Amend 0001 ATT 2 - VA.BSP EHRM Drawings-Conformed Set Vol 1.pdf
PDF 29 MB Posted
- Attached to
- Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)
- Solicitation number
- 36C77624B0004_1
About this file
This document is Amend 0001 ATT 2 - VA.BSP EHRM Drawings-Conformed Set Vol 1, which contains drawings for the EHRM Infrastructure Upgrades - Main Building Construction project in Big Spring, Texas under Solicitation Number 36C77624B0004_1.
The drawings cover architectural, structural, mechanical, electrical, and plumbing details for the construction and renovation work at the Department of Veterans Affairs facility in Big Spring. The drawings provide specifications and layouts for the infrastructure upgrades, including site plans, floor plans, elevations, sections, and details. This is a conformed set, indicating the drawings have been updated to reflect amendments to the original solicitation. No other contractual information or requirements are included in this attachment.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Spring, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12-23-2022
519-21-900
MMAB
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
COVER SHEET
GI100
-2
-9
G I1
.p d f
SHEET # SHEET NAME
M-701 CONTROL DIAGRAMS
M-702 CONTROL DIAGRAMS
06 - ELECTRICAL
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
E-100 ELECTRICAL SITE PLAN
E-101 BUILDING 1 - LEVEL 01 - ELECTRICAL PLANS
E-101A BUILDING 1 - LEVEL 01 - ELECTRICAL PLANS
E-102 BUILDING 1 - LEVEL 02 - ELECTRICAL PLANS
E-103 BUILDING 1 - LEVEL 03 - ELECTRICAL PLANS
E-104 BUILDING 1 - LEVEL 04 - ELECTRICAL PLANS
E-105 BUILDING 1 - LEVEL 05 - ELECTRICAL PLANS
E-106 BUILDING 1 - LEVEL 06 - ELECTRICAL PLAN
E-201 BUILDING 2 - ELECTRICAL PLANS
E-401 BUILDING 4 - LEVEL 01 - OVERALL ELECTRICAL PLAN
E-701 BUILDING 7 - ELECTRICAL PLANS
E-801 BUILDING 8 - ELECTRICAL PLANS
E-1001 BUILDING 10 - ELECTRICAL PLANS
E-1601 BUILDING 16 - ELECTRICAL PLANS
E-1701 BUILDING 17 - ELECTRICAL PLANS
E-1801 BUILDING 18 - ELECTRICAL PLANS
E-2001 BUILDING 20 - ELECTRICAL PLANS
E-2101 BUILDING 21 - ELECTRICAL PLANS
E-2501 BUILDING 25 - ELECTRICAL PLANS
E-3000 ELECTRICAL DETAILS AND SCHEDULES
E-3001 ELECTRICAL DETAILS AND SCHEDULES
E-3002 ELECTRICAL DETAILS AND SCHEDULES
E-3003 TELECOMMUNICATIONS SCHEDULES
E-4000 PANELBOARD SCHEDULES
E-4001 PANELBOARD SCHEDULES
E-4002 PANELBOARD SCHEDULES
E-4003 PANELBOARD SCHEDULES
SHEET # SHEET NAME
03 - ARCHITECTURAL
AE111 BUILDING 1 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE112 BUILDING 1 - LEVEL 2 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE113 BUILDING 1 - LEVEL 3 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE114 BUILDING 1 - LEVEL 4 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE115 BUILDING 1 - LEVEL 5 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE116 BUILDING 1 - LEVEL 6 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE117 BUILDING 2 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE118 BUILDING 7 & 8 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE119 BUILDING 10 & 16 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE120 BUILDING 17 & 18, - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE121 BUILDING 20 & 21 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE122 BUILDING 25 - LEVEL 1 - DEMO AND NEW WORK ENLARGED FLOOR PLANS
AE300 WALL TYPES
AE301 DOOR SCHEDULE, DOOR DETAILS, AND FINISH SCHEDULE
AE302 TYPICAL DATA ROOM
AE500 TYPICAL DETAILS
AE700 REFLECTED CEILING PLAN
04 - FIRE PROTECTION
F-001 FIRE SPRINKLER GENERAL NOTES AND DESIGN DATA
F-101 BUILDING 1 - OVERALL FIRE PLAN - LEVEL 01, 02, 03
F-102 BUILDING 1 - OVERALL FIRE SPRINKLER PLAN - LEVEL 04, 05, 06
F-103 BUILDING 2 - OVERALL FIRE SPRINKLER PLAN
F-104 BUILDING 18 - OVERALL FIRE SPRINKLER PLAN
F-105 BUILDING 25 - OVERALL FIRE SPRINKLER PLAN
F-401 FIRE SPRINKLERENLARGED PLAN
F-402 FIRE SPRINKLERENLARGED PLAN
F-403 FIRE SPRINKLERENLARGED PLAN
F-404 FIRE SPRINKLERENLARGED PLAN
05 - MECHANICAL
M-001 HVAC GENERAL NOTES AND DESIGN DATA
M-002 HVAC ABBREVIATIONS AND SYMBOLS
M-101 BUILDING 1 - OVERALL HVAC PLAN LEVEL 01 & 02
