This document is an Abstract of Offers for a construction solicitation. The solicitation number is 36C77624B0004 and the project title is "EHRM Infrastructure Upgrades Construction - Big Spring, TX". The issuing office is the Department of Veterans Affairs Program Contracting Activity Central (PCAC).

The solicitation received three offers from The Trevino Group, Inc., Angel Design Build Construction LLC, and MILICON INC. DBA ZUTO. All offerors provided bid bonds of 20% and acknowledged the 3 amendments issued. The government estimate for the base bid item is $18,957,000. The offer amounts from the three bidders are $7,980,000, $8,364,765, and $8,458,200 respectively.

View the file

Other files

File Type Posted
S30 - Bid Opening Attendance - Big Spring.pdf PDF
GI100.pdf PDF
36C77624B0004 0003 s.pdf PDF
Design Alert 11 - Device Cables in Telecom Spaces.pdf PDF
Big Spring EHRM - Technical Questions _ AE Responses.pdf PDF
000110 Table of Contents.pdf PDF
321216.pdf PDF
061000 Rough Carpentry.pdf PDF
CIVIL Bid Set.pdf PDF
36C77624B0004 0002 signed.pdf PDF
Big Spring EHRM - Site Visit Sign-In Sheet - 5.2.24.pdf PDF
Amend 0001 ATT 1 - Vol 2-Specifications-EHRM-Big Spring - Rev 4.30.24.pdf PDF
Amend 0001 ATT 3 - VA.BSP EHRM Drawings-Conformed Set Vol 2.pdf PDF
36C77624B0004 0001 signed.pdf PDF
Amend 0001 ATT 2 - VA.BSP EHRM Drawings-Conformed Set Vol 1.pdf PDF
ATT 6 - Vol 2-Drawings-EHRM-Big Spring.pdf PDF
ATT 8 - Vol 4-Drawings-Mechanical Addend-EHRM-Big Spring.pdf PDF
ATT 11 - RFI Responses 2023-EHRM-Big Spring.pdf PDF
ATT 1 - Vol 1-Specifications-EHRM-Big Spring.pdf PDF
ATT 12 - Wage Rates-Howard Co-1-5-24.pdf PDF
ATT 5 - Vol 1-Drawings-EHRM-Big Spring.pdf PDF
ATT 7 - Vol 3-Drawings-EHRM-Big Spring.pdf PDF
ATT 9 - Vol 5-Drawings Addendum-EHRM-Big Spring.pdf PDF
ATT 13 - Limitations on Subcontracting.pdf PDF
ATT 14 - Site Visit Instructions - Big Spring.pdf PDF
ATT 2 - Vol 2-Specifications-EHRM-Big Spring.pdf PDF
Solicitation - 36C77624B0004_1 - EHRM Infra Upgrades - Big Spring.pdf PDF
ATT 4 - Informational-Asbestos Survey Report 2016-EHRM-Big Spring.pdf PDF
ATT 10 - SOW-EHRM-Big Spring.pdf PDF
ATT 3 - Narrative-EHRM-Big Spring.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

519-21-900 EHRM Infrastructure Upgrades Construction - Big Spring, TX

1 Item 1 - Base Bid JB1 18,957,000.00 18,957,000.00 7,980,000.007,980,000.00 8,364,765.00 8,364,765.00

3 -Amendments

36C77624B0004 1 2

Maria Rodeffer Contracting Officer

The Trevino Group, Inc. Angel Design Build ConstructionLLC

Bid Bond - $20M Bid Bond - 20%

Yes - 3 Yes - 3

MARIA RODEFFER

Digitally signed by MARIA

RODEFFER

Date: 2024.05.31 17:46:20 -04'00'

05/31/202404/23/2024

05/31/2024

No erasures, strike overs, or changes in price were noted at the bid opening.

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

36C77624B0004

519-21-900 EHRM Infrastructure Upgrades Construction - Big Spring, TX

Bid Bond - 20% Bid Bond - 20% Bid Bond - 20% Bid Bond - 20%

Yes - 3 Yes - 3 Yes - 3 Yes - 3

1 1 JB 8,458,200.00 8,458,200.00 9,346,800.00 9,346,800.00 9,388,000.00 9,388,000.00 14,559,879 14,559,879

2 2

MILICON INC. DBA ZUTO Briston Construction LLC BlueWay One JV LLC Hurley JV LLP

S07 - Bid Abstract Big Spring - pg 1 combine
S07 - Bid Abstract Big Spring - pg 2 combine

File details come from the government source that posted it. Updated .