S07 - Bid Abstract Big Spring - Signed.pdf
PDF 179 KB Posted
- Attached to
- Z2BG--519-21-900 EHRM Infrastructure Upgrades Main Building Construction - Big Spring, TX (VA-24-00016103)
- Solicitation number
- 36C77624B0004_1
About this file
This document is an Abstract of Offers for a construction solicitation. The solicitation number is 36C77624B0004 and the project title is "EHRM Infrastructure Upgrades Construction - Big Spring, TX". The issuing office is the Department of Veterans Affairs Program Contracting Activity Central (PCAC).
The solicitation received three offers from The Trevino Group, Inc., Angel Design Build Construction LLC, and MILICON INC. DBA ZUTO. All offerors provided bid bonds of 20% and acknowledged the 3 amendments issued. The government estimate for the base bid item is $18,957,000. The offer amounts from the three bidders are $7,980,000, $8,364,765, and $8,458,200 respectively.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
519-21-900 EHRM Infrastructure Upgrades Construction - Big Spring, TX
1 Item 1 - Base Bid JB1 18,957,000.00 18,957,000.00 7,980,000.007,980,000.00 8,364,765.00 8,364,765.00
3 -Amendments
36C77624B0004 1 2
Maria Rodeffer Contracting Officer
The Trevino Group, Inc. Angel Design Build ConstructionLLC
Bid Bond - $20M Bid Bond - 20%
Yes - 3 Yes - 3
MARIA RODEFFER
Digitally signed by MARIA
RODEFFER
Date: 2024.05.31 17:46:20 -04'00'
05/31/202404/23/2024
05/31/2024
No erasures, strike overs, or changes in price were noted at the bid opening.
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
36C77624B0004
519-21-900 EHRM Infrastructure Upgrades Construction - Big Spring, TX
Bid Bond - 20% Bid Bond - 20% Bid Bond - 20% Bid Bond - 20%
Yes - 3 Yes - 3 Yes - 3 Yes - 3
1 1 JB 8,458,200.00 8,458,200.00 9,346,800.00 9,346,800.00 9,388,000.00 9,388,000.00 14,559,879 14,559,879
2 2
MILICON INC. DBA ZUTO Briston Construction LLC BlueWay One JV LLC Hurley JV LLP
| S07 - Bid Abstract Big Spring - pg 1 combine |
| S07 - Bid Abstract Big Spring - pg 2 combine |
File details come from the government source that posted it. Updated .