M-102 BUILDING 1 - OVERALL HVAC PLAN LEVEL 03 & 04
M-103 BUILDING 1 - OVERALL HVAC PLAN LEVEL 05 & 06
M-104 BUILDING 2, 4, 7 - OVERALL HVAC PLAN
M-105 BUILDING 8, 17, 18 - OVERALL HVAC PLAN
M-106 BUILDING 10, 16, 20, 21 - OVERALL HVAC PLAN
M-107 BUILDING 25 - OVERALL HVAC PLAN
M-401 HVAC ENLARGED PLAN
M-402 HVAC ENLARGED PLAN
M-403 HVAC ENLARGED PLAN
M-404 HVAC ENLARGED PLAN
M-405 HVAC ENLARGED PLAN
M-510 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
SHEET # SHEET NAME
00 - GENERAL
GI100 COVER SHEET
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
LS-100 LIFE SAFETY REVIEW
LS-101 LIFE SAFETY PLAN
LS-102 LIFE SAFETY PLAN
LS-103 LIFE SAFETY PLAN
LS-104 LIFE SAFETY PLAN
LS-105 LIFE SAFETY PLAN
LS-106 LIFE SAFETY PLAN
GC201 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 1
GC202 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 2
GC203 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 3
GC204 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 4
GC205 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 5
GC206 BUILDING 1 - EXISTING OVERALL FLOOR PLAN - LEVEL 6
GC207 BUILDING 2,4,7,8, & 10 - EXISTING OVERALL FLOOR PLAN - LEVEL 1
GC208 BUILDING 16,17,18,20,21 & 25 - EXISTING OVERALL FLOOR PLAN - LEVEL 1
GC401 BUILDING 1 - ICRA FLOOR PLAN - LEVEL 1
GC402 BUILDING 1 - ICRA FLOOR PLAN - LEVEL 2
GC403 BUILDING 1 - ICRA FLOOR PLAN - LEVEL 3
GC404 BUILDING 1 - ICRA FLOOR PLAN - LEVEL 4
GC405 BUILDING 1 - ICRA FLOOR PLAN - LEVEL 5 & 6
GC406 BUILDING 2,4,7,8, & 10 - ICRA FLOOR PLAN - LEVEL 1
GC407 BUILDING 16,17,18,20,21 & 25 - ICRA FLOOR PLAN - LEVEL 1
01 - CIVIL
CS-100 OVERALL SITE PLAN
CS-101 ENLARGED LAYOUT PLAN - A
CS-102 ENLARGED LAYOUT PLAN - B
CS-103 PLAN & PROFILE
CS-104 DETAILS
02 - STRUCTURAL
SA-001 STRUCTURAL GENERAL NOTES
SS-101 OVERALL SITE PLAN
SF-101 BUILDING 1 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-102 BUILDING 1 - LEVEL 02 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-103 BUILDING 1 - LEVEL 03 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-104 BUILDING 1 - LEVEL 04 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-105 BUILDING 1 - LEVEL 05 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-106 BUILDING 1 - LEVEL 06 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-107 BUILDING 2 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-108 BUILDING 4 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-109 BUILDING 7 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-110 BUILDINGS 16 & 17 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-111 BUILDINGS 18 & 20 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
SF-112 BUILDINGS 21 & 25 - LEVEL 01 FLOOR PLAN & ENLARGED STRUCTURAL PLANS
Department of Veterans Affairs
VA BSP EHRM INFRASTRUCTURE UPGRADES
West Texas VA Health Care System
Big Spring, TX 79720
VACINITY MAP DRAWING LIST PROJECT DIRECTORY
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
Joshua Junkin
WT VAHCS
PHONE: (W) 432-263-7361 ext. 7015
(M) 432-270-8124 Joshua.Junkin@va.gov
Jeff Craven
WT VAHCS
PHONE: (W) 432-263-7361 ext. 7424
(M) 805-797-9121 Jeffry.Craven@va.gov
CONTRACTING OFFICER (CO)
Lynn Pettit
Department of Veterans Affairs | Contracting
WT VAHCS
PHONE: (W) 254-899-6001
Lynn.Pettit@va.gov
Andrew Stigen Department of Veterans Affairs | Contracting
WT VAHCS
PHONE: (W) 254-899-6011
Andrew.stigen@va.gov
APPROVALS
N.T.S
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
ENLARGED PLAN INDICATIOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT
INDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
NORTH ARROW
FEC
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 3/16"
D2
XX-XX
XXxxx
XXxxx
CL
XXxxx x'-x" VERTICAL HEIGHT INDICATOR
REVISION
REVISION CLOUD
NORTH
BREAK LINE
xx x
DEMOLITION KEYNOTE
NEW ROOM NAME AND NUMBERCORRIDOR
C2
XX
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
SECTION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ENLARGED PLAN NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
WALL MOUNTED FIRE EXTINGUISHERFE
XX
SHEET WHERE
DRAWN
ELEVATION LETTER
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN
MAY NOT BE USED ON THIS PROJECT.
CERTAIN COMMON ABBREVIATIONS
MAY NOT BE SHOWN.
L 1. ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR CONDITIONS
ON THE JOB.
2. SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE SHOULD
BE DIRECTED TO THE CONTRACTING OFFICER DURING THE BID PERIOD.
3. ALL CONSTRUCTION IS TO BE NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR DISCIPLINES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE CONTRACTING OFFICER ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS.
5. CONTRACTOR SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK
SOLE AS TO AVOID CONFLICTS IN THE FIELD.
6. ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTES SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR FUNCTION
ELSEWHERE IN THE BUILDING.
7. WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
8. ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS IN ACCORDANCE WITH A UL LISTED ASSEMBLY. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE
WATERPROOF SEALED.
9. FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL".
CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER INSTALLATION
OF THE NEW WORK.
10. SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
11. IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
12. WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
13. IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT CONTRACTING OFFICER . DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
14. EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
16. CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR
ANCHORING. IN COORDINATION WITH SHOP DRAWINGS.
17. ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. WALL MOUNTED ITEMS ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY EQUIPMENT
OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
18. ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE CONTRACTING OFFICER OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR
TYPE OF DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
19. ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
20. SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR PRIOR TO BEGINNING THEIR PORTION OF THE WORK.
ALL SUBMITTAL ARE TO BE APPROVED BY THE VA PRIOR TO START OF WORK.
22. CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN THE INTEGRITY OF EXISTING SMOKE PARTITION WALLS, SMOKE BARRIER WALLS, AND FIRE RATED WALLS TO REMAIN. SEE LIFE SAFETY DRAWINGS AND ARCHITECTURAL DRAWINGS FOR THE LOCATION OF THESE WALLS. CONSULT COR AND LOCAL VA FIRE / SAFETY PERSONNEL FOR CONFIRMATION OF THESE WALLS PRIOR TO BEGINNING DEMOLITION. DAMAGE TO ANY EXISTING-TO-REMAIN SMOKE PARTITION WALLS, SMOKE BARRIER WALLS, OR FIRE RATED WALLS, INCLUDING DAMAGE FROM REMOVAL OF INTERSECTING WALLS, SHALL BE REPAIRED AT CONTRACTOR’S
EXPENSE.
23. PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS. STORAGE WILL ONLY BE PERMITTED IN THE ENCLOSED CONSTRUCTION SITE, AND DESIGNATED SPACE WITH PRIOR APPROVAL OF THE VA.
24. PATCH ALL EXISTING AND NEW HOLES IN FLOORS, WALLS AND CEILINGS WITHIN THE PROJECT LIMITS. ENSURE THAT ALL EXISTING AND NEW PATCH WORK IS RATED TO THE LEVEL OF FLOORS, WALLS AND CEILINGS TO THE REQUIRED EXISTING CONDITION, PRIOR TO THE START OF NEW WORK.
25. UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC". IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE / DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
26. ALTHOUGH THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY, SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. ANY DISCREPANCIES BETWEEN THE CONTRACT DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION PRIOR TO SUBMITTING A BID AMOUNT IF THERE SHOULD APPEAR TO BE A DISCREPANCY BETWEEN DRAWINGS AND/OR THE SPECIFICATIONS. OTHERWISE, THE MOST STRINGENT (TYPICALLY THE MOST EXPENSIVE) REQUIREMENT SHALL APPLY AT THE DISCRETION OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
27. ABOVE-CEILING COORDINATION – PRIOR TO PERFORMING ANY ABOVE-CEILING WORK, CONTRACTOR, WORKING WITH ALL SUB-CONTRACTORS, SHALL CREATE DRAWINGS THAT SHOW COORDINATION OF ALL ABOVE-CEILING WORK ITEMS WITH EXISTING CONDITIONS AND PROPOSED CEILINGS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE SEQUENCES OF INSTALLATION TO ENSURE THAT ABOVE-CEILING ITEMS CAN FIT ABOVE THE CEILING HEIGHTS INDICATED ON THE REFLECTED CEILING PLAN(S). CONTRACTOR SHALL BRING ALL PERCEIVED CONFLICTS TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR RESOLUTION PRIOR TO THE START OF THE WORK. CONFLICTS RESULTING FROM INACCURATE COORDINATION DRAWINGS AND / OR FAILURE TO IDENTIFY CONFLICTS PRIOR TO INSTALLATION OF THE WORK SHALL BE CORRECTED / ADJUSTED AT THE CONTRACTOR’S EXPENSE AND
SHALL RESULT IN NO ADDITIONAL COST TO THE GOVERNMENT.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Spring, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12-23-2022
519-21-900
MMAB
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-2
-9
G I2
.p d f
SYMBOLS OF MATERIALSDRAWING KEY
ARCHITECTURAL ABBREVIATIONS
GENERAL NOTES
G1 ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR
CONDITIONS ON THE JOB.
