIZE IN INCHES)
ACOUSTICALLY LINED DUCT. FIGURES
ARE INSIDE CLEAR DIMENSIONS IN
INCHES. INCREASE SHEET METAL SIZE
14 / 8ø
ELBOW WITH TURNING VANES
RADIUS ELBOW
MANUAL VOLUME DAMPER (WITH
LOCKING QUADRANT)
SMOKE DETECTOR
CARBON DIOXIDE SENSOR
DUCT AIRFLOW STATION
PRESSURE SENSOR
HUMIDITY SENSOR OR HUMIDISTAT
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
DIFFERENTIAL PRESSURE SENSOR
MOTORIZED ACTUATOR
OPPOSED-BLADE CONTROL DAMPER
PARALLEL-BLADE CONTROL DAMPER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
NEW OR RELOCATED PIPING
EXISTING PIPING TO REMAIN
EX…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .