ATT 7 - Vol 3-Drawings-EHRM-Big Spring.pdf

PDF 17 MB Posted

Attached to
Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)
Solicitation number
36C77624B0004_1
Issued by

About this file

This document appears to be a set of drawings associated with the federal contract opportunity for "Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)". The solicitation number is 36C77624B0004_1 and the agency is the Department of Veterans Affairs Technology Acquisition Center Austin. The contract is for infrastructure upgrades to the main building at the VA facility in Big Spring, Texas. The document contains technical drawings and schematics related to the construction and upgrade work required under this contract opportunity.

View the file

Other files

File Type Posted
S07 - Bid Abstract Big Spring - Signed.pdf PDF
S30 - Bid Opening Attendance - Big Spring.pdf PDF
GI100.pdf PDF
36C77624B0004 0003 s.pdf PDF
Design Alert 11 - Device Cables in Telecom Spaces.pdf PDF
Big Spring EHRM - Technical Questions _ AE Responses.pdf PDF
000110 Table of Contents.pdf PDF
321216.pdf PDF
061000 Rough Carpentry.pdf PDF
CIVIL Bid Set.pdf PDF
36C77624B0004 0002 signed.pdf PDF
Big Spring EHRM - Site Visit Sign-In Sheet - 5.2.24.pdf PDF
Amend 0001 ATT 1 - Vol 2-Specifications-EHRM-Big Spring - Rev 4.30.24.pdf PDF
Amend 0001 ATT 3 - VA.BSP EHRM Drawings-Conformed Set Vol 2.pdf PDF
36C77624B0004 0001 signed.pdf PDF
Amend 0001 ATT 2 - VA.BSP EHRM Drawings-Conformed Set Vol 1.pdf PDF
ATT 6 - Vol 2-Drawings-EHRM-Big Spring.pdf PDF
ATT 8 - Vol 4-Drawings-Mechanical Addend-EHRM-Big Spring.pdf PDF
ATT 11 - RFI Responses 2023-EHRM-Big Spring.pdf PDF
ATT 1 - Vol 1-Specifications-EHRM-Big Spring.pdf PDF
ATT 12 - Wage Rates-Howard Co-1-5-24.pdf PDF
ATT 5 - Vol 1-Drawings-EHRM-Big Spring.pdf PDF
ATT 9 - Vol 5-Drawings Addendum-EHRM-Big Spring.pdf PDF
ATT 13 - Limitations on Subcontracting.pdf PDF
ATT 14 - Site Visit Instructions - Big Spring.pdf PDF
ATT 2 - Vol 2-Specifications-EHRM-Big Spring.pdf PDF
Solicitation - 36C77624B0004_1 - EHRM Infra Upgrades - Big Spring.pdf PDF
ATT 4 - Informational-Asbestos Survey Report 2016-EHRM-Big Spring.pdf PDF
ATT 10 - SOW-EHRM-Big Spring.pdf PDF
ATT 3 - Narrative-EHRM-Big Spring.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLICABLE CODES AND STANDARDS

CODE CRITERIA AND DESIGN CONDITIONS

APPLICABLE CODES

INTERNATIONAL BUILDING CODE

PG-18-1, MASTER CONSTRUCTION SPECIFICATION INDEX

PG-18-3, DESIGN AND CONSTRUCTION PROCEDURES

PG-18-4, STANDARD DETAILS AND CAD STANDARDS

PG-18-5, EQUIPMENT GUIDE LIST

PG-18-9, SPACE AND FACILITY PLANNING CRITERIA

PG-18-10, DESIGN MANUALS:

FIRE PROTECTION

PG-18-15, VA A/E DESIGN SUBMISSION REQUIREMENTS

PG-18-17, ENVIRONMENTAL COMPLIANCE PROGRAM

H-18-8, SEISMIC DESIGN HANDBOOK

SPECIAL DESIGN REQUIREMENTS

A/E QUALITY ALERTS

A/E DESIGN ALERTS

VA 0055, ENERGY AND WATER MANAGEMENT PROGRAM

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

NFPA 70, NATIONAL ELECTRICAL CODE

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT

NFPA 101, LIFE SAFETY CODE

NFPA, NATIONAL FIRE CODES – ALL REFERENCED BY NFPA 101 AND UBC

NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS

PL 100-678 PUBLIC BUILDINGS AMENDMENT ACT

UL FIRE PROTECTION EQUIPMENT DIRECTORY

UL FIRE RESISTANCE DIRECTORY

UL BUILDING MATERIALS DIRECTORY

NOTE DESCRIPTION

FIRE SUPPRESSION GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

NOTE DESCRIPTION

A.

FIRE SPRINKLER PERFORMANCE REQUIREMENTS

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING

OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDINGS 1, 2, 18 AND 25 WILL BE MODIFIED BY

RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO

SPACE FUNCTION, NEW DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE

WITHIN EACH RENOVATED SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I

OCCUPANCIES BASED ON NFPA 13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE SYSTEM SHUT-DOWN AND DRAINAGE IN EACH BUILDING AND ON

EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A MONITORED SPRINKLER SYSTEM WILL

REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE ENTIRE BUILDING OR

FLOOR LEVEL DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.

EXPOSED SPRINKLER PIPE ROUTED IN FINISHED OFFICE AREAS WITH EXPOSED STRUCTURE SHALL BE PAINTED AS DIRECTED BY THE ARCHITECT. PROVIDE COLOR SAMPLES FOR THE ARCHITECT TO

REVIEW AND SELECT. PIPE ROUTING SHALL BE BASED UPON THE SPACE EXPOSED STRUCTURE,

CENTERLINES AND AXES TO ESTABLISH A PATTERN COMPLIMENTARY TO EACH SPACE STRUCTURE.

CONTRACTOR SHALL ARRANGE SPRINKLER HEADS COMPLIMENTARY TO EACH CEILING TYPE.

SPRINKLER HEADS LOCATED IN LAY-IN CEILINGS SHALL BE CENTERED IN RESPECTIVE CEILING TILES (CENTERED IN THE SHORT AXES FOR 2x4 CEILING TILES).

ALL SPRINKLER HEAD LOCATIONS BE COORDINATED WITH THE STRUCTURE, LIGHT FIXTURES, HVAC

ELEMENTS, PLUMBING ELEMENTS, ARCHITECTURAL CEILING TREATMENTS. LAYOUT SHALL BE

COORDINATED WITH AND REVIEWED BY THE ARCHITECT.

THE FIRE PROTECTION AREA DESCRIPTIONS SHOWN ON THE PLAN(S) ARE FOR REFERENCE ONLY.

THE CONTRACTOR SHALL VERIFY WITH THE OWNER AND THE AUTHORITY HAVING JURISDICTION ALL SPACE CLASSIFICATIONS, COMMODITY TYPES AND LOCATIONS OF OBSTACLES PRIOR TO PROVIDING

DESIGN CALCULATIONS OR SPRINKLER SHOP DRAWINGS.

LOCATIONS OF SYSTEM TEST AND DRAIN VALVES SHALL BE COORDINATED WITH THE OWNER BY

SPECIFICALLY CALLING TO THE OWNERS ATTENTION THE LOCATIONS OF THESE SUB-SYSTEMS.

PROVIDE STORAGE CABINET PAINTED RED SIZED TO ACCOMMODATE SIX SPRINKLER HEADS OF EACH

TYPE PROVIDED ON THE PROJECT. PROVIDE PROPERLY SIZED WRENCH(ES) TO FIT SPRINKLER

HEADS (TO BE LOCATED IN THE CABINET). FASTEN CABINET TO WALL ADJACENT TO FIRE SPRINKLER

VALVING AT 5'-0" AFF TO CENTERLINE OF CABINET.

MAKE ALL NECESSARY OFFSETS FOR EXISTING ARCHITECTURAL, STRUCTURAL AND MECHANICAL

FEATURES OF THE BUILDING WHERE NECESSARY TO ACCOMPLISH THE WORK AS INDICATED.

CONTRACTOR SHALL PROVIDE "AS-BUILT" DRAWINGS IN PDF AND "AUTOCAD OR EQUIVALENT" FILES

ON DISK AT END OF INSTALLATION.

ELECTRICAL ROOMS SHALL BE PROVIDED WITH INSTITUTIONAL TYPE AUTOMATIC SPRINKLER HEADS

IN ACCORDANCE WITH AUTHORITY HAVING JURISDICTION.

WHEN PENETRATING FIRE-RATED ENCLOSURE, PROVIDE FIRE-RATED SEALS AROUND

PENETRATIONS EQUAL TO THE FIRE RATING OF THAT ENCLOSURE. REFER ARCHITECTURAL FOR FIRE

RATED ENCLOSURES. ALL FLOORS ABOVE GRADE SHALL BE FIRE-RATED.

EXPOSED PIPING AND HANGERS SHALL BE CLEANED BEFORE BEING PAINTED.

SPRINKLER PIPING SHALL BE ROUTED TO AVOID INTERFERENCE WITH SANITARY WASTE AND VENT PIPING, CHILLED WATER PIPING, DUCT WORK AND DIFFUSERS, ELECTRICAL LIGHT FIXTURES AND

CONDUIT AS SHOWN ON THE CONTRACTOR'S SHOP DRAWINGS.

SPRINKLER HEADS 7'-0" OR LESS ABOVE FINISHED FLOOR SHALL BE PROVIDED WITH SPRINKLER

HEAD GUARDS.

EXPOSED PIPING SHALL BE PAINTED RED AND PROVIDED WITH PIPING LABELS.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

FIRE SPRINKLER GENERAL NOTES

AND DESIGN DATA

F-001

-2

-9

F -0

/2

/1

.p d f

114A

114B

18B

3A

87I

87K

20A

113B

107A

107B

96C

96B

151 150 116

127 128

72F

138A

18A

147C

65B

91G

91J

119A

119B

125D

120D

122A 122B

122D 122C

124A 124B

124C 124D

125A

125C 125B

136137138

147B

147A

ATS

ENG.

145A

120C

120B 120A119C

119C

113A

112H

106B

106A

104A

105A

100A

98 97

164A162 161160

85A

158A82

91C

95A

95B

96A

96D96E

91B

91D 91E

91H

91A 91I

91F87E

87D

9090A

87C 87B

87O

87P

87N 87M

87A

87F87G

87L

152A

153B

153A

1B

1D1E

4B

4A

66A78910

65A

72G

55A

53B5353A

28A

31E

31A

31E

31B

31C

91K

91M91N

91L

112A

HEALTH

BENEFIT

ADMIN.

4C

4E 4F

64B

64A

67A

112B

112C

112D

112E

112F

112G

HEALTH

BENEFIT

ADMIN.

EYEWASH

RO WATER

ICE MACHICE

EYEWASH

EYEWASH

Hose Bibb

3 washers

WH

washer

CLOSET

MENS

BATH RM

MALE

REST RM

CHEMICAL STORAGE

CART WASH

ELECTRICAL CLOSET

HOUSE

KEEPING

SUPPLY

MALE

REST RM

DRESSING RM

DRESSING RM

MALE

REST RM

EMS

SOILED

LINEN RM

REST RM

MALE

REST RM

ELECTRICAL RM ELECTRICAL RM CLOSET

HOUSE KEEPING

TELECOM

CLOSET

SCALE

SOILED UTILITY

REST RM

REST

RM STAFF

TOILET

DATA IRM

TELECOM CLOSET

REST RM

ELECTRICAL RM

HOUSE

KEEPING

FEMALE

REST RM

CLOSET

HOUSE

KEEPING

STORAGE CLOSET

FP

FP

NURSE OFFICE ER

MED DISPENSING

PHARMACY VAULT

SMOKING SHELTERSMOKING SHELTER

FP

CLINIC

WAITING

AREA PRIMARY CARE

SOCIAL

WORKER

NURSE

Office

Primary Care Nurse

ELECTRICAL RM

MED

DISPENSARY

STAIR

EXAM

RM

(PURPLE)

CLINIC

(ORANGE)

COPY RM NURSE CLINIC (GOLD)PHYSICAIN (GOLD)

VACANT

CLINIC

ROOM

(GOLD)

EXAM ROOM (GOLD)

NURSE TRIAGE (SILVER)

PHYSICAIN

(SILVER)

EXAM

RM

(SILVER)

EXAM

ROOM

(SILVER)

NURSE

TRIAGE

(PURPLE)

EXAM

RM

(PURPLE)

PHYSICIAN

(PURPLE)

TELE- HEALTHWOMANS

HEALTH

WHEEL

CHAIR

AREA

RECEPTION CONTROL

FP

STAIR

- C

TEXAS

VETERANS

COMMISSION

CLOSET

D.A.V

CLINIC EXAM (GOLD)

physicain (ORANGE)

NURSE

CLINIC

(ORANGE)

Pahamacist health behavior Coor, AUDIOLOGIST

TRIAGE

UC BED

BREAK RM

MED

RM

CORRIDOR

PATIENT

AFFECT

RM / EMS

PATIENT CLOTHING

LINEN REPAIR

OUTDOOR EQUIP

BREAK RM

LAUNDRY FOREMAN

CLEAN

LINEN

STORAGE

SOILED LINEN

RM / EMS

LINEN

RM EMS

FEMALE

REST

RM EMS

RELEASE OF

INFORMATION

CHIEF

HIMS

STORAGE

EQUINOX RM IRM FILE RM

CLINICAL

PHARMACY

MY

HEALTHY

VET

TELE-

HEALTHPHARMACY WAITING AREA

PHARMACY PATIENT COUNSELING

LINEN CHUTE

BREAK RM

FIRE

ALARM

PHARMACY CHIEF

SECY

AUDIOLOGY

BOOTH

SUPPLY

RM IRM

OFFICEOFFICE

NARC VAULT

STORAGE

CONSULTING RM

INPATIENT PHARMACY

IV

RM

BREAK RM

MEDICATION DISPENSINGINGREDIENT CONTROL

DIET

OFFICE

TRAVEL AGENTAGENT CASHIER

NUTRITION AND FOOD

CHIEF

NUTRITION

FOOD AND SVC

DISHWASHER AREA

FP

POTS

AND

PANS

WASH RM

WALK-IN

REFRIGERATION

FREEZER

FREEZER

WALK-IN REFRIED

WALK-IN

REFRIGERATION

DESSERT / NOURISHMENT AREA

VEGETABLE PREP

WALK-IN

REFRIGERATION

STORAGE

C&P

VACANT

STAFF

OPHTHALMOLOGY

NURSE

OFFICE

PROVIDERS OFFICEEXAM RM

LOCKER RM

TRAINING RM

CHIEF POLICE

PATIENT

REPRESENTATIVE

DIRECTOR

FP

FEE

BASIS

DIRECTORS

STAIR

- B

COMMUNCATION

SPECIALIST

STORAGE

VOLUNTARY

STORAGE

VCS

STORAGE

A/O

CANTEEN OFFICE

FP

FEMALE

REST RM

CHAPEL

FP

CHAPLAIN

STAIR - A

CONFERENCE RM

A/O

INTEGRATED

CARE

A/O

TO THE

DIRECTOR

HEALTH

SYSTEM

BENEFITS

A/O TO

CHIEF OF

STAFF

COPIER

ADMIN OFFICER

ASSOCIATE DIRECTOR

ASST

COS

ADMIN

DIRECTOR

CHIEF STAFF

TELEPHONE

SWITCH

BOARD /

IRM

CORRIDOR

ELEVATOR

CORRIDOR

CORRIDOR

TOILET

CHEMICAL STORAGE

MALE REST RM

FP

TOILET

ELEVATOR

FP

STAIR

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

PHARMACY PATIENT COUNSELING

C&P

VACANT

C&P

VACANT

C&P

FILEROOM

C&P

EXAM

C&P

EXAMC&P

EXAM

C&P

EXAM

C&P

EXAM

C&P

EXAM

C&P

EXAM

CORRIDOR

OFFICE RM

ARMORY RM

HOLDING

RM

POLICE CHECK IN

PATIENT

REPRESENTATIVE

DIRECTOR

PRIVACY

OFFICER

PATIENT

REPRESENTATIVE

DIRECTOR

CHIEF

VOLUNTARY

VOLUNTARY

SERVICE

NURSE

MANAGER

ASST TO

CHIEF

NURSING

NURSE

CHIEF

HEALTH

SYSTEM

BENEFITS

A/O

INTEGRATED

CARE

HK

AOD

EQUIPMENT

STORAGE

UC BED

UC BED

UC BED

ISOLATION

ROOM

AUDIOLOGISTAUDIOLOGY TECH

TELE- HEALTH

WAITING

AREA

VACANT

W A T E R

S U P P L Y

DISH

ROLLING SHUTTER

ROLL UP DOOR 10'2"

UP

WOMEN'S

INFORMATION

RAMP

RAMP

RAMP

VCS

STORAGE

FP

N

FS

TS

D

D S

C

CHR

CHS

(N) O.A. DUCTWORK

CONNECTION POINT.

8x6

3/4" 1"

220A

- 221 222

227 227A

216B

216A

212C 212D

212A

206 205 204 203 202

201K 201I 201H 201G 201F 201E

200A

200201B 201C 200C

201D 200B

265A

237A

236A

237 238

239A

240 241 242

243C

243B

243A 243 243D 244

246A

233A 234 234A

234B 234C

234D

233B

232A

232B

231A

231 AND 232

232E232D232231B

04 01 02

235A

258A 259A

255 255A

252 252B

252A

264B

264A

264A

- 262 261

209 208 207

212B

201K

294 283

231C

212E

212F

213A

HOUSE KEEPING

MENS TOILET

ELECTRICAL

PREP RM

STORAGE

TOILET

TOILET

EMPLOYEE TOILET

FLUORO

SCREEN

DATA RM

SHOWER

HOUSE KEEPING

STORAGE

PATIENT REST RM

DRESSING RM

ELECTRICAL

RM

STORAGE

UNISEX TOILET

CLEAN

AND

STERILE

SUPPLY

SOIL

DISPOSAL

SCRUB

DRESSING

RM

SCHEDULING

CARDIO PULM

SECTION

ELECTRICAL

SOILED HOLDING

AND DISPOSAL

CRASH CART

ELECTRICAL

RM

TELEPHONE

CLOSET

GURNEY

NURSE STATION

PATIENT

HOLDING /

RECOVERY

CLEAN CORE

CAT SCAN

STAIR

ELEVATOR

MALE

STAFF

LOCKER

STAFF

LOCKER

SURGY

CLERK

STAFF LOUNGE

FEMALE

TOILET

FP

STAIR -

A

FP

SUPPLY

NUCLEAR MEDICINE

FP

ULTRA SOUND

RADIOLOGY

OFFICE

CONFERENCE

RM

X-RAY

CHECK-IN

WORK RM

R/F AND SPECIAL

PROCEDURE

GENERAL

RADIOLOGY

RADIATION

TOILET

STORAGE

MECH

GU RM

TOILET

SCOPES

CLEAN UP

STER AND

STORAGE

TOILET

EGD / COLONOSCOPY

GENERAL OR

EQUIP

STORAGE

SCRUB

GENERAL OR

CONTROL

RM

EQUIP RM

PREP RM

DEXA

ULTRA

SOUND

RADIOLOGIST

OFFICE RM

X-RAY WAITING AREA

EKG / STRESS TEST

/ TREADMILLPFT RMECO CARDIOGRAM

OFFICE

CARDIO PULM

SUPERVISION

OFFICEBREAK RM

LAB

DENTAL LAB

DENTAL

CLINIC

OFFICE

SECY PM

AND RSOFFICEPROSTHETICS STORAGE

SPD STORAGE

SPD

PREP ROOM

SPD

DECONTAMINATION

MENS

STORAGE

PROSTHETIC OFFICE

FP

PROSTHETICS

LINEN

CHUTE

PM AND

RS PGM

MGR

OFFICE

PHYSICAL THERAPYOCCUPATIONAL THERAPY

WOMENS

KITCHEN

CONFERENCE

RM

VESTIBULE

CONFERENCE RM

TOILET

STAIR

STAIR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

MECH ROOM

LOCKER RM EMPLOYEE

REST RM

WORK AREA

BLOOD DRAWTOILET

STORAGESTORAGE

DARK RM

STORAGE

EEG AND HOLTER

MONITOR OXYGEN

STORAGE

CLOSET

TOILET

STAIR -

C

DENTAL

STORAGE

FP

FP

LAB

LOUNGE

OFFICE

OFFICE

OFFICE

LAB

STORAGE

LABSTORAGEAUTOMATED CHEMISTRYLAB SVCOFFICE

LABDENTAL LAB DENTAL

OFFICE

DENTAL

SURGY

OPERATORY

DENTAL

DENTAL

OPERATORY

DENTAL

OPERATORYDENTAL HYGIENEX-RAY

DENTAL

WAITING

RMSECY

ESCORT

SVC

LINEN

CHUTE

TOILET

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

LAB PHLEBOTOMY

CORRIDOR

CORRIDOR

T

T

T

T

T

T

TO ROOF OF

1ST FLOOR

TO ROOF 1ST FLOOR

LOCKER

RECEPTION WINDOW

356A

373308

300C

318A318A

364A

320A

341A

350A

369A

368A

365A

374A374A376A377A 300E

300G300A

300E

333A

314A

325 326

328 329

331 332

338 338A 340 341

345 346 346A

351A

351 352 352A 353A

353 354

360A

366366A

367368

374375

378300F

300D 301A

302303 303A

305A

310A

311A

312A 312313

313A

315A

315B

316317318

320322

HC BATH

ELECTRICAL

ELECTRICAL

RM

STORAGE

PATIENT

TOILET

SHOWER

STORAGE

STAFF

TOILET

ANTE RM

STAIR - DSTAIR

- B

PATIENT

TOILET

SHOWER

PATIENT

TOILET

SHOWER

TOILET

PATIENT

TOILET

SHOWER

HOUSE

KEEPING

FP

SECRETARY

NURSING

SOILED UTILITY RM

EQUIP

STORAGE

STORAGE

INFO

RESOURCE

MGMT

HOUSE

KEEPING

FP

STORAGE

BATH

TELE

CLOSET

TOILET

TOILET

TOILET

BATH /

SHOWER

BATH /

SHOWER

BATH /

SHOWER

FEMALE

TOILET

CLOSET

MALE

TOILET

TOILET

EMP HEALTH

STORAGE(O2)

CLOSET

ANTE RM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDORCORRIDOR

2 BED PATIENT

RM

PATIENT

TOILET

SHOWER

OFFICE TUB

RM

CLEAN LINEN

CLEAN

UTILITY

AND ICE

MACH RM

MED

PREP

NURSE

STATION

CC

IV STORAGE /

COMP RM

2 PATIENT RM

BATH /

SHOWER

HEAD NURSE

OFFICE

BIO-HAZARD

RM

STAIR -

C

DUMB

WAITER

PHYSICIAN

OFFICE

STORAGE

STAFF OFFICE

AFGE

OFFICE

AFGE

OFFICE

OFFICE

TELECOM

CLOSET

OFFICE

BATH

OFFICE OFFICE

BATH BATH

LOGISTICS STORAGE LOGISTICS

LOGISTICS

Existing

1700 Sq. Ft.

MECH RM

STAIR - E

FP

SPD

ELEVATOR

BREAK

ROOM

VACANT

HC

TOILET

RESIDENCE

RESIDENCE

RESIDENCE

RESIDENCE

STAFF

OFFICE

STAFF

OFFICE

OFFICE

BREAK RM

FP

RESIDENCE

LACTUTATION

ROOM

LOGISTICS

3 PPLE

RESIDENCE

WAITING RMOFFICE

SECY

AMB.

ADMINISTRATOR

OFFICE

CHIEF NURSING

OFFICE

CHAP

OFFICE

CHAP.

OPTIONAL

CONTRACTOR

ENG.

EXAM ROOM

EYE CLINIC

PATIENT

RM

PATIENT

RM

BATH

TB RMTB RM

BATH

PATIENT

RM

PATIENT

RM ANTE

RM

TOILET

SPD

STORAGE

2 BED PATIENT

RM

1 BED PATIENT

RM

STAIR -

A

1 BED PATIENT

RM

2 BED PATIENT

RM

2 BED PATIENT

RM

TOILET

TOILET

TOILET

TOILET

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

TOILET

STAIR

DOWN

18 19 20 22 24 25 27 28

F-401

F-401

F-401

4442 50

F-401

(E) FIRE STANDPIPE (E) FLOOR

ZONE VALVE(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE (E) FLOOR

ZONE VALVE

F-401

F-401

KEY PLAN NTS

18 19 20 22 24 25 28

F-402

F-402

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE (E) FLOOR

ZONE VALVE

F-402

F-402

18 19 20 22 24 25 27 28

F-402

F-402

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

F-402

F-402

FIRE SPRINKLER NOTES

DESCRIPTIONNOTE

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 1 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW

DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED

SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA

13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE

SYSTEM SHUT-DOWN AND DRAINAGE ON EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A

MONITORED SPRINKLER SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A

FIRE WATCH OF THE ENTIRE BUILDING OR FLOOR LEVEL DURING THE ENTIRE PERIOD THE

SPRINKLER SYSTEM IS SHUT-OFF.

BUILDING 1’S FIRE SUPPRESSION SYSTEM INCLUDES A FIRE PUMP, THREE STAIRWELL WET

STANDPIPES AND FLOOR CONTROL VALVES WITH FLOW SWITCH AND DRAIN ON EACH FLOOR IN

EACH OF THE THREE STAIRWELLS. THE BUILDING IS SEPARATED INTO THREE SMOKE

COMPARTMENTS. EACH SMOKE COMPARTMENT HAS A SEPARATE FLOOR CONTROL VALVE ON

EACH FLOOR. SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS

AND BRANCH PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

BUILDING 1 - OVERALL FIRE PLAN -

LEVEL 01, 02, 03

F-101

-2

-9

F -1

/1

/1

.p d f

1" = 30'-0"

BUILDING 1 - LEVEL 01 - OVERALL FLOOR PLAN

15' 30' 60'0'

1" = 30'SCALE

1" = 30'-0"

BUILDING 1 - LEVEL 02 - OVERALL FLOOR PLAN

1" = 30'-0"

BUILDING 1 - LEVEL 03 - OVERALL FLOOR PLAN

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

N.T.S.

N

40054012

40684066

4019 4014

4030 4027

40504052

4079 4080

4158 4157 4156

4122 4129 4136

4128 4135

4127 4134

41014095

4143 4144

4018 4008 4098 4106

409 476

STAFF

PUBLIC

PUBLIC

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTHMENTAL

HEALTH

MENTAL

HEALTH

GRIEF

OEF/OIF

MANAGER

OEF/OIF

PROGRAM

OEF/OIF

CASE MANAGER

OEF/OIF

CASE MANAGER

OEF/OIF

PATIENT

SAFETY

PATIENT

SAFETY

SUICIDE

PREVENTION

MEDICAL STAFF STAFF

CONFERENCE

CHAPLAIN'S

CHAPLAIN'S

SOCIAL

WORK

SOCIAL

WORK

SOCIAL

WORK

SOCIAL

WORK

GROUP

HUD

VASH

NIEC

SOCIAL WORK

CHIEF'S

MECHANICAL

VOLUNTEER

COMPUTER

MENTAL

HEALTH

MENTAL HEALTH

CHIEF'S MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

PSYCHOLOGY

PSYCHOLOGY

PSYCHOLOGY

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

CONTROL

RELAXATION

CWT

TRAINING

GROUP

GROUP

GROUP

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

EXAM

STAFF

MECHANICAL

RECREATION

THERAPY

MULTI-PURPOSE

PUBLIC

PLAY

TELE-MEDICINE

NURSE'SNURSE'S

SOCIAL

WORK

MENTAL

HEALTH

MENTAL

HEALTH

MENTAL

HEALTH

COPY/

PUBLIC

WORK/

TELE-MEDICINE

PATIENT

PATIENT

WOMEN'S

STAFF

EXISTING EXISTING

TOILET

TOILET

TOILET

OFFICEOFFICE

OFFICE

OFFICE

OFFICEOFFICE

COUNSELING

OFFICE

SUPPORT

OFFICE OFFICE

CLERICAL

SECRETARY

OFFICE

OFFICE

LOUNGE/LIBRARY BREAKROOM

ROOM

OFFICE

OFFICE

OFFICE

SECRETARY

OFFICEOFFICE

ROOM

OFFICE

OFFICE

OFFICE

ROOM

TOILET

AREA

ROOM

ADMIN

OFFICE CLERICAL

OFFICE

OFFICE

OFFICE

EXAM ROOM

EXAM ROOM

EXAM ROOM

OFFICE

OFFICE OFFICE OFFICE

OFFICE

OFFICE

ROOM

ROOM

LAB

ROOM

ROOM

ROOM OFFICE OFFICE

OFFICE OFFICE

OFFICE STORAGE

ROOM

LIBRARY

BREAKROOM

ROOM

ROOM

ROOM

TOILET

ELECTRICAL

STORAGE

AREA

ROOM

OFFICEOFFICE

OFFICE

TOILET

OFFICE

OFFICE OFFICE

COMPUTER

ELECTRICAL

LOBBY

RECEPTION

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR CORRIDOR CORRIDOR CORRIDOR

CORRIDOR

TOILET

COPY

STAIR #1

STAIR #2

STAIR #3

STAIR #4

STAIR #5

TOILET

ROOM

TOILET

LOUNGE

VENDING

DATA

HAC STORAGE

HAC

MECH.

HAC

TOILET

DATA

DATA DATA

DATA

511513

532A

564A

524A

516A

522A

571A

569 567 561

566515

521A 520 518

517 516

510A

509A

509 508

508A

507A

570A

563A

557556555

554A

566A

554553

553A

552A

552551

551A

550A

550549

549A

548A

541540

530529

528A

529A

527A

526A

526525

523522

515A

521D

STAIRWELL

E

FP

COMMUNICATION

HOUSE

KEEPING

TOILET

MECHTOILET /

SHOWER

TOILET /

SHOWER

TOILET /

SHOWER

FP

FP

CORRIDOR

TOILET /

SHOWER

FIRE STAND PIPE IRM FP

HOUSE

KEEPING

LINEN

STORAGE

LINEN CHUTE

VENDING ALCOVE

CORRIDOR

LOBBY

CORRIDORCORRIDOR

SEMI-PRIVATE DINING OFFICE

STAIR - A

SENSORIUM PATIENT RM PATIENT RM CORRIDOR

ELECTRICAL

STAIR - B

PATIENT RM

TOILET

SHOWER

TOILET

PATIENT RM PATIENT RM

TOILET /

SHOWER

TOILET

PATIENT RM

HEAD

NURSE

(ECTU)

MED RM

BREAK RM

WAITING

NURSE WORK

NURSE STATION

FAMILY RM

LAUNDRY

CLEAN UTILITY

PATIENT RM

TOILET

PATIENT RM

STAIR - D

ELECTRICAL

PATIENT RM

SOCIAL WORKER

STORAGE

DUMB

WAITER

TOILET

PATIENT RM TUB AND

SHOWER RM

MULTI PURPOSE

STAIR - E

SUPPLY

RECREATION THERAPIST

RECREATION OFFICERECREATION OFFICEKITCHEN

TOILET

TOILET

PATIENT RMPATIENT RM

TOILET

TOILET

PATIENT RMPATIENT RM

TOILET

TOILET

PATIENT RMPATIENT RM

TOILET

TOILET

PATIENT RM

CLEAN LINEN

TOILET

DAY RMDIETITIAN

SPD STORAGE

STAIR -

C

LINEN CHUTE

SOILED UTILITYPATIENT RM

TOILET

SHOWERPATIENT RM

PATIENT RM

TOILET /

SHOWER

TOILET

SHOWER

PATIENT RMPATIENT RM

PATIENT RM

PATIENT RMPATIENT RM

TOILET

STORAGE

DINING RM

TOILET /

SHOWER

TOILET

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

FOURTH FLOOR ROOF

FOURTH FLOOR ROOF

LOCKER

618G

618F618E 618D

NFS

STORAGE

RENOVATE

CALL

CENTER

619C

616B

602A

613 619A

627B

619B

604A

600A

606A

607B

607A

626A

612A

616A

618A

618B

618C 619

619E

619D 620 621 622

623 623A

625B

627A

627C

629A

630A

600B

603604

606B

607C

612611

610609 609A608

607D

HOUSE KEEPING

DUMP

WAITER

WOMENS TOILET

CLOSET STORAGE

STORAGE

LINEN CHUTE

STORAGE

TOILET

TOILET STAFF

STORAGE

EMS

ENGG

ENGG

TOILET

STORAGE

STORAGE

ENG.

ENGG

CLOSETFP

STAIR

- C

OFFICE

A.D

EEO

A.D.

OFFICE

HAS

STORAGE

IRM

CLOSET

MALE TOILET

STORAGE

UTILITY STORAGE

Wash Room

EMS

MECH RM /

STORAGE

CONFERENCE RMVERA/

MCA/CODING

HASA

STAIR - D

ELECTRICAL CLOSET

FP

TOILET

BREAKROOM

STORAGE

TELEHEALTH

COS

MOBILITY

HAS

WOMENS TOILET

OPERATOR

HAS

CALL CENTER

HB&A

TRANSPORTATION

HAS

CHIEF

HAS

OFFICE

STAFF

INFORMATICS

A.D.

INFORMATICS

A.D.

OFFICE, CHIEF

POSTHETICS

STORAGE

LOGISTICS

FP

ELECTRICAL CLOSET

STAIR

- B

OFFICE, CHIEF

HAS

TOILET

TOILET MALE

STORAGE ENG.

TELEHEALTH

STORAGETELEHEALTH

COS

OFFICE

HAS

OFFICE

HAS

CONFERENCE ROOM

ELEVATOR ELEVATOR ELEVATOR ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

HAS

BREAKROOM OFFICE

LOGISTICS

OFFICE

LOGISTICS

OFFICE

LOGISTICS

VACANT

OFFICE

LOGISTICS

VOLUNTEER

SVC.

STORAGE KEY PLAN NTS

F-403

18 19 20 22 24 25 27 28

F-403

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE (E) FLOOR

ZONE VALVE

F-403

F-403

F-403

F-403

18 19 20 22 24 25 27 28

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

F-403

F-403

F-403

18 19 20 22 24 25 27 28

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

(E) FIRE STANDPIPE

(E) FLOOR

ZONE VALVE

F-403

FIRE SPRINKLER NOTES

DESCRIPTIONNOTE

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 1 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW

DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED

SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA

13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE

SYSTEM SHUT-DOWN AND DRAINAGE ON EACH FLOOR LEVEL OF BUILDING 1. SHUT DOWN OF A

MONITORED SPRINKLER SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A

FIRE WATCH OF THE ENTIRE BUILDING OR FLOOR LEVEL DURING THE ENTIRE PERIOD THE

SPRINKLER SYSTEM IS SHUT-OFF.

BUILDING 1’S FIRE SUPPRESSION SYSTEM INCLUDES A FIRE PUMP, THREE STAIRWELL WET

STANDPIPES AND FLOOR CONTROL VALVES WITH FLOW SWITCH AND DRAIN ON EACH FLOOR IN

EACH OF THE THREE STAIRWELLS. THE BUILDING IS SEPARATED INTO THREE SMOKE

COMPARTMENTS. EACH SMOKE COMPARTMENT HAS A SEPARATE FLOOR CONTROL VALVE ON

EACH FLOOR. SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS

AND BRANCH PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

BUILDING 1 - OVERALL FIRE

SPRINKLER PLAN - LEVEL 04, 05, 06

F-102

-2

-9

F -1

/2

/2

.p d f

1" = 30'-0"

BUILDING 1 - LEVEL 04 - OVERALL FLOOR PLAN

15' 30' 60'0'

1" = 30'SCALE

1" = 30'-0"

BUILDING 1 - LEVEL 05 - OVERALL FLOOR PLAN

1" = 30'-0"

BUILDING 1 - LEVEL 06 - OVERALL FLOOR PLAN

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

BIZHUB 283

SMALL BW

BOILER 3 BOILER 2 BOILER 1

MECH-BOARD

NO.2 COMPRESSOR

FILTER

SOFTNED

CHILLER NO. 1 HEAT CHILLER NO. 2

PUMP PUMP PUMP PUMP

PUMP

PUMP

METER BOARD

PUMP

CHILLER

PLANT 2

PUMP

CONDENSATE

4400-0309

EXCHANGER

UPDN

37B

TOILET STAFF

30A 37C

37D

33C

33D 33

33B

28A

HK

CLOSET

30B

30C

WATER

TEST RM

TOILET /

SHOWERLOCKER STAFF

PUMP RMCHILLER PLANT

WATER

TREATMENT

OFFICE

STORAGE

A/C

SHOP

AUXILIARY

GENERATOR

OPER

OFFICE

OPER

FOREMAN

STORAGE

RECIEVING

AREA

SF 989

BREAKROOM

WAREHOUSE

UP

STAIR

TOWER

BOILER PLANT

Recieving Area

W or k Ta bl e

Mail Clerks

MAIL AND UPS

Office

SENSITIVE DISCU

P S/

A R R

IV

A L S Y

ST

EM

S RECIEVING FILES

EYE

WASH

SPILL

KIT

C B O C S

TO

R A G E/

P

IC

K

U P

CARTS &

EQUIPMENT

AREA

REPRODUCTION AREA

S H

ELF FO

R D

IS

C R

EP

A N C Y O

R N

O N D

ELIV

ER

A B

LE FR

EIG

H T

EI

L S

TO

R A G E

R

EC

Y C

LIN

G

LIFE PACK

STATION

INVENTORY

MANAGER

N

F-404

TR

28B

EXISTING 6"

WATER SERVICE

WITH WET PIPE

FIRE SPRINKLER

VALVE

KEY PLAN

NTS

FIRE SPRINKLER NOTES

DESCRIPTIONNOTE

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 2 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW

DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED

SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA

13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE

SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 2. SHUT DOWN OF A MONITORED SPRINKLER

SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE

ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.

BUILDING 2’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM CHECK

VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING. SPRINKLER

MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS

NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

BUILDING 2 - OVERALL FIRE

SPRINKLER PLAN

F-103

-2

-9

F -1

/1

/2

.p d f

1/16" = 1'-0"

BUILDING 2 - OVERALL FLOOR PLAN

8' 16' 32'0'

1/16" =1'-0"SCALE

TRUE

NORTH

PLAN

F.

O .M

BOILER ROOM

124A

GENERAL STORAGE

CORRIDOR

101C

PUBLIC MALE

TOILET

101D

PUBLIC FEMALE

TOILET

101B

LOBBY

167A

RECEPTION

152C

2 BED RM

152B

2 BED RM

152A

TOILET

52 SF

154A

TOILET

52 SF

154B

2 BED RM

PUBLIC

MALE

TOILET

BREAK ROOM

CORRIDOR

156C

2 BED RM

154C

2 BED RM

PATIENT

LAUNDRY ROOM156B

2 BED RM

PATIENT EMS

162B

HAC

162F

LINEN COLLECTION

ROOM

162E

CLEAN

LINEN

ROOM

162D

TRASH

COLLECTION RM

162C

TELECOM

PATIENT EDUCATION

/ CONFERENCE /

GROUP ROOM

PATIENT EDUCATION

/ CONFERENCE /

GROUP ROOM

EXAM/TREATMENT

ROOM

TREATMENT

ROOM

CORRIDOR

167D

DOMICILIARY

CHIEF

OFFICE

167C

CLINICAL

COORDINATOR

167B

PROVIDER

OFFICE

165A

RESIDENT'S

ENTRY

165B

WAITING

PUBLIC

FEMALE

TOILET

161C

2 BED RM

161A

TOILET

161B

2 BED RM

159A

TOILET

159B

2 BED RM

159C

2 BED RM

157C

2 BED RM

155A

TOILET

157A

TOILET

157B

2 BED RM

155B

2 BED RM

155C

2 BED RM

153C

2 BED RM

153A

TOILET

153B

2 BED RM

151B

KITCHENETTE

151A

TOILET

151C

1 BED

RM SUITE

QUIET ROOM

147A

TOILET

147B

KITCHENETTE

113 SF

147C

1 BED

RM SUITE

FITNESS

143A

TOILET

143B

1 BED RM

141A

TOILET

141B

BARIATRIC ROOM

139A

TOILET

139B

1 BED RM

137A

TOILET

137B

2 BED RM

137C

2 BED RM

135A

TOILET

133C

2 BED RM

135B

1 BED RM

131A

TOILET

133A

TOILET

133B

2 BED RM

131B

2 BED RM

131C

2 BED RM

129C

2 BED RM

129B

2 BED RM

129A

TOILET

127A

TOILET

127B

2 BED RM

127C

2 BED RM

PUBLIC

FEMALE

TOILET

CORRIDOR

134C

2 BED RM

134A

TOILET

132A

TOILET

134B

2 BED RM

132B

2 BED RM

132C

2 BED RM

130C

2BED RM

130A

TOILET

130B

2 BED ROOM

128C

2 BED RM

128A

TOILET

52 SF

128B

2 BED RM

DOMICILIARY

HEALTH

TECHNICIAN 122

CLEAN LINEN

STORAGE

VESTIBULE

124B

PATIENT

LUGGAGE

STORAGE

124C

RECYCLING

PATIENT TV LOUNGE

PATIENT TV LOUNGE

103A

RESIDENT DINING

105B

NON-FOOD STORAGE

132 SF

105C

DISH WASH AND

STORAGE

105A

SERVING UNIT

105D

DIETICIAN'S

WORK

ROOM107

RESIDENT'S KITCHEN

CORRIDOR

ENV. MGMT

STORAGE

HAC

VENDING

PUBLIC

WAITING

MULTI-PURPOSE

ELECTRICAL

ROOM

MECHANICAL

KEY PLAN

8 17

NTS

F-404

F-404

EXISTING 6" WATER

SERVICE WITH WET PIPE

FIRE SPRINKLER VALVE

FIRE

ALARM

PANEL

FIRE ALARM

ANNUCIATOR

PANEL

FIRE SPRINKLER NOTES

DESCRIPTIONNOTE

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 18 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW

DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED

SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA

13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE

SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 18. SHUT DOWN OF A MONITORED SPRINKLER

SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE

ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.

BUILDING 18’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM

CHECK VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING.

SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH

PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

BUILDING 18 - OVERALL FIRE

SPRINKLER PLAN

F-104

-2

-9

F -1

/2

/2

.p d f

1/16" = 1'-0"

BUILDING 18 - OVERALL FLOOR PLAN

8' 16' 32'0'

1/16" =1'-0"SCALE

TRUE

NORTH

PLAN

OC

FOYER

STAFF OFFICE

TYPCIAL RES.

ROOM

TOIL.

1A

TYPICAL RES.

ROOM

TOIL.

2A

TYPICAL RES.

ROOM

TOIL.

3A

TYPICAL RES.

ROOM

TOIL.

5A

LAUNDRY/

SAFE ROOM

TOIL.

10A

TYPICAL RES.

ROOM

TYPICAL RES.

ROOM

TYPICAL RES.

ROOM

TYPICAL RES.

ROOM

TOIL.

8A

ELEC.

PANTRY

TYPICAL RES.

ROOM

TOIL.

6A

SOILED UTIL.

H.A.C.

LAUNDRY

CLEAN

SOILED

TYPICAL RES.

ROOM

TOIL.

7A

GUEST TOIL.

TOIL.

4A

TOIL.

9A

CLEAN

28 SOILED

DINING ROOM

KITCHEN

CORR.

MECHANICAL

CORR.

MEDS

SPA/BATH/SAFE

ROOM

LIVING ROOM

RECEIVING/STORAGE

CORR.

CORR.

C1-25

CORR.

C2-25

DATA

SUPPLIES/EQUIP.

STORAGE

STORAGE

KEY PLAN NTS

(E) FIRE

SPRINKLER

WATER

SERVICE AND

ALARM

VALVING

(E)FIRE ALARM

PANEL

WALL MOUNTED A/C

FIRE SPRINKLER NOTES

DESCRIPTIONNOTE

FIRE SPRINKLER MODIFICATIONS WILL BE LIMITED TO SPACES BEING REMODELED. THE EXISTING OVERHEAD FIRE SPRINKLER SYSTEMS IN BUILDING 25 WILL BE MODIFIED BY RELOCATING EXISTING SPRINKLER HEADS AND BRANCH PIPING AS NECESSARY FOR CHANGES TO SPACE FUNCTION, NEW

DUCTWORK AND ELECTRICAL EQUIPMENT. FIRE SPRINKLER COVERAGE WITHIN EACH RENOVATED

SPACE WILL BE MODIFIED TO PROVIDE ORDINARY HAZARD GROUP I OCCUPANCIES BASED ON NFPA

13. MODIFICATIONS TO ACTIVE FIRE SPRINKLER SYSTEMS WILL INCLUDE COORDINATION OF FIRE

SYSTEM SHUT-DOWN AND DRAINAGE IN BUILDING 25. SHUT DOWN OF A MONITORED SPRINKLER

SYSTEM WILL REQUIRE NOTIFICATION OF THE FIRE DEPARTMENT AND A FIRE WATCH OF THE

ENTIRE BUILDING DURING THE ENTIRE PERIOD THE SPRINKLER SYSTEM IS SHUT-OFF.

BUILDING 25’S FIRE SUPPRESSION SYSTEM INCLUDES A 6” FIRE WATER SERVICE WITH ALARM

CHECK VALVE AND OVERHEAD SPRINKLER PROTECTION FOR THE SINGLE LEVEL BUILDING.

SPRINKLER MODIFICATIONS WILL INCLUDE RELOCATING EXISTING SPRINKLER HEADS AND BRANCH

PIPING AS NECESSARY FOR SPRINKLER COVERAGE OF EACH RENOVATED SPACE.

NOTES BY SYMBOL

DESCRIPTIONNOTE

CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER

DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO

PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF

ROOMS AFFECTED BY CONSTRUCTION.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

BUILDING 25 - OVERALL FIRE

SPRINKLER PLAN

F-105

-2

-9

F -1

/2

/2

.p d f

1/8" = 1'-0"

BUILDING 25 - OVERALL FLOOR PLAN

4' 8' 16'0'

1/8" =1'-0"SCALE

TRUE

NORTH

PLAN

TR

WALL MOUNTED A/C

WALL MOUNTED

A/C

CABLETRAY

LIGHTING

IT RACK

SPRINKLER

TR

TR

TR

WALL

MOUNTED

A/C

WALL

MOUNTED

A/C

CABLETRAY

IT RACK

LIGHTING

SPRINKLER

TELEPHONE

SWITCH BOARD

EQUINOX

ROOM

CEILINGS BEING

REMOVED PENDANT

HEAD REPLACED WITH

UPRIGHT HEADS

OPEN STRUCTURE,

REWORK PIPING FROM

REMOVED DUCTWORK

AND REMOVED

OVERHEAD

MECHANICAL

EQUIPMENT

1IT RACK

(E)CRAC(E)CRAC

CABLE TRAY

CABLE

TRAY

CABLE

TRAY

DUCTWORK

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

NOTES BY SYMBOL

DESCRIPTIONNOTE

CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER

DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO

PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF

ROOMS AFFECTED BY CONSTRUCTION.

OCCUPANCY TYPE LEGEND

ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)

WET PIPE UPRIGHT SPRINKLER

QUICK RESPONSE, STANDARD COVERAGE

DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY

0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER

OPERATION AREA. PROTECTION AREA PER HEAD

SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F

TEMPERATURE HEAD, BRASS FINISH HEAD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

FIRE SPRINKLER ENLARGED PLAN

F-401

-2

-9

F -4

/1

/1

.p d f

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - ROOM 57 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - ROOM 57 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - ROOM 82 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - ROOM 82 NEW WORK

2' 4' 8'0'

1/4" =1'-0"SCALE

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - IRM ROOM 96 & 98 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 01 - IRM ROOM 96 & 98 NEW WORK

OCOC

350A

351A

SOILED UTILITY RM

BATH

OFFICE

BATH

TR

WALL MOUNTED A/C

WALL MOUNTED

A/C

CABLETRAY

IT RACK

LIGHTING

SPRINKLER

SPRINKLER

TR

WALL MOUNTED A/C

WALL MOUNTED A/C

CABLETRAY

IT RACK

SPRINKLER

TR

WALL

MOUNTED A/C

CABLETRAY

IT RACK

SPRINKLER

SPRINKLER

TR

350A

WALL MOUNTED

A/C

WALL MOUNTED

A/C

CABLETRAY

IT

RACK

LIGHTING

SPRINKLER

27 28

19 20

TR

TR

TR

NOTES BY SYMBOL

DESCRIPTIONNOTE

CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER

DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO

PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF

ROOMS AFFECTED BY CONSTRUCTION.

OCCUPANCY TYPE LEGEND

ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)

WET PIPE UPRIGHT SPRINKLER

QUICK RESPONSE, STANDARD COVERAGE

DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY

0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER

OPERATION AREA. PROTECTION AREA PER HEAD

SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F

TEMPERATURE HEAD, BRASS FINISH HEAD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

FIRE SPRINKLER ENLARGED PLAN

F-402

-2

-9

F -4

/1

/2

.p d f

1/4" = 1'-0"

BUILDING 1 - LEVEL 02 - ROOM 229 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 02 - ROOM 236 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 03 - ROOM 340 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 03 - ROOM 350A NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 03 - ROOM 350 DEMO

8 1/4" = 1'-0"

BUILDING 1 - LEVEL 03 - ROOM 340 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 02 - ROOM 229 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 02 - ROOM 236 DEMO

2' 4' 8'0'

1/4" =1'-0"SCALE

TR

WALL

MOUNTED

A/C

CABLE

TRAY

IT RACK

LIGHTING

SPRINKLER

TR

WALL

MOUNTED A/C

WALL

MOUNTED

A/C

CABLETRAY

IT RACK

LIGHTING

SPRINKLER

SPRINKLER

TR

WALL MOUNTED

A/C

CABLETRAY

IT

RACK

SPRINKLER

TR

WALL MOUNTED A/C

WALL MOUNTED A/C

CABLETRAY

IT RACK

SPRINKLER

TR

WALL MOUNTED A/C

WALL MOUNTED A/C

CABLE

TRAY

IT RACK

SPRINKLER

TR

TR

TR

TR

TR

NOTES BY SYMBOL

DESCRIPTIONNOTE

CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER

DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO

PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF

ROOMS AFFECTED BY CONSTRUCTION.

OCCUPANCY TYPE LEGEND

ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)

WET PIPE UPRIGHT SPRINKLER

QUICK RESPONSE, STANDARD COVERAGE

DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY

0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER

OPERATION AREA. PROTECTION AREA PER HEAD

SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F

TEMPERATURE HEAD, BRASS FINISH HEAD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

FIRE SPRINKLER ENLARGED PLAN

F-403

-2

-9

F -4

/2

/2

.p d f

1/4" = 1'-0"

BUILDING 1 - LEVEL 04 - ROOM 4074 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 04 - ROOM 4160 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 05 - ROOM 530 NEW WORK

31/4" = 1'-0"

BUILDING 1 - LEVEL 05 - ROOM 544 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 06 - ROOM 618 NEW WORK

1/4" = 1'-0"

BUILDING 1 - LEVEL 04 - ROOM 4074 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 04 - ROOM 4160 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 05 - ROOM 530 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 05 - ROOM 544 DEMO

1/4" = 1'-0"

BUILDING 1 - LEVEL 06 - ROOM 618 DEMO

2' 4' 8'0'

1/4" =1'-0"SCALE

O C

OC

OC

o s

TR

112A

CABLETRAY

IT RACK

SPRINKLER

TR

28B

CABLETRAY

IT RACK

LIGHTING

LIGHTING

SPRINKLER

SPRINKLER

TR

162C

WALL MOUNTED A/C

WALL MOUNTED A/C

CABLETRAY

SPRINKLER

NOTES BY SYMBOL

DESCRIPTIONNOTE

CONTRACTOR MUST MODIFY OVERHEAD FIRE SPRINKLER

DISTRIBUTION PIPING AND SPRINKLER HEAD PLACEMENT TO

PROVIDE COMPLETE OVERHEAD SPRINKLER COVERAGE OF

ROOMS AFFECTED BY CONSTRUCTION.

OCCUPANCY TYPE LEGEND

ORDINARY HAZARD GROUP 1 OCCUPANCY (NFPA 13)

WET PIPE UPRIGHT SPRINKLER

QUICK RESPONSE, STANDARD COVERAGE

DESIGN DENSITY/AREA METHOD, SPRINKLER DENSITY

0.15 GPM/SQ. FT. FOR 1500 SQ.FT. SPRINKLER

OPERATION AREA. PROTECTION AREA PER HEAD

SHALL NOT EXCEED 130 SQ.FT. 5.6K, 1/2" NPT, 155°F

TEMPERATURE HEAD, BRASS FINISH HEAD

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Springs, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

DGMJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

FIRE SPRINKLER ENLARGED PLAN

F-404

-2

-9

F -4

/2

/2

.p d f

1/2" = 1'-0"

BUILDING 8 - ROOM 112S NEW WORK

1/2" = 1'-0"

BUILDING 2 - ROOM 28B NEW WORK

1' 2' 4'0'

1/2" =1'-0"SCALE

1/2" = 1'-0"

BUILDING 18 - ROOM 162C NEW WORK

1/2" = 1'-0"

BUILDING 18 - ROOM 162C DEMO

NOTE DESCRIPTION

AIRSIDE NOTES

CONSTRUCT DUCTS OF COMMERCIAL G90 GALVANIZED STEEL UNLESS OTHERWISE SPECIFIED.

FABRICATION OF DUCTWORK SYSTEMS MUST CONFORM TO RECOMMENDATIONS AND

STANDARDS OF ASHRAE AND SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" 2005 EDITION

FOR THE PARTICULAR SYSTEM DESIGNED. DUCT PRESSURE CLASS AND SEAL CLASS IS

INDICATED ON THE HVAC DUCT SCHEDULE IN THIS DRAWING SET.

THE MINIMUM ALLOWABLE THICKNESS FOR ALL HVAC DUCTS IS 26 GAGE GALVANIZED STEEL,

EXCEPT FOR DUCT SYSTEMS COMPLETELY CONTAINED WITHIN A SINGLE FIRE AREA. DUCTS THAT

PENETRATE FIRE-RATED CONSTRUCTION ASSEMBLIES MUST BE MINIMUM 24 GAGE GALVANIZED

STEEL.

ALL DUCT DIMENSIONS INDICATED ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS IN INCHES. IF DUCT LINER IS SPECIFIED, THE EXTERNAL SHEET METAL DIMENSIONS MUST BE INCREASED TO

MAINTAIN THE INSIDE DUCT DIMENSIONS SHOWN ON THE PLANS.

PROVIDE TURNING VANES IN ALL 90 DEGREE MITERED ELBOWS AND ALL BULLHEAD TEES EVEN IF

TURNING VANES ARE NOT GRAPHICALLY SHOWN ON PLAN DRAWINGS.

A.

B.

C.

D.

NOTE DESCRIPTION

GENERAL NOTES

SHOULD DISCREPANCIES OCCUR WITHIN THE CONTRACT DOCUMENTS (DRAWINGS AND

SPECIFICATIONS), THE MORE STRINGENT AND MORE COSTLY APPROACH MUST APPLY FOR

BIDDING PURPOSES. THE CONTRACTOR IS TO NOTIFY THE OWNER'S REPRESENTATIVE OF

DISCREPANCIES FOR CLARIFICATION. CLARIFICATIONS ISSUED AFTER THE CONTRACT IS

AWARDED ARE TO BE INCORPORATED BY THE CONTRACTOR AT NO ADDITIONAL COSTS AND ARE

TO BE REVIEWED BY THE OWNER'S REPRESENTATIVE TO DETERMINE IF A REDUCTION IN COST IS

JUSTIFIED.

THE CONTRACTOR MUST OBTAIN ALL PERMITS AND PAY ALL FEES AND CHARGES TO ALL LOCAL

AND OTHER RELATED AGENCIES AS REQUIRED.

PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR A COMPLETE AND

OPERABLE INSTALLATION AS SPECIFIED AND SHOWN ON THE DRAWINGS AND SPECIFICATIONS,

FULLY TESTED, ADJUSTED AND READY FOR USE.

THE DRAWINGS SHOW THE EXTENT OF THE WORK AND THE GENERAL ARRANGEMENT. THE

DRAWINGS, HOWEVER, ARE DIAGRAMMATIC AND EXACT COORDINATED LAYOUT OF THE VARIOUS

SYSTEMS IS THE RESPONSIBILITY OF THE CONTRACTOR.

VERIFY ANY AND ALL INDICATED CONFIGURATIONS, DIMENSIONS AND ELEVATIONS BY FIELD

MEASUREMENTS AND COORDINATED WITH ARCHITECTURAL DRAWINGS AND STRUCTURAL

CONDITIONS.

COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE THE

INSTALLATION OF THE VARIOUS SYSTEM EQUIPMENT AND MATERIALS. NO STRUCTURAL

MEMBERS SHALL BE CUT WITHOUT PRIOR APPROVAL OF STRUCTURAL ENGINEER.

COORDINATE THE INSTALLATION OF THE VARIOUS SYSTEM MATERIALS AND EQUIPMENT ABOVE

CEILINGS WITH SUSPENSION SYSTEM, LIGHT FIXTURES, AND OTHER INSTALLATIONS.

ALL MATERIALS, EQUIPMENT AND APPARATUS INSTALLED ON THE PROJECT MUST BE NEW AND

INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. THE

MANUFACTURER, OR HIS AUTHORIZED REPRESENTATIVE, MUST CERTIFY IN WRITING TO THE

OWNER AND THE OWNER'S REPRESENTATIVE, THAT THE INSTALLATION HAS BEEN MADE IN

ACCORDANCE WITH SUCH PRINTED REQUIREMENTS.

MANUFACTURER'S NAME AND MODEL NUMBERS INDICATED ON THE DRAWINGS ARE ONLY FOR

REFERENCE CONVENIENCE. ENGINEER-APPROVED SUBSTITUTIONS ARE PERMITTED. THE

CONTRACTOR, THROUGH THE MANUFACTURER, IS RESPONSIBLE TO CONFIRM THE

CORRECTNESS OF ALL MODEL NUMBERS SO AS TO MEET THE SPECIFIC PROJECT REQUIREMENTS

AND MINIMUM INDICATED PERFORMANCE.

INSTALL EQUIPMENT, MATERIALS AND PIPING SYSTEMS TO PROVIDE REQUIRED ACCESS FOR

SERVICING, MAINTENANCE, AND GENERAL INSPECTION PER MANUFACTURER'S INSTRUCTIONS

AND LOCAL CODE REQUIREMENTS. COORDINATE THE FINAL LOCATION OF CONCEALED

EQUIPMENT AND DEVICES REQUIRING ACCESS WITH FINAL LOCATION OF REQUIRED ACCESS

PANELS AND DOORS. ALLOW AMPLE SPACE FOR REMOVAL OF ALL PARTS THAT REQUIRE

REPLACEMENT OR SERVICING. PIPING SYSTEMS SHALL NOT BLOCK SERVICE ACCESS OF ANY

NATURE, SUCH AS FILTER REMOVAL, EQUIPMENT ACCESS PANELS, CLEANING OF TUBES, AND

SIMILAR ITEMS.

COORDINATE THE EXACT LOCATION OF THIS WORK WITH THE WORK OF THE OTHER TRADES

PRIOR TO FABRICATION OR INSTALLATION OF SAME. VERIFY ALL DIMENSIONS AND ELEVATIONS.

PROVIDE ADDITIONAL OFFSETS AND SECTIONS OF MATERIAL AS MAY BE REQUIRED TO MEET THE

APPLICABLE JOB CONDITION REQUIREMENTS.

IT WILL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO COORDINATE BETWEEN HIS

EQUIPMENT SUPPLIERS AND ANY SUBCONTRACTOR AS TO WHICH DEVICES ARE SUPPLIED WITH

EQUIPMENT, REQUIRED WIRING AND VOLTAGES AND OTHER COORDINATION ITEMS AS RELATED

TO A PROPER AND OPERABLE INSTALLATION. ALL POWER WIRING AND CONTROL WIRING MUST

COMPLY WITH DIVISION 26 REQUIREMENTS.

DIMENSIONAL LOCATIONS INCLUDING ELEVATIONS INDICATED ON THE DRAWINGS ARE

APPROXIMATE AND FOR REFERENCE ONLY. THE CONTRACTOR MUST COORDINATE WITH OTHER

TRADES AND SERVICES TO AVOID INTERFERENCES ROUTING DUCTWORK AND PIPING.

ALL MATERIALS IN ALL SUPPLY AND RETURN AIR PLENUMS MUST BE PLENUM RATED IN

ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE. MATERIALS WITHIN PLENUM MUST

NOT EXCEED A FLAME SPREAD INDEX OF 25 AND A SMOKE-DEVELOPED INDEX OF 50.