G2 SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE
SHOULD BE DIRECTED TO THE ARCHITECT DURING THE BID PERIOD.
G3 ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
G4 REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID
CONFLICTS IN THE FIELD.
G5 ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTED SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR
FUNCTION ELSEWHERE IN THE BUILDING.
G6 WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
G7 ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVRES, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
G8 FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK, AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL." CONTRACOTRS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER
INSTALLATION OF THE NEW WORK.
G9 SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
G10 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
G11 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
G12 WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
G13 IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFOMRED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G14 EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OPTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
G15 AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
G16 CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT
OR ANCHORING
G17 ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
G18 ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCRAPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF
DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
G19 ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
G20 SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENT OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G21 CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEUDLE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION
OF THE WORK.
G22 PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
G23 PATCH ALL HOLES IN FLOORS, WALLS, AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
G24 UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC." IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTURED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMITIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE/DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
G25 THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED.
IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION OF AN APPARENT DISCREPANCY BETWEEN DRAWINGS AND/OR SPECIFICATIONS DURING THE BIDDING PHASE. OTHERWISE, THE CONTRACTOR SHALL ASSUME THE MOST STRINGENT (TYPICALLY THE MOST
EXPENSIVE) REQUIREMENT SHALL APPLY
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR
TO THE START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR E-CIGARRETES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND
VENDORS EFFECTIVE OCTOBER 1, 2019.
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. A HEPA (HIGH EFFICIENCY PARTICULATE ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS (EFFECTIVE FOR POLLEN, MOLD SPORES, AND DUST PARTICLES) SHALL BE INSTALLED TO INSURE CONTINUOUS NEGATIVE AIR PRESSURES WITHIN THE WORK AREA. THERE SHOULD BE NO RECIRCULATION OF AIR, AND VENTILATION FILTERS WILL BE CHANGED AS NEEDED.
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA MASTER SPECIFICATIONS
10. VA SUSTAINABLE DESIGN MANUAL
1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND
LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS,
UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS. PROPOSED
AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING
FONT, GRAPHICS, CONSTRUCTION, DETAILING, MATERIALS AND COLORS.
2. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.
3. DO NOT SCALE DRAWINGS.
4. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG1812 FOR ADDITIONAL
INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS NOTED IN
SCHEDULE.
5. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN".
6. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE, THE EXISTING MESSAGE SHALL
REMAIN UNCHANGED, U.N.O.
7. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. REFERENCE ALL
DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.
8. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN SIGN
LIMITS.
VA SIGNAGE DESIGN MANUAL
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE SPECIFICATIONS
https://cfm.va.gov/cfm/til/dManual.asp#SIGN
SIGNAGE
THIS SECTION CONTAINS THE VA SIGNAGE DESIGN MANUAL. THE PDF FILES LOCATED HERE
CONTAIN VISUAL ILLUSTRATIONS AND SPECIFICATIONS FOR SIGNS THAT ARE USED AT VA
FACILITIES, AND ARE INHERENTLY GRAPHICAL IN NATURE.
MANDATORY POLICY SIGN DESIGNATIONS
EACH SIGN IN THE PROGRAM GUIDE HAS BEEN GIVEN A SPECIFIC SIGN TYPE NUMBER
DESIGNATION. THIS DESIGNATION PROVIDES A COMMON DESCRIPTION THAT CAN BE
REFERENCED WHEN PROGRAMMING A SITE AND ORDERING SIGNS. THE FOLLOWING EXPLAINS
HOW THE SIGN TYPE DESIGNATIONS ARE DERIVED:
IN-02.03 A
I DESIGNATES AN INTERIOR SIGN.
N IDENTIFIES THE SIGN IS NON-ILLUMINATED.
TWO DIGIT NUMBER IDENTIFIES A PARTICULAR SIGN TYPE FAMILY.
.03 THE TWO DIGIT NUMBER, FOLLOWING THE PERIOD, IDENTIFIES A SPECIFIC
SIGN WITHIN THE SIGN FAMILY.
A THE LETTER DESIGNATES A SPECIFIC SIGN CONFIGURATION, VERSION
AND/OR LAYOUT FOR GRAPHICS.
NOTE:
EACH SIGN SHALL MATCH CAMPUS EXISTING DESIGN.
9"
3/4"
/8
/4
/2
9"
3/4"
/8
/4
/4
TYP. MOUNTING ELEVATION
5'
0"
2"
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX 76102 817-335-3000
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste. 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
West Texas VA Health Care System Big Spring, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
713-864-2900
12-23-2022
519-21-900
MMAB
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
GENERAL NOTES
GI300
-2
-9
G I3
.p d f
GENERAL NOTESREFERENCES
SMOKING POLICY
ENVIRONMENTAL CONTROL NOTES
MEDICAL WASTE NOTES
(THESE NOTES APPLY TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS)
NOTE: SEE LIFE SAFETY DRAWINGS FOR SPECIFIC EDITIONS OF APPLICABLE CODES
SIGNAGE GENERAL NOTES
SIGNAGE REFERENCES
SIGN SYMBOL LEGEND
6" = 1'-0"C12
IN-03.01 - ROOM NUMBER IDENTIFICATION
6" = 1'-0"A12
IN-04.01 - PRIMARY ROOM IDENTIFICATION
BSP EHRM LIFE SAFETY REVIEW:
NFPA 101 LIFE SAFETY CODE 2021
PROJECT DESCRIPTION:
BUILDING MODIFICATION TO SUPPORT THE CERNER ELECTRONIC HEALTH
RECORD (EHR) PLATFORM. THE PROJECT WILL RENOVATE THE TELEPHONE
ROOM (BUILDING - 1 ROOM 96 AND BLDG. 4 OIT) FOR SERVER DEPLOYMENT;
RENOVATE IT CLOSETS AS INDICATED TO INCLUDE ROOM MODIFICATIONS; HVAC
COOLING AND CONTROLS; PATCH PANEL UPGRADES; PROVIDE CABLING
UPGRADES TO CAT 6A; PROVIDE ADDITIONAL POWER AND DATA DROPS FOR END
USER DEPLOYMENT EQUIPMENT; PROVIDE POWER UPGRADES TO IT CLOSETS
AND TELEPHONE ROOM ON THE VAMC VA CAMPUS
LIFE SAFETY ANALYSIS:
THE WORK BEING PERFORMED AT THE BIG SPRINGS VETERAN’S HEALTHCARE
SYSTEM IS RENOVATION WITH SOME MINOR MODIFICATIONS THAT DO NOT
AFFECT EGRESS OR EGRESS CAPACITY. CHAPTER 19 – EXISTING CONTRUCTION
IS THE APPLICABLE CODE SECTION APPLIED TO THE DESIGN REVIEW ALONG WITH
CHAPTER 43 – BUILDING REHABILITATION.
THE IT CLOSETS AND DATA ROOMS ARE NON-OCCUPIED SPACE AND DO NOT ADD
TO THE OCCUPANT LOAD. THE ROOMS INCLUDED IN THIS PROJECT ARE NOT
DEEMED HAZARDOUS AND DO NOT REQUIRE CHANGES TO THE FIRE/SMOKE
BARRIERS. ADJACENT RATED BARRIERS TO THE IT ROOMS WILL BE REQUIRED TO
BE MAINTAINED DURING THE PROJECT WITH COMPLIANT BARRIERS FREE FROM
PENETRATIONS AT THE END OF THE PROJECT.
SPECIAL CARE SHOULD BE TAKEN TO CLEARLY IDENTIFY ALL FIRE/SMOKE
BARRIER THAT WILL BE AFFECTED BY THE REMOVAL/INSTALL OF CABLING. LIFE
SAFETY DRAWINGS FOR BUILDING 1 ARE BEING PROVIDED AS A REFERENCE. ALL
RATED BARRIERS THAT ARE PENETRATED MUST BE REPAIRED WITH AN
APPROVED UL FIRESTOP SYSTEM.
7.1.10 MEANS OF EGRESS RELIABILITY.
7.1.10.1* MAINTENANCE. MEANS OF EGRESS SHALL BE CONTINUOUSLY
MAINTAINED FREE OF ALL OBSTRUCTIONS OR IMPEDIMENTS TO FULL
INSTANT USE IN THE CASE OF FIRE OR OTHER EMERGENCY.
8.2.2.2 FIRE COMPARTMENTS SHALL BE FORMED WITH FIRE BARRIERS THAT
COMPLY WITH SECTION 8.3.
8.3 FIRE BARRIERS
8.3.1.1 FIRE BARRIERS USED TO PROVIDE ENCLOSURE, SUBDIVISION, OR
PROTECTION UNDER THIS CODE SHALL BE CLASSIFIED IN ACCORDANCE
WITH ONE OF THE FOLLOWING FIRE RESISTANCE RATINGS:
• (1) 3-HOUR FIRE RESISTANCE RATING
• (2) 2-HOUR FIRE RESISTANCE RATING
• (3) 1-HOUR FIRE RESISTANCE RATING
• (4)* 1⁄2-HOUR FIRE RESISTANCE RATING
8.3.1.2 FIRE BARRIERS SHALL COMPLY WITH ONE OF THE FOLLOWING:
• (1) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL TO
OUTSIDE WALL OR FROM ONE FIRE BARRIER TO ANOTHER, OR A
COMBINATION THEREOF, INCLUDING CONTINUITY THROUGH ALL
CONCEALED SPACES, SUCH AS THOSE FOUND ABOVE A CEILING,
INCLUDING INTERSTITIAL SPACES.