COORDINATE WITH OTHER TRADES TO PROVIDE PLENUM RATED MATERIALS.

INSTALL ALL SPACE TEMPERATURE SENSORS AND THERMOSTATS 48 INCHES AFF UNLESS

OTHERWISE NOTED.

PIPE PENETRATIONS AT ALL FIRE RATED FLOORS, NON-FIRE RATED FLOORS, FIRE-RATED SHAFTS, WALLS, BARRIERS, PARTITIONS MUST BE SEALED WITH A UL LISTED FIRESTOP ASSEMBLY EQUAL

TO OR GREATER THAN THE ASSEMBLY FIRE RESISTANCE RATING. REFER TO ARCHITECTURAL

PARTITION A-300 DRAWINGS FOR FIRE-RATED ASSEMBLY LOCATIONS.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

NOTE DESCRIPTION

WATER SIDE NOTES

REFER TO "HVAC PIPING SCHEDULE" IN THIS DRAWING SET FOR A SCHEDULE OF PIPING

MATERIALS, JOINING METHODS, INSULATION, HANGER SPACING, AND PRESSURE TESTING

REQUIREMENTS. REFER TO SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS.

ALL JOINTS WHERE DISSIMILAR METALS OCCUR MUST BE PROVIDED WITH A DIELECTRIC BREAK.

RUNOUT PIPING TO ALL VAV TERMINAL UNITS, FAN COIL UNITS, AND OTHER HYDRONIC TERMINAL

DEVICES MUST BE 3/4" UNLESS NOTED OTHERWISE ON PLANS.

INSTALL MANUAL AIR VENTS AT THE HIGH POINT OF PIPING SYSTEM ON EACH LEVEL FOR

HYDRONIC SYSTEMS.

PROVIDE PETE'S PLUGS AT ALL DDC CONTROL DEVICES IN HYDRONIC PIPING.

ALL MANUAL ISOLATION VALVES MUST BE ORDERED WITH EXTENDED STEM LENGTH BEYOND THE

INSULATION THICKNESS.

ALL MANUAL ISOLATION BALL VALVES MUST BE TWO-PIECE, FULL PORT, BRONZE BODY WITH

STAINLESS STEEL TRIM (MINIMUM 150 PSIG RATED).

CONDENSATE DRAIN PIPING MUST BE SLOPED DOWN AT LEAST 1% IN DIRECTION OF FLOW.

A.

B.

C.

D.

E.

F.

G.

H.

INDOOR DESIGN CONDITIONS

AREA

RELATIVE HUMIDITY

TELECOMMUNICATION ROOMS CLASS B * 41-95

DESIGN

TEMPERATURE

DB (°F) MAX (%) MIN (%)

80 8

CODE CRITERIA AND DESIGN CONDITIONS

APPLICABLE

CODES

STANDARDS

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL MECHANICAL CODE

1.2 W/FT2

AMBIENT

DESIGN

CONDITIONS

COOLING DRY BULB DESIGN TEMPERATURE

(0.4%)

LOAD

CRITERIA

EXISTING WALL U-VALUE

ROOF U-VALUE (ASSEMBLY DESCRIPTION BELOW)

2021 INTERNATIONAL PLUMBING CODE

ELEVATION

CLIMATE ZONE (IECC - 2021)

WINDOW UNIT U-VALUE

PLUG LOADS

WINDOW UNIT SOLAR HEAT GAIN COEFFICIENT

100°F

68°F

18°F

105°F

2,441 FEET

NFPA 90A (2020) - STANDARD FOR THE INSTALLATION OF

AIR-CONDITIONING AND VENTILATING SYSTEMS

MEAN COINCIDENT COOLING WET BULB DESIGN TEMPERATURE

(0.4%)

HEATING DESIGN TEMPERATURE

(99.6%)

AMBIENT AIR-COOLED HEAT REJECTION TEMPERATURE

3B

0.326

BTU/(H-FT²-°F)

0.125

BTU/(H-FT²-°F)

0.60

BTU/(H-FT²-°F)

0.80

2.0 W/FT²

LIGHTING LOAD

5 KW1-RACK LOAD

2-RACK LOAD 7.5 KW

3-RACK LOAD 8.5 KW

4-RACK LOAD 10 KW

TELECOMMUNICATIONS ROOM LOADS

DATA CENTER CLASS A1 * 72-81 60 30

NFPA 75 (2020) - STANDARD FOR THE FIRE PROTECTION OF

INFORMATION TECHNOLOGY EQUIPMNET

OIT - INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACES

TELECOMMUNICATION ENCLOSURE ROOMS 60-85 80 8

* TEMPERATURE AND HUMIDITY CONDITIONS AS MEASURED

AT RACK INLET

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000

ARCHITECT:

CB DESIGN GROUP

421 King St., Ste. 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

West Texas VA Health Care System Big Spring, TX 79720

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

CIVIL/STRUCTURAL:

H2B 1225 N Loop W, Suite 800

HOUSTON, TX 77008

713-864-2900

12/23/2022

519-21-900

EALJW

VA BSP EHRM INFRASTRUCTURE

UPGRADES

CONSTRUCTION DOCUMENTS

HVAC GENERAL NOTES AND DESIGN

DATA

M-001

-2

-9

M -0

/2

/1

.p

T

CO2

M

H

Ƨ

P

CO

NO2

LH

Q

AIRSIDE SYMBOLS

14 / 8

14ø

14 / 8ø

PIPING SYMBOLS

CONTROLS SYMBOLS

GENERAL SYMBOLS

G

CHS

CHR

W

HWS

HWR

CD

CWS

CWR

1%

L/G

M

M

M

M

M-###

FCU-1-2

EQUIPMENT NUMBER IN BUILDING

BUILDING NUMBER

TRUE

NORTH

PLAN

NORTH

HVAC SYMBOLS

NOTE:

NOT ALL OF THE SYMBOLS ON THIS SHEET ARE NECESSARILY USED IN THIS PROJECT.

T

(U)

(E-U)

NEW OR RELOCATED

MECHANICAL EQUIPMENT

EXISTING MECHANICAL EQUIPMENT

TO REMAIN

EXISTING MECHANICAL EQUIPMENT

TO BE REMOVED

POINT OF NEW CONNECTION

NOTE BY SYMBOL (DEMOLITION)

NOTE BY SYMBOL (NEW WORK)

3/4" UNDERCUT DOOR

ISOMETRIC VIEW

EQUIPMENT TAGS

NORTH ARROW

TEMPERATURE SENSOR (DDC)

(FIGURE NOTES UNIT SERVED)

THERMOSTAT

(FIGURE NOTES UNIT SERVED)

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

EXHAUST AIR DUCT RISER

NEW OR RELOCATED CEILING-

MOUNTED SUPPLY AIR DIFFUSER

NEW OR RELOCATED CEILING-

MOUNTED RETURN AIR GRILLE

NEW OR RELOCATED CEILING-

MOUNTED EXHAUST AIR GRILLE

EXISTING CEILING-MOUNTED

SUPPLY AIR DIFFUSER TO REMAIN

EXISTING CEILING-MOUNTED SUPPLY

AIR DIFFUSER TO BE REMOVED

EXISTING CEILING-MOUNTED

RETURN AIR GRILLE TO REMAIN

EXISTING CEILING-MOUNTED

RETURN AIR GRILLE TO BE REMOVED

EXISTING CEILING-MOUNTED

EXHAUST AIR GRILLE TO REMAIN

EXISTING CEILING-MOUNTED

EXHAUST AIR GRILLE TO BE REMOVED

NEW OR RELOCATED DUCTWORK

EXISTING DUCTWORK TO REMAIN

EXISTING DUCTWORK TO BE REMOVED

RECTANGULAR DUCT - FIRST

FIGURE IS SIDE SHOWN IN INCHES

ROUND DUCT (FIGURE=SIZE IN INCHES)

OVAL DUCT (FIGURE=SIZE IN INCHES)

ACOUSTICALLY LINED DUCT. FIGURES

ARE INSIDE CLEAR DIMENSIONS IN

INCHES. INCREASE SHEET METAL SIZE

14 / 8ø

ELBOW WITH TURNING VANES

RADIUS ELBOW

MANUAL VOLUME DAMPER (WITH

LOCKING QUADRANT)

SMOKE DETECTOR

CARBON DIOXIDE SENSOR

DUCT AIRFLOW STATION

PRESSURE SENSOR

HUMIDITY SENSOR OR HUMIDISTAT

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

DIFFERENTIAL PRESSURE SENSOR

MOTORIZED ACTUATOR

OPPOSED-BLADE CONTROL DAMPER

PARALLEL-BLADE CONTROL DAMPER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

NEW OR RELOCATED PIPING

EXISTING PIPING TO REMAIN

EX…

This is the start of the file's text. The full file is on GovTribe.