• (2) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL TO
OUTSIDE WALL OR FROM ONE FIRE BARRIER TO ANOTHER, AND FROM
THE FLOOR TO THE BOTTOM OF THE INTERSTITIAL SPACE, PROVIDED
THAT THE CONSTRUCTION ASSEMBLY FORMING THE BOTTOM OF THE
INTERSTITIAL SPACE HAS A FIRE RESISTANCE RATING NOT LESS THAN
THAT OF THE FIRE BARRIER.
9.2.1 AIR-CONDITIONING, HEATING, VENTILATING DUCTWORK, AND RELATED
EQUIPMENT.
AIR-CONDITIONING, HEATING, VENTILATING DUCTWORK, AND RELATED
EQUIPMENT SHALL BE IN ACCORDANCE WITH NFPA 90A OR NFPA 90B, AS
APPLICABLE, UNLESS SUCH INSTALLATIONS ARE APPROVED EXISTING
INSTALLATIONS, WHICH SHALL BE PERMITTED TO BE CONTINUED IN SERVICE.
19.1.1.4.3 REHABILITATION.
19.1.1.4.3.1 FOR PURPOSES OF THE PROVISIONS OF THIS CHAPTER, THE
FOLLOWING SHALL APPLY:
(2) A MINOR REHABILITATION SHALL INVOLVE THE MODIFICATION OF NOT
MORE THAN 50 PERCENT, AND NOT MORE THAN 4500 FT2 (420 M2), OF THE
AREA OF THE SMOKE COMPARTMENT.
19.1.1.4.3.2 WORK THAT IS EXCLUSIVELY PLUMBING, MECHANICAL, FIRE
PROTECTION SYSTEM, ELECTRICAL, MEDICAL GAS, OR MEDICAL EQUIPMENT
WORK SHALL NOT BE INCLUDED IN THE COMPUTATION OF THE
MODIFICATION AREA WITHIN THE SMOKE COMPARTMENT
19.2.2.2.4 DOORS WITHIN A REQUIRED MEANS OF EGRESS SHALL NOT BE
EQUIPPED WITH A LATCH OR LOCK THAT REQUIRES THE USE OF A TOOL OR
KEY FROM THE EGRESS SIDE, UNLESS OTHERWISE PERMITTED BY ONE
OF THE FOLLOWING:
(1) LOCKS COMPLYING WITH 19.2.2.2.5 SHALL BE PERMITTED.
19.2.2.2.5.1* DOOR-LOCKING ARRANGEMENTS SHALL BE PERMITTED WHERE
THE CLINICAL NEEDS OF PATIENTS REQUIRE SPECIALIZED SECURITY
MEASURES OR WHERE PATIENTS POSE A SECURITY THREAT, PROVIDED
THAT STAFF CAN READILY UNLOCK DOORS AT ALL TIMES IN ACCORDANCE
WITH 19.2.2.2.6.
BSP EHRM LIFE SAFETY REVIEW:
19.3 PROTECTION.
19.3.4.1 GENERAL. HEALTH CARE OCCUPANCIES SHALL BE PROVIDED WITH
A FIRE ALARM SYSTEM IN ACCORDANCE WITH SECTION 9.6.
19.3.5.1 BUILDINGS CONTAINING HEALTH CARE OCCUPANCIES SHALL BE
PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC
SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7, UNLESS
OTHERWISE PERMITTED BY 19.3.5.5.
19.3.5.12 PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ALL
HEALTH CARE OCCUPANCIES IN ACCORDANCE WITH SECTION 9.9.
19.3.6 CORRIDORS.
19.3.6.1 CORRIDOR SEPARATION. CORRIDORS SHALL BE SEPARATED FROM
ALL OTHER AREAS BY PARTITIONS COMPLYING WITH 19.3.6.2 THROUGH
19.3.6.5 (SEE ALSO 19.2.5.4), UNLESS OTHERWISE PERMITTED BY ONE OF
THE FOLLOWING:
19.3.6.2 CONSTRUCTION OF CORRIDOR WALLS.
19.3.6.2.1 CORRIDOR WALLS SHALL BE PERMITTED TO TERMINATE AT THE
CEILING WHERE THE CEILING IS CONSTRUCTED TO LIMIT THE TRANSFER OF
SMOKE.
19.3.6.2.2 NO FIRE RESISTANCE RATING SHALL BE REQUIRED FOR
CORRIDOR WALLS.
19.3.6.2.3 CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE
TRANSFER OF SMOKE.
19.3.6.3 CORRIDOR DOORS.
19.3.6.3.1 DOORS, INCLUDING DOORS OR PANELS TO NURSE SERVERS AND
PASS-THROUGH OPENINGS, PROTECTING CORRIDOR OPENINGS SHALL BE
CONSTRUCTED TO RESIST THE PASSAGE OF SMOKE, AND THE FOLLOWING
ALSO SHALL APPLY:
(1) COMPLIANCE WITH NFPA 80 SHALL NOT BE REQUIRED.
(3) FOR DOORS PROTECTING PASS-THROUGH OPENINGS, A CLEARANCE
BETWEEN THE BOTTOM OF THE DOOR AND THE SILL NOT EXCEEDING 1⁄8 IN.
(3 MM) SHALL BE PERMITTED.
19.3.6.3.11 DOOR-CLOSING DEVICES SHALL NOT BE REQUIRED ON DOORS IN
CORRIDOR WALL OPENINGS OTHER THAN THOSE SERVING REQUIRED
EXITS, SMOKE BARRIERS, OR ENCLOSURES OF VERTICAL OPENINGS AND
HAZARDOUS AREAS.
CHAPTER 43 BUILDING REHABILITATION
43.1.3 MULTIPLE REHABILITATION WORK CATEGORIES
43.1.3.1 WORK OF MORE THAN ONE REHABILITATION WORK CATEGORY
SHALL BE PERMITTED TO BE PART OF A SINGLE WORK PROJECT.
43.1.3.2 WHERE A PROJECT INCLUDES ONE CATEGORY OF REHABILITATION
WORK IN ONE BUILDING AREA AND ANOTHER CATEGORY OF
REHABILITATION WORK IN A SEPARATE AREA OF THE BUILDING, EACH
PROJECT AREA SHALL COMPLY WITH THE REQUIREMENTS OF THE
RESPECTIVE CATEGORY OF REHABILITATION WORK.
43.1.3.3 WHERE A PROJECT CONSISTING OF MODIFICATION AND
RECONSTRUCTION IS PERFORMED IN THE SAME WORK AREA, OR IN
CONTIGUOUS WORK AREAS, THE PROJECT SHALL COMPLY WITH THE
REQUIREMENTS APPLICABLE TO RECONSTRUCTION, UNLESS OTHERWISE
SPECIFIED IN 43.1.3.4.
43.1.3.4 WHERE THE RECONSTRUCTION WORK AREA IS LESS THAN 10
PERCENT OF THE MODIFICATION WORK AREA, THE TWO SHALL BE
CONSIDERED INDEPENDENT WORK AREAS, AND THE RESPECTIVE
REQUIREMENTS SHALL APPLY.
43.1.4COMPLIANCE
43.1.4.1 REPAIRS, RENOVATIONS, MODIFICATIONS, RECONSTRUCTION,
CHANGES OF USE OR OCCUPANCY CLASSIFICATION, AND ADDITIONS SHALL
CONFORM TO THE SPECIFIC REQUIREMENTS FOR EACH CATEGORY IN
OTHER SECTIONS OF THIS CHAPTER.
43.2 REPAIRS
43.2.1 GENERAL REQUIREMENTS
43.3.1.1 A REPAIR, AS DEFINED IN 43.2.2.1.1, IN OTHER THAN HISTORIC
BUILDINGS SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 43.3.
43.3.1.3 THE WORK SHALL BE DONE USING LIKE MATERIALS OR MATERIALS
PERMITTED BY OTHER SECTIONS OF THIS CODE.
43.3.1.4 THE WORK SHALL NOT MAKE THE BUILDING LESS CONFORMING
WITH THE OTHER SECTIONS OF THIS CODE, OR WITH ANY PREVIOUSLY
APPROVED ALTERNATIVE ARRANGEMENTS, THAN IT WAS BEFORE THE
REPAIR WAS UNDERTAKEN.
BSP EHRM LIFE SAFETY REVIEW:
43.4 RENOVATIONS
43.4.1.3 ALL NEW WORK SHALL COMPLY WITH THE REQUIREMENTS OF THIS
CODE APPLICABLE TO EXISTING BUILDINGS.
43.4.1.4 THE WORK SHALL NOT MAKE THE BUILDING LESS CONFORMING
WITH OTHER SECTIONS OF THIS CODE, OR WITH ANY PREVIOUSLY
APPROVED ALTERNATIVE ARRANGEMENTS, THAN IT WAS BEFORE THE
RENOVATION WAS UNDERTAKEN, UNLESS OTHERWISE SPECIFIED IN
43.4.1.5.
43.4.1.5 MINOR REDUCTIONS IN THE CLEAR OPENING DIMENSIONS OF
REPLACEMENT DOORS AND WINDOWS THAT RESULT FROM THE USE OF
DIFFERENT MATERIALS SHALL BE PERMITTED UNLESS SUCH REDUCTIONS
ARE PROHIBITED.
43.4.2 CAPACITY OF MEANS OF EGRESS THE CAPACITY OF MEANS OF
EGRESS, DETERMINED IN ACCORDANCE WITH SECTION 7.3, SHALL BE
SUFFICIENT FOR THE OCCUPANT LOAD THEREOF, UNLESS ONE OF THE
FOLLOWING CONDITIONS EXISTS:
(2) *THE EGRESS CAPACITY SHALL HAVE BEEN PREVIOUSLY APPROVED
AS BEING ADEQUATE.
43.4.3 INTERIOR FINISH REQUIREMENTS NEW INTERIOR FINISH MATERIALS
SHALL MEET THE REQUIREMENTS FOR NEW CONSTRUCTION.
43.4.4 OTHER REQUIREMENTS THE RECONFIGURATION OR EXTENSION OF
ANY SYSTEM, OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT,
SHALL COMPLY WITH SECTION 43.5.
43.5 MODIFICATIONS
43.5.1GENERALREQUIREMENTS
43.5.1.1 A MODIFICATION, AS DEFINED IN 43.2.2.1.3, IN OTHER THAN HISTORIC
BUILDINGS SHALL COMPLY WITH BOTH OF THE FOLLOWING:
(1) SECTION 43.5
(2) SECTION 43.4
43.5.1.3 NEWLY CONSTRUCTED ELEMENTS, COMPONENTS, AND SYSTEMS
SHALL COMPLY WITH THE REQUIREMENTS OF OTHER SECTIONS OF THIS
CODE APPLICABLE TO NEW CONSTRUCTION.
NFPA 241, 2019 - SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS
8.6.2.1 PROTECTION SHALL BE PROVIDED TO SEPARATE AN OCCUPIED
PORTION OF THE STRUCTURE FROM A PORTION OF THE STRUCTURE
UNDERGOING ALTERATION, CONSTRUCTION, OR DEMOLITION OPERATIONS
WHEN SUCH OPERATIONS ARE CONSIDERED AS HAVING A HIGHER LEVEL
OF HAZARD THAN THE OCCUPIED PORTION OF THE BUILDING.
8.6.2.1.1 WALLS SHALL HAVE AT LEAST A 1-HOUR FIRE RESISTANCE RATING.
8.6.2.1.2 OPENING PROTECTIVES SHALL HAVE AT LEAST A 45-MINUTE FIRE
PROTECTION RATING.
8.6.2.2 WALLS IN 8.6.2.1.1 AND OPENING PROTECTIVES IN 8.6.2.1.2 SHALL BE
PERMITTED TO BE NONRATED WHEN AN APPROVED AUTOMATIC SPRINKLER
SYSTEM IS INSTALLED AND OPERATIONAL.
**IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT
THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL
CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION
AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION. **
**ALL RATED BARRIER PENETRATIONS ARE TO BE REPAIRED WITH AN
APPROVED UL SYSTEM**
VA Project
Building:
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
PROFESSIONAL
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
12-23-2022
21984.07
AuthorChecker
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
LIFE SAFETY REVIEW
LS-100
4.
. L S-
0.
0/
/2
0.
pd f
VA Project
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
PROFESSIONAL
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
12-23-2022
21984.07
AuthorChecker
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
LIFE SAFETY PLAN
BUILDING 1 FLOOR 1
LS-101
4.
. L S-
1.
0/
/2
0.
pd
FOR REFERENCE ONLY
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
PROFESSIONAL
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
12-23-2022
21984.07
AuthorChecker
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
LIFE SAFETY PLAN
BUILDING 1 FLOOR 2
LS-102
4.
. L S-
2.
0/
/2
0.
pd
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
PROFESSIONAL
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
12-23-2022
21984.07
AuthorChecker
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
LIFE SAFETY PLAN
BUILDING 1 FLOOR 3
LS-103
4.
. L S-
3.
0/
/2
0.
pd
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
PROFESSIONAL
West Texas VA Health Care System Big Springs, TX 79720
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
CIVIL/STRUCTURAL:
H2B 1225 N Loop W, Suite 800
HOUSTON, TX 77008
12-23-2022
21984.07
AuthorChecker
VA BSP EHRM INFRASTRUCTURE
UPGRADES
CONTRACT DOCUMENTS
LIFE SAFETY PLAN
BUILDING 1 FLOOR 4
LS-104
4.
. L S-
4.
0/
/2
0.
pd
Drawing
Project
Project
Issue
Checked Drawn By:
Drawing
FULLY
SPRINKLER
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submissi
ARCHITECT / ENGINEER OF
Revision Dat
CONSULTANTS:
/8
'-0
4 '
8 ' 6 '
/4
'-0
/8
'-0
/2
'-0
/4
'-0
'-0
-1
/2
'-0
'-0
ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300 Fort Worth, TX
ARCHITECT:
CB DESIGN GROUP
421 King St., Ste.
ALEXANDRIA, VA
22314
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .